Gaganyaan

From Bharatpedia, an open encyclopedia
Information red.svg
Scan the QR code to donate via UPI
Dear reader, We need your support to keep the flame of knowledge burning bright! Our hosting server bill is due on June 1st, and without your help, Bharatpedia faces the risk of shutdown. We've come a long way together in exploring and celebrating our rich heritage. Now, let's unite to ensure Bharatpedia continues to be a beacon of knowledge for generations to come. Every contribution, big or small, makes a difference. Together, let's preserve and share the essence of Bharat.

Thank you for being part of the Bharatpedia family!
Please scan the QR code on the right to donate.

0%

   

transparency: ₹0 raised out of ₹100,000 (0 supporter)



Gaganyaan (India)
Gaganyaan crewed spacecraft in deployed twin solar panel configuration.png
Rendering of Gaganyan crew module
Manufacturer
Country of originIndia
OperatorISRO
ApplicationsCrewed orbital vehicle
Specifications
Spacecraft typeCrewed
Launch mass8,200 kg (18,100 lb) (includes service module)[1]
Dry mass3,735 kg (8,234 lb)[2]
Crew capacity3[3]
DimensionsDiameter: 3.5 m (11 ft)[4]
Height: 3.58 m (11.7 ft)[4]
Volume8 m3 (280 cu ft)[5]
PowerPhotovoltaic array
RegimeLow Earth orbit
Design life7 days
Production
StatusIn development
Maiden launchQ2 2024 (uncrewed)[6][7]
NET 2025 (crewed)[8]

Gaganyaan (from Sanskrit: gagana, "celestial" and yāna, "craft, vehicle") is an Indian crewed orbital spacecraft intended to be the formative spacecraft of the Indian Human Spaceflight Programme. The spacecraft is being designed to carry three people, and a planned upgraded version will be equipped with rendezvous and docking capabilities. In its maiden crewed mission, the Indian Space Research Organisation (ISRO)'s largely autonomous 5.3-metric ton capsule will orbit the Earth at 400 km altitude for up to seven days with a two- or three-person crew on board. The first crewed mission was originally planned to be launched on ISRO's LVM3 rocket in December 2021.[9][10] As of September 2023, it is expected to be launched by mid-2024.[11][7]

The Hindustan Aeronautics Limited (HAL)-manufactured crew module underwent its first uncrewed experimental flight on 18 December 2014.[12] As of May 2019, design of the crew module has been completed.[13] Defence Research and Development Organisation (DRDO) will provide support for critical human-centric systems and technologies such as space-grade food, crew healthcare, radiation measurement and protection, parachutes for the safe recovery of the crew module, and the fire suppression system.[14]

On 11 June 2020, it was announced that the first uncrewed Gaganyaan launch would be delayed due to the COVID-19 pandemic in India.[15] The overall timeline for crewed launches was expected to remain unaffected.[16] ISRO chairman S. Somanath announced on 30 June 2022, that the first crewed mission will not take place until 2024 at the earliest because of safety concerns.[17] Further sources in 2023 confirmed that ISRO has been aiming for a 2024 launch.[18][8][7]

Background[edit]

Soyuz T-11 with Indian Flag

In 1984, Rakesh Sharma became the first Indian born citizen to enter space through a joint Interkosmos mission between ISRO and Soviet space program, when he flew aboard the Soviet rocket Soyuz T-11 launched from Baikonur Cosmodrome in the Kazakh Soviet Socialist Republic on 3 April 1984. The Soyuz T-11 spacecraft carrying cosmonauts including Sharma docked and transferred the three member Soviet-Indian international crew, consisting of the ship's commander, Yury Malyshev, and flight engineer, Gennadi Strekalov, to the Salyut 7 Orbital Station. Sharma spent 7 days, 21 hours, and 40 minutes aboard the Salyut 7.[19]

Gaganyaan Program history[edit]

Gaganyaan development timeline

Preliminary studies and technological development of Gaganyaan started in 2006 under the generic name "Orbital Vehicle". The plan was to design a simple capsule with an endurance of about a week in space, a capacity of two astronauts, and a splashdown landing after re-entry. The project was commissioned in 2007, with expected completion by 2024 and a budget of around ₹10,000 crore.[20] The design was finalized by March 2008 and submitted to the Government of India for funding. The government's funding for the Indian Human Spaceflight Program was sanctioned in February 2009,[21] But it fell short due to limited developmental funding.[21] Initially, the first uncrewed flight of the orbital vehicle was proposed to be in 2013,[22] then it was revised to 2016.[23] However, in April 2012, it was reported that funding problems placed the future of the project in serious doubt.[24] And in August 2013, it was announced that all crewed spaceflight efforts by India had been designated as being "off ISRO's priority list".[25] By early 2014, the project had been reconsidered and was one of the main beneficiaries of a substantial budget increase announced in February 2014.[26] ISRO is developing the Gaganyaan orbital vehicle based on the tests performed with their scaled 550 kg Space Capsule Recovery Experiment (SRE), which was launched and recovered in January 2007.[27][28]

