Dear reader, We need your support to keep the flame of knowledge burning bright! Our hosting server bill is due on June 1st, and without your help, Bharatpedia faces the risk of shutdown. We've come a long way together in exploring and celebrating our rich heritage. Now, let's unite to ensure Bharatpedia continues to be a beacon of knowledge for generations to come. Every contribution, big or small, makes a difference. Together, let's preserve and share the essence of Bharat.

Thank you for being part of the Bharatpedia family!
Please scan the QR code on the right click here to donate.

0%

   

transparency: ₹0 raised out of ₹100,000 (0 supporter)


INS Kalvari (S21) at sea.jpg
Class overview
Name: Kalvari class
Builders: Mazagon Dock Limited
Operators:  Indian Navy
Preceded by:
Succeeded by: Project 75I-class submarine
Cost:
  • 23,652 crore (equivalent to 270 billion or US$3.8 billion in 2019) for six units
  • 3,942 crore (equivalent to 46 billion or US$640 million in 2019) per unit (FY 2016)
In commission: 2017 – present
Planned: 6[1]
Building: 1
Completed: 5
Active: 5
General characteristics
Type: Attack submarine
Displacement:
  • Surfaced: 1,615 tonnes (1,589 long tons)
  • Submerged: 1,775 tonnes (1,747 long tons)
Length: 67.5 m (221 ft 5 in)[2]
Beam: 6.2 m (20 ft 4 in)[3]
Height: 12.3 m (40 ft 4 in)[2]
Draught: 5.8 m (19 ft 0 in)[3]
Propulsion:
  • 4 x MTU 12V 396 SE84 diesel engines[3]
  • 360 x battery cells
  • DRDO PAFC Fuel Cell AIP (Expected to be added in 2023 onwards)
Speed:
  • Surfaced: 11 knots (20 km/h; 13 mph)
  • Submerged: 20 knots (37 km/h; 23 mph)
Range:
  • 6,500 nmi (12,000 km; 7,500 mi) at 8 kn (15 km/h; 9.2 mph) (surfaced)
  • 550 nmi (1,020 km; 630 mi) at 4 kn (7.4 km/h; 4.6 mph) (submerged)[4]
Endurance: 50 days[5]
Test depth: 350 metres (1,150 ft)[6]
Complement:
  • 8 officers
  • 35 sailors
Electronic warfare
& decoys:
C303/S anti-torpedo countermeasure system[7]
Armament:

The Kalvari class is a class of diesel-electric attack submarines based on the -class submarine being built for the Indian Navy. The class and submarines take their names from the first submarines inducted in the Indian Navy. The submarines are designed by French naval defence and energy company DCNS and are being manufactured by Mazagon Dock Limited in Mumbai.

Project history[edit]

In 1997, Indian Ministry of Defence approved a plan to acquire 24 submarines under Project 75. In 1998, India began negotiating with DCN for four Scorpène submarines with two to be built in Mazagon Dock Limited from knocked-down kits.[8] After the Kargil War in 1999, Cabinet Committee on Security approved a 30-year submarine building plan that called for two parallel production lines, each constructing six submarines. The older Project 75 was brought under the new plan, with the two production lines to be built under Project 75 and Project 75I using transfer of technology from different foreign manufacturers.[9] The negotiations were subsequently expanded to include Armaris, a joint venture of DCN and Thales, for six submarines to be built in Mazagon Dock Limited.[8]

On 6 October 2005, India signed a series of contracts for transfer of technology to construct six submarines in Mazagon Dock Limited with Armaris, supply of equipment and services with the Government of France and supply of SM39 Exocet missiles with MBDA. DCN International was designated as the prime contractor in partnership with Navantia. Armaris was responsible for supply of combat systems and technical advisors for construction of submarines at MDL. The entire programme was valued at €2.4 billion.[10] The deal included a 30% offset clause and the submarines were to be delivered over five years starting from 2012.[10][11] The Scorpène design won the deal because of the capability to fire Exocet anti-ship missiles and an agreement on the air-independent propulsion.[12] India cancelled plans to incorporate DRDO-developed air-independent propulsion system onto the last two submarines being built due to a delay in its development.[13] A plan to buy three more submarines under the options clause was cancelled in September 2016.[14]

