== Infrastructure == | == Infrastructure == | ||
AAI has built the airport at a cost of ₹ 400 crore. It includes the construction of the runway, having a length of {{cvt|2,500|m}} and {{cvt|45|m|adj=on}} wide, construction of a {{convert|4,000|sqm|adj=on}} terminal building can handle 200 passengers per hour, an [[Air traffic control|Air Traffic Control]] (ATC) tower, an apron for two Airbus A320s, taxiways and an isolation bay. | AAI has built the airport at a cost of ₹ 400 crore. It includes the construction of the runway, having a length of {{cvt|2,500|m}} and {{cvt|45|m|adj=on}} wide, construction of a {{convert|4,000|sqm|adj=on}} terminal building can handle 200 passengers per hour, an [[Air traffic control|Air Traffic Control]] (ATC) tower, an apron for two Airbus A320s, taxiways and an isolation bay. | ||
[[File:IMG Deoghar Airport Runway.jpg|thumb|2500 m fully flattened concrete runway at Deoghar]] | [[File:IMG Deoghar Airport Runway.jpg|thumb|2500 m fully flattened concrete runway at Deoghar]] | ||
The terminal building has six check-in counters and two arrival belts with a peak hour handling capacity of 200 passengers.The design of the terminal building is inspired from the [[Baidyanath Temple]]'s structure, and there are murals and paintings of [[Adivasi]] art, handicrafts and local tourist sites inside the airport. A [[DVOR]]/DME navigational facility is also planned. Construction commenced in January 2018 and completed in June 2022 | The terminal building has six check-in counters and two arrival belts with a peak hour handling capacity of 200 passengers.The design of the terminal building is inspired from the [[Baidyanath Temple]]'s structure, and there are murals and paintings of [[Adivasi]] art, handicrafts and local tourist sites inside the airport. A [[DVOR]]/DME navigational facility is also planned. Construction commenced in January 2018 and completed in June 2022 | ||
The adequate infrastructure and basic public facilities have been put in place in the terminal ensuring convenient and user-friendly experience for passengers thereby smooth flight operations from the airport. | The adequate infrastructure and basic public facilities have been put in place in the terminal ensuring convenient and user-friendly experience for passengers thereby smooth flight operations from the airport. | ||