The latest push for the Indian Human Spaceflight Program took place in 2017,[29] And it was accepted and formally announced by Prime Minister Narendra Modi during his 2018 Independence Day address to the nation.[30] The current design calls for a crew of three.[3] ISRO will perform four biological and two physical science experiments related to microgravity during the Gaganyaan mission.[31] ISRO is planning to replace hydrazine with green propellant on Gaganyaan missions, for which Liquid Propulsion Systems Centre (LPSC) is already working on a monopropellant blended formulation consisting of hydroxylammonium nitrate (HAN), ammonium nitrate, methanol and water.[32][33]

As of October 2021, ISRO selected five science experiments that will be conducted on Gaganyaan. The payloads will be developed by the Indian Institute of Space Science and Technology (IIST), University of Agricultural Sciences, Dharwad (UASD), Tata Institute of Fundamental Research (TIFR), IIT Patna, Indian Institute of Chemical Technology (IICT) and the Jawaharlal Nehru Centre for Advanced Scientific Research (JNCASR). Out of the five, two are biological experiments that will be conducted by IIST, UASD and TIFR and will include kidney stone formation and Sirtuin 1 gene marker effects in Drosophila melanogaster. IIT Patna will run experiments on a heat sink that can handle very high heat flux, IICT will study crystallization phenomena, and JNCASR will examine fluid mixing characteristics.[34]

Funding and infrastructure[edit]

A crewed spacecraft would require about 12,400 crore (US$1.77 billion) over a period of seven years, including the 5,000 crore (US$0.7 billion) for the initial work of the crewed spacecraft during the Eleventh Five-Year Plan (2007–2012) out of which the Government released 50 crore (US$7 million) in 2007–2008.[35][36] In December 2018, the government approved a further 10,000 crore (US$1.5 billion) for a 7-day crewed flight of 3 astronauts to take place by 2021.[9]

Madhavan Chandradathan, director of Satish Dhawan Space Centre (SDSC), stated that ISRO would need to set up an astronaut training facility in Bangalore. The newly established Human Space Flight Centre (HSFC) will coordinate the IHSF efforts.[37] Existing launch facilities will be upgraded for launches under the Indian Human Spaceflight project.[38][39] With extra facilities needed for launch escape systems.[36] Russia is likely to provide astronaut training.[40] In Spring 2009, the full-scale mock-up of the crew capsule of Gaganyaan was built and delivered to Satish Dhawan Space Center for the training of astronauts.[41]

India has already successfully developed and tested several building blocks, including re-entry space capsule, pad abort test, safe crew ejection mechanism in case of rocket failure, a flight suit developed by Defence Bioengineering and Electromedical Laboratory (DEBEL) and the powerful GSLV-MkIII launch vehicle.[42] Having met all required technological keystones, the Indian Human Spaceflight Programme was accepted and formally announced by the Prime Minister Narendra Modi on 15 August 2018.[43] Gaganyaan will be the first crewed spacecraft under this programme.[44]

ISRO's Human Space Flight Centre and Glavcosmos, which is a subsidiary of the Russian state corporation Roscosmos, signed an agreement on 1 July 2019 for cooperation in the selection, support, medical examination and space training of Indian astronauts.[45] An ISRO Technical Liaison Unit (ITLU) has been approved to be set up in Moscow for coordination.[46][47] Glavkosmos has also contracted NPP Zvezda for manufacturing customized IVA flight-suits for Indian astronauts.[48][49][50] ISRO is planning to develop a ground station for Gaganyaan mission at Cocos (Keeling) Islands, and after a brief discussion with Australian Space Agency, a temporary ground station for the mission has been set up by ISRO in Cocos (Keeling) Islands, as of 2021.[32]

Description[edit]

Crew module[edit]

Gaganyaan full-scale test article for TV-D1

Gaganyaan crew module is a fully autonomous 5.3 t (12,000 lb) spacecraft designed to carry a 3-member crew to orbit and safely return to the Earth after a mission duration of up to seven days.[1] The crew module is equipped with two parachutes for redundancy, with one parachute enough for a safe splashdown. The parachutes would reduce the speed of the crew module from over 216 m/s (710 ft/s) to under 11 m/s (36 ft/s) at splashdown.[51]

