Nalban | |||||
|---|---|---|---|---|---|
| Template:Kolkata Metro Infobox station line | |||||
![]() | |||||
| Location | HM Block, Sector IV, Bidhannagar, Kolkata, West Bengal 700106 (Beside of Nicco Park) | ||||
| Coordinates | 22°34′24″N 88°25′16″E / 22.5732216°N 88.4211529°E | ||||
| Owned by | Metro Railway, Kolkata | ||||
| Line(s) | Template:Rcb | ||||
| Platforms | 2 side platforms | ||||
| Tracks | 2 | ||||
| Construction | |||||
| Structure type | Elevated | ||||
| History | |||||
| Opened | 2026 (expected)[1] | ||||
| Electrified | 750 V DC third rail | ||||
| Previous names | Nicco Park | ||||
| Services | |||||
|
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Kolkata Metro' not found. | |||||
| |||||
| Location | |||||
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | |||||
Nalban (Also known as Nicco Park)[2] is a metro station of Orange Line of the Kolkata Metro.[3][4] It is situated at just beside of Nicco Park. It will serve the area of Nalban, Salt Lake Sector IV and surrounding areas in Bidhannagar, Kolkata.[5][6] The station is named after its adjacent locality, Nalban.[7][8]
Location[edit | edit source]

This station is located beside Nicco Park on the Salt Lake Bypass branch of Biswa Bangla Sarani at Nalban.[9][10] The main elevated structure of the station in the middle of Biswa Bangla Sarani with footover bridges on either side othe road.[11][12] It is geographically located at 22°33′40″N 88°24′53″E / 22.5610117°N 88.4147441°E.[13][14] The previous station of the station is Gour Kishore Ghosh metro station at a distance of 1.5 km (0.93 mi) and the next station is IT Centre metro station at a distance of 1.5 km (0.93 mi).[15][16]
History[edit | edit source]
This project was sanctioned in the budget of 2010–11 by Mamata Banerjee with a project deadline of six years.[17][18] The execution of this project has been entrusted to RVNL at a cost of Rs 3951.98 crore.[19][20] It will help to reduce travel time between the southern fringes of Kolkata to Netaji Subhas Chandra Bose International Airport.[21][22] In October 2011, RVNL awarded Gammon India Limited, the tender for the construction of the metro corridor from VIP Bazar Metro Station to Nicco Park (Nalban metro station),[23][24] including stations, as part of Package-II of Orange Line.[25][26][17] In early 2020s, the construction of the metro station along with the metro line started.[27][28] The station is still under construction after structural work completion.[29][30][31][32] It is slated to be completed in March 2025.[33][31][34] Alongside, there were several delays in filling viaduct gaps between Beleghata and Gour Kishore Ghosh.[35][36] These delays were caused due to road blocks as these gaps span over busy Eastern Metropolitan Bypass and Chingrighata crossing.[37][38][39] Currently, a 366 m (1,201 ft) viaduct gap between Chingrighata crossing and Gour Kishore Ghosh metro station is still left to be filled, with current completion target set for March 2025.[40][41][42] The station is expected to be operational by mid-2025.[43][44]
Station[edit | edit source]
Structure[edit | edit source]
Nalban Metro Station is an elevated metro station and has a total of 3 levels.[45][46] Station entrances and exits begin or end at the first level or ground level.[47][48] Second-level or L1 or intermediate level houses station fare control, station agents, metro vending machines, crossovers, etc.[49] The third level or L2 or the final level houses the platforms and rail tracks. The station is 200 meters long and 25 meters wide.[15][31][50][16]
The station has four entrances and exits. The station is being built with state-of-the-art technology. In addition to staircases, it will be equipped with lifts and escalators. The station also has drinking water and toilet facilities.[15][31][50][51]
layout[edit | edit source]
| style="color:white;background:#Template:Rcr;text-align:center;padding:5px"| Nalban track layout | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
| ||||||||||||||||||||||||||||||||||||||||||
| G | Street Level | Exit/Entrance |
| L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| L2 | Side platform doors will open on the left | |
| Southbound | Towards →Kavi Subhash→ next station is Gour Kishore Ghosh→ | |
| Northbound | →Towards ←Jai Hind← next station is IT Centre← | |
| Side platform doors will open on the left | ||
| L2 | ||
Power and signal systems[edit | edit source]
Like other stations and lines of Kolkata Metro, this station has 750 volt DC powered third rail. The electricity system will be used to operate the train.[52]
Train movement at this station will be managed by communication based train control signaling system. With this signal system, trains can be operated at intervals of 90 seconds.[53]
Services[edit | edit source]
Services have not started from this station. Currently the station is under construction and is set to be opened in 2025.[43][33]
See also[edit | edit source]
References[edit | edit source]
- ↑ "Metro eyes full orange line operations by march 2025". Times of India. 26 July 2024.
