Created by MB
Last edited July 31, 2023
UpdateBot (talk | contribs)
robot: Update article (please report if you notice any mistake or error in this edit)
Delinker (talk | contribs)
m Bot: Delinking broken file(s) using script (info)
 
Line 60: Line 60:
== Infrastructure ==
== Infrastructure ==
AAI has built the airport at a cost of ₹ 400 crore. It includes the construction of the runway, having a length of {{cvt|2,500|m}} and {{cvt|45|m|adj=on}} wide, construction of a {{convert|4,000|sqm|adj=on}} terminal building can handle 200 passengers per hour, an [[Air traffic control|Air Traffic Control]] (ATC) tower, an apron for two Airbus A320s, taxiways and an isolation bay.
AAI has built the airport at a cost of ₹ 400 crore. It includes the construction of the runway, having a length of {{cvt|2,500|m}} and {{cvt|45|m|adj=on}} wide, construction of a {{convert|4,000|sqm|adj=on}} terminal building can handle 200 passengers per hour, an [[Air traffic control|Air Traffic Control]] (ATC) tower, an apron for two Airbus A320s, taxiways and an isolation bay.
[[File:National flag at deoghar airport.png|thumb|National flag at entrance of the terminal]]
 
[[File:IMG Deoghar Airport Runway.jpg|thumb|2500 m fully flattened concrete runway  at Deoghar]]
[[File:IMG Deoghar Airport Runway.jpg|thumb|2500 m fully flattened concrete runway  at Deoghar]]
[[File:ATC tower cum building at Deoghar Airport.png|thumb|ATC tower complex]]
 
The terminal building has six check-in counters and two arrival belts with a peak hour handling capacity of 200 passengers.The design of the terminal building is inspired from the [[Baidyanath Temple]]'s structure, and there are murals and paintings of [[Adivasi]] art, handicrafts and local tourist sites inside the airport. A [[DVOR]]/DME navigational facility is also planned. Construction commenced in January 2018 and completed in June 2022
The terminal building has six check-in counters and two arrival belts with a peak hour handling capacity of 200 passengers.The design of the terminal building is inspired from the [[Baidyanath Temple]]'s structure, and there are murals and paintings of [[Adivasi]] art, handicrafts and local tourist sites inside the airport. A [[DVOR]]/DME navigational facility is also planned. Construction commenced in January 2018 and completed in June 2022


The adequate infrastructure and basic public facilities have been put in place in the terminal ensuring convenient and user-friendly experience for passengers thereby smooth flight operations from the airport.
The adequate infrastructure and basic public facilities have been put in place in the terminal ensuring convenient and user-friendly experience for passengers thereby smooth flight operations from the airport.


[[File:Terminal building night view at Deoghar Airport.png|thumb|Terminal building of the airport]]


[[File:Check-in Counters inside terminal of Deoghar Airport.png|thumb|Check-in counters]]


[[File:Concourse area inside terminal building at Deoghar Airport.png|thumb|Concourse area inside the terminal]]


[[File:Boarding gate of terminal building at Deoghar Airport.png|thumb|Boarding gates]]


[[File:X-ray machine and Security checks area inside terminal at Deoghar Airport.png|thumb|X-ray machines and security check areas]]
 
 
 
 
 


==Airlines and destinations==
==Airlines and destinations==

Latest revision as of 19:16, 31 July 2023


Deoghar Airport
File:Terminal building night view at Deoghar Airport.png
Terminal building at Deoghar Airport
Summary
Airport typePublic (will be used by DRDO also)
OwnerAirports Authority of India
ServesDeoghar
LocationKunda, Deoghar, Jharkhand
Opened12 July (Expected)2022[3]
Elevation AMSL833 ft / 254 m
Coordinates24°26′41″N 086°42′09″E / 24.44472°N 86.70250°E / 24.44472; 86.70250
Map
DGH is located in Jharkhand
DGH
DGH
Location in Jharkhand
DGH is located in India
DGH
DGH
Location in India
Runways
Direction Length Surface
ft m
09/27 8,202 2,500 Concrete

Deoghar Airport (IATA: DGH, ICAO: VEDO)[4][5] also known as Baba Baidyanath Airport, is located in Deoghar, Jharkhand India. The airport is spread over 654 acres (265 ha). The airport has a 2500 meter long runway, capable of handling both Airbus A320 and Boeing 737 type of aircraft.[6] Prime Minister Narendra Modi laid the foundation stone of development of the airport in Jharkhand on 25 May 2018.[7]

Development[edit | edit source]

The Government of Jharkhand had signed a Memorandum of Understanding (MoU) with the Airports Authority of India (AAI) in 2013, to develop the airport, to promote religious tourism in the state.[8]

