Electronic City Elevated Expressway: Difference between revisions

Created by Vinn03
Last edited January 23, 2025
>Vinn03
Year
 
m brief adjusted intro after review and added references based on references
 
Line 1: Line 1:
{{Use dmy dates|date=June 2016}}
{{Short description|Road in India}}
{{Use dmy dates|date=January 2025}}
{{Use Indian English|date=June 2016}}
{{Use Indian English|date=June 2016}}
{{Infobox Bridge
{{Infobox Bridge
|bridge_name= Bangalore Elevated Tollway <br> Electronic City Elevated Expressway
|bridge_name= Electronic City Elevated Expressway
|image= BETL-BMIC-Hosur- Road-Junction.jpg
|image= Bangalore Elevated highway (4910689177).jpg
|caption= The Bangalore Elevated Tollway as seen over [[NICE Road]] in March 2011
|caption= Electronic City elevated expressway
|official_name= Bangalore Elevated Tollway
|official_name=  
|carries= 4 lanes of road traffic
|other_name='''Electronic City Expressway'''<br/>'''Electronic City Flyover'''<br>'''Bengaluru City Expressway'''<br/>'''Hosur Road Expressway'''|carries= Road traffic
|crosses= [[Electronic City]], [[Singasandra]], [[Bommanahalli]], [[Bangalore–Mysore Infrastructure Corridor]]
|crosses= [[Bommanahalli]]<br/>Garvebhavipalya<br/>Kudlu Gate<br/>[[Singasandra]]<br/>Hosa Road<br/>[[Bangalore–Mysore Infrastructure Corridor]]<br/>Konappana Agrahara
|locale= [[Bengaluru]]
|locale= [[Bangalore]]
|design= [[Reinforced concrete|RCC precast structure]]
|design= [[Reinforced concrete|RCC precast structure]]
|length= {{cvt|9.985|km|mi}} <ref name="nhdppp3">{{cite web|url=http://www.nhai.org/nhdpphase3.asp|title=Completed Stretches of NHDP Phase 3|publisher=[[National Highways Authority of India]]|access-date=18 May 2012|archive-url=https://web.archive.org/web/20120517221019/http://www.nhai.org/nhdpphase3.asp|archive-date=17 May 2012|url-status=dead}}</ref>
|length= {{cvt|9.985|km|mi}}<ref name="nhdppp3">{{cite web|url=http://www.nhai.org/nhdpphase3.asp|title=Completed Stretches of NHDP Phase 3|publisher=[[National Highways Authority of India]]|access-date=18 May 2012|archive-url=https://web.archive.org/web/20120517221019/http://www.nhai.org/nhdpphase3.asp|archive-date=17 May 2012|url-status=dead}}</ref>
|height={{cvt|17|m|ft}}
|height={{cvt|17|m|ft}}
|starts= January 22, 2010        
|starts= Roopena Agrahara        
|ends= March 19, 2021
|ends= [[Electronic City]]
|website = http://www.blrelevated.co.in
|website = http://www.blrelevated.co.in
}}
}}


