Lakkasandra
Template:Namma Metro Infobox station line
Under Construction of this metro station under Namma Metro's Pink Line as of April 2026
LocationBannerghatta Road, Chennakeshava Nagar, Ayappa Garden, Adugodi, Bengaluru, Karnataka 560027
Coordinates12°56′58″N 77°36′11″E / 12.9493354°N 77.6030797°E / 12.9493354; 77.6030797
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Template:Rcb
PlatformsIsland platform (TBC)
Platform-1 → Template:Stl
Platform-2 → Template:Stl
Platform Numbers (TBC)
Tracks2 (TBC)
Construction
Structure typeUnderground, Double track
Platform levels2 (TBC)
Parking(TBC)
ArchitectAfcons Infrastructure
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningDecember 2026; 4 months' time (December 2026) (TBC)
Electrified(TBC)
Services
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found.
Location
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).

Lakkasandra is an upcoming underground metro station on the North-South corridor of the Pink Line[1] of Namma Metro in Bengaluru, India. This metro station serves Lakkasandra and adjoining areas.

As per the latest updates, this metro station, under the second phase, covering the total underground distance of 13.8 km (Dairy Circle - Nagawara) is expected to be operational around December 2026. [2][3][4][5][6][7]

History[edit | edit source]

In June 2017, Bangalore Metro Rail Corporation Limited (BMRCL) sought bids for constructing the Dairy Circle metro station along the 3.66 km South Ramp - National Military School stretch of the 21.25 km Pink Line of Namma Metro. In November 2019, Afcons Infrastructure emerged as the lowest bidders for this stretch which aligned closely with the original estimate, thus leading to a successful award for this company. They commenced the construction of this metro station as per the agreements.

Station Layout[edit | edit source]

Station Layout - To Be Confirmed

style="color:;background:#Template:Rail color;text-align:center;padding:5px"|
Lakkasandra track layout (TBC)
P#
P#
Station with two tracks and one Island platform
** Proposed
G Street level Exit/ Entrance
L1 Mezzanine Fare control, station agent, Ticket/token, shops
L2 Platform #
Southbound
Towards → Template:Stl
Next Station: Template:Stl
Change at the next station for Template:Rcb
Island platform | Doors will open on the right Disabled access
Platform #
Northbound
Towards ← Template:Stl
Next Station: Template:Stl
L2

See also[edit | edit source]

References[edit | edit source]

  1. "Namma Metro Pink Line: Route, Status, Completion Date & More". timesproperty. Retrieved 15 December 2023.
  2. "Bengaluru: Namma Metro pushes Pink Line deadline to December 2026". Deccan Herald. Retrieved 4 November 2024.
  3. "Namma Metro's Pink line likely to open in phases". The Hindu. 4 August 2024. ISSN 0971-751X. Retrieved 7 August 2024.
  4. "Namma Metro's Pink Line: This Upcoming Corridor Is Set To Redefine The City Commute". TimesNow. 25 June 2023. Retrieved 15 December 2023.
  5. "Namma Metro Phase 2 In Bengaluru To Be Operational By 2025, Announces Karnataka Deputy CM". TimesNow. 10 February 2024. Retrieved 12 February 2024.
  6. Staff Reporter (27 September 2023). "Good News! Pink Line of Bengaluru Metro to be 90% Ready by Second-half of 2024". Metro Rail News. Retrieved 15 December 2023.
  7. "Namma Metro: Bengaluru's Under-Construction Pink Line Slated To Achieve 2 Milestones In a Week". TimesNow. 31 January 2024. Retrieved 1 February 2024.