Dear reader, We need your support to keep the flame of knowledge burning bright! Our hosting server bill is due on June 1st, and without your help, Bharatpedia faces the risk of shutdown. We've come a long way together in exploring and celebrating our rich heritage. Now, let's unite to ensure Bharatpedia continues to be a beacon of knowledge for generations to come. Every contribution, big or small, makes a difference. Together, let's preserve and share the essence of Bharat.
Thank you for being part of the Bharatpedia family! 0% transparency: ₹0 raised out of ₹100,000 (0 supporter) |
Faridabad–Noida–Ghaziabad Expressway | |
---|---|
FNG Expressway | |
Route information | |
Length | 56 km (35 mi) |
Status | Under-construction |
Existed | 2022 (expected)–present |
Major junctions | |
North end | Ghaziabad |
South end | Faridabad |
Location | |
States | Uttar Pradesh and Haryana |
Major cities | Ghaziabad, Noida, Greater Noida and Faridabad |
Highway system | |
|
The Faridabad–Noida–Ghaziabad Expressway or FNG Expressway is an under-construction 56 km long, 6-lane wide (expandable to 8) expressway in Delhi NCR region of India. It will connect Faridabad in Haryana with Noida and Ghaziabad in Uttar Pradesh.
Route[edit]
The expressway is around 56 km long with 20 km in Noida–Greater Noida region, 8 km in Ghaziabad, while the remaining 28.1km is in the Faridabad region, especially the developing sectors of Neharpar. According to the plan, the expressway from Noida side will become operational in the next 14 months, while it would take three years for the whole stretch to become fully operational.[1]
Design[edit]
The completed expressway designed by IIT-Roorkee will offer commuters direct connectivity between Noida and Greater Faridabad[2] A bridge is also planned from Noida's Sector 150 to National Highway 19 in Faridabad as a part of the FNG (Faridabad–Noida–Ghaziabad Expressway).
Status Updates[edit]
- Sep 2014: Work is under progress on the Uttar Pradesh part of the upcoming expressway.[3][4]
- Oct 2015: 70% work on Noida part is completed. Work not started in Faridabad part.
- Oct 2015: National Highways Authority of India (NHAI) takes over the project.
- Dec 2017: Work on expressway to start in 2018.
- Apr 2018: Work on expressway started in Noida.
See also[edit]
References[edit]
- ↑ "Article Window". epaper.timesofindia.com.
- ↑ "Archived copy". Archived from the original on 27 January 2016. Retrieved 27 July 2015.
{{cite web}}
: CS1 maint: archived copy as title (link) - ↑ "FNG cleared of squatters".
- ↑ "Noida plans a double-decker elevated road".