'''Electronic City Elevated Expressway''' (officially '''Bangalore Elevated Tollway''') was a {{cvt|9.985|km|mi}} long elevated highway from [[Silk Board junction]] to [[Electronic City]] in [[Bangalore]], [[India]]. The project was a part of the BETL (Bangalore Elevated Tollways Ltd), project as part of the [[National Highways Development Project]] and the Elevated Highways Project. It was initiated in early 2006, and was inaugurated on 22 January 2010.<ref>{{cite web|url=http://www.deccanherald.com/content/48391/expressway-elevates-commuting.html|title=Expressway Elevates Commuting|publisher=Deccan Herald}}</ref> It started from [[Bomanahalli]] after the Central Silk Board flyover and went on up to [[Electronic City]]. It went above the BMIC flyover, at a height of {{cvt|17|m|ft}}, thus making it Bangalore's tallest flyover.<ref name="height">{{cite news|url=http://articles.timesofindia.indiatimes.com/2005-09-09/bangalore/27853160_1_bmic-project-bmic-road-flyover|archive-url=https://web.archive.org/web/20120426183717/http://articles.timesofindia.indiatimes.com/2005-09-09/bangalore/27853160_1_bmic-project-bmic-road-flyover|url-status=dead|archive-date=26 April 2012|title=56-foot-high highway to fly over BMIC road|author=Sowmya Aji Mehu|date=9 September 2005|access-date=31 March 2011|work=[[The Times of India]]|location=Bangalore}}</ref>  
The '''Electronic City Elevated Expressway''' is a {{cvt|9.985|km|mi}} long elevated highway from [[Silk Board junction]] to [[Electronic City]] in [[Bengaluru]], India. The project was part of the BETL (Bengaluru Elevated Tollways Ltd), project as part of the [[National Highways Development Project]] and the Elevated Highways Project. It was initiated in early 2006, and was inaugurated on 22 January 2010.<ref>{{cite web|url=http://www.deccanherald.com/content/48391/expressway-elevates-commuting.html|title=Expressway Elevates Commuting|work=Deccan Herald}}</ref> Operating at a height of {{cvt|17|m|ft}}, it was Bangalore's tallest [[Overpass|flyover]] at the time of its opening.<ref name="height">{{cite news|url=http://articles.timesofindia.indiatimes.com/2005-09-09/bangalore/27853160_1_bmic-project-bmic-road-flyover|archive-url=https://web.archive.org/web/20120426183717/http://articles.timesofindia.indiatimes.com/2005-09-09/bangalore/27853160_1_bmic-project-bmic-road-flyover|url-status=dead|archive-date=26 April 2012|title=56-foot-high highway to fly over BMIC road|author=Sowmya Aji Mehu|date=9 September 2005|access-date=31 March 2011|work=[[The Times of India]]|location=Bangalore}}</ref>


The elevated expressway had helped to reduce the commute time to the tech hub of [[Electronic City]] greatly. Post the construction of this expressway, the travel time to [[Electronic City]] from [[Silk Board junction]] near [[Koramangala]] was reduced to a mere 10 minutes. The [[Bruhat Bengaluru Mahanagara Palike]] and [[Bangalore Development Authority]] had planned a series of [[Overpass|flyovers]] and [[underpass]]es to make this arterial road signal free.<ref name="wideningsignalfree">{{cite news|url=http://epaper.timesofindia.com/Repository/ml.asp?Ref=QkdNSVIvMjAwOS8xMC8yNyNBcjAwNTAw&Mode=HTML&Locale=english-skin-custom|title=Hosur Road widening is in full swing|author=Manasi|date=Oct 27, 2009|publisher=Bangalore Mirror|access-date=27 March 2011|location=Bangalore|archive-url=https://web.archive.org/web/20120829211630/http://epaper.timesofindia.com/Repository/ml.asp?Ref=QkdNSVIvMjAwOS8xMC8yNyNBcjAwNTAw&Mode=HTML&Locale=english-skin-custom|archive-date=29 August 2012|url-status=dead}}</ref>
The elevated expressway has helped to reduce the commute time to the tech hub of [[Electronic City]] greatly.  
The [[Bruhat Bengaluru Mahanagara Palike]] and [[Bangalore Development Authority]] had planned a series of [[Overpass|flyovers]] and [[underpass]]es to make this arterial [[Hosur Road]] signal free.<ref name="wideningsignalfree">{{cite news|url=http://epaper.timesofindia.com/Repository/ml.asp?Ref=QkdNSVIvMjAwOS8xMC8yNyNBcjAwNTAw&Mode=HTML&Locale=english-skin-custom|title=Hosur Road widening is in full swing|author=Manasi|date=27 October 2009|work=Bangalore Mirror|access-date=27 March 2011|location=Bangalore|archive-url=https://web.archive.org/web/20120829211630/http://epaper.timesofindia.com/Repository/ml.asp?Ref=QkdNSVIvMjAwOS8xMC8yNyNBcjAwNTAw&Mode=HTML&Locale=english-skin-custom|archive-date=29 August 2012|url-status=dead}}</ref>


