Green Line (Namma Metro): Difference between revisions

Created by BattyBot
Last edited February 19, 2026
UpdateBot (talk | contribs)
m robot: Update article (please report if you notice any mistake or error in this edit)
Freelaw67 (talk | contribs)
No edit summary
 
Line 1: Line 1:
{{short description|Line of Bengaluru's Namma Metro}}
{{short description|Line of Bengaluru's Namma Metro}}
{{about|the metro line in Bangalore|the railway segment in Bangalore|Green Route}}
{{about|the metro line in Bengaluru|the railway segment in Bengaluru|Green Route}}
{{Use Indian English|date=June 2017}}
{{Use Indian English|date=June 2017}}
{{Use dmy dates|date=September 2020}}
{{Use dmy dates|date=September 2020}}
Line 6: Line 6:
| box_width                      = 300
| box_width                      = 300
| name                            = Green Line
| name                            = Green Line
| other_name                      = North - South corridor
| other_name                      = {{hlist|North–South Corridor|Line 2|Madavara–Silk Institute Line}}
| color                          = {{rail color|Namma Metro|Green}}
| native_name                    = ಹಸಿರು ಮಾರ್ಗ (Hasiru mārga)
| native_name_lang                = Kannada
| color                          = {{rcr|Namma Metro|Green}}
| logo                            =  
| logo                            =  
| logo_width                      = 150
| logo_width                      = 150
| logo_alt                        =  
| logo_alt                        =  
| image                          = Green line metro train.jpg
| image                          = Green Line Namma Metro trainset.jpg
| image_width                    = 300
| image_width                    = 300
| caption                        = A Green Line metro train
| caption                        = This trainset on standby at {{stl|Namma Metro|Banashankari}} metro station and heading towards {{stl|Namma Metro|Silk Institute}} metro station
| type                            = [[Rapid Transit]]
| type                            = [[Rapid transit]]
| system                          = [[Namma Metro]]
| system                          = [[Namma Metro]]
| status                          = Operational
| status                          = Operational
| locale                          = [[Bangalore|Bengaluru]], [[Karnataka]], India
| locale                          = [[Bangalore|Bengaluru]], [[Karnataka]], India
| start                          = [[Nagasandra metro station|Nagasandra]]
| start                          = {{stl|Namma Metro|Madavara}}
| end                            = [[Silk Institute metro station|Silk Institute]]
| end                            = [[Silk Institute metro station|Silk Institute]]
| stations                        = 29 (Operational)<br/>3 (Under Construction)
| connectinglines                = '''''Operational''''' (2):<br>{{rcb|Namma Metro|Purple|croute}} {{rcb|Namma Metro|Yellow|croute}}
<br>'''''Upcoming''''' (1):<br>{{rcb|Namma Metro|Orange|croute}} <br>'''''Planned''''' (1):<br>{{rcb|Namma Metro|Inner Ring|croute}}
| stations                        = 32 (Operational)
| daily_ridership                = 170,685
| daily_ridership                = 170,685
| ridership2                      = 62.3 million (2018)<ref>{{cite web |title=Namma Metro surges ahead, clocks four-crore jump in annual ridership - Times of India |url=https://timesofindia.indiatimes.com/city/bengaluru/namma-metro-surges-ahead-clocks-four-crore-jump-in-annual-ridership/articleshow/67631785.cms |website=The Times of India |access-date=24 January 2019}}</ref>
| ridership2                      = 62.3 million (2018)<ref>{{cite news |title=Namma Metro surges ahead, clocks four-crore jump in annual ridership - Times of India |url=https://timesofindia.indiatimes.com/city/bengaluru/namma-metro-surges-ahead-clocks-four-crore-jump-in-annual-ridership/articleshow/67631785.cms |website=The Times of India |date=22 January 2019 |access-date=24 January 2019}}</ref>
| open                            = 1 March 2014
| open                            = {{start date and age|1 March 2014|df=yes}}
| lastextension                  = {{start date and age|07 November 2024|df=yes}}
| close                          =  
| close                          =  
| owner                          = Bengaluru Metro Rail Corporation Limited (BMRCL)
| owner                          = Bengaluru Metro Rail Corporation Limited (BMRCL)
| character                      = Elevated and underground
| character                      = Elevated and underground
| stock                          = Hyundai Rotem - BEML
| stock                          = BEML
| depot                          = Peenya
| depot                          = Peenya<br>Anjanapura (Under Construction)
| linelength_km                  = 30.69
| linelength_km                  = 33.46
| tracklength                    =  
| tracklength                    =  
| tracklength_km                  =  
| tracklength_km                  =  
Line 50: Line 55:
}}
}}


'''Green Line''' of [[Namma Metro]] was built along with the Purple Line during the first phase of construction of the [[Rapid transit|metro]] rail system for the city of [[Bengaluru]], [[Karnataka]], [[India]]. The 30.5&nbsp;km line connects [[Nagasandra metro station|Nagasandra]] in the northwest to [[Silk Institute metro station|Silk Institute]] in the south. The line connects the industrial centers of [[Peenya]] and [[Yelahanka]] in the north with the central hub of [[Majestic, Bangalore|Majestic]] and the southern residential areas of Bangalore ([[Basavanagudi]], [[Jayanagar, Bangalore|Jayanagar]], [[Banashankari|Banshankari]] etc.). Green Line is mostly elevated, with 26 elevated stations and 3 underground stations. The Line passes through [[Majestic metro station|Majestic station]] which is an interchange station between Green and [[Purple Line (Namma Metro)|Purple Lines]].
The '''Green Line''' is a line on the [[Namma Metro]] [[Rapid transit|rail system]]. As of 2025, the line is {{cvt|33.46|km|mi|abbr=on}} long and connects [[Madavara metro station|Madavara]] in the northwest to [[Silk Institute metro station|Silk Institute]] in the south. The line connects the north western suburbs and neighbourhoods of Bengaluru, such as [[Madavara metro station|Madavara]], [[Jalahalli]], [[Peenya]], [[Yeshwanthpur]], [[Rajajinagar]] and [[Malleshwaram, Bengaluru|Malleshwaram]] along Tumkur Road with the central hub of [[Majestic, Bangalore|Majestic]] and the southern residential areas of Bangalore such as [[Basavanagudi]], [[Jayanagar, Bangalore|Jayanagara]], [[Banashankari]], [[Konanakunte]] and [[Thalaghattapura metro station|Thalaghattapura]] along Kanakapura Road. The Green Line is mostly elevated, with 29 elevated and 3 underground stations. There are two interchanges along the Green Line, One with the [[Purple Line (Namma Metro)|Purple Line]] at [[Nadaprabhu Kempegowda station, Majestic metro station|Nadaprabhu Kempegowda Station, Majestic]] and the other with the [[Yellow Line (Namma Metro)|Yellow Line]] at [[Rashtreeya Vidyalaya Road metro station|Rashtreeya Vidyalaya Road]].
 
When Phase II is completed, the line will stretch from Madavara in northwest to Silk Institute in the South. The length of the line will increase to {{Convert|34.46|km|mi}}.


==History==
==History==
Green Line sections were opened as indicated below.<ref>{{cite web|title=Metro Network|url=http://www.bmrc.co.in/English/Network.htm|website=www.bmrc.co.in|access-date=27 April 2016|archive-url=https://web.archive.org/web/20150814222834/http://www.bmrc.co.in/English/Network.htm#|archive-date=14 August 2015|url-status=dead}}</ref>
Green Line sections were opened as indicated below.<ref>{{cite web|title=Metro Network|url=http://www.bmrc.co.in/English/Network.htm|website=www.bmrc.co.in|access-date=27 April 2016|archive-url=https://web.archive.org/web/20150814222834/http://www.bmrc.co.in/English/Network.htm|archive-date=14 August 2015}}</ref>


{|class="wikitable" style="text-align: center;"
{|class="wikitable" style="text-align: center;"
|-
|-
! colspan="6" style="background:#{{rail color|Namma Metro|Green}};" | <span style="color:WHITE;">'''History'''</span>
! colspan="7" style="background:#{{rcr|Namma Metro|Green}};" | <span style="color:WHITE;">'''History'''</span>
|-
|-
! Name
! Phase
! Extension date
! Section
! Opening date
! colspan="2"|Terminals
! colspan="2"|Terminals
! Length
! Length
! Stations
! Stations
|-
|-
| Reach 3 || 1 March 2014 ||[[Yeshwanthpur metro station|Yeshwanthpura]]||[[Sampige Road metro station|Sampige Road]]||{{convert|5.10|km|mi|abbr=on}}||7
| rowspan="6" |1||Reach 3 || rowspan="2" | 1 March 2014 ||[[Mantri Square Sampige Road metro station|Mantri Square Sampige Road]]||[[Yeshwanthpur metro station|Yeshwanthpur]] ||{{cvt|5.10|km|mi|abbr=on}}||7
|-
|-
| Reach 3A || 1 March 2014 ||[[Peenya Industry]]||[[Yeshwanthpur metro station|Yeshwanthpura]]||{{convert|4.80|km|mi|abbr=on}}||3
|Reach 3A ||[[Yeshwanthpur metro station|Yeshwanthpur]]||[[Peenya Industry]]||{{cvt|4.80|km|mi|abbr=on}}||3
|-
|-
| Reach 3B || 1 May 2015 || [[Nagasandra metro station|Nagasandra]] ||[[Peenya Industry]]||{{convert|2.50|km|mi|abbr=on}}|| 3
|Reach 3B || 1 May 2015 || [[Peenya Industry]]||[[Nagasandra metro station|Nagasandra]]||{{cvt|2.50|km|mi|abbr=on}}|| 3
|-
|-
| Reach 4 || 18 June 2017<ref name=":0">{{Cite news|url=http://www.newindianexpress.com/cities/bengaluru/2017/jun/08/all-of-bangalore-metro-phase-1-will-be-up-and-running-from-june-18-1614155.html|title=All of Bangalore Metro Phase-1 will be up and running from June 18|work=The New Indian Express|access-date=2017-06-15}}</ref> || [[National College metro station|National College]] ||[[Rashtreeya Vidyalaya Road metro station|Rashtreeya Vidyalaya Road]]||{{convert|4.10|km|mi|abbr=on}} ||5
|UG 2 || rowspan="3" | 18 June 2017<ref name=":0">{{Cite news |title=All of Bangalore Metro Phase-1 will be up and running from June 18 |url=https://www.newindianexpress.com/cities/bengaluru/2017/jun/08/all-of-bangalore-metro-phase-1-will-be-up-and-running-from-june-18-1614155.html |access-date=2017-06-15 |work=The New Indian Express}}</ref>||[[Mantri Square Sampige Road metro station|Mantri Square Sampige Road]]||[[National College metro station|National College]]||{{cvt|4.0|km|2|abbr=on}}<ref>{{cite news|last1=ReporterBengaluru|first1=Staff|title=BMRCL races to meet April 15 deadline|url=http://www.thehindu.com/news/cities/bangalore/bmrcl-races-to-meet-april-15-deadline/article17428832.ece|website=The Hindu|date=8 March 2017 |access-date=8 March 2017|language=en}}</ref>||3
|-
|-
| Reach 4A || 18 June 2017<ref name=":0" /> ||[[Rashtreeya Vidyalaya Road metro station|Rashtreeya Vidyalaya Road]]||[[Yelachenahalli metro station|Yelachenahalli]] || {{convert|3.90|km|mi|abbr=on}} ||3
|Reach 4 || [[National College metro station|National College]]||[[Rashtreeya Vidyalaya Road metro station|Rashtreeya Vidyalaya Road]]||{{cvt|4.10|km|mi|abbr=on}} ||5
|-
|-
| UG 2 || 18 June 2017<ref name=":0" /> ||[[Sampige Road metro station|Sampige Road]]||[[National College metro station|National College]]||{{convert|4.0|km|mi|abbr=on}}<ref>{{cite web|last1=ReporterBengaluru|first1=Staff|title=BMRCL races to meet April 15 deadline|url=http://www.thehindu.com/news/cities/bangalore/bmrcl-races-to-meet-april-15-deadline/article17428832.ece|website=The Hindu|access-date=8 March 2017|language=en}}</ref>||3
|Reach 4A ||[[Rashtreeya Vidyalaya Road metro station|Rashtreeya Vidyalaya Road]]||[[Yelachenahalli metro station|Yelachenahalli]]|| {{cvt|3.90|km|mi|abbr=on}} ||3
|-
|-
| Reach 4B || 15 January 2021 <ref name=":1">{{Cite web|title=Revised dates due to covid|url=https://www.thenewsminute.com/article/how-will-covid-19-impact-already-delayed-metro-projects-bengaluru-130028|access-date=2020-09-07|website=www.thenewsminute.com}}</ref>||[[Yelachenahalli metro station|Yelachenahalli]]|| [[Silk Institute metro station|Silk Institute]]||{{convert|6.29|km|mi|abbr=on}}<ref name = "BM Phase II length"/>||5
| rowspan="2" | 2||Reach 4B || 15 January 2021<ref>{{Cite web |title=Namma Metro's 6 Km Yelachenahalli To Silk Institute Stretch Flagged-off |url=https://www.moneycontrol.com/news/india/namma-metros-6-km-yelachenahalli-to-silk-institute-stretch-flagged-off-6347911.html |access-date=2021-09-01 |website=Moneycontrol |language=en}}</ref>||[[Yelachenahalli metro station|Yelachenahalli]]|| [[Silk Institute metro station|Silk Institute]]||{{cvt|6.29|km|mi|abbr=on}}<ref name="BM Phase II length" />||5
|-
|-
| Reach 3C || ''June 2022''<ref name=":1" /> ||[[Nagasandra metro station|Nagasandra]]||Madavara||{{convert|3.77|km|mi|abbr=on}}<ref name = "BM Phase II length">{{cite web|title=BMRCL begins razing structures for metro to Whitefield|url=https://timesofindia.indiatimes.com/city/bengaluru/bengaluru-manpower-crunch-may-delay-kanakapura-mysuru-road-metro-lines/articleshow/76764238.cms?|website=Bangalore Mirror|access-date=4 April 2017}}</ref>||3
|Reach 3C || 7 November 2024<ref name=":1">{{Cite web |title=Bengaluru Metro's Green Line extension set to open on Nov 7 |url=https://www.deccanherald.com/india/karnataka/bengaluru/bengaluru-metros-green-line-extension-set-to-open-on-nov-7-3263488 |access-date=2024-11-06 |website=Deccan Herald |language=en}}</ref>||[[Nagasandra metro station|Nagasandra]]||[[Madavara metro station|Madavara]]||{{cvt|3.14|km|mi|abbr=on}}<ref name="BM Phase II length">{{Cite web |title=Day before public launch, DK Shivakumar takes metro ride to Madavara |url=https://www.deccanherald.com/india/karnataka/bengaluru/day-before-public-launch-dk-shivakumar-takes-metro-ride-to-madavara-3265346 |access-date=2024-11-07 |website=Deccan Herald |language=en}}</ref>||3
|-
|-
!Total|| ||Madavara||Anjanapura||{{convert|34.46|km|mi|abbr=on}}||32
! colspan="3" |Total||Madavara||Silk Institute||{{cvt|33.46|km|mi|abbr=on}}
!32
|}
|}
[[File:NammaMetro-GreenLine.jpg|left|frameless|863x863px]]
[[File:NammaMetro-GreenLine-2025-08-18.jpg|left|frameless|863x863px]]


