>Vinn03 Year |
m brief adjusted intro after review and added references based on references |
||
| Line 1: | Line 1: | ||
{{Use dmy dates|date= | {{Short description|Road in India}} | ||
{{Use dmy dates|date=January 2025}} | |||
{{Use Indian English|date=June 2016}} | {{Use Indian English|date=June 2016}} | ||
{{Infobox Bridge | {{Infobox Bridge | ||
|bridge_name= | |bridge_name= Electronic City Elevated Expressway | ||
|image= | |image= Bangalore Elevated highway (4910689177).jpg | ||
|caption= | |caption= Electronic City elevated expressway | ||
|official_name= | |official_name= | ||
|carries= | |other_name='''Electronic City Expressway'''<br/>'''Electronic City Flyover'''<br>'''Bengaluru City Expressway'''<br/>'''Hosur Road Expressway'''|carries= Road traffic | ||
|crosses= [[ | |crosses= [[Bommanahalli]]<br/>Garvebhavipalya<br/>Kudlu Gate<br/>[[Singasandra]]<br/>Hosa Road<br/>[[Bangalore–Mysore Infrastructure Corridor]]<br/>Konappana Agrahara | ||
|locale= [[ | |locale= [[Bangalore]] | ||
|design= [[Reinforced concrete|RCC precast structure]] | |design= [[Reinforced concrete|RCC precast structure]] | ||
|length= {{cvt|9.985|km|mi}} <ref name="nhdppp3">{{cite web|url=http://www.nhai.org/nhdpphase3.asp|title=Completed Stretches of NHDP Phase 3|publisher=[[National Highways Authority of India]]|access-date=18 May 2012|archive-url=https://web.archive.org/web/20120517221019/http://www.nhai.org/nhdpphase3.asp|archive-date=17 May 2012|url-status=dead}}</ref> | |length= {{cvt|9.985|km|mi}}<ref name="nhdppp3">{{cite web|url=http://www.nhai.org/nhdpphase3.asp|title=Completed Stretches of NHDP Phase 3|publisher=[[National Highways Authority of India]]|access-date=18 May 2012|archive-url=https://web.archive.org/web/20120517221019/http://www.nhai.org/nhdpphase3.asp|archive-date=17 May 2012|url-status=dead}}</ref> | ||
|height={{cvt|17|m|ft}} | |height={{cvt|17|m|ft}} | ||
|starts= | |starts= Roopena Agrahara | ||
|ends= | |ends= [[Electronic City]] | ||
|website = http://www.blrelevated.co.in | |website = http://www.blrelevated.co.in | ||
}} | }} | ||
'''Electronic City Elevated Expressway''' | The '''Electronic City Elevated Expressway''' is a {{cvt|9.985|km|mi}} long elevated highway from [[Silk Board junction]] to [[Electronic City]] in [[Bengaluru]], India. The project was part of the BETL (Bengaluru Elevated Tollways Ltd), project as part of the [[National Highways Development Project]] and the Elevated Highways Project. It was initiated in early 2006, and was inaugurated on 22 January 2010.<ref>{{cite web|url=http://www.deccanherald.com/content/48391/expressway-elevates-commuting.html|title=Expressway Elevates Commuting|work=Deccan Herald}}</ref> Operating at a height of {{cvt|17|m|ft}}, it was Bangalore's tallest [[Overpass|flyover]] at the time of its opening.<ref name="height">{{cite news|url=http://articles.timesofindia.indiatimes.com/2005-09-09/bangalore/27853160_1_bmic-project-bmic-road-flyover|archive-url=https://web.archive.org/web/20120426183717/http://articles.timesofindia.indiatimes.com/2005-09-09/bangalore/27853160_1_bmic-project-bmic-road-flyover|url-status=dead|archive-date=26 April 2012|title=56-foot-high highway to fly over BMIC road|author=Sowmya Aji Mehu|date=9 September 2005|access-date=31 March 2011|work=[[The Times of India]]|location=Bangalore}}</ref> | ||
The elevated expressway | The elevated expressway has helped to reduce the commute time to the tech hub of [[Electronic City]] greatly. | ||
The [[Bruhat Bengaluru Mahanagara Palike]] and [[Bangalore Development Authority]] had planned a series of [[Overpass|flyovers]] and [[underpass]]es to make this arterial [[Hosur Road]] signal free.<ref name="wideningsignalfree">{{cite news|url=http://epaper.timesofindia.com/Repository/ml.asp?Ref=QkdNSVIvMjAwOS8xMC8yNyNBcjAwNTAw&Mode=HTML&Locale=english-skin-custom|title=Hosur Road widening is in full swing|author=Manasi|date=27 October 2009|work=Bangalore Mirror|access-date=27 March 2011|location=Bangalore|archive-url=https://web.archive.org/web/20120829211630/http://epaper.timesofindia.com/Repository/ml.asp?Ref=QkdNSVIvMjAwOS8xMC8yNyNBcjAwNTAw&Mode=HTML&Locale=english-skin-custom|archive-date=29 August 2012|url-status=dead}}</ref> | |||