The space capsule will have life support and environmental control systems. It will be equipped with emergency mission abort capabilities and a Crew Escape System (CES) that can be activated during the first stage or second rocket stage burn.[52] The nose of the original version of the orbital vehicle was free for a docking mechanism, but primary entry was evidently through a side hatch secured by explosive bolts.[53] On 7 December 2022, The Hindu reported that the crew module had entered the production stage.[54]

Service module[edit]

Its 2.9 t (6,400 lb)[1] service module is powered by liquid propellant engines. The crew module is mated to the service module, and together they constitute 8.2 t (18,000 lb) orbital module.[1]

The Service Module Propulsion System (SMPS) will perform an orbit raising manoeuvre allowing Gaganyaan to reach 400 km in low Earth orbit (LEO), then remain docked during a deorbit burn until atmospheric reentry. It will use an unified bipropellant system consisting of MON-3 and Monomethylhydrazine as oxidizer and fuel, having five main engines derived from ISRO's liquid apogee motor with 440 N (99 lbf) thrust and sixteen 100 N reaction control system (RCS) thrusters.

Development[edit]

Human Rated LVM3

Following three uncrewed orbital flight demonstrations of the spacecraft, a crewed Gaganyaan is slated to be launched on the HLVM3 (Human-rated version of LVM3) launcher no earlier than 2025.[8] Though the spacecraft is designed to carry 3 people, it is likely that the first flight will carry one person only.[55]

Test flights[edit]

Development timeline of Gaganyaan
Flight Date Regime Crew Notes Outcome
Re-entry Test 18 December 2014 Sub-orbital N/A Sub-orbital test of scaled down boilerplate Gaganyaan capsule, launched aboard the sub-orbital first test flight of ISRO's GSLV Mark III rocket. Success
Pad Abort Test 5 July 2018 Atmospheric N/A 4-minute test of Gaganyaan's Launch abort system from launch pad at Satish Dhawan Space Centre. Success
Drogue parachute deployment tests[56] 12 August 2023 Drogue parachute N/A The Gaganyaan mission crew module's safe re-entry by stabilising and reducing velocity. Success
TV-D1[57][58] 21 October 2023 Atmospheric N/A High altitude abort test.[59] Success
TV-D2[60] 2023[60] Atmospheric N/A Uncrewed mission to test flight parameters.[59] Planned
TV-D3[60] 2024[60] Atmospheric N/A Planned
TV-D4[60] 2024[60] Atmospheric N/A Planned
G1[61] 2024[60] LEO N/A First orbital test flight of Gaganyaan capsule.[60] Planned
G2[61] 2024[60] LEO N/A Second orbital test flight of Gaganyaan capsule.[60] Planned
G3[61] 2024[60] LEO N/A Third orbital test flight of Gaganyaan capsule.[62] Planned
H1[61] 2025[60] LEO India TBA
India TBA
India TBA
First crewed flight of Gaganyaan, carrying 3 Indian astronauts on a short orbital test flight.[63][60] Planned

Test flight profile[edit]

About 16 minutes after liftoff from the Satish Dhawan Space Centre (SDSC), Sriharikota, the rocket will inject the spacecraft into an orbit 300–400 km (190–250 mi) above Earth. When ready to land, its service module and solar panels will be disposed of before reentry. The capsule would return for a parachute splashdown in the Bay of Bengal.[64]

Testing[edit]

Crew Module Atmospheric Re-entry Experiment[edit]

Test of water landing of CARE on 18 December 2014

On 13 February 2014, Hindustan Aeronautics Limited handed over the first boilerplate prototype of Crew Module structural assembly to ISRO for Crew Module Atmospheric Re-entry Experiment (CARE).[12][65] ISRO's Vikram Sarabhai Space Centre would equip the Crew Module with systems necessary for life support, navigation, guidance and control systems.[66]

ISRO undertook an uncrewed test launch of the vehicle aboard the LVM3-X, for an experimental sub-orbital flight on 18 December 2014. The crew module separated from the rocket at an altitude of 126 km. On-board motors controlled and reduced the speed of the module until an altitude of 80 km (50 mi). Thrusters were shut off at that altitude and atmospheric drag further reduced speed of the capsule.

