Deoghar Airport: Difference between revisions

690 bytes removed ,  31 July 2023
m
Bot: Delinking broken file(s) using script (info)
(robot: Update article (please report if you notice any mistake or error in this edit))
m (Bot: Delinking broken file(s) using script (info))
 
Line 60: Line 60:
== Infrastructure ==
== Infrastructure ==
AAI has built the airport at a cost of ₹ 400 crore. It includes the construction of the runway, having a length of {{cvt|2,500|m}} and {{cvt|45|m|adj=on}} wide, construction of a {{convert|4,000|sqm|adj=on}} terminal building can handle 200 passengers per hour, an [[Air traffic control|Air Traffic Control]] (ATC) tower, an apron for two Airbus A320s, taxiways and an isolation bay.
AAI has built the airport at a cost of ₹ 400 crore. It includes the construction of the runway, having a length of {{cvt|2,500|m}} and {{cvt|45|m|adj=on}} wide, construction of a {{convert|4,000|sqm|adj=on}} terminal building can handle 200 passengers per hour, an [[Air traffic control|Air Traffic Control]] (ATC) tower, an apron for two Airbus A320s, taxiways and an isolation bay.
[[File:National flag at deoghar airport.png|thumb|National flag at entrance of the terminal]]
 
[[File:IMG Deoghar Airport Runway.jpg|thumb|2500 m fully flattened concrete runway  at Deoghar]]
[[File:IMG Deoghar Airport Runway.jpg|thumb|2500 m fully flattened concrete runway  at Deoghar]]
[[File:ATC tower cum building at Deoghar Airport.png|thumb|ATC tower complex]]
 
The terminal building has six check-in counters and two arrival belts with a peak hour handling capacity of 200 passengers.The design of the terminal building is inspired from the [[Baidyanath Temple]]'s structure, and there are murals and paintings of [[Adivasi]] art, handicrafts and local tourist sites inside the airport. A [[DVOR]]/DME navigational facility is also planned. Construction commenced in January 2018 and completed in June 2022
The terminal building has six check-in counters and two arrival belts with a peak hour handling capacity of 200 passengers.The design of the terminal building is inspired from the [[Baidyanath Temple]]'s structure, and there are murals and paintings of [[Adivasi]] art, handicrafts and local tourist sites inside the airport. A [[DVOR]]/DME navigational facility is also planned. Construction commenced in January 2018 and completed in June 2022


The adequate infrastructure and basic public facilities have been put in place in the terminal ensuring convenient and user-friendly experience for passengers thereby smooth flight operations from the airport.
The adequate infrastructure and basic public facilities have been put in place in the terminal ensuring convenient and user-friendly experience for passengers thereby smooth flight operations from the airport.


[[File:Terminal building night view at Deoghar Airport.png|thumb|Terminal building of the airport]]


[[File:Check-in Counters inside terminal of Deoghar Airport.png|thumb|Check-in counters]]


[[File:Concourse area inside terminal building at Deoghar Airport.png|thumb|Concourse area inside the terminal]]


[[File:Boarding gate of terminal building at Deoghar Airport.png|thumb|Boarding gates]]


[[File:X-ray machine and Security checks area inside terminal at Deoghar Airport.png|thumb|X-ray machines and security check areas]]
 
 
 
 
 


==Airlines and destinations==
==Airlines and destinations==
1,603

edits