===Phase I===
===Phase I===
Construction work on Reach 3 and 3A of Phase I of the Namma Metro began in 2009–10. The total cost of the project on this stretch was {{INR}}2,100&nbsp;crore.<ref>{{cite news|url=http://timesofindia.indiatimes.com/city/bangalore/Green-train-rolls-out-on-March-1/articleshow/30965848.cms |title=Green train rolls out on March 1 |newspaper=The Times of India |date=25 February 2014 |access-date=27 March 2014}}</ref> Work on the underground section commenced in May 2011. TBMs named ''Kaveri,'' ''Krishna'' and ''Godavari'' were used for tunnel boring work for the Green Line.<ref>{{cite web|author=Rohith B R, Bangalore, 14 Oct 2012, DHNS |url=http://www.deccanherald.com/content/285446/automation-helps-precise-work-metro.html |title=Automation helps precise work on metro tunnels |work=Deccan Herald |date=14 October 2012 |access-date=4 March 2013}}</ref><ref>{{cite web|author=RohithB R, Bangalore, 13 Oct 2012, DHNS |url=http://www.deccanherald.com/content/285209/metro-makes-steady-inroads.html |title=Metro makes steady inroads |work=Deccan Herald |date=13 October 2012 |access-date=4 March 2013}}</ref><ref>{{cite news|author=Special Correspondent |url=http://www.thehindu.com/news/cities/bangalore/a-smoother-passage-for-margarita/article3944879.ece |title=A smoother passage for Margarita |work=The Hindu |date=28 September 2012 |access-date=4 March 2013 |location=Chennai, India}}</ref><ref>{{cite web|author=Bangalore, 23 Sep 2012, DHNS |url=http://www.deccanherald.com/content/280683/tunnelling-along-north-south-corridor.html |title=Tunnelling along north-south corridor to begin soon |work=Deccan Herald |date=23 September 2012 |access-date=4 March 2013}}</ref><ref>{{cite web |url=http://www.deccanchronicle.com/121218/news-current-affairs/article/metro-rushes-meet-deadline |title=Metro rushes to meet deadline |work=Deccan Chronicle |date=18 December 2012 |access-date=4 March 2013 |last=Update : 06:47&nbsp;pm IST |url-status=dead |archive-url=https://web.archive.org/web/20130106033920/http://www.deccanchronicle.com/121218/news-current-affairs/article/metro-rushes-meet-deadline |archive-date=6 January 2013 |df=dmy-all }}</ref><ref>{{cite web|author=Bangalore, 21 Feb 2013, DHNS |url=http://www.deccanherald.com/content/313939/after-helen-margarita-its-krishna.html |title=After Helen, Margarita, it's Krishna and Kaveri |work=Deccan Herald |date=21 February 2013 |access-date=4 March 2013}}</ref> The first trial run on the Green Line was conducted on 8 August 2013.<ref>{{cite news|author=Special Correspondent |url=http://www.thehindu.com/news/cities/bangalore/labour-ministry-puts-bmrcl-on-notice-for-labour-law-violations/article5004284.ece |title=Labour Ministry puts BMRCL on notice for labour law violations |newspaper=The Hindu |date=9 August 2013 |access-date=27 March 2014 |location=Chennai, India}}</ref>
Construction work on Reach 3 and 3A of Phase I of the Namma Metro began in 2009–10. The total cost of the project on this stretch was {{INR}}2,100&nbsp;crore.<ref>{{cite news|url=http://timesofindia.indiatimes.com/city/bangalore/Green-train-rolls-out-on-March-1/articleshow/30965848.cms |title=Green train rolls out on March 1 |newspaper=The Times of India |date=25 February 2014 |access-date=27 March 2014}}</ref> Work on the underground section commenced in May 2011. [[Tunnel boring machine|Tunnel boring machines]] named ''Kaveri,'' ''Krishna'' and ''Godavari'' were used for tunnel boring work for the Green Line.<ref>{{cite news |author=Rohith B R |url=http://www.deccanherald.com/content/285446/automation-helps-precise-work-metro.html |title=Automation helps precise work on metro tunnels |newspaper=Deccan Herald |date=14 October 2012 |access-date=4 March 2013}}</ref><ref>{{cite news |author=Rohith B R |url=http://www.deccanherald.com/content/285209/metro-makes-steady-inroads.html |title=Metro makes steady inroads |newspaper=Deccan Herald |date=13 October 2012 |access-date=4 March 2013}}</ref><ref>{{cite news |url=http://www.thehindu.com/news/cities/bangalore/a-smoother-passage-for-margarita/article3944879.ece |title=A smoother passage for Margarita |work=The Hindu |date=28 September 2012 |access-date=4 March 2013 |location=Chennai, India}}</ref><ref>{{cite news |url=http://www.deccanherald.com/content/280683/tunnelling-along-north-south-corridor.html |title=Tunnelling along north-south corridor to begin soon |newspaper=Deccan Herald |date=23 September 2012 |access-date=4 March 2013}}</ref><ref>{{cite news |url=http://www.deccanchronicle.com/121218/news-current-affairs/article/metro-rushes-meet-deadline |title=Metro rushes to meet deadline |newspaper=Deccan Chronicle |date=18 December 2012 |access-date=4 March 2013 |archive-url=https://web.archive.org/web/20130106033920/http://www.deccanchronicle.com/121218/news-current-affairs/article/metro-rushes-meet-deadline |archive-date=6 January 2013 |df=dmy-all }}</ref><ref>{{cite news |url=http://www.deccanherald.com/content/313939/after-helen-margarita-its-krishna.html |title=After Helen, Margarita, it's Krishna and Kaveri |newspaper=Deccan Herald |date=21 February 2013 |access-date=4 March 2013}}</ref> The first trial run on the Green Line was conducted on 8 August 2013.<ref>{{cite news |url=http://www.thehindu.com/news/cities/bangalore/labour-ministry-puts-bmrcl-on-notice-for-labour-law-violations/article5004284.ece |title=Labour Ministry puts BMRCL on notice for labour law violations |newspaper=The Hindu |date=9 August 2013 |access-date=27 March 2014 |location=Chennai, India}}</ref>


Construction required 1.3&nbsp;lakh tonnes of concrete, 44,500 tonnes of steel bars, and 190&nbsp;km of high tension wires weighing 2900 tonnes. A total of 395 piers, including station piers and portals, were constructed on the stretch. The tallest pier of the viaduct is a 21-metre pier between Kuvempu Road and Sriramapura stations, opposite Gayatri Devi Park. There 353 spans on the stretch, the longest being the 66-metre curved span over the railway track off Sriramapura. The total roofing area of the 10 stations on the stretch was 47,000 square metres.<ref name="thehindu1">{{cite news|author=Anil Kumar Sastry |url=http://www.thehindu.com/news/cities/bangalore/peenyasampige-road-metro-line-to-be-thrown-open-on-saturday/article5722354.ece |title=Peenya-Sampige Road metro line to be thrown open on Saturday |newspaper=The Hindu |date=24 February 2014 |access-date=27 March 2014 |location=Chennai, India}}</ref><ref>{{Cite web|title=green line metro stations list|url=http://comodos.cz/blog/e734d4-green-line-metro-stations-list|access-date=2020-09-07|website=comodos.cz}}</ref>
Construction required 1.3&nbsp;lakh tonnes of concrete, {{Convert|44500|t|lb}} of steel bars, and {{Cvt|190|km|1}} of high tension wires weighing {{Convert|2900|t|lb}}. A total of 395 piers, including station piers and portals, were constructed on the stretch. The tallest pier of the viaduct is a {{Convert|21|m|adj=on}} pier between [[Mahakavi Kuvempu Road metro station|Mahakavi Kuvempu Road]] and [[Srirampura metro station|Srirampura]] stations, opposite Gayatri Devi Park. There 353 spans on the stretch, the longest being the {{Convert|66|m|adj=on}} curved span over the railway track off Srirampura. The total roofing area of the 10 stations on the stretch was {{Convert|47000|m2}}.<ref name="thehindu1">{{cite news|author=Anil Kumar Sastry |url=http://www.thehindu.com/news/cities/bangalore/peenyasampige-road-metro-line-to-be-thrown-open-on-saturday/article5722354.ece |title=Peenya-Sampige Road metro line to be thrown open on Saturday |newspaper=The Hindu |date=24 February 2014 |access-date=27 March 2014 |location=Chennai, India}}</ref><ref>{{Cite web|title=green line metro stations list|url=http://comodos.cz/blog/e734d4-green-line-metro-stations-list|access-date=2020-09-07|website=comodos.cz}}</ref>


