Created by Ajay Kumar
Last edited September 1, 2023

Jayadeva Hospital
Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found. station
LocationJayadeva Flyover, BHBCS Layout, Stage 2, BTM Layout, Bengaluru, Karnataka 560029
Coordinates12°55′00″N 77°36′00″E / 12.91673°N 77.60009°E / 12.91673; 77.60009
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Lua error in Module:Adjacent_stations at line 446: Unknown line "Yellow". Lua error in Module:Adjacent_stations at line 446: Unknown line "Pink".
PlatformsSide platform
Platform-1 → Rashtreeya Vidyalaya Road
Platform-2 → Bommasandra
Side platform (TBC)
Platform-3 - Kalena Agrahara
Platform-4 - Nagawara
Platform numbers (TBC)
Tracks(TBC)
Construction
Structure typeElevated, Double track
Platform levels(TBC)
Parking(TBC)
Disabled access(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
Opening  December 2023; 2 years ago (December 2023) (TBC)
  2025; 1 year ago (2025) (TBC)
Electrified750 V DC third rail (TBC)
Services
Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found.
Location
Map

Jayadeva Hospital is an upcoming important double-elevated interchange metro station on the North-South corridor of the Yellow Line and Pink Line of Namma Metro in Bangalore, India. This metro station will be Bengaluru's first ever multi-elevated interchange metro station in the whole of Namma Metro network. Around this metro station holds the main Sri Jayadeva Institute of Cardiovascular Sciences and Research Healthcare Institute followed by Valtech, a software company in Bengaluru. This metro station (under Yellow Line) is stated to be operational around December 2023 (under Pink Line, around 2025).[1][2][3]

Station layout[edit | edit source]

This metro station will comprise of 5 levels from underground to the top level as given below:-

  • Level 1 → Underpass connecting Bannerghatta and Dairy Circle
  • Level 2 → Street Level surface connecting Ragigudda and BTM Layout
  • Level 3 → Elevated Flyover from Ragigudda to Central Silk Board
  • Level 4 → Yellow Line Platforms
  • Level 5 → Pink Line Platforms

Station Layout (TBC)[edit | edit source]

Jayadeva Hospital track layout (TBC)
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Bommasandra next station is BTM Layout
Platform 1
Northbound
Towards ← Rashtreeya Vidyalaya Road next station is Ragigudda
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits[edit | edit source]

See also[edit | edit source]

References[edit | edit source]

  1. ↑ "Namma Metro Update: Bengaluru's biggest metro station, Jayadeva junction slated for year-end launch". Financialexpress. 26 July 2023. Retrieved 31 August 2023.
  2. ↑ "Namma Metro News: Bengaluru's Biggest Metro Station at Jayadeva Junction Set to Open by Year-End". TimesNow. 25 July 2023. Retrieved 31 August 2023.
  3. ↑ Reporter, Staff (24 July 2023). "Bengaluru's Jayadeva Junction: Largest Metro Station Expected to Open by End of 2023". Metro Rail News. Retrieved 31 August 2023.

External links[edit | edit source]