INS Vikrant (2013)

From Bharatpedia, an open encyclopedia
Information red.svg
Scan the QR code to donate via UPI
Dear reader, We need your support to keep the flame of knowledge burning bright! Our hosting server bill is due on June 1st, and without your help, Bharatpedia faces the risk of shutdown. We've come a long way together in exploring and celebrating our rich heritage. Now, let's unite to ensure Bharatpedia continues to be a beacon of knowledge for generations to come. Every contribution, big or small, makes a difference. Together, let's preserve and share the essence of Bharat.

Thank you for being part of the Bharatpedia family!
Please scan the QR code on the right click here to donate.

0%

   

transparency: ₹0 raised out of ₹100,000 (0 supporter)



IAC1 Vikrant with INS Kolkata (D63) during sea trial (cropped).jpg
Vikrant with Kolkata during her sea trials
History
India
Name: Vikrant
Namesake: Vikrant (1961)
Operator: Indian Navy
Ordered: 2004
Builder: Cochin Shipyard Limited
Cost: 23,000 crore (US$3.2 billion)[1][2]
Laid down: 28 February 2009
Launched: 12 August 2013
Acquired: 28 July 2022 [3]
Commissioned: 2 September 2022
Identification: Pennant number: R11
Motto:
  • जयेम सं युधिस्पृधः (Sanskrit)
  • "I defeat those who fight against me" (translated)
Status: In active service[4][5]
Badge: INS Vikrant crest.jpg
General characteristics
Displacement:
Length: 262 m (860 ft)
Beam: 62 m (203 ft)
Height: 59 m (194 ft)[7]
Draught: 8.4 m (28 ft)
Depth: 25.6 m (84 ft)
Decks: 14
Installed power:
Propulsion: Two shafts
Speed: 30 kn (56 km/h; 35 mph)[9]
Range: 8,000 nmi (15,000 km; 9,200 mi)[10]
Crew: 196 officers, 1,449 sailors (including air crew)[11]
Sensors and
processing systems:
Electronic warfare
& decoys:
DRDO Shakti EW suite[9]
Armament:
Aircraft carried:

INS Vikrant (pronounced [vikrɑːnt̪])[18] is an aircraft carrier constructed by the Cochin Shipyard Limited (CSL) at Kerala for the Indian Navy. It is the first aircraft carrier to be built in India. It is named Vikrant as a tribute to India's first aircraft carrier, INS Vikrant (1961). The name Vikrant means "courageous" in Sanskrit.[19] The motto of the ship, "जयेम सं युधिस्पृधः", means "I defeat those who fight against me".

Up to 26 MiG-29K[20] fighter jets along with 4 Kamov Ka-31[21] helicopters or 2 HAL Dhruv NUH[22] utility helicopters or 4 MH-60R[23] multi-role helicopters[2] will fly from INS Vikrant. At a 262-metre (860 ft) length, with a top speed of 28 knots (52 km/h; 32 mph), and endurance of 7,500 nautical miles (13,900 km; 8,600 mi), the ship has 2,300 compartments manned by 1700 seamen. It has a hospital complex, cabins for female officers, two football field-sized flight decks, 8 kilometres (5.0 mi)* of corridors, and eight generators capable of lighting up a city of 2 million people.[24]

Work on the ship's design began in 1999, and the keel was laid in 2009. The carrier was floated out of dry dock on 29 December 2011[25] and launched on 12 August 2013.[26] Basin trials were completed in December 2020,[27] and sea trials started in August 2021.[28] Her commissioning ceremony was held on 2 September 2022.[29] Aircraft flight trials will be completed in 2023.[28][30] The total cost of the project is approximately 230 billion (US$3.2 billion) at the time of first sea trials.[1][2]

Background[edit]

In 1999, Defence Minister George Fernandes authorised the development and construction of an aircraft carrier, INS Vikrant, under the Project 71 Air Defence Ship (ADS).[31] By that time, given the ageing Sea Harrier fleet, the letter of intent called for a carrier that would carry more modern jet fighters. In 2001, Cochin Shipyard Limited (CSL) released a graphic illustration showing a 32,000-tonne (31,000-long-ton; 35,000-short-ton) STOBAR (Short Take-Off But Arrested Recovery) design with a pronounced ski jump.[32] The aircraft carrier project finally received formal government approval in January 2003. By then, design updates called for a 37,500-tonne (36,900-long-ton; 41,300-short-ton) carrier to operate the Mikoyan MiG-29K. India opted for a three-carrier fleet consisting of one carrier battle group stationed on each seaboard, and a third carrier held in reserve, in order to continuously protect both its flanks, to protect economic interests and mercantile traffic, and to provide humanitarian platforms in times of disasters, since a carrier can provide a self-generating supply of fresh water, medical assistance or engineering expertise to populations in need for assistance.[33]

In August 2006, Chief of the Naval Staff Admiral Arun Prakash stated that the designation for the vessel had been changed from Air Defence Ship (ADS) to Indigenous Aircraft Carrier (IAC). The euphemistic ADS had been adopted in planning stages to ward off concerns about a naval build-up. Final revisions to the design increased the displacement of the carrier from 37,500 tons to over 45,000 tons. The length of the ship also increased from 252 metres (827 ft) to 262 metres (860 ft).[34]