The module's heat shield was expected to experience temperature in excess of 1,600 °C (2,910 °F). Parachutes were deployed at an altitude of 15 km (9.3 mi) to slow down the module, which performed a splashdown in the Bay of Bengal near Andaman and Nicobar Islands.[67][68]

This flight was used to test orbital injection, separation and re-entry procedures and systems of the Crew Capsule. Also tested were the capsule separation, heat shields and aerobraking systems, parachute deployment, retro-firing, splashdown, flotation systems, and procedures to recover the Crew Capsule from the Bay of Bengal.[69][70] Inflight launch abort and parachute tests were expected to be conducted by the end of 2019.[71]

Pad Abort Test[edit]

Info-graphic on ISRO's first Pad Abort Test (PAT-01) displayed at 6th Bangalore Space Expo 2018, 6–8 September 2018.

The Indian Space Research Organisation's Pad Abort Test was conducted successfully on 5 July 2018.[72] As of September 2021, Vikram Sarabhai Space Centre (VSSC) was integrating a test vehicle to conduct an uncrewed flight test of Crew Escape System (CES) before the official launch of Gaganyaan mission. The test vehicle was planned be ready by the end of 2021.[73]

Vikas engine qualification[edit]

Vikas engine undergoing long duration hot test at Principal Test Stand, ISRO Propulsion Complex on 14 July 2021.

Vikas engine variants are used to power the second stage of the Polar Satellite Launch Vehicle (PSLV), boosters and second stage of the Geosynchronous Satellite Launch Vehicle (GSLV) Mark I and II, and also the core stage of LVM 3.

On 14 July 2021 ISRO conducted third long duration hot test of Vikas engine for core L110 liquid stage of GSLV Mark III at ISRO Propulsion Complex as part of the engine qualification requirements of the Gaganyaan mission. The engine was successfully test fired for a duration of 240 seconds validating all the required performance parameters.[74][75]

On 20 January 2022, High Thrust Vikas Engine successfully underwent a hot qualification test for duration of 25 seconds at ISRO Propulsion Complex to validate engine robustness under non-nominal operating conditions for fuel-oxidiser mixture ratio and chamber pressure.[76]

Static test for Low Altitude Escape Motor[edit]

On 11 August 2022 ISRO successfully completed the test firing of Low Altitude Escape Motor (LEM) for Crew Escape System. LEM consists of a solid rocket motor with four reverse flow nozzles that generates maximum sea level thrust of 842 kN (nominal) with burn time of 5.98 second (nominal). The nozzle end of LEM is mounted at the fore end of the launch vehicle to avoid exhaust plume impingement on crew module. This is why there are reverse flow multiple nozzle in the solid rocket motor. The reverse flow nozzle makes exhaust gas flow in opposite direction in the nozzle region.[77]

The objective of this test was to check ballistic parameters, validate motor subsystem performance (and confirm the design margins), evaluate the thermal performance of nozzle liners especially to confirm the ablative characteristics, validate integrity of all interfaces, evaluate the head-end mounted safe arm (HMSA) based ignition system performance, and evaluate side thrust due to misalignment and variation in flow and other functional parameters including flow reversal.[78]

Service Module Propulsion System[edit]

On 28 August 2021 ISRO successfully tested a System Demonstration Model (SDM) of the Service Module Propulsion System (SMPS) that will be integrated into the Gaganyaan spacecraft. During on-ground testing at ISRO Propulsion Complex (IPRC), the SDM was fired for a duration of 450 seconds which matched the pre-test prediction data using five main engines and eight RCS thrusters. Each 440 N thrust engine will also be tested individually for longer duration involving various parameters to gain human-rating certification.[79][80]

CE-20 engine qualification[edit]

On 12 January 2022, ISRO conducted a hot qualification test on CE-20 cryogenic engine for a duration of 720 seconds at ISRO Propulsion Complex (IPRC).[81][82] On 28 October 2022, CE-20 E11 successfully completed a Pressure Chamber Test for 30 seconds at IPRC. It was done to check the efficacy of the engine for Gaganyaan missions. On 9 November 2022, the duration was increased to 70 seconds. The test results were on expected lines as per ISRO sources.[83]

Static fire test of HS200[edit]

A human-rated variant of the S200 solid strap-on booster, or 'HS200', was developed for the Gaganyaan programme. The first static fire test of HS200 was conducted on 13 May 2022 at SDSC SHAR for a duration of 135 seconds with nominal performance.[84]

Integrated Main Parachute Airdrop Test[edit]

Integrated Main Parachute Airdrop Test for Parachute Deceleration System.