Steel cutting for the first submarine began on 14 December 2006 and hull construction was started on 23 May 2007.[2][15] As of August 2014, the project was running four years behind schedule.[16] The delay has been attributed to slow finalisation of contracts for procurement of sensors and propulsion system components by Mazagon Dock Limited and DCNS.[17] The first submarine, INS Kalvari (Malayalam: tiger shark), was launched on 28 October 2015 and commenced sea trials on 1 May 2016.[2]

In June 2016, a plan to arm Kalvari-class submarines with 98 Black Shark torpedoes from WASS was cancelled in response to corruption allegations against WASS's sister company, AgustaWestland.[18][19] The defense minister Manohar Parikkar under the NDA government, said that the torpedoes for the submarine will be procured from other companies.[20] SeaHake torpedoes from Germany's Atlas Elektronik and France's F21 torpedoes may be considered.[21] Indigenous torpedoes Varunastra under development by DRDO may also be used as replacements.[22] The submarines have been configured to fire Surface and Underwater Target (SUT) torpedoes for the time being.[23] Naval Materials Research Laboratory (NMRL) of the DRDO is developing an indigenous air-independent propulsion (AIP) systems which will be installed during the first refit programme from 2023.[24]

Design and description[edit]

The Kalvari class is capable of offensive operations across the entire spectrum of naval warfare including anti-surface warfare, anti-submarine warfare, intelligence gathering, mine laying and area surveillance.[25] It has a length of 67.5 m (221 ft 5 in), height of 12.3 m (40 ft 4 in), overall beam of 6.2 m (20 ft 4 in) and a draught of 5.8 m (19 ft 0 in). It can reach a top speed of 20 knots (37 km/h; 23 mph) when submerged and a maximum speed of 11 knots (20 km/h; 13 mph) when surfaced. The submarine has a range of 6,500 nautical miles (12,000 km; 7,500 mi) at 8 knots (15 km/h; 9.2 mph) when surfaced.[3] Each ship is powered by four MTU 12V 396 SE84 diesel engines, has 360 battery cells (750 kg, 1,650 lb each), for power and has a silent Permanently Magnetised Propulsion Motor. The hull, fin and hydroplanes are designed for minimum underwater resistance and all equipment inside the pressure hull is mounted on shock absorbing cradles for enhanced stealth.[2] Special steel was used in its construction which has high tensile strength, capable of withstanding high yield stress and hydro-static force. Each submarine has 60 km (37 mi) of cabling and 11 km (6.8 mi) of piping.[25] The class displaces 1,615 tonnes (1,589 long tons) when surfaced and 1,775 t (1,747 long tons) when submerged.[23]

This class is equipped with six 533 mm (21 in) torpedo tubes for a combination of 18 heavyweight wire-guided German-made Surface and Underwater Target (SUT) torpedoes and SM39 Exocet anti-ship missiles or 30 mines in place of both.[26][27] The class is also fitted with mobile C303/S anti-torpedo decoys for self-defence.[19][2] The weapon systems and sensors are integrated with Submarine Tactical Integrated Combat System (SUBTICS). It has a sonar system is capable of Low Frequency Analysis and Ranging (LOFAR) enabling long range detection and classification.[2] Each submarine has a complement of 8 officers and 35 sailors.[28]

Ships of the class[edit]

Name Pennant Yard Builder Launched Commissioned Homeport Status
Kalvari S21 11875 Mazagon Dock Limited 27 October 2015[2] 14 December 2017[29] Active
Khanderi[30] S22[31] 11876 12 January 2017[32] 28 September 2019[33]
Karanj S23 11877[34] 31 January 2018[35] 10 March 2021[36][37][38]
Vela[39] S24 11878[40] 6 May 2019[41] 25 November 2021 [42]
Vagir[43] S25 11879[44] 12 November 2020[43] January 2023(expected)[45][46][47] Delivered[48]
Vagsheer S26 11880 20 April 2022[49] March 2024 (expected)[50] Launched

Gallery[edit]

See also[edit]

References[edit]