Design[edit]

The indigenous aircraft carrier INS Vikrant is 262 metres (860 ft) long and 62 metres (203 ft) wide, and displaces about 45,000 tonnes (44,000 long tons; 50,000 short tons).[35] It features a STOBAR configuration[36] with a ski-jump. The deck is designed to enable aircraft such as the MiG-29K to operate from the carrier. It is expected to carry an air group of up to thirty aircraft, which will include up to 24–26 fixed-wing combat aircraft,[37] primarily the MiG-29K, besides carrying 10 HAL Dhruv or Sikorskey MH 60R Romeo helicopters. The Ka-31 will fulfill the airborne early warning (AEW) role and the Sea King will provide anti-submarine warfare (ASW) capability.[38][39]

A schematic diagram of INS Vikrant

Vikrant is powered by four General Electric LM2500+ gas turbines on two shafts, generating over 80 megawatts (110,000 hp) of power. The gearboxes for the carriers were designed and supplied by Elecon Engineering.[25][40][41]

The ship's combat management system (CMS) was developed by Tata Power Strategic Engineering Division in collaboration with Weapon and Electronics System Engineering Establishment and MARS, Russia. It is the first CMS developed by a private company for the Indian Navy, and was handed over to the Navy on 28 March 2019.[42][43]

Carrier Air Group[edit]

India considered a number of aircraft for operation from its aircraft carrier, INS Vikramaditya and the planned indigenous aircraft carrier. India evaluated the Russian Sukhoi Su-33, but chose the lighter MiG-29K as Vikramaditya was smaller and lacked an aircraft catapult.[44] On 18 January 2010, it was reported that India and Russia were close to signing a deal for 29 MiG-29K fighters to operate from IAC-1.[45] In addition, the Navy signed a deal for six naval-variants of the indigenous HAL Tejas.[46] In June 2012, Flight Global reported that the Indian Navy was considering the use of the Dassault Rafale M (Naval variant) on these carriers.[47] On 6 January 2022, The Indian Navy started testing the Rafale-M for operations from INS Vikrant at the shore-based test facility at INS Hansa in Goa. Some reports citing the same also indicated that the Boeing F/A-18E/F Super Hornet would be tested at the same locale in March 2022[48][49][50][51]

In December 2016, the Navy announced that the HAL Tejas was overweight for carrier operations, and other alternatives would be looked at.[52][53] The Navy settled with MiG-29K as the primary aircraft for the IAC-1.[54][55]

In late January 2017, the Indian Navy released an international Request for Information (RFI) for 57 "Multi-Role Carrier Borne Fighters". The main contest was between the Boeing F/A-18E/F Super Hornet and the Dassault Rafale-M. Both these aircraft are operable on the Vikrant and Vikramaditya.[56] In December 2020, Boeing demonstrated F/A-18E/F operations from Indian carriers at the shore-based test facility at Naval Air Station Patuxent River in Maryland, US.[57][58] In mid 2020, the Navy announced that it was seeking 36 fighters instead of the initial 57 proposed due to budgetary constraints.[59]

After the HAL Tejas and the Tejas Mk2 were considered overweight for carrier operations, the Defence Research and Development Organization introduced a program to develop a twin-engine, carrier based, multirole combat aircraft called the HAL Twin Engine Deck Based Fighter (TEDBF) for the Indian Navy. A model of the aircraft was displayed at Aero India 2021. The first flight is expected in 2026 with induction into the forces by 2032. The TEDBF is expected to perform multiple roles like combat air patrol, air-to-air combat, anti-ship strike and buddy refueling.[60] This aircraft has also been envisioned to operate from the INS Vikrant, INS Vikramaditya and the future aircraft carrier INS Vishal.

Construction[edit]

IAC-1 on its maiden sea voyage.

Vikrant is the first aircraft carrier to be designed by the Warship Design Bureau (formerly Directorate of Naval Design) of the Indian Navy and the first warship to be built by Cochin Shipyard. Its construction involved participation of a large number of private and public firms.

The Defence Metallurgical Research Laboratory (DMRL) and Steel Authority of India Limited (SAIL) created facilities to manufacture the DMR 249 grade steel in India.[25][61] Reportedly, 26,000 tonnes (26,000 long tons; 29,000 short tons) of three types of special steel for the hull, flight deck and floor compartments were manufactured at the Bokaro Steel Plant, Jharkhand, Bhilai Steel Plant, Chhattisgarh and Rourkela Steel Plant, Odisha. Due to this, Vikrant is the first ship of the Indian Navy to be built completely using domestically produced steel.[62] The main switch board, steering gear and water tight hatches have been manufactured by Larsen & Toubro in Mumbai and Talegaon; high-capacity air conditioning and refrigeration systems have been manufactured in Kirloskar Group's plants in Pune; most pumps have been supplied by Best and Crompton; Bharat Heavy Electricals (BHEL) supplied the Integrated Platform Management System (IPMS), which is being installed by Avio, an Italian company; the gear box was supplied by Elecon Engineering; and the electrical cables are being supplied by Nicco Industries.[63] Fincantieri provided consultancy for the propulsion package while Russia's Nevskoye Design Bureau designed the aviation complex.[64]

