Kodambakkam
Template:Chennai Metro Infobox station line
Coordinates13°03′09″N 80°13′52″E / 13.05251°N 80.23121°E / 13.05251; 80.23121
Owned byChennai Metro Rail Limited (CMRL)
Operated byChennai Metro
Line(s)Template:Rcb
PlatformsIsland platform
Platform-1 → Template:Stl
Platform-2 → Template:Stl
Tracks2
Connectionsup Kodambakkam
Construction
Structure typeUnderground, Double track
Platform levels2
Other information
StatusUnder Construction
History
OpeningMarch 2027; 7 months' time (March 2027) (TBC)
ElectrifiedSingle phase 25 kV, 35 Hz AC through overhead catenary
Services
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Chennai Metro' not found.
Location
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).

Kodambakkam is an upcoming underground metro station on the East-West Corridor of the Yellow Line of Chennai Metro in Chennai, India. This metro station will be among the 30 stations of Corridor IV and 12 underground stations along Corridor IV of the Chennai Metro, Poonamallee BypassLighthouse stretch. This metro station is a key station in Yellow Line having Chennai Suburban Railway station connectivity. It is slated to be operational by March 2027 along with remaining underground stations in yellow line till Light house.[1][2]

History[edit | edit source]

In February 2021, Chennai Metro Rail Limited (CMRL) invited bids for the construction of this Kodambakkam metro station situated on the underground section stretching from Kodambakkam Flyover to Boat Club, which also forms a part of Corridor 4 under Phase 2 of the Chennai Metro network. [3]

Apart from this metro station, this package includes four other stations, namely Kodambakkam Flyover, Panagal Park, Nandanam, and Boat Club. The group of bidders participated in this package as well, namely ITD Cementation India Ltd., Larsen & Toubro (L&T), Gulermak, Shanghai Tunnel Engineering Co. Ltd. (STEC), and a joint venture of J Kumar Infraprojects–Patel Infrastructure.

Upon evaluation, ITD Cementation India Ltd., submitted the most favorable bid in both technical and financial terms and was consequently awarded the contract.[4] They commenced underground construction in accordance with the approved execution framework, marking another milestone in the progress of Corridor 4.[5] The tunneling work from Template:Stl to Kodambakkam station is completed by March 2025.[6]

Station layout[edit | edit source]

Station Layout - To Be Confirmed

style="color:blue;background:#Template:Rail color;text-align:center;padding:5px"|
Kodambakkam track layout (TBC)
P1
P2
Station with two tracks and one Island platform
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Ticket/token, shops
L2 Platform 1
Eastbound
Towards → Template:Stl
Next Station: Template:Stl
Island platform | Doors will open on the right Disabled access
Platform 2
Westbound
Towards ← Template:Stl **
Next Station: Template:Stl
L2 Note: ** (Further extension to Template:Stl in the future)

See also[edit | edit source]

References[edit | edit source]

  1. Sampath, Nirupa (23 January 2025). "Metro to T Nagar to be operational by March 2027". DT Next. Retrieved 14 April 2025.
  2. "Chennai Metro Phase 2 – Information, Route Maps, Tenders & Updates". The Metro Rail Guy. Retrieved 7 April 2025.
  3. "6 Bidders for Chennai Metro Line-4's Underground Work". The Metro Rail Guy. 16 August 2021. Retrieved 8 April 2025.
  4. "ITD Cem Wins Chennai Metro Line-4's Underground Work". The Metro Rail Guy. 25 November 2021. Retrieved 8 April 2025.
  5. "ITD Cem Awarded Chennai Metro Line-4's Underground Contracts". The Metro Rail Guy. 13 January 2022. Retrieved 8 April 2025.
  6. Sekar, Sunitha (9 November 2024). "Chennai Metro Rail's tunnel from T. Nagar to Kodambakkam to be ready by March 2025". The Hindu. Retrieved 14 April 2025.