The first section of Green Line was opened to public on 1 March 2014.<ref>{{cite news|author=Special Correspondent |url=http://www.thehindu.com/news/cities/bangalore/cm-in-a-hurry-delays-namma-metro-launch/article5737303.ece |title=CM in a hurry, delays Namma Metro launch |newspaper=The Hindu |date=28 February 2014 |access-date=27 March 2014 |location=Chennai, India}}</ref> BMRCL Managing Director Pradeep Singh Kharola stated that about 25,000 passengers traveled on the line on the opening day.<ref>{{cite news|url=http://www.deccanherald.com/content/389661/25000-ride-green-line-metro.html |title=25,000 ride Green line Metro on 1st working day |newspaper=Deccan Herald |date=3 March 2014 |access-date=27 March 2014}}</ref> In the first month of operations, 7.62&nbsp;lakh people at an average of 24,605 people daily used the Green Line, generating a revenue of {{INRConvert|1.5|c|nolink=yes}}.<ref>{{cite news| url=http://www.thehindu.com/news/cities/bangalore/byappanahallimg-road-metro-stretch-more-popular/article5876934.ece | location=Chennai, India | work=The Hindu | first=Tanu | last=Kulkarni | title=Byappanahalli-M.G. Road metro stretch more popular | date=5 April 2014}}</ref>
The first section of Green Line was opened to public on 1 March 2014.<ref>{{cite news |url=http://www.thehindu.com/news/cities/bangalore/cm-in-a-hurry-delays-namma-metro-launch/article5737303.ece |title=CM in a hurry, delays Namma Metro launch |newspaper=The Hindu |date=28 February 2014 |access-date=27 March 2014 |location=Chennai, India}}</ref> BMRCL Managing Director Pradeep Singh Kharola stated that about 25,000 passengers traveled on the line on the opening day.<ref>{{cite news|url=http://www.deccanherald.com/content/389661/25000-ride-green-line-metro.html |title=25,000 ride Green line Metro on 1st working day |newspaper=Deccan Herald |date=3 March 2014 |access-date=27 March 2014}}</ref> In the first month of operations, 7.62&nbsp;lakh people at an average of 24,605 people daily used the Green Line, generating a revenue of {{INRConvert|1.5|c|nolink=yes}}.<ref>{{cite news| url=http://www.thehindu.com/news/cities/bangalore/byappanahallimg-road-metro-stretch-more-popular/article5876934.ece | location=Chennai, India | work=The Hindu | first=Tanu | last=Kulkarni | title=Byappanahalli-M.G. Road metro stretch more popular | date=5 April 2014}}</ref>


TBM ''Godavari'' began drilling the 970-metre underground section between Sampige Road and Majestic stations in April 2014. ''Godavari'' broke down a few months later, and needed to have its cutter head replaced. The machine broke down due to tough terrain including hard rock and boulders. The cutter head had to be imported from Italy. The machine restarted work in September 2015. ''Godavari'' completed drilling and emerged on the Majestic station end of the tunnel on 19 April 2016.<ref>{{cite web|title=Godavari sees light - Bangalore Mirror -|url=http://www.bangaloremirror.com/bangalore/others/Godavari-sees-light/articleshow/51899949.cms|website=Bangalore Mirror|access-date=20 April 2016}}</ref><ref name="indiatimes">{{cite web|title=Bengaluru: East-west corridor from Byappanahalli to Mysuru Road may open next week - The Economic Times|url=http://economictimes.indiatimes.com/industry/transportation/railways/bengaluru-east-west-corridor-from-byappanahalli-to-mysuru-road-may-open-next-week/articleshow/51905831.cms|access-date=10 April 2017|publisher=economictimes.indiatimes.com}}</ref> Meanwhile, ''Kaveri'' and ''Krishna'' continued drilling the underground section between National College and Nadaprabhu Kempegowda station.
TBM ''Godavari'' began drilling the {{Convert|970|m|adj=on}} underground section between Sampige Road and Majestic stations in April 2014. ''Godavari'' broke down a few months later, and needed to have its cutter head replaced, due to contact with tough terrain including hard rock and boulders. The machine restarted work in September 2015 after importing the cutter head from Italy. ''Godavari'' completed drilling and emerged on the Majestic station end of the tunnel on 19 April 2016.<ref>{{cite web|title=Godavari sees light - Bangalore Mirror -|url=https://bangaloremirror.indiatimes.com/bangalore/others/Godavari-sees-light/articleshow/51899949.cms|website=Bangalore Mirror|access-date=20 April 2016}}</ref><ref name="indiatimes">{{cite news|title=Bengaluru: East-west corridor from Byappanahalli to Mysuru Road may open next week - The Economic Times|newspaper=The Economic Times |date=20 April 2016 |url=http://economictimes.indiatimes.com/industry/transportation/railways/bengaluru-east-west-corridor-from-byappanahalli-to-mysuru-road-may-open-next-week/articleshow/51905831.cms|access-date=10 April 2017|publisher=economictimes.indiatimes.com}}</ref> Meanwhile, ''Kaveri'' and ''Krishna'' drilled the underground section between National College and Nadaprabhu Kempegowda station.


Construction of the underground section of Green Line required the use of 3,000 transit mixer loads of concrete. 1,000&nbsp;km of cable had to be laid.<ref>{{cite web|title=April deadline nears but trial runs yet to begin|url=http://timesofindia.indiatimes.com/city/bengaluru/april-deadline-nears-but-trial-runs-yet-to-begin/articleshow/57547938.cms|website=The Times of India|access-date=9 March 2017}}</ref>
Construction of the underground section of Green Line required the use of 3,000 transit mixer loads of concrete. {{Cvt|1000|km}} of cable had to be laid.<ref>{{cite news|title=April deadline nears but trial runs yet to begin|url=http://timesofindia.indiatimes.com/city/bengaluru/april-deadline-nears-but-trial-runs-yet-to-begin/articleshow/57547938.cms|website=The Times of India|date=9 March 2017 |access-date=9 March 2017}}</ref>


Trial runs on the elevated section between National College and Yelachenahalli began on 23 November 2016. Trials were conducted between National College and Jayanagara initially at a speed of 10&nbsp;km/h, and then along the entire elevated section between National College and Yelachenahalli at a speed of 25&nbsp;km/h.<ref>{{cite web|title=Bengaluru Metro to go underground on south side soon|url=http://www.newindianexpress.com/cities/bengaluru/2017/mar/03/bengaluru-metro-to-go-underground-on-south-side-soon-1576992--2.html|website=The New Indian Express|access-date=3 March 2017}}</ref> Trial runs began in the tunneled section on 30 March 2017.
Trial runs on the elevated section between National College and Yelachenahalli began on 23 November 2016. Trials were conducted between National College and Jayanagara initially at a speed of {{Cvt|10|km/h}}, and then along the entire elevated section between National College and Yelachenahalli at a speed of {{Cvt|25|km/h|1}}.<ref>{{cite web|title=Bengaluru Metro to go underground on south side soon|url=http://www.newindianexpress.com/cities/bengaluru/2017/mar/03/bengaluru-metro-to-go-underground-on-south-side-soon-1576992--2.html|archive-url=https://web.archive.org/web/20170303201527/http://www.newindianexpress.com/cities/bengaluru/2017/mar/03/bengaluru-metro-to-go-underground-on-south-side-soon-1576992--2.html|archive-date=3 March 2017|website=The New Indian Express|access-date=3 March 2017}}</ref> Trial runs began in the tunneled section on 30 March 2017.


Services at Sampige Road, Srirampura and Kuvempu Road stations were suspended between 13 and 22 March 2017 to allow authorities to conduct static and other tests and to link Sampige Road station with Nadaprabhu Kempegowda station. During the 10-day testing period, services operated only between Nagasandra and Rajajinagar stations. The BMTC introduced special feeder bus services to transport passengers from Rajajinagara to Hosahalli.<ref>{{cite web|title=Part of Namma Metro Green Line to be shut for 10 days|url=http://www.deccanherald.com/content/600637/part-namma-metro-green-line.html|website=Deccan Herald|access-date=11 March 2017}}</ref><ref>{{cite web|author=Staff Reporter|title=Three metro stations on Green Line to be closed from Monday|url=http://www.thehindu.com/news/cities/bangalore/three-metro-stations-on-green-line-to-be-closed-from-monday/article17444227.ece|website=The Hindu|access-date=11 March 2017|language=en}}</ref> Services between Sampige Road and Rajajinagara were suspended again for four days beginning 13 April 2017 to conduct trial runs on the underground section between Sampige Road and National College.<ref>{{cite web|author=Staff Reporter|title=Metro suspended|url=http://www.thehindu.com/todays-paper/tp-national/tp-karnataka/metro-suspended/article17939916.ece|website=The Hindu|access-date=13 April 2017|language=en}}</ref><ref>{{cite web|title=Sampige Road-Rajajinagar Metro shut for 4 days|url=http://www.deccanherald.com/content/605972/sampige-road-rajajinagar-metro-shut.html|website=Deccan Herald|access-date=13 April 2017}}</ref> Trial runs were completed on 16 May 2017.<ref>{{cite web|title=Metro trial runs to be over today|url=http://www.deccanherald.com/content/611772/metro-trial-runs-over-today.html|website=Deccan Herald|access-date=16 May 2017}}</ref>
Services at Sampige Road, Srirampura and Kuvempu Road stations were suspended between 13 and 22 March 2017 to allow authorities to conduct static and other tests and to link Sampige Road station with Nadaprabhu Kempegowda station. During the 10-day testing period, services operated only between Nagasandra and Rajajinagar stations. The BMTC introduced [[Rail replacement bus service|rail replacement bus services]] from Rajajinagara to Hosahalli.<ref>{{cite web|title=Part of Namma Metro Green Line to be shut for 10 days|url=http://www.deccanherald.com/content/600637/part-namma-metro-green-line.html|website=Deccan Herald|access-date=11 March 2017}}</ref><ref>{{cite news|author=Staff Reporter|title=Three metro stations on Green Line to be closed from Monday|url=http://www.thehindu.com/news/cities/bangalore/three-metro-stations-on-green-line-to-be-closed-from-monday/article17444227.ece|website=The Hindu|date=10 March 2017 |access-date=11 March 2017|language=en}}</ref> Services between Sampige Road and Rajajinagara were suspended again for four days beginning 13 April 2017 to conduct trial runs on the underground section between Sampige Road and National College.<ref>{{cite news|author=Staff Reporter|title=Metro suspended|url=http://www.thehindu.com/todays-paper/tp-national/tp-karnataka/metro-suspended/article17939916.ece|website=The Hindu|date=11 April 2017 |access-date=13 April 2017|language=en}}</ref><ref>{{cite web|title=Sampige Road-Rajajinagar Metro shut for 4 days|url=http://www.deccanherald.com/content/605972/sampige-road-rajajinagar-metro-shut.html|website=Deccan Herald|access-date=13 April 2017}}</ref> Trial runs were completed on 16 May 2017.<ref>{{cite web|title=Metro trial runs to be over today|url=http://www.deccanherald.com/content/611772/metro-trial-runs-over-today.html|website=Deccan Herald|access-date=16 May 2017}}</ref>