The keel for Vikrant was laid by Defence Minister A.K. Antony at the Cochin Shipyard on 28 February 2009.[65][66][67] The ship uses modular construction, with 874 blocks joined for the hull. By the time the keel was laid, 423 blocks weighing over 8,000 tons had been completed.[68] In August 2011, the Defence Ministry reported to the Lok Sabha that 75% of the construction work for the hull of the lead carrier had been completed and the carrier would be first launched in December 2011, following which further works would be completed until commissioning.[69][70] On 29 December 2011, the completed hull of the carrier was first floated out of its dry dock at CSL, with its displacement at over 14,000 tonnes (14,000 long tons; 15,000 short tons).[40] Interior works and fittings on the hull would be carried out until the second half of 2012, when it would again be dry-docked for integration with its propulsion and power generation systems.[10][25] By late 2012, work commenced for the next stage of construction, which included the installation of the integrated propulsion system, the superstructure, the upper decks, the cabling, sensors and weapons.[71]

Launch[edit]

INS Vikrant during its launch in August 2013

In July 2013, Defence Minister Antony announced that Vikrant would be launched on 12 August at the Cochin Shipyard. The ship was launched by his wife, Elizabeth Antony, on 12 August 2013.[72]

According to Admiral Robin Dhowan, about 83% of the fabrication work and 75% of the construction work had been completed at the time of launching. He said that 90% of the body work of the aircraft carrier had been designed and made in India, about 50% of the propulsion system, and about 30% of its weaponry. He also said that the ship would be equipped with a long range missile system with multi-function radar and a close-in weapon system (CIWS).[73] After the launch, Vikrant would be re-docked for the second phase of construction, in which the ship would be fitted with various weapons and sensors, and the propulsion system, flight deck and the aircraft complex would be integrated.[63]

Undocking and fitting-out[edit]

INS Vikrant during its undocking in June 2015

Vikrant was undocked on 10 June 2015 after the completion of structural work. Cabling, piping, heat and ventilation works were scheduled to be completed by 2017 with sea trials to begin thereafter.[74] By October 2015, the construction of the hull was close to 98 percent complete, with flight deck construction underway.[75] The installation of machinery, piping and the propeller shafts was in progress by January 2016; it was reported, however, that there were delays in the delivery of equipment from Russia for the carrier's aviation complex.[76] By May 2017, the carrier's fitting-out was 62% complete, with trials of the auxiliary systems scheduled by late 2017.[11]

In February 2020, all major structural and outfitting work was declared complete.[77]

Harbour and sea trials[edit]

On 31 October 2019, Cochin Shipyard received a 30 billion (US$420 million) contract for the Phase-III of the project.[78] This contract included funds for the harbour trials, sea trials and support for the ship during its weapons and aviation trials after its delivery.[79] In December 2019, it was reported the engines had been switched on.[80] By September 2020, Vikrant had completed harbour trials while the basin trials started from October 2020 to check propulsion, electric transmission and shafting systems.[81] On 30 November 2020, the basin trials were completed, paving the way for sea trials, the final phase of the IAC-I project.[82][83]

Basin trials of the aircraft carrier.

In April 2021, it was reported work had begun to integrate the long-range surface-to-air missile (LRSAM) onboard Vikrant.[84][85][86] On 15 June 2021, Vikrant was moved to the Ernakulam Wharf in Kochi, Kerala.[87] On 4 August 2021, sea trials finally began.[88] The first phase of the sea trials was successfully completed on 8 August 2021.[89] The second phase of the trials was conducted on 24 October 2021,[90] followed by the third phase from 9–17 January 2022,[91][92][93] both of which were completed successfully.[94] On 10 July, the fourth and final phase of the sea trials was successfully completed. This phase involved integrated trials of most of the equipment and systems aboard Vikrant, including portions of the Aviation Facilities Complex.[95]

A Westland WS-61 Sea King approaches Vikrant while on sea trials

Completion and commissioning[edit]

Prime Minister Narendra Modi commissioned INS Vikrant on 2 September 2022 in Kochi, Kerala.

Prime Minister Narendra Modi commissioned INS Vikrant on 2 September 2022 in a grand ceremony at Cochin Shipyard.[29][96] Earlier, INS Vikrant was delivered to the Indian Navy on 28 July 2022.[4] Flight trials of its aircraft complement are expected to be completed by mid-2023, after which the ship will be fully operational.[28] In March 2020, it was revealed that after its commissioning, the Navy will deploy Vikrant at Larsen & Toubro's shipyard in Kattupalli near Chennai. This was done as the planned naval base in Rambilli near Vishakhapatnam was not ready yet. The Navy wants to lease a 260 m berth at Kattupalli shipyard for 8 years between 2022 and 2030 for interim berthing of the ship, by which time the naval base at Rambilli is expected to be available.[97]

Commanding officers[edit]