On 18 November 2022, Vikram Sarabhai Space Centre (VSSC) conducted an Integrated Main Parachute Airdrop Test (IMAT) of the Parachute Deceleration System (PDS), in which 5-ton dummy mass equivalent of the actual crew module mass was taken to an altitude of 2.5 km and dropped from Ilyushin Il-76 by Indian Air Force. Two small pyro-based mortar-deployed pilot parachutes then pulled the main parachutes free. The size of the main parachutes was initially restricted to a smaller area to reduce opening shock. After 7 seconds, the pyro-based reefing line cutters cut the area restricting line, allowing the parachutes to inflate fully. The fully inflated main parachutes reduced the payload speed to a safe landing speed. The entire sequence lasted about 2-3 minutes.[85][86]

The Parachute Deceleration System is jointly developed by ISRO and DRDO. System design, analytical simulations for parachute deployment, development of ordnance devices for parachute ejection, mechanical assembly, instrumentation and avionics were done by VSSC. In total, five air dropped tests (of 10 parachutes) are planned as part of qualification process.[87][88]

Gaganyaan TV-D1 launch

Test Vehicle Abort Mission-1[edit]

Test Vehicle Abort Mission-1[89] (TV-D1[89][90]) was a high altitude abort test as part of the Gaganyaan program, initially set to be held on 21 October 2023 at around 8:00 a.m IST.[91]

Vyommitra[edit]

Vyommitra

On 22 January 2020, ISRO announced Vyommitra, a female-looking robot who will accompany the other astronauts in the mission. ISRO aims not to fly animals onboard experimental missions unlike other nations that have carried out human space flight. Instead, it will fly humanoid robots for a better understanding of what weightlessness and radiation do to the human body during long durations in space.[92]

Vyommitra is expected to be onboard uncrewed Gaganyaan missions to perform microgravity experiments, monitor module parameters, and support astronauts in crewed missions by simulating functions like a human from the waist up. It does not have legs.[93] It is programmed to speak Hindi and English and perform multiple tasks.[94][95][96][97]

It can detect and give out warnings if environmental changes within the cabin get uncomfortable to astronauts and change the air condition. It can autonomously complete tasks and follow new commands.[98]

See also[edit]

References[edit]