===Phase II===
===Phase II===
Contract for construction of the 6.5&nbsp;km Reach 4B from Yelachenahalli to Silk Institute (previously named Anjanapura) was awarded to Nagarjuna Construction Co. The extension was estimated to cost {{INRConvert|508.86|c}}.<ref name="ET22">{{cite web|title=At Rs 247 crore, contract for Namma Metro purple line extension finalised|url=http://economictimes.indiatimes.com/industry/transportation/railways/at-rs-247-crore-contract-for-namma-metro-purple-line-extension-finalised/articleshow/57386842.cms|website=The Economic Times|access-date=28 February 2017}}</ref> Civil work on the extension began in October 2016<ref name="DC22" /> and was completed by 2020. Trial runs were conducted on 18–19 December 2020<ref>{{cite web |title=CMRS Inspects Bangalore Metro Green Line's Anjanapura Extn |url=https://themetrorailguy.com/2020/11/19/cmrs-inspects-bangalore-metro-green-lines-anjanapura-extn/ |website=The Metro Rail Guy |access-date=14 January 2021}}</ref> following which the extension was inaugurated on 14 January 2021,<ref>{{cite news |last1=Lalitha |first1=S |title=First line of Bangalore Metro's Phase-2 flagged off |url=https://www.newindianexpress.com/cities/bengaluru/2021/jan/14/first-line-of-bangalore-metros-phase-2-flagged-off-2250181.html |access-date=14 January 2021 |work=The New Indian Express |date=14 January 2021}}</ref> making it the first section of Phase II to start commercial operations.
{{Rapid transit OSM map|stroke-width=5|system_qid=Q17054000|single_line=y|stations=y|stations_qid=Q17054000|frame-width=200|frame-height=200|frame-align=right}}
Contract for construction of the 6.5&nbsp;km Reach 4B from Yelachenahalli to Silk Institute was awarded to Nagarjuna Construction Co. The extension was estimated to cost {{INRConvert|508.86|c}}.<ref name="ET22">{{cite news|title=At Rs 247 crore, contract for Namma Metro purple line extension finalised|url=http://economictimes.indiatimes.com/industry/transportation/railways/at-rs-247-crore-contract-for-namma-metro-purple-line-extension-finalised/articleshow/57386842.cms|website=The Economic Times|date=28 February 2017 |access-date=28 February 2017 |last1=Menezes |first1=Naveen }}</ref> Civil work on the extension began in October 2016<ref name="DC22" /> and was completed by 2020. Trial runs were conducted on 18–19 December 2020,<ref>{{cite web |title=CMRS Inspects Bangalore Metro Green Line's Anjanapura Extn |url=https://themetrorailguy.com/2020/11/19/cmrs-inspects-bangalore-metro-green-lines-anjanapura-extn/ |website=The Metro Rail Guy |date=19 November 2020 |access-date=14 January 2021}}</ref> and the extension was opened on 14 January 2021,<ref>{{cite news |last1=Lalitha |first1=S |title=First line of Bangalore Metro's Phase-2 flagged off |url=https://www.newindianexpress.com/cities/bengaluru/2021/jan/14/first-line-of-bangalore-metros-phase-2-flagged-off-2250181.html |access-date=14 January 2021 |work=The New Indian Express |date=14 January 2021}}</ref> making it the first section of Phase II to start commercial operations.
 
In October 2016, BMRCL invited bids for the construction of viaduct and stations on the 3.031&nbsp;km extension (Reach 3C) of the Green Line from Nagasandra to Madavara (previously named Bengaluru International Exhibition Centre).<ref name = "DC22">{{cite web|title=BMRCL invites bids for 3-km extension from Nagasandra.|url=http://www.deccanherald.com/content/575499/bmrcl-invites-bids-3-km.html|website=Deccan Herald|access-date=28 February 2017}}</ref> Reach 3C was awarded to Simplex Infrastructure Limited in late February 2017. The contract specified a cost of {{INRConvert|247.41|c}} and a deadline for completion of 27 months.<ref name="ET22"/><ref>{{cite web|title=Metro to start work on third stretch of Phase-II|url=https://www.newindianexpress.com/cities/bengaluru/2017/apr/10/metro-to-start-work-on-third-stretch-of-phase-ii-1591915.html|website=The New Indian Express|date=10 April 2017 |access-date=13 April 2017}}</ref> The start of construction on the extension was delayed by 4 months due to land acquisition issues concerning land near Jindal Aluminium Limited in Kirloskar Layout. The issues were resolved and construction began in June 2017.<ref>{{cite web |title=Work on BIEC Metro link begins as Jindal land acquired |url=https://www.deccanherald.com/content/629788/work-biec-metro-link-begins.html |website=Deccan Herald |access-date=8 October 2018 |language=en |date=25 August 2017}}</ref> Trial runs were conducted in August 2024 and it was opened on 7 November 2024.
 
After Phase II was completed, the line extended its stretch from Madavara in northwest to Silk Institute in the South. The length of the line increased to {{convert|34.46|km|mi}}. Commercial operations on the Nagasandra-Madavara stretch started from November 7, 2024.<ref>{{Cite news |date=2024-11-05 |title=Extended Namma Metro Green Line operation launch likely on November 6 |url=https://timesofindia.indiatimes.com/city/bengaluru/namma-metro-green-line-extended-operations-set-to-launch-on-november-6/articleshow/114990458.cms |access-date=2024-11-06 |work=The Times of India |issn=0971-8257}}</ref><ref>{{Cite web |date=2024-08-06 |title=Bengaluru Metro might face delays as Green Line Extension trial run begins today {{!}} Check details |url=https://www.news9live.com/city/bengaluru/bengaluru-metro-might-face-delays-as-green-line-extension-trial-run-begins-today-check-details-2645672 |access-date=2024-08-07 |website=News9live |language=en-US}}</ref><ref>{{Cite web |last=Naima |first=Kathija |date=2024-08-06 |title=Bengaluru Metro Green Line Extension Trials Begin |url=https://newskarnataka.com/karnataka/bengaluru/bengaluru-metro-green-line-extension-begins-trial-runs/06082024/ |access-date=2024-08-07 |website=News Karnataka |language=en-US}}</ref><ref>{{Cite web |last=India |first=The Hans |date=2024-08-05 |title=Metro trial service on Nagasandra-Madavara route from Aug 6 |url=https://www.thehansindia.com/news/cities/bengaluru/metro-trial-service-on-nagasandra-madavara-route-from-aug-6-896944 |access-date=2024-08-07 |website=www.thehansindia.com |language=en}}</ref>


In October 2016, BMRCL invited bids for the construction of viaduct and stations on the 3.031&nbsp;km extension (Reach 3C) of the Green Line from Nagasandra to Madavara (previously named Bengaluru International Exhibition Centre).<ref name = "DC22">{{cite web|title=BMRCL invites bids for 3-km extension from Nagasandra.|url=http://www.deccanherald.com/content/575499/bmrcl-invites-bids-3-km.html|website=Deccan Herald|access-date=28 February 2017}}</ref> Reach 3C was awarded to Simplex Infrastructure Limited in late February 2017. The contract specified a cost of {{INRConvert|247.41|c}} and a deadline for completion of 27 months.<ref name="ET22"/><ref>{{cite web|title=Metro to start work on third stretch of Phase-II|url=http://www.newindianexpress.com/cities/bengaluru/2017/apr/10/metro-to-start-work-on-third-stretch-of-phase-ii-1591915.html|website=The New Indian Express|access-date=13 April 2017}}</ref> The start of construction on the extension was delayed by 4 months due to land acquisition issues concerning land near Jindal Aluminium Limited in Kirloskar Layout. The issues were resolved and construction began in June 2017.<ref>{{cite web |title=Work on BIEC Metro link begins as Jindal land acquired |url=https://www.deccanherald.com/content/629788/work-biec-metro-link-begins.html |website=Deccan Herald |access-date=8 October 2018 |language=en |date=25 August 2017}}</ref> Construction work on Reach 3C is expected to be ready by June–August 2022.<ref>{{Cite web|date=3 July 2020|first=Christin Mathew |last=Philip|title=Bangalore Metro News: Manpower crunch may delay Kanakapura, Mysuru Road Metro lines|url=https://timesofindia.indiatimes.com/city/bengaluru/bengaluru-manpower-crunch-may-delay-kanakapura-mysuru-road-metro-lines/articleshow/76764238.cms|access-date=2020-09-07|website=The Times of India|language=en}}</ref>
There have been petitions to extend the line further south till the [[Art of Living Foundation|Art of Living International Centre]] in the outskirts of Bengaluru.


==Stations==
==Stations==
{{Main|List of Namma Metro stations}}
{{Main|List of Namma Metro stations}}
There will be 32 stations on the Green Line. Of these, 29 are currently operational. Each station has around 60 surveillance cameras. Passenger lifts and escalators are provided at all stations.


{|class="wikitable" style="text-align: center;"
There are 32 stations on the Green Line. Each station has around 60 surveillance cameras. Passenger lifts and escalators are provided at all stations. The Line has an operational depot at [[Peenya metro station|Peenya]] and another under construction at [[Silk Institute metro station|Silk Institute]]
! align="center" colspan="7" style="background:#{{rail color|Namma Metro|Green}};"| <span style="color:WHITE;">'''Green Line'''</span>
 
=== Interchanges ===
Passenger interchange facilities, connecting to other metro and railway lines, will be provided at the following stations: 
 
* [[Peenya metro station|Peenya]] (connects to the [[Orange Line (Namma Metro)|Orange Line]], which runs between [[Kempapura metro station|Kempapura]] and [[JP Nagar 4th Phase metro station|JP Nagar 4th Phase]])
* [[Yeshwanthpur metro station|Yeshwanthpur]] (connects to the [[Yesvantpur Junction railway station]])
* [[Nadaprabhu Kempegowda station, Majestic metro station|Nadaprabhu Kempegowda station, Majestic]] (connects to the [[Purple Line (Namma Metro)|Purple Line]], which runs between [[Whitefield (Kadugodi) metro station|Whitefield (Kadugodi)]] and [[Challaghatta metro station|Challaghatta]], also connects to the [[Bengaluru City railway station]] and [[Kempegowda Bus Station]])
 
* [[Rashtreeya Vidyalaya Road metro station|Rashtreeya Vidyalaya Road]] (connects to the [[Yellow Line (Namma Metro)|Yellow Line]], which runs between [[Rashtreeya Vidyalaya Road metro station|Rashtreeya Vidyalaya Road]] and [[Delta Electronics Bommasandra metro station|Delta Electronics Bommasandra]])
* [[Jaya Prakash Nagar metro station|Jaya Prakash Nagar]] (connects to the [[Orange Line (Namma Metro)|Orange Line]], which runs between [[Kempapura metro station|Kempapura]] and [[JP Nagar 4th Phase metro station|JP Nagar 4th Phase]])
 