Name Assumed office Left office Notes
Captain Vidhyadhar Harke VSM 7 May 2021 Present First CO of Vikrant.[98]

Project delays[edit]

The IAC project experienced numerous delays. The construction plan originally called for the carrier to be launched in 2010, when it would displace some 20,000 tonnes (20,000 long tons; 22,000 short tons), as a larger displacement could not be accommodated in the building bay. It was planned that after about a year's development in the refit dock, the carrier would be launched when all the major components, including underwater systems, would be in place. Outfitting would then be carried out after launch. Vikrant was intended to be delivered in December 2010[99] and commissioned in 2016. As per the Cabinet Committee on Security (CCS), sea trials were initially planned to commence in 2013, with the ship to be commissioned in 2014.[100][101] This was later postponed, with sea trials to begin in 2017 and commissioning planned for 2018.[102] In March 2011, it was reported that the project had been affected by the delay in the delivery of the main gearboxes for the carrier. The supplier, Elecon, attributed it to having to work around a number of technical complexities due to the length of the propulsion shafts.[103] Other issues resulting in delays included an accident with a diesel generator and an issue with its alignment.[104] In July 2012, The Times of India reported that construction of Vikrant had been delayed by three years, and the ship would be ready for commissioning by 2018.[105] Later, in November 2012, Indian English-language news channel NDTV reported that the cost of the aircraft carrier had increased and the delivery has been delayed by at least five years and is expected to be with the Indian Navy only after 2018 as against the scheduled date of delivery of 2014.[106]

In July 2016, the Comptroller & Auditor General (CAG) published a 2014 project plan, supplied by the Cochin Shipyard, that showed an expected completion date in 2023,[99] though the Navy hoped to partially commission the ship before this date.[107] In December 2017, the Chief of Naval Staff Admiral Sunil Lanba announced that the ship was expected to commence sea trials and be commissioned in 2020.[102][108] In January 2018, Commodore J Chowdhary, the principal director of naval design, announced the remaining procurement delays stalling Vikrant's construction had been resolved, and that the carrier would be completed and delivered by December 2018; it would then undergo two years of sea trials before its then-expected commissioning in October 2020.[109]

During the December 2019 Navy Day press briefing, Chief of Naval Staff Admiral Karambir Singh said Vikrant would be fully operational before the end of 2022.[110] A part of the blame for the delay in delivery of Vikrant was attributed to the delay in the supply of aviation equipment from Russia. In response to a question in the Rajya Sabha, Sripad Naik, the Minister of State for Defence, stated: "Ship's targeted delivery was affected due to delay in supply of aviation equipment from Russia".[111] The Navy expected to commission Vikrant by the end of 2021,[81] with an April 2021 report by the Hindustan Times claiming Vikrant, along with the stealth guided missile destroyer INS Visakhapatnam, would be delivered to the Indian Navy by the end of 2021.[112][113] Other construction and procurement delays initially delayed the warship's sea trials to April 2020 from their originally scheduled date of 12 March 2020. Due to the Covid-19 pandemic, trials were further postponed to late 2020,[110] but ultimately began in August 2021. The carrier was commissioned on 2 September 2022.[114][115][116]

See also[edit]

References[edit]