  1. "India Drops Plans to Add 3 More French Stealth Attack Submarines". The Diplomat. 8 September 2016. Archived from the original on 8 September 2016.
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 "Curtain Raiser : Kalvari to be Commissioned Tomorrow at Mumbai". pib.nic.in. 13 December 2017. Archived from the original on 14 December 2017. Retrieved 13 December 2017.
  3. 3.0 3.1 3.2 3.3 Rahmat, Ridzwan (7 June 2017). "India's second Scorpène submarine begins sea trials". Jane's Defence Weekly. Archived from the original on 28 December 2017.
  4. Commodore Stephen Saunders, ed. (2005). "India". Jane's Fighting Ships 2005-2006 (108th ed.). Coulsdon: Jane's Information Group. p. 308. ISBN 0710626924.
  5. "India, France to ink Scorpene deal". The Times of India. PTI. 27 September 2005. Archived from the original on 30 April 2018.
  6. "Scorpene 1000". DCNS. Archived from the original on 15 September 2014. Retrieved 8 April 2015.
  7. Bedi, Rahul (31 January 2018). "India launches third Scorpène-class submarine". Jane's Defence Weekly. Archived from the original on 5 February 2018.
  8. 8.0 8.1 Saw, David (2005). "The World Submarine Situation". Armada International. Vol. 29, no. 6. Gurgaon: Media Transasia India Ltd. pp. 52–58. ISSN 0252-9793.
  9. Singh, Sushant (13 November 2015). "Explained: India's submarine story in deep waters, long way to go". The Indian Express. Archived from the original on 15 February 2018.
  10. 10.0 10.1 Mohanty, Deba (2006). "India and France Ink SCORPÈNE Deal". Military Technology. Vol. 30, no. 2. Bonne: Mönch Publishing Group. pp. 34–36. ISSN 0722-3226.
  11. "Envisaging more defence ties". The Hindu Business Line. 20 February 2006. Archived from the original on 30 April 2018.
  12. "Exocet Missiles, AIP Swing India Submarine Order". defense-aerospace.com. 13 September 2005. Archived from the original on 12 April 2015. Retrieved 8 April 2015.
  13. Peri, Dinakar (19 June 2017). "Last two Scorpene submarines from Mazgaon Docks to join Navy without AIP system". The Hindu. Archived from the original on 24 June 2017.
  14. Miglani, Sanjeev (22 September 2016). "India shelves plan to expand French submarine order after data breach". Reuters. Archived from the original on 15 February 2018.
  15. Bhatt, Arunkumar (24 May 2007). "Scorpene construction work begins in Mumbai". The Hindu. Archived from the original on 30 April 2018.
  16. Pandit, Ranjat (28 August 2014). "Defence minister Arun Jaitley reviews delayed Scorpene submarine project". The Times of India. Archived from the original on 29 August 2014. Retrieved 8 April 2014.
  17. Bedi, Rahul (19 June 2013). "Indian Scorpene delivery faces further delays". IHS Jane's Defence Weekly. Coulsdon: Jane's Information Group. 50 (28): 16. ISSN 2048-3430.
  18. Unnithan, Sandeep (1 June 2016). "Contract for 98 Black Shark torpedoes scrapped, Indian nuclear submarine programme further delayed". India Today. Archived from the original on 15 February 2018.
  19. 19.0 19.1 Bedi, Rahul (3 May 2016). "India's first Scorpene boat begins sea trials without primary weapons". IHS Jane's Defence Weekly. Archived from the original on 4 May 2016. Retrieved 5 May 2016.
  20. "Manohar Parrikar interview: 'I believe in performance, not dressing up'". The Indian Express. Archived from the original on 7 November 2016. Retrieved 2 January 2017.
  21. "India Has Alternative For Finmeccanica Torpedoes Says Parrikar". Businessworld.in. 29 May 2016. Archived from the original on 8 October 2016. Retrieved 2 January 2017.
  22. "DRDO gets nod to make torpedoes for Indian submarines". Deccan Herald. 30 June 2016. Archived from the original on 3 July 2016. Retrieved 18 July 2016.
  23. 23.0 23.1 Bedi, Rahul (14 December 2017). "Indian Navy commissions first licence-built Scorpène-class submarine". Jane's Defence Weekly. Archived from the original on 28 December 2017.