==Exits== | ==Exits== | ||
Electronic City Elevated Expressway | {{Cleanup road junction list|date=November 2021}} | ||
The Electronic City Elevated Expressway has 3 exits in [[Electronic City]] which were, one directing towards [[Electronic City|Electronic City Phase 1]] on the right side with both upward and downward ramp, second one directing [[Electronic City|Electronic City Phase 2]] on the left side with downward ramp and a straight third one directing towards [[Hosur]] on [[National Highway 44 (India)|NH 44]] with both upward and downward ramps. | |||
==See also== | |||
* [[Infrastructure in Bengaluru]] | |||
* [[Inner Ring Road, Bengaluru]] | |||
* [[Outer Ring Road, Bengaluru]] | |||
* [[Bangalore–Mysore Infrastructure Corridor|NICE Road]] | |||
* [[Peripheral Ring Road]] | |||
* [[Satellite Town Ring Road]] | |||
==References== | ==References== | ||
| Line 31: | Line 42: | ||
[[Category:Expressways in Karnataka]] | [[Category:Expressways in Karnataka]] | ||
[[Category:Roads in | [[Category:Roads in Bengaluru]] | ||
Latest revision as of 23:35, 23 January 2025
Electronic City Elevated Expressway | |
|---|---|
![]() Electronic City elevated expressway | |
| OS grid reference | Template:Gbmappingsmall |
| Carries | Road traffic |
| Crosses | Bommanahalli Garvebhavipalya Kudlu Gate Singasandra Hosa Road Bangalore–Mysore Infrastructure Corridor Konappana Agrahara |
| Locale | Bangalore |
| Begins | Roopena Agrahara |
| Ends | Electronic City |
| Other name(s) | Electronic City Expressway Electronic City Flyover Bengaluru City Expressway Hosur Road Expressway |
| Website | www |
| Characteristics | |
| Design | RCC precast structure |
| Total length | 9.985 km (6.204 mi)[1] |
| Height | 17 m (56 ft) |
| Location | |
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | |
The Electronic City Elevated Expressway is a 9.985 km (6.204 mi) long elevated highway from Silk Board junction to Electronic City in Bengaluru, India. The project was part of the BETL (Bengaluru Elevated Tollways Ltd), project as part of the National Highways Development Project and the Elevated Highways Project. It was initiated in early 2006, and was inaugurated on 22 January 2010.[2] Operating at a height of 17 m (56 ft), it was Bangalore's tallest flyover at the time of its opening.[3]
The elevated expressway has helped to reduce the commute time to the tech hub of Electronic City greatly. The Bruhat Bengaluru Mahanagara Palike and Bangalore Development Authority had planned a series of flyovers and underpasses to make this arterial Hosur Road signal free.[4]
Exits[edit | edit source]
Template:Cleanup road junction list The Electronic City Elevated Expressway has 3 exits in Electronic City which were, one directing towards Electronic City Phase 1 on the right side with both upward and downward ramp, second one directing Electronic City Phase 2 on the left side with downward ramp and a straight third one directing towards Hosur on NH 44 with both upward and downward ramps.
See also[edit | edit source]
- Infrastructure in Bengaluru
- Inner Ring Road, Bengaluru
- Outer Ring Road, Bengaluru
- NICE Road
- Peripheral Ring Road
- Satellite Town Ring Road
References[edit | edit source]
- ↑ "Completed Stretches of NHDP Phase 3". National Highways Authority of India. Archived from the original on 17 May 2012. Retrieved 18 May 2012.
- ↑ "Expressway Elevates Commuting". Deccan Herald.
- ↑ Sowmya Aji Mehu (9 September 2005). "56-foot-high highway to fly over BMIC road". The Times of India. Bangalore. Archived from the original on 26 April 2012. Retrieved 31 March 2011.
- ↑ Manasi (27 October 2009). "Hosur Road widening is in full swing". Bangalore Mirror. Bangalore. Archived from the original on 29 August 2012. Retrieved 27 March 2011.