  1. 1.0 1.1 "India's first indigenous aircraft carrier INS Vikrant sets off for sea trials from Kochi". The New Indian Express. 4 August 2021. Archived from the original on 5 August 2021. Retrieved 4 August 2021.
  2. 2.0 2.1 2.2 "IAC Vikrant, India's first indigenously-built aircraft carrier, to be commissioned on September 2". msn. Retrieved 23 August 2022.
  3. "Indigenous aircraft carrier INS Vikrant handed over to Indian Navy". 29 July 2022. Archived from the original on 28 July 2022. Retrieved 28 July 2022.
  4. 4.0 4.1 "Delivery of Indigenous Aircraft Carrier (IAC) 'Vikrant'". Press Information Bureau of India. 28 July 2022. Archived from the original on 29 August 2022. Retrieved 28 August 2022.
  5. "Aircraft carrier Vikrant completes third sea trials, returns to Kochi harbour". The New Indian Express. Archived from the original on 15 May 2022. Retrieved 17 January 2022.
  6. Farley, Robert. "An Update on India's Aircraft Carrier Aspirations". thediplomat.com. Archived from the original on 20 January 2022. Retrieved 25 October 2020.
  7. "Commencement of Sea Trials of Indigenous Aircraft Carrier IAC-P71 "VIKRANT"". Press Information Bureau. Government of India. 4 August 2021. Archived from the original on 27 February 2022. Retrieved 6 August 2021.
  8. "LM2500 Engines To Power India's First Indigenous Aircraft Carrier". Naval News.
  9. 9.0 9.1 "Indigenous Aircraft Carrier, to be named INS Vikrant, is biggest ship made in India". The Hindu. Special Correspondent. 25 June 2021. ISSN 0971-751X. Archived from the original on 28 June 2021. Retrieved 10 July 2021.{{cite news}}: CS1 maint: others (link)
  10. 10.0 10.1 "India Floats out Its First Indigenous Aircraft Carrier". DefenceNow.com. 2 January 2012. Archived from the original on 13 February 2015. Retrieved 18 May 2015.
  11. 11.0 11.1 Anandan, S. (13 May 2017). "In the heart of the iron beast". The Hindu. Archived from the original on 28 August 2017. Retrieved 13 May 2017.
  12. "Annual Report 2019–20" (PDF). Cochin Shipyard Ltd. Archived (PDF) from the original on 18 October 2020. Retrieved 25 September 2020.
  13. "List of Aircraft Carriers Under Construction: 2013". World Defense Review. Archived from the original on 19 May 2015. Retrieved 17 May 2015.
  14. Navy to go for VISHAL | Vikrant's Lift 10x14m at YouTube
  15. "Vikrant's Lift 10x14m". YouTube.
  16. "How will American Super Hornet compete with French Rafale for multi-billion Indian Navy deal". www.timesnownews.com.
  17. "India to buy 26 fighters for INS Vikrant on G-2-G basis". Hindustan times. 30 May 2022. Retrieved 30 May 2022.
  18. Gady, Franz-Stefan. "India's First Homegrown Aircraft Carrier to Enter Sea Trials in Early 2020". The Diplomat. Archived from the original on 30 March 2019. Retrieved 5 April 2019.
  19. Singh, Harmeet (12 August 2013). "India unveils home-built aircraft carrier, INS Vikrant". CNN. Archived from the original on 17 May 2015. Retrieved 18 May 2015.
  20. "India to buy 26 fighters for INS Vikrant on G-2-G basis". Hindustan times. 30 May 2022. Archived from the original on 30 May 2022. Retrieved 30 May 2022.
  21. Raghuvanshi, Vivek (16 May 2022). "India halts Ka-31 helicopter deal with Russia". Defense News. Archived from the original on 4 September 2022. Retrieved 29 May 2022.
  22. "India's First Indigenous Aircraft Carrier - INS Vikrant". Archived from the original on 12 March 2016.
  23. Negi, Manjeet; Bhalla, Abhishek (17 July 2021). "Indian Navy receives first two 24 MH-60R helicopters from US". India Today. Archived from the original on 29 May 2022. Retrieved 18 July 2021.
  24. "IAC Vikrant, India's first indigenously-built aircraft carrier, to be commissioned on September 2". msn. Retrieved 23 August 2022.
  25. 25.0 25.1 25.2 25.3 Anandan, S.; Martin, K. A. (30 December 2011). "Navy floats out first Indigenous Aircraft Carrier". The Hindu. Archived from the original on 4 January 2012. Retrieved 18 May 2015.
  26. India launches first indigenous aircraft carrier INS Vikrant Archived 20 August 2016 at the Wayback Machine Times of India 12 August 2013
  27. "India's New Aircraft Carrier IAC 1 – INS Vikrant Passes Basin Trials". Naval News. 30 November 2020. Archived from the original on 30 November 2020. Retrieved 5 December 2020.
  28. 28.0 28.1 28.2 "India's first indigenous aircraft carrier, to be named INS Vikrant, finally begins sea trials". Times of India. Archived from the original on 4 August 2021. Retrieved 4 August 2021.
  29. 29.0 29.1 "PM Commissions INS Vikrant". Press Trust of India. 2 September 2022. Archived from the original on 4 September 2022. Retrieved 2 September 2022.
  30. "Navy's long-term plan is to have three aircraft carriers, says Navy chief Admiral Karambir Singh". Business Line. 3 December 2019. Archived from the original on 6 August 2021. Retrieved 4 December 2019.
  31. "Indian Aircraft Carrier (Project-71)". Bharat Rakshak. Archived from the original on 17 February 2012.
  32. John Pike. "Air Defense Ship". Globalsecurity.org. Archived from the original on 28 December 2010. Retrieved 1 February 2011.