=== List of stations ===
{| class="wikitable" style="text-align: center;"
! align="center" colspan="8" style="background:#{{rcr|Namma Metro|Green}};" | <span style="color:WHITE;">'''Green Line'''</span>
|-
|-
! rowspan="2"|#
! rowspan="2" |#
! colspan="2"|Station Name
! colspan="2" |Station name
! rowspan="2"|Opening
! rowspan="2" |Opening
! rowspan="2"|Connections/Transits/Terminals
! rowspan="2" |Connections
! rowspan="2"|Layout
! rowspan="2" |Station type
! rowspan="2"|Coordinates
! rowspan="2" |Platform type
|-
|-
! [[English language|English]]||[[Kannada]]
! [[English language|English]]||[[Kannada]]
|-
|-
|1|| style="text-align:center;"|{{metro|Madavara}}||ಮದವರ
|1|| style="text-align:center;" |{{stl|Namma Metro|Madavara}}||[[Madavara metro station|ಮಾದಾವರ]]
|September 2022
|7 November 2024
| ||Elevated
| ||Elevated
|
|Side
|-
|-
|2|| style="text-align:center;"|{{metro|Chikkabidarakallu}}||  
|2|| style="text-align:center;" |{{stl|Namma Metro|Chikkabidarakallu}}||
ಚಿಕ್ಕಬಿದರಕಲ್ಲು  
[[Chikkabidarakallu metro station|ಚಿಕ್ಕಬಿದರಕಲ್ಲು]]
|''September 2022''|| ||Elevated
|7 November 2024 || ||Elevated
|
|Side
|-
|-
|3|| style="text-align:center;"|{{metro|Manjunathanagara}}||ಮಂಜುನಾಥನಗರ
|3|| style="text-align:center;" |{{stl|Namma Metro|Manjunath Nagar}}||[[Manjunath Nagar metro station|ಮಂಜುನಾಥನಗರ]]
|''September 2022''
|7 November 2024
| ||Elevated
| ||Elevated
|
|Side
|-
|-
|4|| style="text-align:center;"|[[Nagasandra metro station|Nagasandra]]|| ನಾಗಸಂದ್ರ
|4|| style="text-align:center;" |[[Nagasandra metro station|Nagasandra]]|| [[Nagasandra metro station|ನಾಗಸಂದ್ರ]]
| 1 May 2015 || ||Elevated||
| 1 May 2015 || ||Elevated
|Side
|-
|-
|5|| style="text-align:center;"|[[Dasarahalli metro station|Dasarahalli]]||ದಾಸರಹಳ್ಳಿ  
|5|| style="text-align:center;" |[[Dasarahalli metro station|Dasarahalli]]||[[Dasarahalli metro station|ದಾಸರಹಳ್ಳಿ]]
| 1 May 2015 || ||Elevated||
| 1 May 2015 || ||Elevated
|Side
|-
|-
|6|| style="text-align:center;"|[[Jalahalli metro station|Jalahalli]]|| ಜಾಲಹಳ್ಳಿ  
|6|| style="text-align:center;" |[[Jalahalli metro station|Jalahalli]]|| [[Jalahalli metro station|ಜಾಲಹಳ್ಳಿ]]
| 1 May 2015 ||{{rint|bus}}Basaveshwara Bus Station||Elevated||
| 1 May 2015 ||{{rint|bus}} Basaveshwara Bus Station||Elevated
|Side
|-
|-
|7|| style="text-align:center;"|[[Peenya Industry]]|| ಪೀಣ್ಯ ಕಾರ್ಖಾನೆ
|7|| style="text-align:center;" |[[Peenya Industry]]|| [[Peenya Industry metro station|ಪೀಣ್ಯ ಇಂಡಸ್ಟ್ರಿ]]
| 1 March 2014 || ||Elevated||
| 1 March 2014 || ||Elevated
|Side
|-
|-
|8|| style="text-align:center;"|[[Peenya metro station|Peenya]]|| ಪೀಣ್ಯ  
|8|| style="text-align:center;" |[[Peenya metro station|Peenya]]|| [[Peenya metro station|ಪೀಣ್ಯ]]
| 1 March 2014 || ||Elevated||
| 1 March 2014 ||{{rint|bengaluru|metro}} {{rcb|Namma Metro|Orange|croute}} (''<small>Approved</small>'') ||Elevated
|Side
|-
|-
|9|| style="text-align:center;"|[[Goraguntepalya metro station|Goraguntepalya]]|| ಗೊರಗುಂಟೆಪಾಳ್ಯ  
|9|| style="text-align:center;" |[[Goraguntepalya metro station|Goraguntepalya]]|| [[Goraguntepalya metro station|ಗೊರಗುಂಟೆಪಾಳ್ಯ]]
| 1 March 2014 ||{{rint|subway}} {{rcb|Namma Metro|Orange|inline=yes}} (''Planned, Ph lll'')||Elevated||
| 1 March 2014 || ||Elevated
|Side
|-
|-
|10|| style="text-align:center;"|[[Yeshwanthpur metro station|Yeshwanthpura]]|| ಯಶವಂತಪುರ  
|10|| style="text-align:center;" |[[Yeshwanthpur metro station|Yeshwanthpura]]|| [[Yeshwanthpur metro station|ಯಶವಂತಪುರ]]
| 1 March 2014 ||{{rint|rail}}[[Yesvantpur Junction railway station|Yesvantpur railway station]]||Elevated||
| 1 March 2014 ||
{{ric|Indian Railways}} [[Yesvantpur Junction railway station|Yesvantpur Junction]]
||Elevated
|Side
|-
|-
|11|| style="text-align:center;"|[[Sandal Soap Factory]] || ಸ್ಯಾಂಡಲ್ ಸೋಪ್ ಫ್ಯಾಕ್ಟರಿ  
|11|| style="text-align:center;" |[[Sandal Soap Factory]]|| [[Sandal Soap Factory metro station|ಸ್ಯಾಂಡಲ್ ಸೋಪ್ ಫ್ಯಾಕ್ಟರಿ]]
| 1 March 2014 ||{{rint|bus}}Yeshwanthpura TTMC||Elevated||
| 1 March 2014 ||{{rint|bus}} Yeshwanthpura TTMC||Elevated
|Side
|-
|-
|12|| style="text-align:center;"|[[Mahalakshmi metro station|Mahalakshmi]]|| ಮಹಾಲಕ್ಷ್ಮಿ
|12|| style="text-align:center;" |[[Mahalakshmi metro station|Mahalakshmi]]|| [[Mahalakshmi metro station|ಮಹಾಲಕ್ಷ್ಮೀ]]
| 1 March 2014 || ||Elevated||
| 1 March 2014 || ||Elevated
|Side
|-
|-
|13|| style="text-align:center;"|[[Rajajinagar metro station|Rajajinagara]]|| ರಾಜಾಜಿನಗರ  
|13|| style="text-align:center;" |[[Rajajinagar metro station|Rajajinagara]]|| [[Rajajinagar metro station|ರಾಜಾಜಿನಗರ]]
| 1 March 2014 || ||Elevated||
| 1 March 2014 || ||Elevated
|Side
|-
|-
|14|| style="text-align:center;"|[[Kuvempu Road metro station|Mahakavi Kuvempu Road]]|| ಮಹಾಕವಿ ಕುವೆಂಪು ರಸ್ತೆ  
|14|| style="text-align:center;" |[[Mahakavi Kuvempu Road metro station|Mahakavi Kuvempu Road]]|| [[Mahakavi Kuvempu Road metro station|ಮಹಾಕವಿ ಕುವೆಂಪು ರಸ್ತೆ]]
| 1 March 2014 || ||Elevated||
| 1 March 2014 || ||Elevated
|Side
|-
|-
|15|| style="text-align:center;"|[[Srirampura metro station|Srirampura]]|| ಶ್ರೀರಾಂಪುರ
|15|| style="text-align:center;" |[[Srirampura metro station|Srirampura]]|| [[Srirampura metro station|ಶ್ರೀರಾಮ್ ಪುರ]]
| 1 March 2014 || ||Elevated||
| 1 March 2014 || ||Elevated
|Side
|-
|-
|16|| style="text-align:center;"|[[Sampige Road metro station|Sampige Road]]|| ಸಂಪಿಗೆ ರಸ್ತೆ  
|16|| style="text-align:center;" |[[Mantri Square Sampige Road metro station|Mantri Square Sampige Road]]|| [[Mantri Square Sampige Road metro station|ಮಂತ್ರಿ ಸ್ಕ್ವೇರ್ ಸಂಪಿಗೆ ರಸ್ತೆ]]
| 1 March 2014 || {{rint|rail}}''Planned Srirampura Suburban stn''||Elevated||
| 1 March 2014 |1 March 2014
| ||Elevated
|Side
|-
|-
|17|| style="text-align:center;"|[[Majestic metro station|Nadaprabhu Kempegowda station, Majestic]]|| ನಾಡಪ್ರಭು ಕೆಂಪೇಗೌಡ ನಿಲ್ದಾಣ, ಮೆಜೆಸ್ಟಿಕ್
|17|| style="text-align:center;" |[[Nadaprabhu Kempegowda station, Majestic metro station|Nadaprabhu Kempegowda station, Majestic]]|| [[Nadaprabhu Kempegowda station, Majestic metro station|ನಾಡಪ್ರಭು ಕೆಂಪೇಗೌಡ ನಿಲ್ದಾಣ, ಮೆಜೆಸ್ಟಿಕ್]]
| 18 June 2017 ||{{rint|subway}} {{rcb|Namma Metro|Purple|inline=yes}},
| 18 June 2017 ||{{rint|bengaluru|metro}} {{rcb|Namma Metro|Purple|croute}}<br>{{ric|Indian Railways}} [[Bengaluru City railway station|KSR Bengaluru]]<br/>{{rint|bus}} [[Kempegowda Bus Station]]
{{rint|bus}}[[Kempegowda Bus Station]],
|Underground
 
