m Bot: Delinking broken file(s) using script (info) |
ZPWClaudio (talk | contribs) No edit summary |
||
| Line 5: | Line 5: | ||
| embed = | | embed = | ||
| name = Electric Loco Shed, Ludhiana | | name = Electric Loco Shed, Ludhiana | ||
| image = | | image = Ldh shed.jpg | ||
| image_upright = 1.25 | | image_upright = 1.25 | ||
| image_alt = | | image_alt = | ||
| caption =LDH based WAG- | | caption = LDH based [[WAG-9]] At Electric Loco Shed, Ludhiana | ||
| map_type = India Punjab | | map_type = India Punjab | ||
| coordinates = {{Coord|30.912|N|75.848|E|type:railwaystation_region:IN|format=dms|display=inline,title}} | | coordinates = {{Coord|30.912|N|75.848|E|type:railwaystation_region:IN|format=dms|display=inline,title}} | ||
| Line 18: | Line 18: | ||
| type = [[Engine shed]] | | type = [[Engine shed]] | ||
| roads = | | roads = | ||
| rollingstock = [[ | | rollingstock = [[WAP-7]] <br> [[WAG-9]] | ||
| routes = | | routes = | ||
| opened = {{Start date and age|2001|||df=y}} | | opened = {{Start date and age|2001|||df=y}} | ||
| Line 25: | Line 25: | ||
| pregrouping = | | pregrouping = | ||
| postgrouping = | | postgrouping = | ||
| former_rolling_stock = [[Indian locomotive class WAP-4|WAP-4]] <br> [[Indian locomotive class WAG-5|WAG-5]] | | former_rolling_stock = [[Indian locomotive class WAP-4|WAP-4]] <br> [[Indian locomotive class WAG-5|WAG-5]] <br> [[WAM-4]] <br> [[WAG-7]] | ||
| image_width = | | image_width = | ||
}} | }} | ||
'''Electric Loco Shed, Ludhiana''' is a [[motive power depot]] performing locomotive maintenance and repair facility for electric | '''Electric Loco Shed, Ludhiana''' is a [[motive power depot]] performing locomotive maintenance and repair facility for [[electric locomotive]]s of the [[Indian Railways]], located at {{stnlnk|Ludhiana Junction}} of the [[Northern Railway zone]] in [[Punjab, India|Punjab]], India. | ||
== | ==Operation== | ||
Being one of the three electric engine sheds in Northern Railway, various major and minor maintenance schedules of electric locomotives are carried out here. It has the sanctioned capacity of 175 engine units. Beyond the operating capacity, this shed houses a total of 198 engine units, including 55 [[Indian locomotive class WAG-7|WAG-7]] and 143 [[WAG-9]]. LDH used to hold [[WAP-4]] & [[Indian locomotive class WAG-5|WAG-5]] locomotives, which are now all transferred to other sheds. Like all locomotive sheds, LDH does regular maintenance, overhaul and repair including painting and washing of locomotives.{{citation needed|date=June 2021}} | |||
In 2020, the depot built a battery-operated [[shunter]] using components scavenged from decommissioned locomotives. The shunter can be powered either directly from overhead wires, or from battery power for limited time periods. It operates in place of a diesel shunter.<ref>{{Cite web|last=Bhatia|first=Kuldip|date=2020-08-17|title=Electric Loco Shed makes engine from scrap|url=https://www.tribuneindia.com/news/ludhiana/electric-loco-shed-makes-engine-from-scrap-127488|access-date=2021-06-21|website=The Tribune}}</ref><ref>{{Cite web|last=|first=|last2=|last3=|first3=|date=2020-08-17|title=Railways develop unique electric engine for maintaining high temsion cables {{!}} Ludhiana News – Times of India|url=https://timesofindia.indiatimes.com/city/ludhiana/railways-develop-unique-electric-engine-for-maintaining-high-temsion-cables/articleshow/77580117.cms|access-date=2021-06-21|website=The Times of India}}</ref> | |||
In 2020, the depot built a battery-operated shunter using components scavenged from decommissioned locomotives. The shunter can be powered either directly from overhead wires, or from battery power for limited time periods. It operates in place of a diesel shunter.<ref>{{Cite web|last=Bhatia|first=Kuldip|date=2020-08-17|title=Electric Loco Shed makes engine from scrap|url=https://www.tribuneindia.com/news/ludhiana/electric-loco-shed-makes-engine-from-scrap-127488 | |||
== Locomotives == | == Locomotives == | ||
{| class="wikitable" | {| class="wikitable" | ||
! | !Serial No. | ||
! | !Locomotive Class | ||
! | !Horsepower | ||
! | !Quantity | ||
|- | |- | ||
|1. | |1. | ||
| | |[[WAP-7]] | ||
| | |6350 | ||
|44 | |||
| | |||
|- | |- | ||
|2. | |2. | ||
|[[WAG-9]] | |||
|6120 | |||
|205 | |||
|[[ | |||
| | |||
| | |||
|- | |- | ||
| colspan="3" |'''Total locomotives active as of | | colspan="3" |'''Total locomotives active as of January 2026'''<ref>{{Cite web|title=e-Locos|url=http://elocos.railnet.gov.in/Holding/holding.html}}</ref> | ||
| | |249 | ||
|} | |} | ||
Latest revision as of 16:39, 13 March 2026
![]() LDH based WAG-9 At Electric Loco Shed, Ludhiana | |
| Location | |
|---|---|
| Location | Ludhiana, Punjab |
| Coordinates | 30°54′43″N 75°50′53″E / 30.912°N 75.848°E |
| Characteristics | |
| Owner | Indian Railways |
| Operator | Northern Railway zone |
| Depot code | LDH |
| Type | Engine shed |
| Rolling stock | WAP-7 WAG-9 |
| History | |
| Opened | 2001 |
| Former rolling stock | WAP-4 WAG-5 WAM-4 WAG-7 |
Electric Loco Shed, Ludhiana is a motive power depot performing locomotive maintenance and repair facility for electric locomotives of the Indian Railways, located at Ludhiana Junction of the Northern Railway zone in Punjab, India.
Operation[edit | edit source]
Being one of the three electric engine sheds in Northern Railway, various major and minor maintenance schedules of electric locomotives are carried out here. It has the sanctioned capacity of 175 engine units. Beyond the operating capacity, this shed houses a total of 198 engine units, including 55 WAG-7 and 143 WAG-9. LDH used to hold WAP-4 & WAG-5 locomotives, which are now all transferred to other sheds. Like all locomotive sheds, LDH does regular maintenance, overhaul and repair including painting and washing of locomotives.[citation needed]
In 2020, the depot built a battery-operated shunter using components scavenged from decommissioned locomotives. The shunter can be powered either directly from overhead wires, or from battery power for limited time periods. It operates in place of a diesel shunter.[1][2]
Locomotives[edit | edit source]
| Serial No. | Locomotive Class | Horsepower | Quantity |
|---|---|---|---|
| 1. | WAP-7 | 6350 | 44 |
| 2. | WAG-9 | 6120 | 205 |
| Total locomotives active as of January 2026[3] | 249 | ||
References[edit | edit source]
- ↑ Bhatia, Kuldip (17 August 2020). "Electric Loco Shed makes engine from scrap". The Tribune. Retrieved 21 June 2021.
- ↑ "Railways develop unique electric engine for maintaining high temsion cables | Ludhiana News – Times of India". The Times of India. 17 August 2020. Retrieved 21 June 2021.
- ↑ "e-Locos".