- ↑ "New System Map of Kolkata Metro". mtp.indianrailways.gov.in. Retrieved 24 September 2024.
- ↑ "'7-day traffic block trial run for Metro construction work to end on June 15'". MillenniumPost. 14 June 2024. Retrieved 24 December 2024.
- ↑ "SEGMENT LAUNCHING WORK NEAR THE PROPOSED NALBAN METRO STATION STARTED". IBG News. 20 August 2023. Retrieved 24 December 2024.
- ↑ "চিংড়িঘাটার মেট্রো স্টেশনের কাজ অনেকটা শেষ! রইল অন্দরমহলের ঝাঁ-চকচকে ফার্স্ট লুক". Hindustantimes Bangla (in Bengali). 28 October 2023. Archived from the original on 30 November 2024. Retrieved 13 November 2024.
- ↑ "Sec V lane on Salt Lake Bypass in Kolkata to be shut from Sunday in 7-day trial run". The Times of India. ISSN 0971-8257. Retrieved 24 December 2024.
- ↑ "Construction of Gour Kishor Ghosh station going on in full swing". The Statesman. 8 July 2024.
- ↑ "Metro Railway Kolkata / Indian Railways Portal". mtp.indianrailways.gov.in. Retrieved 24 September 2024.
- ↑ "Beleghata-Ruby Section of Kolkata Metro Undergoes Inspection, Here's Why". News18. 30 March 2024. Retrieved 8 May 2024.
- ↑ "Metro Railway Kolkata / Indian Railways Portal". mtp.indianrailways.gov.in. Retrieved 8 May 2024.
- ↑ "Kolkata Metro: বাইপাসের উপর 'প্রায় তৈরি' নয়া মেট্রো স্টেশন, কবে জুড়বে গড়িয়া-এয়ারপোর্ট রুট?". Aaj Tak বাংলা (in Bengali). Retrieved 8 May 2024.
- ↑ "Kolkata: Bypass Metro Pier at Chingrighata Metro Completes, Traffic to Resume Soon". Times Now. 4 June 2024. Retrieved 13 November 2024.
- ↑ "Rail Vikas Nigam Limited plans 4 km extension from Ruby Metro to Beliaghata by puja". The Times of India. 20 February 2023. ISSN 0971-8257. Retrieved 8 May 2024.
- ↑ "Budget boost: Metro eyes full Orange Line ops by March '25". The Times of India. ISSN 0971-8257. Retrieved 13 November 2024.
- ↑ 15.0 15.1 15.2 MP, Team (30 September 2023). "Concreting work of Ritwik Ghatak Metro Station nears completion". www.millenniumpost.in. Retrieved 29 March 2024.
- ↑ 16.0 16.1 railanalysis3 (13 October 2023). "Kolkata Metro Update: The construction work of Ritwik Ghatak metro station of Kavi Subhash-Biman Bandar corridor going on in full swing". Rail Analysis India. Retrieved 29 March 2024.
{{cite web}}: CS1 maint: numeric names: authors list (link) - ↑ 17.0 17.1 "Rail set to take over East-West". The Telegraph. Calcutta, India. 8 February 2011. Archived from the original on 13 February 2011.
- ↑ "Kolkata: Bypass-New Town flyover plan with PWD for scrutiny". The Times of India. ISSN 0971-8257. Retrieved 24 December 2024.
- ↑ ""Seven projects meant to change the face of Calcutta are entangled in a web of land politics and pandering. Metro explores the tunnel vision"". Telegraph india.
- ↑ "Kolkata Metro update: Orange Line's Chingrighata-Sector 5 section inspected by General Manager – Details inside". Financialexpress. 7 December 2024. Retrieved 24 December 2024.
- ↑ SNS (29 October 2023). "Metro Railway completes structural work of Gour Ghosh Metro station near Chingrighata". The Statesman. Retrieved 13 November 2024.
- ↑ "Kolkata: Salt Lake Bypass flyover plan ready, awaits nod". The Times of India. ISSN 0971-8257. Retrieved 24 December 2024.
- ↑ "বরুণ সেনগুপ্ত মেট্রো স্টেশনের নির্মাণ কাজ তুঙ্গে, অন্দরমহলটা দেখে নিন". Eisamay (in Bengali). Retrieved 8 May 2024.
- ↑ "MSN". www.msn.com. Retrieved 24 December 2024.
- ↑ "Details of tenders/contracts" (PDF). Archived from the original (PDF) on 19 March 2020. Retrieved 30 March 2024.
- ↑ ""Road Ahead….. Projects sanctioned"". mtp.indianrailways.gov.in. Retrieved 28 March 2024.
- ↑ ""Construction of VIP Bazar station begins after two years"".
- ↑ "RVNL gets Nicco Park metro site for 90 days". The Times of India. ISSN 0971-8257. Retrieved 24 December 2024.
