| Template:Chennai Metro Infobox station line | ||
![]() | ||
| Location | Chennai – Trichy Hwy, Anna Salai, Triplicane, Chennai, Tamil Nadu 600002 India | |
| Coordinates | 13°03′52″N 80°15′57″E / 13.0645067°N 80.2658909°E | |
| Owned by | Chennai Metro | |
| Operated by | Chennai Metro Rail Limited (CMRL) | |
| Line(s) | Template:Rcb | |
| Platforms | Island platform Platform-1 → Chennai International Airport (to be extended to Kilambakkam in the future) Platform-2 → Wimco Nagar Depot | |
| Tracks | 2 | |
| Construction | ||
| Structure type | Underground, Double Track | |
| Parking | No | |
| Other information | ||
| Station code | SLI | |
| History | ||
| Opened | 10 February 2019 | |
| Electrified | Single phase 25 kV, 50 Hz AC through overhead catenary | |
| Services | ||
|
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Chennai Metro' not found. | ||
| Location | ||
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | ||
LIC is an underground metro station on the North-South Corridor of the Blue Line of Chennai Metro in Chennai, India. This station serves the neighbourhoods of Egmore and Royapettah. The station is named so because of the presence of the LIC Building, the city's first skyscraper, in the vicinity. The station was opened for public on 10 February 2019. However, some portions of the construction work remains incomplete on the date of inauguration.[1]
Station layout[edit | edit source]
| style="color:;background:#Template:Rail color;text-align:center;padding:5px"| LIC track layout | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and one Island platform
| ||||||||||||||||||||||||||||||||||||||||||
| G | Street level | Exit/Entrance |
| M | Mezzanine | Fare control, station agent, Ticket/token, shops |
| P | Platform 1 Southbound |
Towards → Chennai International Airport Next Station: Thousand Lights (to be further extended to Kilambakkam in the future) |
| Island platform | Doors will open on the right | ||
| Platform 2 Northbound |
Towards ← Wimco Nagar Depot Next Station: Government Estate | |
| LIC metro station | |
|---|---|
| General information | |
| Status | Complete |
| Type | Metro station |
| Location | Anna Salai |
| Town or city | Chennai |
| Country | India |
| Elevation | 10.0m |
| Completed | 2019 |
| Opened | 10 February 2019 |
| Inaugurated | 10 February 2019 |
| Design and construction | |
| Main contractor | L&T-SUCG JV |
| Website | |
| http://chennaimetrorail.org/ | |
See also[edit | edit source]
References[edit | edit source]
- ↑ Sekar, Sunitha (21 January 2019). "Work on LIC, Thousand Lights Metro stations still on". The Hindu. Retrieved 10 February 2019.
External links[edit | edit source]
- chennaimetrorail
.org - UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.
- Google. "LIC metro station" (Map). Google Maps. Google.
{{cite map}}:|author=has generic name (help)