The Government later signed a tripartite MoU with the AAI and Defence Research and Development Organisation (DRDO) in March 2017, to develop the airport for non-military use of Airbus A320 category aircraft.[9]


As of February 2022, the airport is completed, with currently the ATC testing being underway. The airport is expected to become operational in March 2022, likely after the festival of Holi.[10]

As of April 2022, the airport has received its license issued by Directorate General of Civil Aviation, India (DGCA) for regular use of the airport for flight operations, under public use category.[11]

As of June 2022, IndiGo did its maiden trial flight to the airport from Netaji Subhas Chandra Bose International Airport before its commercial operations. The flight successfully managed to perform smooth take-off and landing multiple times without any hurdles, which clears that the airport is capable and fit for commercial operations.[12] The airport will be inaugurated by Prime Minister Narendra Modi on 12 July 2022.[13]

Infrastructure[edit | edit source]

AAI has built the airport at a cost of ₹ 400 crore. It includes the construction of the runway, having a length of 2,500 m (8,200 ft) and 45 m (148 ft) wide, construction of a 4,000-square-metre (43,000 sq ft) terminal building can handle 200 passengers per hour, an Air Traffic Control (ATC) tower, an apron for two Airbus A320s, taxiways and an isolation bay.

2500 m fully flattened concrete runway at Deoghar

The terminal building has six check-in counters and two arrival belts with a peak hour handling capacity of 200 passengers.The design of the terminal building is inspired from the Baidyanath Temple's structure, and there are murals and paintings of Adivasi art, handicrafts and local tourist sites inside the airport. A DVOR/DME navigational facility is also planned. Construction commenced in January 2018 and completed in June 2022

The adequate infrastructure and basic public facilities have been put in place in the terminal ensuring convenient and user-friendly experience for passengers thereby smooth flight operations from the airport.






Airlines and destinations[edit | edit source]

AirlinesDestinations
IndiGoBangalore, Delhi (both begin from 22 July 2022)[14], Kolkata, Mumbai, (both begin from 12 July 2022)[15]

See also[edit | edit source]

References[edit | edit source]

  1. "Airline and Location Code Search".
  2. https://aim-india.aai.aero/sites/default/files/aip_supplements/AIPS_2022_35_0.pdf Template:Bare URL PDF
  3. "Deoghar: देवघर में जल्द शुरू होगा एयरपोर्ट, 12 जुलाई को पीएम मोदी करेंगे उद्घाटन". Zee News. Retrieved 14 June 2022.
  4. "Deoghar Airstrip (IN-0090) @ OurAirports". ourairports.com.
  5. "Airline and Location Code Search". www.iata.org. Retrieved 2022-03-13.
  6. "Airport construction will lead to development of Dhalbhumgarh area: CM". The Pioneer. 11 January 2019. Retrieved 30 July 2019.
  7. "PM Modi Lays Foundation Stone Of Deoghar Airport In Jharkhand; CM Says Committed To Begin Flights From Districts". Businessworld. 27 May 2018. Retrieved 30 July 2019.
  8. "Jharkhand To Get International Airport At Deoghar". iGovernment. 12 December 2013. Retrieved 26 March 2017.
  9. "Jharkhand inks MoU for Deoghar International airport expansion". Hindustan Times. 26 March 2017. Retrieved 26 March 2017.
  10. "होली के बाद देवघर एयरपोर्ट से शुरू हो सकती है उड़ान". NEWSWING. 2022-02-10. Retrieved 2022-02-12.
  11. "Deoghar Airport: मिली DGCA की हरी झंडी, अब किसी भी दिन शुरू हो सकती है देवघर अंतर्राष्‍ट्रीय हवाई अड्डे से उड़ान". Dainik Jagran (in हिन्दी). Retrieved 2022-06-11.
  12. "Local boy touches down in Deoghar airport trial run". The Times of India. June 9, 2022.
  13. "Airport will start soon in Deoghar PM Modi will inaugurate on July 12 know all details in Hindi | Deoghar: देवघर में जल्द शुरू होगा एयरपोर्ट, 12 जुलाई को पीएम मोदी करेंगे उद्घाटन | Hindi News, Jharkhand". zeenews.india.com. Retrieved 2022-06-14.
  14. "Deoghar Airport: 12 जुलाई को पीएम करेंगे उद्घाटन, कोलकाता, रांची और पटना के लिए शुरू होगी उड़ान". Jagran (in Hindi). Retrieved 30 June 2022.
  15. "Deoghar Airport: देवघर एयरपोर्ट से दिल्ली, मुंबई व बेंगलुरु के लिए कब से शुरू होगी इंडिगो की हवाई सेवा". Prabhat Khabar (in Hindi). Retrieved 16 June 2022.