|{{Abbr|Island|Green Line under Namma Metro}} & {{Abbr|Side|Purple Line under Namma Metro}}
{{rint|rail}}[[Bangalore City railway station|KSR City Railway Station]]
|Underground||
|-
|-
|18|| style="text-align:center;"|[[Chickpet metro station|Chickpete]]|| ಚಿಕ್ಕಪೇಟೆ  
|18|| style="text-align:center;" |[[Chickpete metro station|Chickpete]]|| [[Chickpete metro station|ಚಿಕ್ಕಪೇಟೆ]]
| 18 June 2017 || ||Underground||
| 18 June 2017 || ||Underground
|Island
|-
|-
|19|| style="text-align:center;"|[[Krishna Rajendra Market metro station|Krishna Rajendra Market]]|| ಕೃಷ್ಣ ರಾಜೇಂದ್ರ ಮಾರುಕಟ್ಟೆ  
|19|| style="text-align:center;" |[[Krishna Rajendra Market metro station|Krishna Rajendra Market]]|| [[Krishna Rajendra Market metro station|ಕೃಷ್ಣ ರಾಜೇಂದ್ರ ಮಾರುಕಟ್ಟೆ]]
| 18 June 2017 || ||Underground||
| 18 June 2017 || ||Underground
|Island
|-
|-
|20|| style="text-align:center;"|[[National College metro station|National College]]|| ನ್ಯಾಷನಲ್ ಕಾಲೇಜು
|20|| style="text-align:center;" |[[National College metro station|National College]]|| [[National College metro station|ನ್ಯಾಷನಲ್ ಕಾಲೇಜ್]]
| 18 June 2017 || ||Elevated||
| 18 June 2017 || ||Elevated
|Side
|-
|-
|21|| style="text-align:center;"|[[Lalbagh metro station|Lalbagh Botanical Garden]]|| ಲಾಲ್ ಬಾಗ್
|21|| style="text-align:center;" |[[Lalbagh metro station|Lalbagh]]|| [[Lalbagh metro station|ಲಾಲ್ಬಾಗ್]]
| 18 June 2017 || ||Elevated||
| 18 June 2017 || ||Elevated
|Side
|-
|-
|22|| style="text-align:center;"|[[Southend Circle metro station|South End Circle]]|| ಸೌತ್ ಎಂಡ್ ವೃತ್ತ
|22|| style="text-align:center;" |[[South End Circle metro station|South End Circle]]|| [[South End Circle metro station|ಸೌತ್ ಎಂಡ್ ಸರ್ಕಲ್]]
| 18 June 2017 || ||Elevated||
| 18 June 2017 || ||Elevated
|Side
|-
|-
|23|| style="text-align:center;"|[[Jayanagar metro station|Jayanagar]]|| ಜಯನಗರ  
|23|| style="text-align:center;" |[[Jayanagar metro station|Jayanagara]]|| [[Jayanagar metro station|ಜಯನಗರ]]
| 18 June 2017 ||{{rint|bus}}Jayanagara TTMC||Elevated||
| 18 June 2017 ||{{rint|bus}} Jayanagara TTMC||Elevated
|Side
|-
|-
|24|| style="text-align:center;"|[[Rashtreeya Vidyalaya Road metro station|Rashtreeya Vidyalaya Road]]|| ರಾಷ್ಟೀಯ ವಿದ್ಯಾಲಯ ರಸ್ತೆ  
|24|| style="text-align:center;" |[[Rashtreeya Vidyalaya Road metro station|Rashtreeya Vidyalaya Road]]|| [[Rashtreeya Vidyalaya Road metro station|ರಾಷ್ಟ್ರೀಯ ವಿದ್ಯಾಲಯ ರಸ್ತೆ]]
| 18 June 2017 ||{{rint|subway}} {{rcb|Namma Metro|Yellow|inline=yes}} (''Under Construction'')||Elevated||
| 18 June 2017 ||{{rint|bengaluru|metro}} {{rcb|Namma Metro|Yellow|croute}}||Elevated
|Island & Side
|-
|-
|25|| style="text-align:center;"|[[Banashankari metro station|Banashankari]]|| ಬನಶಂಕರಿ  
|25|| style="text-align:center;" |[[Banashankari metro station|Banashankari]]|| [[Banashankari metro station|ಬನಶಂಕರಿ]]
| 18 June 2017 ||{{rint|bus}}Banashankari TTMC||Elevated||
| 18 June 2017 ||{{rint|bus}} Banashankari TTMC||Elevated
|Side
|-
|-
|26|| style="text-align:center;"|[[Jayaprakash Nagar metro station|Jaya Prakash Nagar]]|| ಜಯ ಪ್ರಕಾಶ ನಗರ
|26|| style="text-align:center;" |[[Jaya Prakash Nagar metro station|Jaya Prakash Nagar]]|| [[Jaya Prakash Nagar metro station|ಜಯಪ್ರಕಾಶ ನಗರ]]
| 18 June 2017 ||{{rint|subway}} {{rcb|Namma Metro|Orange|inline=yes}} (''Planned ph lll'')||Elevated||
| 18 June 2017 ||{{rint|bengaluru|metro}} {{rcb|Namma Metro|Orange|croute}} ''<small>(Approved)</small>''||Elevated
|Side
|-
|-
|27|| style="text-align:center;"|[[Yelachenahalli metro station|Yelachenahalli]]|| ಎಲಚೇನಹಳ್ಳಿ
|27|| style="text-align:center;" |[[Yelachenahalli metro station|Yelachenahalli]]|| [[Yelachenahalli metro station|ಯಲಚೇನಹಳ್ಳಿ]]
| 18 June 2017 || ||Elevated||
| 18 June 2017 || ||Elevated
|Side
|-
|-
|28|| style="text-align:center;"|{{metro|Konanakunte Cross}}||ಕೋಣನಕುಂಟೆ ಕ್ರಾಸ್
|28|| style="text-align:center;" |{{stl|Namma Metro|Konanakunte Cross}}||[[Konanakunte Cross metro station|ಕೋಣನಕುಂಟೆ ಕ್ರಾಸ್]]
| 15 January 2021
| 15 January 2021
| ||Elevated
| ||Elevated
|
|Side
|-
|-
|29|| style="text-align:center;"|{{metro|Doddakallasandra}}|| ದೊಡ್ಡಕಲ್ಲಸಂದ್ರ  
|29|| style="text-align:center;" |{{stl|Namma Metro|Doddakallasandra}}|| [[Doddakallasandra metro station|ದೊಡ್ಡಕಲ್ಲಸಂದ್ರ]]
| 15 January 2021
| 15 January 2021
| ||Elevated
| ||Elevated
|
|Side
|-
|-
|30|| style="text-align:center;"|{{metro|Vajarahalli}}|| ವಾಜರಹಳ್ಳಿ
|30|| style="text-align:center;" |{{stl|Namma Metro|Vajarahalli}}|| [[Vajarahalli metro station|ವಾಜರಹಳ್ಳಿ]]
| 15 January 2021
| 15 January 2021
| ||Elevated
| ||Elevated
|
|Side
|-
|-
|31|| style="text-align:center;"|[[Thalaghattapura metro station|Thalaghattapura]]|| ತಲಘಟ್ಟಪುರ
|31|| style="text-align:center;" |[[Thalaghattapura metro station|Thalaghattapura]]|| [[Thalaghattapura metro station|ತಲಘಟ್ಟಪುರ]]
| 15 January 2021
| 15 January 2021
| ||Elevated
| ||Elevated
|
|Side
|-
|-
|32|| style="text-align:center;"|{{metro|Silk Institute}}|| ರೇಷ್ಮೆ ಸಂಸ್ಥೆ
|32|| style="text-align:center;" |{{stl|Namma Metro|Silk Institute}}|| [[Silk Institute metro station|ರೇಷ್ಮೆ ಸಂಸ್ಥೆ]]
| 15 January 2021
| 15 January 2021
| ||Elevated
| ||Elevated
|
|Side
|}
|}


==Infrastructure==
==Infrastructure==
===Rolling stock===
===Rolling stock===
BMRC procured 150 metro coaches for fifty 3-car train sets in DMC-TC-DMC formation for Phase l of Namma Metro from BEML-Hyundai Rotem at a cost of Rs 1,672.50 crore (Rs 16.72 billion). Coach specifications were as follows. Dimensions: Length-20.8m, Width-2.88m, and Height-3.8m. Each coach has a seating capacity of about 50 and standing capacity of 306 (basis 8 per sqm). Thus, each train had a capacity of about 1000. Traction was through four 180Kw motors in each motor coach. The trains have a maximum speed of 80&nbsp;km/h and axle load of 15 tonnes. The trains operate on 750V DC with third rail bottom power collector system. Features include stainless steel body fully air-conditioned coaches, longitudinal bank of wide seats, wide vestibules between coaches, non-skid and non-slip floor surfaces, wi-fi enabled, four wide passenger access doors on each side, wide windows, automatic voice announcement system and electronic information and destination display system.
BMRC procured 150 metro coaches for fifty 3-car train sets for Phase l of Namma Metro from [[BEML]]-[[Hyundai Rotem]] at a cost of Rs 1,672.50 crore (Rs 16.72 billion). Coaches were 20.8 metres (68 ft) long, 2.88 metres (9.4 ft) wide and 3.8 metres (12 ft) high. Each coach has a seating capacity of about 50 and standing capacity of approximately 306, making each train have a capacity of about 1000. Traction was through four 180 kW motors in each motor coach. The trains have a maximum speed of 80 km/h, axle load of 15 tonnes, and operate on 750 volt [[direct current]] with [[third rail]] power collection. The coaches are made of stainless steel and are fully air-conditioned, and contain longitudinal banks of seats, wide vestibules between coaches, non-skid and non-slip floor surfaces, four wide passenger access doors on each side, an automatic voice announcement system and electronic information and destination displays.


Initial operations on the Green Line began with twenty-one 3-coach trains. As loads increased with increasing ridership, all trains were converted to six coaches. Rolling stock on the Green Line are silver with a streak of bright green along its length.<ref name="thehindu3">{{cite news|author=Preeti Zachariah |url=http://www.thehindu.com/features/metroplus/society/a-ride-through-the-clouds/article5826028.ece |title=A ride through the clouds |newspaper=The Hindu |date=24 March 2014 |access-date=27 March 2014 |location=Chennai, India}}</ref>
Initial operations on the Green Line began with twenty-one 3-coach trains. As loads increased with increasing ridership, all trains were converted to six coaches. Rolling stock on the Green Line are silver with a streak of bright green along its length.<ref name="thehindu3">{{cite news|author=Preeti Zachariah |url=http://www.thehindu.com/features/metroplus/society/a-ride-through-the-clouds/article5826028.ece |title=A ride through the clouds |newspaper=The Hindu |date=24 March 2014 |access-date=27 March 2014 |location=Chennai, India}}</ref>
Line 250: Line 296:


===Signaling===
===Signaling===
In September 2009, the consortium led by [[Alstom]] Project India Limited were awarded a contract worth ₹563.4 crore (US$79.0 million) to supply control and signalling system for the first phase of the project. The consortium is led by Alstom and composed of Alstom Transport SA, [[Thales Group]] Portugal S A and [[Sumitomo Corporation]]. Alstom will provide the design, manufacture, supply, installing, testing and commissioning of the train control and signalling system and Thales will provide the design, installing, testing and commissioning of the telecommunication system for Phase I of the metro system. It includes the Urbalis 200 Automatic Train Control system which will ensure optimal safety, flexible operations and heightened passenger comfort.
In September 2009, a consortium led by [[Alstom]] Project India Limited was awarded a contract worth ₹563.4 crore (US$66.6 million) to supply control and signalling system for the first phase of the project. The consortium is led by Alstom and composed of Alstom Transport SA, [[Thales Group]] Portugal S A and [[Sumitomo Corporation]]. Alstom will provide the design, manufacture, supply, installing, testing and commissioning of the train control and signalling system and Thales will provide the design, installing, testing and commissioning of the telecommunication system for Phase I of the metro system. It includes the Urbalis 200 Automatic Train Control system which will ensure optimal safety, flexible operations and heightened passenger comfort.


The integrated control centre at [[Baiyappanahalli metro station|Baiyyappanahalli]] has direct communication with trains and stations are [[CCTV]] fitted with visual and audio service information.
The integrated control centre at [[Baiyappanahalli metro station|Baiyyappanahalli]] has direct communication with trains and stations, which are fitted with [[CCTV]] with visual and audio service information.


==Operations==
==Operations==
===Frequency and capacity===
===Frequency and capacity===
Trains initially operated on the Green Line from 6&nbsp;am to 11&nbsp;pm. This was extended from 5AM to 11PM from 1 December 2015. The frequency along the line was 15 minutes between 5AM and 8AM and 8PM and 11PM, and 10 minutes between 8AM and 8PM.<ref name="newindianexpress">{{cite web|url=http://www.newindianexpress.com/cities/bengaluru/Metro-Services-Extended/2015/11/26/article3147404.ece|publisher=newindianexpress.com|title=Metro Services Extended- The New Indian Express|access-date=10 April 2017}}</ref> Trains halt for 30 seconds at each station.<ref>{{cite web|last=Nair |first=Anisha |url=http://news.oneindia.in/bangalore/malleshwaram-peenya-metro-phase-ready-public-use-from-march-1-1404191.html |title=Malleshwaram-Peenya metro phase ready for public use from March 1 |publisher=News Oneindia |date=1 March 2014 |access-date=27 March 2014}}</ref> The 24.2&nbsp;km journey is usually covered in about 42 minutes. Each six-coach train has a capacity of 2,004 passengers.<ref name="thehindu1"/>
Trains initially operated on the Green Line from 6&nbsp;am to 11&nbsp;pm. This was extended from 5 am to 11 pm from 1 December 2015. The frequency along the line was 15 minutes from 5 am to 8 am and 8 pm to 11 pm, and 10 minutes between 8 am and 8 pm.<ref name="newindianexpress">{{cite web|url=http://www.newindianexpress.com/cities/bengaluru/Metro-Services-Extended/2015/11/26/article3147404.ece|archive-url=https://web.archive.org/web/20151208074749/http://www.newindianexpress.com/cities/bengaluru/Metro-Services-Extended/2015/11/26/article3147404.ece|archive-date=8 December 2015|publisher=newindianexpress.com|title=Metro Services Extended- The New Indian Express|access-date=10 April 2017}}</ref> Trains halt for 30 seconds at each station.<ref>{{cite web|last=Nair |first=Anisha |url=http://news.oneindia.in/bangalore/malleshwaram-peenya-metro-phase-ready-public-use-from-march-1-1404191.html |archive-url=https://web.archive.org/web/20140305144539/http://news.oneindia.in/bangalore/malleshwaram-peenya-metro-phase-ready-public-use-from-march-1-1404191.html |url-status=dead |archive-date=5 March 2014 |title=Malleshwaram-Peenya metro phase ready for public use from March 1 |publisher=News Oneindia |date=1 March 2014 |access-date=27 March 2014}}</ref> Each six-coach train has a capacity of 2,004 passengers.<ref name="thehindu1"/>
 
'''Fire Department.'''
 
Namma Metro has a dedicated fire team to take care of operations and maintenance of the firefighting system installed in metro stations. They conduct regular mock exercises and liaison with the state fire department for any assistance in case of a fire emergency.