  1. 1.0 1.1 1.2 1.3 Expert Talk by Dr R.Venkatraman, Dy.Director on Challenges in launch pad systems for Gaganyaan (Video). SDSC SHAR. 6 October 2020. Retrieved 6 October 2020.
  2. "Indian Manned Spacecraft". Astronautix. 2014. Archived from the original on 28 December 2016.
  3. 3.0 3.1 "Gaganyaan: Astronauts on mission likely to be pilots, crew module design to be finalised soon". India Today. 20 January 2019. Retrieved 26 November 2022.
  4. 4.0 4.1 Kunhikrishnan, P. "India's Human Spaceflight Programme: GAGANYAAN" (PDF). UNOOSA. Archived from the original (PDF) on 20 February 2019. Retrieved 20 February 2019.
  5. "Integrated Cabin Pressure Control System" (PDF). isro.gov.in. ISRO. p. 11. Archived from the original (PDF) on 21 August 2019. Retrieved 23 August 2019.
  6. "Gaganyaan launch delayed: Manned mission now in 'fourth quarter of 2024'". Times of India. 21 December 2022. Retrieved 15 February 2023.
  7. 7.0 7.1 7.2 Singh, Surendra (27 September 2023). "Isro all geared up for first test flight of Gaganyaan crew capsule in October: Chairman S Somanath". The Times of India. Retrieved 1 October 2023.
  8. 8.0 8.1 8.2 Dutt, Anonna (9 April 2023). "Gaganyaan: From astronauts' training to tech upgrade, ISRO making leaps to meet 2025 target for manned mission". The Indian Express. Retrieved 10 April 2023.
  9. 9.0 9.1 Singh, Surendra (29 December 2018). "Rs 10,000 crore plan to send 3 Indians to space by 2022". The Times of India. Retrieved 29 December 2018.
  10. PTI (15 August 2018). "Gaganyaan mission to take Indian astronaut to space by 2022: PM Modi". The Hindu. ISSN 0971-751X. Retrieved 26 November 2022.
  11. Shah, Aditi (19 May 2023). "Gaganyaan Mission: Launch Date, Cost, Timeline, And Other Details". BQ Prime. Retrieved 5 September 2023.
  12. 12.0 12.1 "Hindustan Aeronautics Limited". Archived from the original on 22 February 2014. Retrieved 17 February 2014.
  13. "India's first solar mission in 2020: ISRO chairman". The Times of India. 4 May 2019. Retrieved 5 May 2019.
  14. "Gaganyaan: DRDO to provide special space food and emergency survival kit for ISRO's manned mission". The Financial Express. 4 March 2020. Retrieved 6 March 2020.
  15. "No Gaganyaan Unmanned Flight This Year". 11 June 2020. Retrieved 13 June 2020.
  16. "India's First Human Space Mission "Gaganyaan" Will not Be Affected by COVID Pandemic: Dr.Jitendra Singh". 3 July 2020. Archived from the original on 3 July 2020. Retrieved 3 July 2020.
  17. "Gaganyaan mission can't happen this year or next year, focus fully on safety aspects: Isro chief". The Times of India. 30 June 2022. Archived from the original on 30 June 2022. Retrieved 2 July 2022.
  18. "India to launch Gaganyaan mission by end of 2023 or 2024: Jitendra Singh". The Economic Times. 18 May 2023. ISSN 0013-0389. Retrieved 5 September 2023.
  19. Srinivasan, Pankaja (4 April 2010). "The down to earth Rakesh Sharma". The Hindu. Archived from the original on 24 July 2015. Retrieved 5 April 2014.
  20. Bordoloi, Pritam (18 November 2022). "Gaganyaan is the First Step in India's Grand Space Ambitions". Analytics India Magazine. Retrieved 27 November 2022.
  21. 21.0 21.1 Priyadarshi, Siddhanta (23 February 2009). "Planning Commission Okays ISRO Manned Space Flight Program". Indian Express. p. 2.
  22. "Gaganyan: How to send an Indian into space". 16 August 2018.
  23. Beary, Habib (27 January 2010). "India announces first manned space mission". BBC News. Bangalore. Retrieved 5 May 2010.
  24. "Spaceflight stuck due to budget: CAG". The Times of India. New Delhi. 25 April 2012. Retrieved 11 June 2013.
  25. "Human space flight mission off ISRO priority list". Retrieved 18 August 2013.
  26. "Rs 171 crore boost to manned space project". The Times of India. 18 February 2014. Retrieved 26 November 2022.
  27. China View: India's first space capsule returns to earth, 22 January 2007
  28. ISRO Press Release Archived 14 May 2008 at the Wayback Machine 22 January 2007
  29. Rao, Mukund Kadursrinivas Rao; Sridhara Murthi, K. R; Prasad, M. Y. S (25 September 2017). "The Decision for Indian Human Spaceflight Programme. Political Perspective, National Relevance and Technological Challenges" (PDF). National Institute of Advanced Studies. Retrieved 26 November 2022.
  30. Indian will take national flag to space on board Gaganyaan by 2022, says PM Narendra Modi in Independence Day speech Hindustan Times, 15 August 2018
  31. "Lok Sabha, Unstarred Question number 2259" (PDF). 4 March 2020. Archived (PDF) from the original on 5 March 2020. Retrieved 4 March 2020.
  32. 32.0 32.1 "Gaganyaan, India's human space mission, will use 'green propulsion': ISRO". Hindustan Times. 26 March 2021. Retrieved 1 April 2021.