  33. "India's Future Aircraft Carrier Force and the Need for Strategic Flexibility". idsa.in. Archived from the original on 6 April 2013. Retrieved 17 March 2019.
  34. "Antony lays keel of first Indigenous Aircraft Carrier". Pib.nic.in. Archived from the original on 14 January 2011. Retrieved 1 February 2011.
  35. Farley, Robert. "An Update on India's Aircraft Carrier Aspirations". thediplomat.com. Archived from the original on 20 January 2022. Retrieved 10 July 2021.
  36. Shrivastava, Sanskar (25 August 2013). "Comparison of Chinese Aircraft Carrier Liaoning and Indian INS Vikrant". The World Reporter. Archived from the original on 28 August 2013. Retrieved 18 May 2015.
  37. Ramsay, Sushil (March 2014). "Force Projection and Modernization of Indian Navy". SP's Naval Forces. pp. 4–6. Archived from the original on 4 May 2014. Retrieved 18 May 2015.
  38. Anandan, S. (29 September 2008). "Keel-laying of indigenous aircraft carrier in December". The Hindu. Archived from the original on 4 February 2016. Retrieved 18 May 2015.
  39. Simha, Rakesh Krishnan (5 December 2012). "Vikramaditya and Liaoning – forces of the future". IndRus. Retrieved 18 May 2015.
  40. 40.0 40.1 Vora, Rutan (26 December 2011). "Elecon to supply gears for India's first aircraft carrier". Business Standard. Archived from the original on 4 September 2022. Retrieved 18 May 2015.
  41. "India starts work on second indigenous aircraft carrier". The Economic Times. 16 July 2012. Archived from the original on 30 August 2017. Retrieved 18 May 2015.
  42. Gurung, Shaurya Karanbir (29 March 2019). "Indian Navy gets combat management system for INS Vikrant". The Economic Times. Archived from the original on 3 July 2019. Retrieved 3 July 2019.
  43. "Indian Navy gets most critical, made in India, CM system for its indigenous Aircraft Carrier". The Financial Express. 29 March 2019. Archived from the original on 3 July 2019. Retrieved 3 July 2019.
  44. "MiG-29 Shuts Down The Su-33". 13 October 2009. Archived from the original on 5 November 2012. Retrieved 31 December 2011.
  45. Pandit, Rajat (18 January 2010). "India, Russia to ink $1.2 bn deal for 29 more MiG-29Ks". The Times of India. Archived from the original on 2 February 2014.
  46. Sandeep Unnithan (2 December 2009). "First indigenous aircraft carrier to be launched next year: Navy chief: LATEST HEADLINES: India Today". Indiatoday.intoday.in. Archived from the original on 26 January 2010. Retrieved 1 February 2011.
  47. "IAC enters trial as navy eyes Rafale". Flight magazine. Archived from the original on 23 June 2012. Retrieved 1 August 2012.
  48. P, Rajat (6 January 2022). "Demonstration of Rafale fighter for Navy begins at Goa, F/A-18 next in March | India News - Times of India". The Times of India. Archived from the original on 6 January 2022. Retrieved 6 January 2022.
  49. "Navy to test Rafale-M jet for INS Vikrant". Hindustan Times. 1 January 2022. Archived from the original on 6 January 2022. Retrieved 6 January 2022.
  50. Dubois, Gastón (3 January 2022). "Rafale M to begin Ski-Jump take-off trials for Indian Navy". Aviacionline.com (in español). Archived from the original on 6 January 2022. Retrieved 6 January 2022.
  51. "Indian Navy to conduct flight tests of Rafale-M fighter jet". Naval Technology. 4 January 2022. Archived from the original on 6 January 2022. Retrieved 6 January 2022.
  52. "Navy rejects Tejas, says "overweight" fighter does not meet its requirements". The Times of India. Archived from the original on 6 December 2016. Retrieved 22 December 2016.
  53. "Navy rules out deploying "overweight" Tejas on aircraft carriers". indianexpress.com. 2 December 2016. Archived from the original on 20 December 2016. Retrieved 22 December 2016.
  54. "IAC-1 to be inducted into Indian Navy in 2020". Zee News. 4 December 2018. Archived from the original on 6 December 2018. Retrieved 18 February 2021.
  55. PTI (3 December 2018). "IAC-1 to be inducted into Indian Navy in 2020 | India News - Times of India". The Times of India. Archived from the original on 27 February 2021. Retrieved 18 February 2021.
  56. "Requests for proposals: Indian Navy looks to buy 57 fighters for Rs 95,000 crore". The Financial Express. 18 April 2018. Archived from the original on 29 April 2021. Retrieved 29 April 2021.
  57. Peri, Dinakar (21 December 2020). "F/A-18 operation on Indian carriers successfully demonstrated: Boeing". The Hindu. ISSN 0971-751X. Archived from the original on 10 March 2021. Retrieved 29 April 2021.
  58. "boeing: Boeing announces Super Hornet demonstrated compatibility with Indian carriers - The Economic Times". The Economic Times. Archived from the original on 29 April 2021. Retrieved 29 April 2021.
  59. "Indian Navy wants to join IAF in fighter jet shopping". THE HINDU. 6 December 2020. Archived from the original on 20 October 2021. Retrieved 5 August 2021.
  60. Sutton, H. I. (17 March 2021). "India's New Aircraft Carrier, Vikrant, May Get 5th-Generation Fighter". NAVAL NEWS. Archived from the original on 4 August 2021. Retrieved 10 June 2021.
