Created by JerryGuerrero
Last edited April 4, 2026

Gold Line
Overview
StatusApproved by the State Government
OwnerMMRDA, CIDCO
LocaleMumbai, Maharashtra, India
TerminiCSMIA T2
NMIA T2
Service
TypeAirport Express Train
SystemMumbai Metro
Operator(s)MMRDA, CIDCO
Technical
Line length35 km (22 mi)
CharacterElevated, Underground
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge

Line 8 or the Gold Line is an approved line of the Mumbai Metro. It would run from Chhatrapati Shivaji Maharaj International Airport to Navi Mumbai International Airport.[1][2] The 35-kilometre (22 mi) line would be both elevated and underground and cost ₹150,000,000,000.[2]

It has been approved by the Government of Maharashtra, the Detailed Project Report may be made by CIDCO. It is to be developed in a Public-Private Partnership (PPP) model, similar to Mumbai Metro Blue Line 1.[3]

Stations[edit | edit source]

Gold Line (Line 8)
# Station Interchange Opened Alignment
English Marathi
1 Lua error: expandTemplate: template "Mumbai Metro stations" does not exist. छत्रपती शिवाजी महाराज आंतरराष्ट्रीय विमानतळ - टी२ File:Mumbai Metro Line 1 logo.png Lua error: expandTemplate: template "Mumbai Metro color" does not exist. (under construction)

Lua error: expandTemplate: template "Mumbai Metro color" does not exist.

Proposed Underground
2 Phoenix Mall फिनिक्स मॉल Proposed Underground
3 Lua error: expandTemplate: template "Mumbai Metro stations" does not exist. एस.जी. बर्वे मार्ग File:Mumbai Metro Line 1 logo.png Lua error: expandTemplate: template "Mumbai Metro color" does not exist. (under construction) Proposed Underground
4 Kurla कुर्ला Proposed Underground
5 Lokmanya Tilak Terminus लोकमान्य टिळक टर्मिनस Proposed Underground
6 Lua error: expandTemplate: template "Mumbai Metro stations" does not exist. गरोडिया नगर File:Mumbai Metro Line 1 logo.png Lua error: expandTemplate: template "Mumbai Metro color" does not exist. (under construction) Proposed Underground
7 Baiganwadi बैगनवाडी Proposed Elevated
8 Lua error: expandTemplate: template "Mumbai Metro stations" does not exist. मानखुर्द File:Mumbai Metro Line 1 logo.png Lua error: expandTemplate: template "Mumbai Metro color" does not exist. (under construction) Proposed Elevated
9 ISBT आयएसबीटी Proposed Elevated
10 Vashi वाशी Proposed Elevated
11 Sanpada सानपाडा Proposed Elevated
12 Juinagar जुईनगर Proposed Elevated
13 LP एल.पी. Proposed Elevated
14 Nerul नेरुळ Proposed Elevated
15 Seawoods सीवूड्स Proposed Elevated
16 Apollo अपोलो Proposed Elevated
17 Sagar Sangam सागर संगम Proposed Elevated
18 Targhar तरघर Proposed Elevated
19 Navi Mumbai International Airport West नवी मुंबई आंतरराष्ट्रीय विमानतळ पश्चिम Proposed Elevated
20 Navi Mumbai International Airport Terminal 2 नवी मुंबई आंतरराष्ट्रीय विमानतळ टर्मिनल २ Proposed Elevated

References[edit | edit source]

  1. ↑ "Mumbai's airport Metro will have a train every 15 minutes". Hindustan Times. 30 March 2018. Archived from the original on 24 June 2024. Retrieved 27 December 2024.
  2. ↑ 2.0 2.1 "Gold Line Metro: Maharashtra govt to finalise executing agency for Rs 15,000 crore corridor linking Mumbai, Navi Mumbai airports". The Times of India. 13 December 2024. ISSN 0971-8257. Retrieved 27 December 2024.
  3. ↑ "Metro Line 8 approved: Seamless Chhatrapati Shivaji Maharaj International Airport (CSMIA) to Navi Mumbai International Airport (NMIA) connectivity; all you need to know". The Times of India. 28 January 2025. ISSN 0971-8257. Retrieved 2 March 2025.