  33. Nandakumar, T. (13 May 2018). "ISRO making green propellant". The Hindu. ISSN 0971-751X. Retrieved 1 April 2021.
  34. Kumar, Chethan (21 October 2021). "Kidney stone formation to gene marking: 5 experiments shortlisted for Isro mission; MoUs in place". The Times of India. Retrieved 26 October 2021.
  35. "Eleventh Five year Plan (2007-2012) proposals for Indian space program" (PDF). Archived from the original (PDF) on 12 May 2013. Retrieved 2 March 2022.
  36. 36.0 36.1 Mishra, Bibhu Ranjan (8 October 2008). "ISRO plans manned mission to moon in 2014". Business Standard India. Sriharikota Range (SHAR): Business Standard. Retrieved 14 June 2013.
  37. D.S., Madhumathi (11 January 2019). "ISRO starts Human Space Flight centre". The Hindu. ISSN 0971-751X. Retrieved 11 January 2019.
  38. "India's human space programme gets a fillip". Retrieved 11 January 2019. Initially, the plan was the construct a new launch pad for the human space flight, but Sivan told the Express that due to paucity of time one of the two existing launch pads is being modified to meet the requirement.
  39. "Question number 1733 in Rajya Sabha" (PDF). Retrieved 11 January 2019. It is proposed to utilise the existing launch pad with augmentation for carrying out the initial flights under the Gaganyaan manned space flight programme.[permanent dead link]
  40. "Russia To Help India In 2022 Space Mission: Russian Envoy". NDTV. 3 December 2018. Retrieved 26 November 2022.
  41. T.S. Subramanian (2 May 2009), "Model of space crew module ready", The Hindu, Chennai, archived from the original on 4 May 2009, retrieved 14 June 2013
  42. "ISRO: India's manned space mission is on, Cabinet okays Rs 10,000 crore plan". The Economic Times. 28 December 2018. Retrieved 26 November 2022.
  43. "PM Modi promises India's first manned space mission by 2022 in Independence Day speech". India Today. 15 August 2018. Retrieved 26 November 2022.
  44. "Gaganyaan". ISRO. Retrieved 26 November 2022.
  45. "Gaganyaan: India chooses Russia to pick and train astronauts". The Times of India. 1 July 2019. Retrieved 1 August 2019.
  46. "Cabinet approves setting up of ISRO's technical liaison unit in Moscow". India Today. 31 July 2019. Retrieved 26 November 2022.
  47. "ISRO Technical Liaison Unit at Moscow". Examrace. Retrieved 26 November 2022.
  48. "Russia to make spacesuits for Indian cosmonauts". Glavkosmos. 7 September 2020. Retrieved 23 July 2021.
  49. Pramanik, Ayan; Krishnan, Raghu. "After Gaganyaan, ISRO chairman K Sivan to set sights on space station". The Economic Times. Retrieved 23 July 2021.
  50. Peri, Dinakar (28 August 2021). "Indian pilots to return to Russia soon for customised space suits". The Hindu. ISSN 0971-751X. Retrieved 3 September 2021.
  51. "Agra lab parachutes to bring back India astronauts". Deccan Herald. 4 January 2019. Retrieved 11 January 2019.
  52. Ray, Kalyan (4 January 2009). "ISRO gears up for manned space mission". Deccan Herald. Shillong. Archived from the original on 3 February 2014. Retrieved 14 June 2013.
  53. "Orbital Vehicle". Encyclopedia Astronautica. Archived from the original on 1 December 2008.
  54. "Spacecraft for 'Gaganyaan' mission developed: ISRO scientist". The Hindu. 7 December 2022. ISSN 0971-751X. Retrieved 10 December 2022.
  55. "India's first manned mission Gaganyaan may take 1 astronaut". Hindustan Times. 8 January 2020. Retrieved 9 January 2020.
  56. "Gaganyaan: Gaganyaan Mission: ISRO successfully conducts series of drogue parachute deployment tests - The Economic Times Video | ET Now". m.economictimes.com. Retrieved 14 August 2023.
  57. "Chandrayaan-3 on Moon: What's Next for Isro?". India Today. 24 August 2023. Retrieved 25 August 2023.
  58. "Gaganyaan TV-D1 Mission". www.isro.gov.in. Retrieved 21 October 2023.
  59. 59.0 59.1 Karthik, K K (8 December 2022). "Centre Wants Gaganyaan Launch before 2024 Lok Sabha Polls". The New Indian Express. Retrieved 10 December 2022.
  60. 60.00 60.01 60.02 60.03 60.04 60.05 60.06 60.07 60.08 60.09 60.10 60.11 60.12 "Gaganyaan's First Test Abort Flight in May | All You Need to Know about India's Ambitious Space Mission". News18. 16 March 2023. Retrieved 8 May 2023.
  61. 61.0 61.1 61.2 61.3 "Record G1, G2, H1 [1.3.112.4.7.1494]". Space Assigned Numbers Authority. Retrieved 16 February 2022.
  62. "Prime Minister reviews readiness of Gaganyaan Mission".
  63. "Gaganyaan: ISRO to Launch First Full-Scale Unmanned Mission in February Next Year". The New Indian Express. Retrieved 8 May 2023.
  64. "ISRO inches closer to manned mission". The Times of India. 10 January 2014. Archived from the original on 12 January 2014. Retrieved 13 January 2014. "We will be checking the crew capsule for all parameters".