==See also==
==See also==
Line 265: Line 315:
** [[Blue Line (Namma Metro)|Blue Line]]
** [[Blue Line (Namma Metro)|Blue Line]]
** [[Orange Line (Namma Metro)|Orange Line]]
** [[Orange Line (Namma Metro)|Orange Line]]
* [[List of Namma Metro stations|List of Namma Metro Stations]]
** [[Grey Line (Namma Metro)|Grey Line]]
** [[Red Line (Namma Metro)|Red Line]]
** [[Aqua Line (Namma Metro)|Inner Ring Line]]
* [[List of Namma Metro stations]]
* [[Rapid transit in India]]
* [[Rapid transit in India]]
* [[List of metro systems]]
* [[List of metro systems]]
Line 277: Line 330:
{{Commons|Namma Metro}}
{{Commons|Namma Metro}}


{{Namma Metro}}
{{Namma Metro|green line=yes}}


[[Category:Namma Metro lines]]
[[Category:Namma Metro lines]]

Latest revision as of 22:00, 19 February 2026


Green Line
This trainset on standby at Template:Stl metro station and heading towards Template:Stl metro station
Overview
Other name(s)
  • North–South Corridor
  • Line 2
  • Madavara–Silk Institute Line
Native nameಹಸಿರು ಮಾರ್ಗ (Hasiru mārga)
StatusOperational
OwnerBengaluru Metro Rail Corporation Limited (BMRCL)
LocaleBengaluru, Karnataka, India
TerminiTemplate:Stl
Silk Institute
Connecting linesOperational (2):
Template:Rcb Template:Rcb
Upcoming (1):
Template:Rcb
Planned (1):
Template:Rcb
Stations32 (Operational)
Websitebmrc.co.in
Service
TypeRapid transit
SystemNamma Metro
Depot(s)Peenya
Anjanapura (Under Construction)
Rolling stockBEML
Daily ridership170,685
Ridership62.3 million (2018)[1]
History
Opened1 March 2014; 12 years ago (1 March 2014)
Last extension07 November 2024; 21 months ago (07 November 2024)
Technical
Line length33.46 km (20.79 mi)
Number of tracks2
CharacterElevated and underground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Operating speed40 km/h (25 mph)
Green Line map

Madavara
Chikkabidarakallu
Manjunathanagara
Nagasandra
Dasarahalli
Jalahalli
Bus interchange Basaveshwara
Peenya Industry
Peenya
Goraguntepalya
Subway interchange Orange Line (Planned)
Yeshwanthpur
Yesvantpur Junction railway station
Sandal Soap Factory
Bus interchange Yeshwanthpura TTMC
Mahalakshmi
Parking
Rajajinagar
Kuvempu Road
Srirampura
Sampige Road
Majestic
Purple Line (Namma Metro) Kempegowda Bus Station Bangalore City railway station
Chickpet
Krishna Rajendra Market
National College
Lalbagh
Southend Circle
Jayanagar
Parking Bus interchange Jayanagara TTMC
Rashtreeya Vidyalaya Road
Yellow Line (Namma Metro)
Banashankari
Bus interchange Banashankari TTMC
Jayaprakash Nagar
Subway interchange Orange Line (Planned)
Yelachenahalli
Konankunte Cross
Doddakallasandra
Vajarahalli
Talaghattapura
Silk Institute

The Green Line is a line on the Namma Metro rail system. As of 2025, the line is 33.46 km (20.79 mi) long and connects Madavara in the northwest to Silk Institute in the south. The line connects the north western suburbs and neighbourhoods of Bengaluru, such as Madavara, Jalahalli, Peenya, Yeshwanthpur, Rajajinagar and Malleshwaram along Tumkur Road with the central hub of Majestic and the southern residential areas of Bangalore such as Basavanagudi, Jayanagara, Banashankari, Konanakunte and Thalaghattapura along Kanakapura Road. The Green Line is mostly elevated, with 29 elevated and 3 underground stations. There are two interchanges along the Green Line, One with the Purple Line at Nadaprabhu Kempegowda Station, Majestic and the other with the Yellow Line at Rashtreeya Vidyalaya Road.

History[edit | edit source]

Green Line sections were opened as indicated below.[2]

colspan="7" style="background:#Template:Rcr;" | History
Phase Section Opening date Terminals Length Stations
1 Reach 3 1 March 2014 Mantri Square Sampige Road Yeshwanthpur 5.10 km (3.17 mi) 7
Reach 3A Yeshwanthpur Peenya Industry 4.80 km (2.98 mi) 3
Reach 3B 1 May 2015 Peenya Industry Nagasandra 2.50 km (1.55 mi) 3
UG 2 18 June 2017[3] Mantri Square Sampige Road National College 4.0 km (2.49 mi)[4] 3
Reach 4 National College Rashtreeya Vidyalaya Road 4.10 km (2.55 mi) 5
Reach 4A Rashtreeya Vidyalaya Road Yelachenahalli 3.90 km (2.42 mi) 3
2 Reach 4B 15 January 2021[5] Yelachenahalli Silk Institute 6.29 km (3.91 mi)[6] 5
Reach 3C 7 November 2024[7] Nagasandra Madavara 3.14 km (1.95 mi)[6] 3
Total Madavara Silk Institute 33.46 km (20.79 mi) 32

Phase I[edit | edit source]

Construction work on Reach 3 and 3A of Phase I of the Namma Metro began in 2009–10. The total cost of the project on this stretch was 2,100 crore.[8] Work on the underground section commenced in May 2011. Tunnel boring machines named Kaveri, Krishna and Godavari were used for tunnel boring work for the Green Line.[9][10][11][12][13][14] The first trial run on the Green Line was conducted on 8 August 2013.[15]

Construction required 1.3 lakh tonnes of concrete, 44,500 tonnes (98,100,000 lb) of steel bars, and 190 km (118.1 mi) of high tension wires weighing 2,900 tonnes (6,400,000 lb). A total of 395 piers, including station piers and portals, were constructed on the stretch. The tallest pier of the viaduct is a 21-metre (69 ft) pier between Mahakavi Kuvempu Road and Srirampura stations, opposite Gayatri Devi Park. There 353 spans on the stretch, the longest being the 66-metre (217 ft) curved span over the railway track off Srirampura. The total roofing area of the 10 stations on the stretch was 47,000 square metres (510,000 sq ft).[16][17]

The first section of Green Line was opened to public on 1 March 2014.[18] BMRCL Managing Director Pradeep Singh Kharola stated that about 25,000 passengers traveled on the line on the opening day.[19] In the first month of operations, 7.62 lakh people at an average of 24,605 people daily used the Green Line, generating a revenue of 1.5 crore (US$210,000).[20]

TBM Godavari began drilling the 970-metre (3,180 ft) underground section between Sampige Road and Majestic stations in April 2014. Godavari broke down a few months later, and needed to have its cutter head replaced, due to contact with tough terrain including hard rock and boulders. The machine restarted work in September 2015 after importing the cutter head from Italy. Godavari completed drilling and emerged on the Majestic station end of the tunnel on 19 April 2016.[21][22] Meanwhile, Kaveri and Krishna drilled the underground section between National College and Nadaprabhu Kempegowda station.

Construction of the underground section of Green Line required the use of 3,000 transit mixer loads of concrete. 1,000 km (620 mi) of cable had to be laid.[23]

Trial runs on the elevated section between National College and Yelachenahalli began on 23 November 2016. Trials were conducted between National College and Jayanagara initially at a speed of 10 km/h (6.2 mph), and then along the entire elevated section between National College and Yelachenahalli at a speed of 25 km/h (15.5 mph).[24] Trial runs began in the tunneled section on 30 March 2017.

Services at Sampige Road, Srirampura and Kuvempu Road stations were suspended between 13 and 22 March 2017 to allow authorities to conduct static and other tests and to link Sampige Road station with Nadaprabhu Kempegowda station. During the 10-day testing period, services operated only between Nagasandra and Rajajinagar stations. The BMTC introduced rail replacement bus services from Rajajinagara to Hosahalli.[25][26] Services between Sampige Road and Rajajinagara were suspended again for four days beginning 13 April 2017 to conduct trial runs on the underground section between Sampige Road and National College.[27][28] Trial runs were completed on 16 May 2017.[29]

Phase II[edit | edit source]

Template:Rapid transit OSM map Contract for construction of the 6.5 km Reach 4B from Yelachenahalli to Silk Institute was awarded to Nagarjuna Construction Co. The extension was estimated to cost 508.86 crore (US$71 million).[30] Civil work on the extension began in October 2016[31] and was completed by 2020. Trial runs were conducted on 18–19 December 2020,[32] and the extension was opened on 14 January 2021,[33] making it the first section of Phase II to start commercial operations.

In October 2016, BMRCL invited bids for the construction of viaduct and stations on the 3.031 km extension (Reach 3C) of the Green Line from Nagasandra to Madavara (previously named Bengaluru International Exhibition Centre).[31] Reach 3C was awarded to Simplex Infrastructure Limited in late February 2017. The contract specified a cost of 247.41 crore (US$35 million) and a deadline for completion of 27 months.[30][34] The start of construction on the extension was delayed by 4 months due to land acquisition issues concerning land near Jindal Aluminium Limited in Kirloskar Layout. The issues were resolved and construction began in June 2017.[35] Trial runs were conducted in August 2024 and it was opened on 7 November 2024.

After Phase II was completed, the line extended its stretch from Madavara in northwest to Silk Institute in the South. The length of the line increased to 34.46 kilometres (21.41 mi). Commercial operations on the Nagasandra-Madavara stretch started from November 7, 2024.[36][37][38][39]

There have been petitions to extend the line further south till the Art of Living International Centre in the outskirts of Bengaluru.

Stations[edit | edit source]

There are 32 stations on the Green Line. Each station has around 60 surveillance cameras. Passenger lifts and escalators are provided at all stations. The Line has an operational depot at Peenya and another under construction at Silk Institute

Interchanges[edit | edit source]

Passenger interchange facilities, connecting to other metro and railway lines, will be provided at the following stations: 

List of stations[edit | edit source]

align="center" colspan="8" style="background:#Template:Rcr;" | Green Line
# Station name Opening Connections Station type Platform type
English Kannada
1 Template:Stl ಮಾದಾವರ 7 November 2024 Elevated Side
2 Template:Stl

ಚಿಕ್ಕಬಿದರಕಲ್ಲು

7 November 2024 Elevated Side
3 Template:Stl ಮಂಜುನಾಥನಗರ 7 November 2024 Elevated Side
4 Nagasandra ನಾಗಸಂದ್ರ 1 May 2015 Elevated Side
5 Dasarahalli ದಾಸರಹಳ್ಳಿ 1 May 2015 Elevated Side
6 Jalahalli ಜಾಲಹಳ್ಳಿ 1 May 2015 Bus interchange Basaveshwara Bus Station Elevated Side
7 Peenya Industry ಪೀಣ್ಯ ಇಂಡಸ್ಟ್ರಿ 1 March 2014 Elevated Side
8 Peenya ಪೀಣ್ಯ 1 March 2014 Add→{{rail-interchange}} Template:Rcb (Approved) Elevated Side
9 Goraguntepalya ಗೊರಗುಂಟೆಪಾಳ್ಯ 1 March 2014 Elevated Side
10 Yeshwanthpura ಯಶವಂತಪುರ 1 March 2014