==Exits==
==Exits==
Electronic City Elevated Expressway had 3 exits in [[Electronic City]] which were, one directing towards Electronic City Phase 1 by right side, second one directing Electronic City Phase 2 by left side and third one directing to [[Attibele]] in [[Anekal]].
{{Cleanup road junction list|date=November 2021}}
The Electronic City Elevated Expressway has 3 exits in [[Electronic City]] which were, one directing towards [[Electronic City|Electronic City Phase 1]] on the right side with both upward and downward ramp, second one directing [[Electronic City|Electronic City Phase 2]] on the left side with downward ramp and a straight third one directing towards [[Hosur]] on [[National Highway 44 (India)|NH 44]] with both upward and downward ramps.
 
==See also==
* [[Infrastructure in Bengaluru]]
* [[Inner Ring Road, Bengaluru]]
* [[Outer Ring Road, Bengaluru]]
* [[Bangalore–Mysore Infrastructure Corridor|NICE Road]]
* [[Peripheral Ring Road]]
* [[Satellite Town Ring Road]]


==References==
==References==
Line 31: Line 42:


[[Category:Expressways in Karnataka]]
[[Category:Expressways in Karnataka]]
[[Category:Roads in Bangalore]]
[[Category:Roads in Bengaluru]]

Latest revision as of 23:35, 23 January 2025


Electronic City Elevated Expressway
Electronic City elevated expressway
OS grid referenceTemplate:Gbmappingsmall
CarriesRoad traffic
CrossesBommanahalli
Garvebhavipalya
Kudlu Gate
Singasandra
Hosa Road
Bangalore–Mysore Infrastructure Corridor
Konappana Agrahara
LocaleBangalore
BeginsRoopena Agrahara
EndsElectronic City
Other name(s)Electronic City Expressway
Electronic City Flyover
Bengaluru City Expressway
Hosur Road Expressway
Websitewww.blrelevated.co.in
Characteristics
DesignRCC precast structure
Total length9.985 km (6.204 mi)[1]
Height17 m (56 ft)
Location
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).

The Electronic City Elevated Expressway is a 9.985 km (6.204 mi) long elevated highway from Silk Board junction to Electronic City in Bengaluru, India. The project was part of the BETL (Bengaluru Elevated Tollways Ltd), project as part of the National Highways Development Project and the Elevated Highways Project. It was initiated in early 2006, and was inaugurated on 22 January 2010.[2] Operating at a height of 17 m (56 ft), it was Bangalore's tallest flyover at the time of its opening.[3]

The elevated expressway has helped to reduce the commute time to the tech hub of Electronic City greatly. The Bruhat Bengaluru Mahanagara Palike and Bangalore Development Authority had planned a series of flyovers and underpasses to make this arterial Hosur Road signal free.[4]

Exits[edit | edit source]

Template:Cleanup road junction list The Electronic City Elevated Expressway has 3 exits in Electronic City which were, one directing towards Electronic City Phase 1 on the right side with both upward and downward ramp, second one directing Electronic City Phase 2 on the left side with downward ramp and a straight third one directing towards Hosur on NH 44 with both upward and downward ramps.

See also[edit | edit source]

References[edit | edit source]

  1. "Completed Stretches of NHDP Phase 3". National Highways Authority of India. Archived from the original on 17 May 2012. Retrieved 18 May 2012.
  2. "Expressway Elevates Commuting". Deccan Herald.
  3. Sowmya Aji Mehu (9 September 2005). "56-foot-high highway to fly over BMIC road". The Times of India. Bangalore. Archived from the original on 26 April 2012. Retrieved 31 March 2011.
  4. Manasi (27 October 2009). "Hosur Road widening is in full swing". Bangalore Mirror. Bangalore. Archived from the original on 29 August 2012. Retrieved 27 March 2011.