  65. "Human space flight prog: HAL hands over crew module assembly to ISRO". @businessline. 13 February 2014.
  66. "Crew module Atmospheric Re-entry Experiment (CARE)". ISRO. 18 December 2014.
  67. First Experimental Flight of India's Next Generation Launch Vehicle GSLV Mk-III Successful - ISRO Press Release - 18 December 2014
  68. "India successfully launches its heaviest rocket GSLV-Mk III". International Business Times UK. 18 December 2014.
  69. "GSLV Mark III takes to the skies in test flight". The Hindu. 18 December 2014. ISSN 0971-751X. Retrieved 26 November 2022.
  70. "India launches largest rocket and unmanned capsule". BBC News. 18 December 2014. Retrieved 26 November 2022.
  71. "Episode 90 – An update on ISRO's activities with S. Somanath and R. Umamaheshwaran". Astro talk UK. 24 October 2019. Retrieved 30 October 2019.
  72. "ISRO conducts pad abort test for Indian human space program". NASASpaceFlight.com. 4 July 2018. Retrieved 5 July 2018.
  73. Kumar, Chethan (27 September 2021). "Gaganyaan: ISRO readies for Crew Escape System test vehicle flights". The Times of India. Retrieved 28 September 2021.
  74. "Third Successful Vikas Engine Long Duration Hot Test for Gaganyaan Program". ISRO. Retrieved 21 January 2022.
  75. "ISRO successfully conducts 3rd Vikas Engine hot test for Gaganyaan mission". Mint. 14 July 2021. Retrieved 1 September 2021.
  76. "Qualification testing of VIKAS Engine for Gaganyaan Programme - ISRO". ISRO. Retrieved 21 January 2022.
  77. "Gaganyaan Low Altitude Escape Motor (LEM) Static Test". Indian Space Research Organisation. Retrieved 30 November 2022.
  78. Kumar, Chethan (11 August 2022). "Gaganyaan: Low Altitude Escape motor of crew escape system tested". The Times of India. TNN. Retrieved 30 November 2022.
  79. "Successful hot Test of Gaganyaan Service Module Propulsion System – System Demonstration Model (SDM) - ISRO". ISRO. 28 August 2021. Retrieved 31 August 2021.
  80. MP, Sidharth (30 August 2021). "ISRO successfully tests a system that will propel India's human-carrying spacecraft". WION. Retrieved 31 August 2021.
  81. "Qualification testing of Cryogenic Engine for Gaganyaan Programme". ISRO. Retrieved 21 January 2022.
  82. Surendra Singh (12 January 2022). "Isro successfully conducts cryo engine test for Gaganyaan rocket". The Times of India. Retrieved 12 January 2022.
  83. "Gaganyaan cryogenic engine test successful: IPRC". The Hindu. 9 November 2022. ISSN 0971-751X. Retrieved 27 November 2022.
  84. "ISRO successfully tests large human rated solid rocket booster for the Gaganyaan programme - ISRO". www.isro.gov.in. 13 May 2022. Archived from the original on 13 May 2022. Retrieved 13 May 2022.
  85. "ISRO Completes Major Development Test of its Gaganyaan Parachute System". Vikram Sarabhai Space Centre. Retrieved 27 November 2022.
  86. "Gaganyaan: Isro tests parachutes that will bring Indian astronauts to Earth from space". India Today. 19 November 2022. Retrieved 27 November 2022.
  87. Kumar, Chethan (19 November 2022). "Gaganyaan: Key parachute test simulating astronaut landing complete". The Times of India. TNN. Retrieved 26 November 2022.
  88. "ISRO Completes Major Development Test of its Gaganyaan Parachute System". ISRO. Retrieved 26 November 2022.
  89. 89.0 89.1 "First Crew Module for Gaganyaan test flight takes shape". www.isro.gov.in. Retrieved 8 October 2023.
  90. Times of India, 28 April 2022.
  91. TV-D1 Flight Test: ISRO on X: https://x.com/isro/status/1714208678675628360?s=20
  92. "Why is India sending robots into space?". 25 July 2019. Retrieved 25 January 2020.
  93. "ISRO to send humanoid Vyommitra in unmanned Gaganyaan spacecraft ahead of human spaceflight". The Economic Times. 24 January 2020. Retrieved 29 August 2021.
  94. Kumar, Chethan (22 January 2020). "Gaganyaan mission: First glimpse of 'Vyommitra', the humanoid for Gaganyaan; it's a 'She'". The Times of India. Retrieved 22 January 2020.
  95. "ISRO's manned mission to Moon will happen, but not right now: K Sivan". The Indian Express. 22 January 2020. Retrieved 22 January 2020.
  96. "'व्योममित्रा'ची पहिली झलक! भारताकडून 'ती' पहिल्यांदा जाणार अवकाशात". Loksatta (in मराठी). 22 January 2020. Retrieved 22 January 2020.
  97. "ISRO's prototype humanoid for Gaganyaan mission is Vyom Mitra which will go to space before astronauts". Times Now News. 22 January 2020. Retrieved 22 January 2020.
  98. Dwarakanath, Nagarjun (22 January 2020). "Gaganyaan mission: Meet Vyommitra, the talking human robot that Isro will send to space". India Today. Retrieved 22 January 2020.

External links[edit]

Template:Crewed spacecraft