Template:Ric Yesvantpur Junction

Elevated Side
11 Sandal Soap Factory ಸ್ಯಾಂಡಲ್ ಸೋಪ್ ಫ್ಯಾಕ್ಟರಿ 1 March 2014 Bus interchange Yeshwanthpura TTMC Elevated Side
12 Mahalakshmi ಮಹಾಲಕ್ಷ್ಮೀ 1 March 2014 Elevated Side
13 Rajajinagara ರಾಜಾಜಿನಗರ 1 March 2014 Elevated Side
14 Mahakavi Kuvempu Road ಮಹಾಕವಿ ಕುವೆಂಪು ರಸ್ತೆ 1 March 2014 Elevated Side
15 Srirampura ಶ್ರೀರಾಮ್ ಪುರ 1 March 2014 Elevated Side
16 Mantri Square Sampige Road ಮಂತ್ರಿ ಸ್ಕ್ವೇರ್ ಸಂಪಿಗೆ ರಸ್ತೆ 1 March 2014 Elevated Side
17 Nadaprabhu Kempegowda station, Majestic ನಾಡಪ್ರಭು ಕೆಂಪೇಗೌಡ ನಿಲ್ದಾಣ, ಮೆಜೆಸ್ಟಿಕ್ 18 June 2017 Add→{{rail-interchange}} Template:Rcb
Template:Ric KSR Bengaluru
Bus interchange Kempegowda Bus Station
Underground Island & Side
18 Chickpete ಚಿಕ್ಕಪೇಟೆ 18 June 2017 Underground Island
19 Krishna Rajendra Market ಕೃಷ್ಣ ರಾಜೇಂದ್ರ ಮಾರುಕಟ್ಟೆ 18 June 2017 Underground Island
20 National College ನ್ಯಾಷನಲ್ ಕಾಲೇಜ್ 18 June 2017 Elevated Side
21 Lalbagh ಲಾಲ್ಬಾಗ್ 18 June 2017 Elevated Side
22 South End Circle ಸೌತ್ ಎಂಡ್ ಸರ್ಕಲ್ 18 June 2017 Elevated Side
23 Jayanagara ಜಯನಗರ 18 June 2017 Bus interchange Jayanagara TTMC Elevated Side
24 Rashtreeya Vidyalaya Road ರಾಷ್ಟ್ರೀಯ ವಿದ್ಯಾಲಯ ರಸ್ತೆ 18 June 2017 Add→{{rail-interchange}} Template:Rcb Elevated Island & Side
25 Banashankari ಬನಶಂಕರಿ 18 June 2017 Bus interchange Banashankari TTMC Elevated Side
26 Jaya Prakash Nagar ಜಯಪ್ರಕಾಶ ನಗರ 18 June 2017 Add→{{rail-interchange}} Template:Rcb (Approved) Elevated Side
27 Yelachenahalli ಯಲಚೇನಹಳ್ಳಿ 18 June 2017 Elevated Side
28 Template:Stl ಕೋಣನಕುಂಟೆ ಕ್ರಾಸ್ 15 January 2021 Elevated Side
29 Template:Stl ದೊಡ್ಡಕಲ್ಲಸಂದ್ರ 15 January 2021 Elevated Side
30 Template:Stl ವಾಜರಹಳ್ಳಿ 15 January 2021 Elevated Side
31 Thalaghattapura ತಲಘಟ್ಟಪುರ 15 January 2021 Elevated Side
32 Template:Stl ರೇಷ್ಮೆ ಸಂಸ್ಥೆ 15 January 2021 Elevated Side

Infrastructure[edit | edit source]

Rolling stock[edit | edit source]

BMRC procured 150 metro coaches for fifty 3-car train sets for Phase l of Namma Metro from BEML-Hyundai Rotem at a cost of Rs 1,672.50 crore (Rs 16.72 billion). Coaches were 20.8 metres (68 ft) long, 2.88 metres (9.4 ft) wide and 3.8 metres (12 ft) high. Each coach has a seating capacity of about 50 and standing capacity of approximately 306, making each train have a capacity of about 1000. Traction was through four 180 kW motors in each motor coach. The trains have a maximum speed of 80 km/h, axle load of 15 tonnes, and operate on 750 volt direct current with third rail power collection. The coaches are made of stainless steel and are fully air-conditioned, and contain longitudinal banks of seats, wide vestibules between coaches, non-skid and non-slip floor surfaces, four wide passenger access doors on each side, an automatic voice announcement system and electronic information and destination displays.

Initial operations on the Green Line began with twenty-one 3-coach trains. As loads increased with increasing ridership, all trains were converted to six coaches. Rolling stock on the Green Line are silver with a streak of bright green along its length.[40]

Power[edit | edit source]

Power is supplied to the Green Line from the Peenya sub-station of the Karnataka Power Transmission Corporation Ltd. (KPTCL).[41][42]

Signaling[edit | edit source]

In September 2009, a consortium led by Alstom Project India Limited was awarded a contract worth ₹563.4 crore (US$66.6 million) to supply control and signalling system for the first phase of the project. The consortium is led by Alstom and composed of Alstom Transport SA, Thales Group Portugal S A and Sumitomo Corporation. Alstom will provide the design, manufacture, supply, installing, testing and commissioning of the train control and signalling system and Thales will provide the design, installing, testing and commissioning of the telecommunication system for Phase I of the metro system. It includes the Urbalis 200 Automatic Train Control system which will ensure optimal safety, flexible operations and heightened passenger comfort.

The integrated control centre at Baiyyappanahalli has direct communication with trains and stations, which are fitted with CCTV with visual and audio service information.

Operations[edit | edit source]

Frequency and capacity[edit | edit source]

Trains initially operated on the Green Line from 6 am to 11 pm. This was extended from 5 am to 11 pm from 1 December 2015. The frequency along the line was 15 minutes from 5 am to 8 am and 8 pm to 11 pm, and 10 minutes between 8 am and 8 pm.[43] Trains halt for 30 seconds at each station.[44] Each six-coach train has a capacity of 2,004 passengers.[16]

Fire Department.

Namma Metro has a dedicated fire team to take care of operations and maintenance of the firefighting system installed in metro stations. They conduct regular mock exercises and liaison with the state fire department for any assistance in case of a fire emergency.

See also[edit | edit source]

References[edit | edit source]

  1. "Namma Metro surges ahead, clocks four-crore jump in annual ridership - Times of India". The Times of India. 22 January 2019. Retrieved 24 January 2019.
  2. "Metro Network". www.bmrc.co.in. Archived from the original on 14 August 2015. Retrieved 27 April 2016.
  3. "All of Bangalore Metro Phase-1 will be up and running from June 18". The New Indian Express. Retrieved 15 June 2017.
  4. ReporterBengaluru, Staff (8 March 2017). "BMRCL races to meet April 15 deadline". The Hindu. Retrieved 8 March 2017.
  5. "Namma Metro's 6 Km Yelachenahalli To Silk Institute Stretch Flagged-off". Moneycontrol. Retrieved 1 September 2021.
  6. 6.0 6.1 "Day before public launch, DK Shivakumar takes metro ride to Madavara". Deccan Herald. Retrieved 7 November 2024.
  7. "Bengaluru Metro's Green Line extension set to open on Nov 7". Deccan Herald. Retrieved 6 November 2024.
  8. "Green train rolls out on March 1". The Times of India. 25 February 2014. Retrieved 27 March 2014.
  9. Rohith B R (14 October 2012). "Automation helps precise work on metro tunnels". Deccan Herald. Retrieved 4 March 2013.
  10. Rohith B R (13 October 2012). "Metro makes steady inroads". Deccan Herald. Retrieved 4 March 2013.
  11. "A smoother passage for Margarita". The Hindu. Chennai, India. 28 September 2012. Retrieved 4 March 2013.
  12. "Tunnelling along north-south corridor to begin soon". Deccan Herald. 23 September 2012. Retrieved 4 March 2013.
  13. "Metro rushes to meet deadline". Deccan Chronicle. 18 December 2012. Archived from the original on 6 January 2013. Retrieved 4 March 2013.
  14. "After Helen, Margarita, it's Krishna and Kaveri". Deccan Herald. 21 February 2013. Retrieved 4 March 2013.
  15. "Labour Ministry puts BMRCL on notice for labour law violations". The Hindu. Chennai, India. 9 August 2013. Retrieved 27 March 2014.
  16. 16.0 16.1 Anil Kumar Sastry (24 February 2014). "Peenya-Sampige Road metro line to be thrown open on Saturday". The Hindu. Chennai, India. Retrieved 27 March 2014.
  17. "green line metro stations list". comodos.cz. Retrieved 7 September 2020.
  18. "CM in a hurry, delays Namma Metro launch". The Hindu. Chennai, India. 28 February 2014. Retrieved 27 March 2014.
  19. "25,000 ride Green line Metro on 1st working day". Deccan Herald. 3 March 2014. Retrieved 27 March 2014.
  20. Kulkarni, Tanu (5 April 2014). "Byappanahalli-M.G. Road metro stretch more popular". The Hindu. Chennai, India.
  21. "Godavari sees light - Bangalore Mirror -". Bangalore Mirror. Retrieved 20 April 2016.
  22. "Bengaluru: East-west corridor from Byappanahalli to Mysuru Road may open next week - The Economic Times". The Economic Times. economictimes.indiatimes.com. 20 April 2016. Retrieved 10 April 2017.
  23. "April deadline nears but trial runs yet to begin". The Times of India. 9 March 2017. Retrieved 9 March 2017.
  24. "Bengaluru Metro to go underground on south side soon". The New Indian Express. Archived from the original on 3 March 2017. Retrieved 3 March 2017.
  25. "Part of Namma Metro Green Line to be shut for 10 days". Deccan Herald. Retrieved 11 March 2017.
  26. Staff Reporter (10 March 2017). "Three metro stations on Green Line to be closed from Monday". The Hindu. Retrieved 11 March 2017.
  27. Staff Reporter (11 April 2017). "Metro suspended". The Hindu. Retrieved 13 April 2017.
  28. "Sampige Road-Rajajinagar Metro shut for 4 days". Deccan Herald. Retrieved 13 April 2017.
  29. "Metro trial runs to be over today". Deccan Herald. Retrieved 16 May 2017.
  30. 30.0 30.1 Menezes, Naveen (28 February 2017). "At Rs 247 crore, contract for Namma Metro purple line extension finalised". The Economic Times. Retrieved 28 February 2017.
  31. 31.0 31.1 "BMRCL invites bids for 3-km extension from Nagasandra". Deccan Herald. Retrieved 28 February 2017.
  32. "CMRS Inspects Bangalore Metro Green Line's Anjanapura Extn". The Metro Rail Guy. 19 November 2020. Retrieved 14 January 2021.
  33. Lalitha, S (14 January 2021). "First line of Bangalore Metro's Phase-2 flagged off". The New Indian Express. Retrieved 14 January 2021.
  34. "Metro to start work on third stretch of Phase-II". The New Indian Express. 10 April 2017. Retrieved 13 April 2017.
  35. "Work on BIEC Metro link begins as Jindal land acquired". Deccan Herald. 25 August 2017. Retrieved 8 October 2018.
  36. "Extended Namma Metro Green Line operation launch likely on November 6". The Times of India. 5 November 2024. ISSN 0971-8257. Retrieved 6 November 2024.
  37. "Bengaluru Metro might face delays as Green Line Extension trial run begins today | Check details". News9live. 6 August 2024. Retrieved 7 August 2024.
  38. Naima, Kathija (6 August 2024). "Bengaluru Metro Green Line Extension Trials Begin". News Karnataka. Retrieved 7 August 2024.
  39. India, The Hans (5 August 2024). "Metro trial service on Nagasandra-Madavara route from Aug 6". www.thehansindia.com. Retrieved 7 August 2024.
  40. Preeti Zachariah (24 March 2014). "A ride through the clouds". The Hindu. Chennai, India. Retrieved 27 March 2014.
  41. "Green Line Namma Metro services disrupted for an hour". The Hindu. Chennai, India. 6 April 2014.
  42. "Power cut disrupts Greenline metro services". Deccan Herald. Bangalore, India. 7 April 2014.
  43. "Metro Services Extended- The New Indian Express". newindianexpress.com. Archived from the original on 8 December 2015. Retrieved 10 April 2017.
  44. Nair, Anisha (1 March 2014). "Malleshwaram-Peenya metro phase ready for public use from March 1". News Oneindia. Archived from the original on 5 March 2014. Retrieved 27 March 2014.

External links[edit | edit source]


Template:Namma Metro