  61. Shukla, Ajai (29 August 2013). "INS Vikrant's first victory: Being built from Indian steel". The Business Standard. Archived from the original on 5 March 2016. Retrieved 18 March 2015.
  62. Shukla, Ajai (7 August 2013). "INS Vikrant's first victory: being built from Indian steel". Business Standard. Archived from the original on 11 August 2013. Retrieved 18 May 2015.
  63. 63.0 63.1 "'Vikrant' Reborn in Indigenous Avtar". Indian Defence Review. 12 August 2013. Archived from the original on 26 February 2014. Retrieved 18 May 2015.
  64. "In the heart of the iron beast, INS Vikrant". The Hindu. 13 May 2017. Archived from the original on 28 August 2017. Retrieved 30 September 2017.
  65. "Govt overhauls coastal security; gives overall charge to Navy". dnaindia. Archived from the original on 10 April 2016. Retrieved 7 April 2016.
  66. "India overhauls coastal security, Navy gets charge". NDTV.com. 28 February 2009. Archived from the original on 8 September 2012. Retrieved 1 February 2011.
  67. "India to lay keel of new aircraft carrier on Saturday | World | RIA Novosti". En.rian.ru. 26 February 2009. Archived from the original on 5 June 2011. Retrieved 1 February 2011.
  68. Ray, Kaylan (1 March 2009). "India joins elite warships club". Deccan Herald. Archived from the original on 15 July 2012. Retrieved 18 May 2015.
  69. "Indigenous aircraft carrier launch this Dec". Zeenews. 2 August 2011. Archived from the original on 9 June 2015. Retrieved 18 May 2015.
  70. "First indigenous aircraft carrier to be completed by Dec: Govt". Ibnlive.in.com. 2 August 2011. Archived from the original on 7 November 2012.
  71. Pandit, Rajat (16 August 2014). "PM Modi inducts India's largest indigenously built warship INS Kolkata". The Times of India. Archived from the original on 2 October 2015. Retrieved 18 May 2015.
  72. "India launches home-built, 37,500-tonne aircraft carrier in a shot across the bow to China". National Post. Associated Press. 12 August 2013. Archived from the original on 14 August 2013. Retrieved 18 May 2015. The 37,500 tonne INS Vikrant is expected to go for extensive trials in 2016 before being inducted into the navy by 2017, reports say. With this, India joins the select group of countries comprising the United States, the United Kingdom, Russia and France capable of building such a vessel.
  73. Sen, Sudhi Ranjan (11 August 2013). "INS Vikrant, first Indian-made aircraft carrier, enters water next week". NDTV. Archived from the original on 14 December 2013. Retrieved 18 May 2015.
  74. Anandan, S. (10 June 2015). "Cochin Shipyard undocks INS Vikrant". The Hindu. Archived from the original on 17 July 2015. Retrieved 12 June 2015.
  75. Gupta, Jayanta (15 October 2015). "Aircraft carrier INS Vikrant will be delivered to Navy on time: Cochin Shipyard chief". The Times of India. Archived from the original on 18 October 2015. Retrieved 18 October 2015.
  76. "Navy chief reviews Vikrant project". The Hindu. 17 January 2016. Archived from the original on 17 January 2016. Retrieved 30 March 2016.
  77. Gurung, Shaurya Karanbir (10 February 2020). "Structural and outfitting work of India's first indigenous aircraft carrier complete". The Economic Times. Archived from the original on 10 November 2020. Retrieved 12 February 2020.
  78. "Cochin Shipyard hits 52-week high after bagging Rs 3,000-crore contract". Moneycontrol. 1 November 2019. Archived from the original on 1 November 2019. Retrieved 1 November 2019.
  79. Narasimhan, T. E. (1 November 2019). "Cochin Shipyard bags Rs 3,000 crore contract for aircraft carrier Vikrant". Business Standard India. Archived from the original on 1 November 2019. Retrieved 1 November 2019.
  80. Pubby, Manu (2 December 2019). "Engines fired up, basin trials next for Indigenous Aircraft Carrier". The Economic Times. Archived from the original on 12 February 2020. Retrieved 2 December 2019.
  81. 81.0 81.1 "India's first Indigenous Aircraft Carrier "ready" for basin trials in September". The New Indian Express. Archived from the original on 24 August 2020. Retrieved 23 August 2020.
  82. @DefencePROkochi (30 November 2020). "Tweet from Public Relations Ministry of Defence" (Tweet) – via Twitter.
  83. "Major Milestone Achieved by IAC - Basin Trials Successful". Indian Navy. 30 November 2020. Archived from the original on 14 March 2022. Retrieved 2 December 2020.
  84. "LRSAM system to equip the future Indian aircraft carrier INS Vikrant". www.navyrecognition.com. Archived from the original on 13 April 2021. Retrieved 13 April 2021.
  85. "INS Vikrant to get LRSAM Cover Soon". www.eletimes.com. 9 April 2021. Archived from the original on 10 April 2021. Retrieved 10 April 2021.
  86. "INS Vikrant to get LRSAM Cover Soon". Defence News India. 10 April 2021. Archived from the original on 10 April 2021. Retrieved 10 April 2021.
  87. "Outlook India Photo Gallery - Jun 15, 2021". www.outlookindia.com/. Archived from the original on 18 June 2021. Retrieved 18 June 2021.
  88. "India's first indigenous aircraft carrier, to be named INS Vikrant, finally begins sea trials". Times of India. Archived from the original on 4 August 2021. Retrieved 4 August 2021.
