Created by Bihar
Last edited November 10, 2025


Barddhaman–Rampurhat Express
Overview
Service typeExpress
First serviceMay 2, 2011; 15 years ago (2011-05-02)
Last service11 May 2020 (Discontinued due to COVID)
Current operator(s)Eastern Railway zone
Route
StartBarddhaman Junction (BWN)
Stops4
EndRampurhat Junction (RPH)
Distance travelled112 km (70 mi)
Average journey time2h 20m
Service frequencyThrice [lower-alpha 1]
Train number(s)13013/13014
On-board services
Class(es)General Unreserved
Seating arrangementsNo
Sleeping arrangementsYes
Catering facilitiesOn-board catering
E-catering
Observation facilitiesICF coach
Entertainment facilitiesNo
Baggage facilitiesNo
Technical
Rolling stock2
Track gauge1,676 mm (5 ft 6 in)
Operating speed48 km/h (30 mph), including halts

The Barddhaman–Rampurhat Express is an Express train belonging to Eastern Railway zone that runs between Barddhaman Junction and Rampurhat Junction in India. It was operated with 13013/13014 train numbers on thrice in a week basis.It is currently not operating and cancelled. Before cancel , It runs from Bardhaman on Monday, Thursday & Saturday and from Rampurhat on Wednesday, Friday & Sunday[1]

Service[edit | edit source]

The 13013/Barddhaman–Rampurhat Express has an average speed of 48 km/h and covers 112 km in 2h 20m. 13014/Rampurhat–Barddhaman Express has an average speed of 41 km/h and covers 112 km in 2h 45m.

Route and halts[edit | edit source]

The important halts of the train are:

Coach composition[edit | edit source]

The train has standard LCF rakes with max speed of 110 kmph. The train consists of 10 coaches:

  • 8 General
  • 2 Generators cum Luggage/parcel van

Traction[edit | edit source]

Both trains are hauled by an Asansol Loco Shed-based WAG-5P electric locomotive from Barddhaman to Rampurhat and vice versa.

Rake sharing[edit | edit source]

Train shares its rake with 12373/12374 Sealdah–Rampurhat Intercity Express

See also[edit | edit source]

Notes[edit | edit source]

  1. Runs three days in a week for every direction.

External links[edit | edit source]

References[edit | edit source]

  1. "Train Services to be Modified for Few Days for Commissioning of 3rd Line Between Sainthia & Rampurhat]". er.indianrailways.gov.in. Eastern Railway. 6 April 2017. Retrieved 22 April 2018.s