  24. "DRDO system to help Indian Navy's Scorpene submarines stay hidden for longer periods". www.aninews.in. Retrieved 15 February 2020.
  25. 25.0 25.1 "Maiden Sea Trial of Kalvari – First Scorpene Class Submarine". pib.nic.in. 1 May 2016. Archived from the original on 15 December 2017. Retrieved 15 December 2017.
  26. Bonsignore, Luca (2005). ""Carrera": The first real Spanish export-submarine floated". Naval Forces. Vol. 26, no. 1. Aldershot: Monch Publications. p. 135. ISSN 0722-8880. 18 torpedoes and missiles can be carried otherwise 30 mines.
  27. Dominguez, Gabriel (22 September 2017). "MDL delivers first of six Scorpène-class submarines to Indian Navy". Jane's Defence Weekly. Archived from the original on 28 December 2017.
  28. "Road to development in the 21st century goes through the Indian ocean – Shri Narendra Modi, Prime Minister". pib.nic.in. Archived from the original on 15 December 2017. Retrieved 15 December 2017.
  29. Shukla, Tarun (14 December 2017). "INS Kalvari, India's first Scorpene submarine, commissioned by Narendra Modi". Livemint. Archived from the original on 2 March 2018.
  30. "INS Khanderi: A Scorpene class submarine, handed over to Navy". Jagranjosh.com. 20 September 2019. Retrieved 12 November 2020.
  31. "Submarines Active | Indian Navy". indiannavy.nic.in. Indian Navy. Retrieved 18 October 2019.
  32. "Second Scorpene class submarine Khanderi to be launched on Jan 12". The Economic Times. Archived from the original on 12 January 2017. Retrieved 9 January 2017.
  33. "Rajnath commissions INS Khanderi attack submarine". The Times of India. 28 September 2019. Retrieved 29 September 2019.
  34. "Third Scorpene-class submarine to be launched". Deccan Herald. 29 January 2018.
  35. "Third Scorpene submarine 'Karanj' Launched at Mazagon Docks". pib.nic.in. 31 January 2018. Archived from the original on 1 February 2018. Retrieved 31 January 2018.
  36. "INS Karanj - third Kalvari class Submarine commissioned at Naval Dockyard, Mumbai". PIB. 10 March 2021.
  37. Sharma, Manasvi Shanker (11 March 2021). "India commissions third Kalvari-class submarine". Janes. Retrieved 14 March 2021.
  38. Dominguez, Gabriel; Bedi, Rahul. "Indian Navy commissions third Kalvari (Scorpène)-class submarine". Janes. Retrieved 14 March 2021.
  39. Mahale, Ajeet (31 January 2018). "INS Karanj boosts Navy's firepower". The Hindu. Archived from the original on 1 February 2018. Retrieved 31 January 2018.
  40. "Launch of Fourth Scorpene Class Submarine - Vela". 6 May 2019. Retrieved 15 July 2019.
  41. "INS Vela: Indian Navy's 4th Scorpene-class made in India submarine launched". The Financial Express. Retrieved 6 May 2019.
  42. "Navy commissions submarine INS Vela".
  43. 43.0 43.1 Desk, India com News (12 November 2020). "Indian Navy's Fifth Scorpene-Class Submarine INS Vagir Launched". India News, Breaking News, Entertainment News | India.com. Retrieved 12 November 2020.
  44. @navalgroup_IN (12 November 2020). "INS Vagir-fifth Kalvari class submarine in collaboration with navalgroup launched today" (Tweet) – via Twitter.
  45. "Indian Navy to receive the Scorpene class submarine Vagir in December". www.navyrecognition.com. 13 September 2022.
  46. Dominguez, Gabriel; Bedi, Rahul (10 March 2021). "Indian Navy commissions third Kalvari (Scorpène)-class submarine". Janes. Retrieved 13 March 2021.
  47. Baggonkar, Swaraj (20 February 2022). "India's ₹43,000 crore submarine project P-75I faces multiple delays". The Hindu Business Line. Retrieved 26 March 2022.
  48. "DELIVERY OF FIFTH SCORPENE SUBMARINE 'VAGIR' TO INDIAN NAVY". pib.gov.in. Retrieved 20 December 2022.
  49. "LAUNCH OF SIXTH SCORPENE SUBMARINE 'VAGSHEER' AT MAZAGON DOCK LIMITED (MDL), MUMBAI" (Press release). PIB. 20 April 2022.
  50. "India Launches Its Sixth And Final Scorpene Submarine". www.navalnews.com. 20 April 2022.

Template:Scorpène class submarine