  89. "Vikrant successfully completes 5-day maiden sea voyage - Rediff.com". Archived from the original on 10 February 2022. Retrieved 11 August 2021.
  90. "India's first indigenous aircraft carrier, INS Vikrant begins second phase of sea trials". The Hindu. 24 October 2021. Archived from the original on 9 January 2022. Retrieved 24 October 2021.
  91. "India's first indigenous aircraft carrier INS Vikrant begins another set of sea trials". Archived from the original on 9 January 2022. Retrieved 9 January 2022.
  92. "Indigenous Aircraft Carrier Vikrant heads out for next round of sea trials". The Hindu. 9 January 2022. Archived from the original on 9 January 2022. Retrieved 9 January 2022.
  93. "India's first indigenous aircraft carrier Vikrant enters third phase of trials Top Points". India Today. 9 January 2022. Archived from the original on 9 January 2022. Retrieved 9 January 2022.
  94. "EXPLAINED: Why Indigenous Aircraft Carrier INS Vikrant Puts India In Select Group Of Nations". News18. 17 January 2022. Archived from the original on 18 January 2022. Retrieved 18 January 2022.
  95. "Indigenous Aircraft Carrier Vikrant: Completion of Fourth Phase of Sea Trials". Press Information Bureau of India. 10 July 2022. Archived from the original on 13 July 2022. Retrieved 13 July 2022.
  96. "INS Vikrant, 1st India-Made Aircraft Carrier, Commissioned By PM". NDTV.com. Archived from the original on 4 September 2022. Retrieved 2 September 2022.
  97. "Indian Navy to berth new aircraft carrier at private shipyard". Archived from the original on 21 September 2020. Retrieved 16 March 2020.
  98. Som, Vishnu (15 August 2021). "Vikrant, First Made-In-India Aircraft Carrier, Not A Liability: Navy". www.ndtv.com. Archived from the original on 16 August 2021. Retrieved 16 August 2021.
  99. 99.0 99.1 "CHAPTER II: PERFORMANCE AUDIT ON CONSTRUCTION OF INDIGENOUS AIRCRAFT CARRIER - page 39" (PDF). Comptroller and Auditor General (CAG) of India. Government of India. Archived (PDF) from the original on 28 July 2016. Retrieved 17 January 2020.
  100. Unnithan, Sandeep (18 February 2009). "Keel laying of indigenous aircraft carrier next week". Indiatoday. Archived from the original on 27 July 2009. Retrieved 18 May 2015.
  101. Sharma, Suman (7 October 2010). "Indigenous Aircraft Carrier's nucleus ready". Dnaindia.com. Archived from the original on 10 February 2011. Retrieved 18 May 2015.
  102. 102.0 102.1 "India's First Homegrown Aircraft Carrier to Begin Sea Trials in 2020". The Diplomat. Archived from the original on 5 December 2018. Retrieved 6 December 2018.
  103. Anandan, S. (12 March 2011). "Indigenous aircraft carrier a year behind schedule". The Hindu. Archived from the original on 14 December 2013. Retrieved 18 May 2015.
  104. Prasad, K.V. (3 December 2011). "INS Arihant on track". The Hindu. Archived from the original on 14 December 2013. Retrieved 18 May 2015.
  105. "India's first indigenous aircraft carrier to be inducted in 2018 - Times of India". The Times of India. Archived from the original on 17 December 2016. Retrieved 17 December 2016.
  106. Sen, Sudhi Ranjan (20 November 2012). "Indian aircraft carrier: More costly, already delayed". Ndtv.com. Archived from the original on 9 July 2014. Retrieved 18 May 2015.
  107. Pandit, Rajat. "India without aircraft carrier for 8 months". The Times of India. Archived from the original on 4 December 2016. Retrieved 17 November 2016.
  108. Gurung, Shaurya Karanbir (1 December 2017). "14 Chinese navy ships spotted in Indian Ocean, Indian Navy monitoring locations". The Economic Times. Archived from the original on 2 December 2017. Retrieved 2 December 2017.
  109. Peri, Dinakar (19 January 2018). "Navy confident of commissioning aircraft carrier Vikrant in two years". The Hindu. Archived from the original on 11 June 2022. Retrieved 4 February 2018.
  110. 110.0 110.1 "Delivery date of Indian Navy Aircraft Carrier INS Vikrant once again delayed". Navy Recognition. 25 May 2020. Archived from the original on 4 July 2020. Retrieved 24 August 2020.
  111. "Delay in supply of equipment from Russia affected delivery of India's aircraft carrier". Defence Star. 14 February 2020.
  112. "Indian Navy to get INS Vikrant and INS Visakhapatnam by end of 2021". www.navyrecognition.com. Archived from the original on 29 April 2021. Retrieved 29 April 2021.
  113. "Navy to get aircraft carrier Vikrant, missile destroyer Visakhapatnam in 2021". Hindustan Times. 27 April 2021. Archived from the original on 29 April 2021. Retrieved 29 April 2021.
  114. "INS Vikrant: India's first homegrown aircraft carrier puts it among world's naval elites - CNN". Archived from the original on 4 September 2022. Retrieved 2 September 2022.
  115. "INS Vikrant, "City on the Move": 18 Floors, 1,600 Crew, 16-Bed Hospital". Archived from the original on 4 September 2022. Retrieved 2 September 2022.
  116. "Inside India's newly-commissioned aircraft carrier". BBC News. 1 September 2022. Archived from the original on 3 September 2022. Retrieved 2 September 2022.

External links[edit]

Template:Aircraft carrier classes in service