PSLV-C6

From Bharatpedia, an open encyclopedia
Information red.svg
Scan the QR code to donate via UPI
Dear reader, We need your support to keep the flame of knowledge burning bright! Our hosting server bill is due on June 1st, and without your help, Bharatpedia faces the risk of shutdown. We've come a long way together in exploring and celebrating our rich heritage. Now, let's unite to ensure Bharatpedia continues to be a beacon of knowledge for generations to come. Every contribution, big or small, makes a difference. Together, let's preserve and share the essence of Bharat.

Thank you for being part of the Bharatpedia family!
Please scan the QR code on the right click here to donate.

0%

   

transparency: ₹0 raised out of ₹100,000 (0 supporter)


PSLV-C6
The PSLV – C6 on its mobile pedestal after having been strapped to launch tower at Sriharikota on May 1, 2005 (1).jpg
The PSLV – C6 on its mobile pedestal after having been strapped to launch tower at Sriharikota on 1 May 2005
NamesHAMSAT mission
Mission typeDeployment of two satellites.
OperatorISRO
COSPAR ID{{#property:P247}}
WebsiteISRO website
Mission duration1,120 seconds
Spacecraft properties
SpacecraftPolar Satellite Launch Vehicle
Spacecraft typeExpendable launch vehicle
ManufacturerISRO
Launch mass295,980 kilograms (652,520 lb)
Payload mass1,602.5 kilograms (3,533 lb)
Dimensions44.4 metres (146 ft)
(overall height)
Start of mission
Launch date04:44:00, May 5, 2005 (UTC) (2005-05-05T04:44:00UTC) (UTC)
RocketPolar Satellite Launch Vehicle
Launch siteSriharikota Launching Range
ContractorISRO
End of mission
DisposalPlaced in graveyard orbit
DeactivatedMay 5, 2005 (2005-05-05)
Orbital parameters
Reference systemSun-synchronous orbit
Payload
India flag-XL-anim.gif Cartosat-1
India flag-XL-anim.gif HAMSAT
Mass1,602.5 kilograms (3,533 lb)
← PSLV-C5
PSLV-C7 →
 

PSLV-C6 was the sixth operational launch and overall ninth mission of the PSLV program. This launch was also the fifty-fourth launch by Indian Space Research Organisation since its first mission on 1 January 1962. The vehicle carried and injected India's two satellites; Cartosat-1 (a.k.a. IRS-P5) and HAMSAT into the Sun-synchronous orbit. PSLV-C6 was launched at 04:44 hours Coordinated Universal Time (10:14 hours Indian Standard Time) on 5 May 2005 from the second launch pad of the Satish Dhawan Space Centre.[1][2][3][4][5]

Mission highlights[edit]

Mission parameters[edit]

  • Mass:
    • Total liftoff weight: 295,980 kilograms (652,520 lb)
    • Payload weight: 1,602.5 kilograms (3,533 lb)
  • Overall height: 44.4 metres (145.7 ft)
  • Propellant:
  • Engine:
    • First stage: Core (PS 1) + 6 strap-on PSOM
    • Second stage: Vikas
    • Third stage: PS 3
    • Fourth stage: PS 4
  • Thrust:
    • First stage: 4,762 + 645 x 6 kN
    • Second stage: 800 kN
    • Third stage: 246 kN
    • Fourth stage: 7.3 x 2 kN
  • Altitude: 628.535 kilometres (391 mi)
  • Maximum velocity:7,546 metres per second (24,757 ft/s) (recorded at time of payload separation)
  • Duration: 1,120 seconds

[6][7][9]

Payload[edit]

PSLV-C6 carried and deployed two Indian satellites, Cartosat-1 (a.k.a. IRS-P5) and HAMSAT into the Sun-synchronous orbit. Built by ISRO, Cartosat-1 was a stereoscopic remote sensing satellite and first of the Cartosat series of satellites.[5] HAMSAT was a microsatellite, built for providing satellite based amateur radio satellite to the national as well as the international community of amateur radio operators (HAM).[10]

Country Name Nos Mass Type Objective
India India IRS-P5 1 1,560 kg Satellite Remote sensing satellite
HAMSAT 1 42.5 kg Microsatellite Amateur radio satellite

Launch & planned flight profile[edit]

PSLV-C 6 blasting off from launch Tower at Sriharikota on May 5, 2005
Heat shield of PSLV displayed at HAL heritage center.

PSLV-C6 was launched at 04:44 hours Coordinated Universal Time (10:14 hours Indian Standard Time) on 5 May 2005 from the second launch pad of the Satish Dhawan Space Centre. The mission was planned with pre-flight prediction of covering overall distance of 622 kilometres (386 mi). Following was the flight profile.[9]

Stage Time
(seconds)
Altitude
(kilometer)
Velocity
(meter/sec)
Event Remarks
First stage T+0 0.025 452 Ignition of PS 1 Lift off
T+1.19 0.026 452 Ignition of 4 ground-lit PSOM
T+25 2.463 551 Ignition of 2 air-lit PSOM
T+68 23.748 1,179 Separation of 4 ground-lit PSOM
T+90 42.768 1,659 Separation of 2 air-lit PSOM
T+112.03 67.411 1,995 Separation of PS 1
Second stage T+112.23 67.635 1,994 Ignition of PS 2
T+156.03 115.244 2,314 Separation of heat shield
T+263.38 233.873 4,087 Separation of PS 2
Third stage T+264.58 235.304 4,083 Ignition of HPS 3
T+517.52 498.974 5,865 Separation of HPS 3
Fourth stage T+531.50 509.092 5,851 Ignition of PS 4
T+1,043.62 627.153 7,542 Cut-off of PS 4
T+1,080.62 627.801 7,546 Cartosat-1 separation
T+1,120.62 628.535 7,546 HAMSAT separation Mission complete

See also[edit]

References[edit]

  1. "PSLV series". astronautix.com. Archived from the original on August 20, 2016. Retrieved 28 August 2016.
  2. "PSLV-C6: A path-breaking launch". Business Standard. Retrieved 28 August 2016.
  3. "ISRO scientists meet Prime Minister". Indian Space Research Organisation. Retrieved 28 August 2016.
  4. "India's PSLV-C6 Successfully Launches 2 Satellites". spaceref.com. Retrieved 28 August 2016.
  5. 5.0 5.1 "PSLV-C6 launched from Sriharikota". The Economic Times. Retrieved 28 August 2016.
  6. 6.0 6.1 "PSLV-C6". Indian Space Research Organisation. Retrieved 28 August 2016.
  7. 7.0 7.1 "PSLV". spacelaunchreport.com. Retrieved 28 August 2016.
  8. "ISRO timeline". Indian Space Research Organisation. Retrieved 28 August 2016.
  9. 9.0 9.1 "PSLV-C6 brochure" (PDF). Indian Space Research Organisation. Retrieved 28 August 2016.
  10. "HAMSAT". Indian Space Research Organisation. Retrieved 28 August 2016.

External links[edit]