- ↑ "Airport-New Garia Metro: Site visit next week to bridge VIP Bazar gap". The Times of India. 12 March 2023. ISSN 0971-8257. Retrieved 28 March 2024.
- ↑ "Man electrocuted at construction site". The Times of India. 19 February 2024. ISSN 0971-8257. Retrieved 28 March 2024.
- ↑ 31.0 31.1 31.2 31.3 "শেষের মুখে কলকাতা মেট্রোর আরও ১ স্টেশনের কাজ! ভিতরটা কেমন হল? রইল 'ফার্স্ট লুক'". Hindustantimes Bangla (in Bengali). 28 September 2023. Archived from the original on 29 March 2024. Retrieved 29 March 2023.
- ↑ "মেট্রোর পথ করতে নোনাডাঙায় সরছে পুরোনো ভিআইপি বাজার". Eisamay (in Bengali). Retrieved 28 March 2024.
- ↑ 33.0 33.1 "CRS check till Metropolitan: No Ruby ops on Thurs, Fri". The Times of India. 27 March 2024. ISSN 0971-8257. Retrieved 29 March 2024.
- ↑ "Kolkata: Pipe bridge lifted out of Metro alignment". The Times of India. 15 July 2020. ISSN 0971-8257. Retrieved 29 March 2024.
- ↑ MP, Team (30 October 2023). "Structural work at Gour Kishor Ghosh Metro Station completed". MillenniumPost. Retrieved 13 November 2024.
- ↑ "Bypass metro pier 319 ready, RVNL set to hand over Chingrighata site". The Times of India. ISSN 0971-8257. Retrieved 13 November 2024.
- ↑ SNS (8 July 2024). "Construction of Gour Kishor Ghosh station going on in full swing". The Statesman. Retrieved 13 November 2024.
- ↑ "Kolkata: New Garia-Airport Metro Work to Affect Traffic Near Chingrighata Junction; Check Advisory". Times Now. 28 February 2024. Retrieved 13 November 2024.
- ↑ dev (4 June 2024). "Kolkata Metro Progress RVNL Nears Completion of Second Pier Prepares for Handover - Urban Acres". Retrieved 13 November 2024.
- ↑ "Ritwik Ghatak Metro Station: ঋত্বিক ঘটক মেট্রো স্টেশনের কাজ শেষ পর্যায়ে, ফাস্ট লুকেই হাঁকাল ছক্কা! » Najarbandi 24X7". najarbandi.in (in Bengali). 29 September 2023. Retrieved 29 March 2024.
- ↑ "After 6 yrs, Orange line's gap at Metropolitan bridged". The Times of India. ISSN 0971-8257. Retrieved 19 November 2024.
- ↑ "Hanging bridge on Bypass solves Metro problem at Tagore Park". The Times of India. 3 November 2023. ISSN 0971-8257. Retrieved 29 March 2024.
- ↑ 43.0 43.1 "Trial run extended beyond Ruby to Metropolitan on Kolkata Metro's Airport Line | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 29 March 2024.
- ↑ "মেট্রো থেকে বেরিয়েই নিক্কোপার্ক ও পিকনিক স্পট- কেমন দেখতে হচ্ছে নলবন স্টেশন?". Hindustantimes Bangla (in Bengali). 17 December 2023. Archived from the original on 19 January 2025. Retrieved 24 December 2024.
- ↑ SNS (8 July 2024). "Construction of Gour Kishor Ghosh station going on in full swing". The Statesman. Retrieved 13 November 2024.
- ↑ "Kolkata: Deadline for Orange Line's Phase II extension revised to March 2025 due to construction delays". propnewstime.com. Retrieved 24 December 2024.
- ↑ "Metro Railway Kolkata / Indian Railways Portal". mtp.indianrailways.gov.in. Retrieved 8 May 2024.
- ↑ dev (19 July 2024). "Rs 727 Cr Sanctioned for Kolkata Flyover - Urban Acres". Retrieved 24 December 2024.
- ↑ "Kolkata metro service on New Garia to airport corridor to be extended till Beleghata soon – Details inside". Financialexpress. 25 June 2024. Retrieved 24 December 2024.
- ↑ 50.0 50.1 "Ritwik Ghatak Metro Station: ঋত্বিক ঘটক মেট্রো স্টেশন চোখ ধাঁধানো, কাজ প্রায় শেষ, কেমন হল? দেখুন". Aaj Tak বাংলা (in Bengali). Retrieved 29 March 2024.
- ↑ "নিউ গড়িয়া-বিমানবন্দর মেট্রো করিডোরে বড় খবর, নতুন স্টেশনের ছবি দেখুন". Eisamay (in Bengali). Retrieved 29 March 2024.
- ↑ "Metro Railway Kolkata / Indian Railways Portal". mtp.indianrailways.gov.in. Retrieved 8 May 2024.
- ↑ "Metro Railway Kolkata / Indian Railways Portal". mtp.indianrailways.gov.in. Retrieved 8 May 2024.