>IndianGeneralist |
->BrownHairedGirl {{Bare URL inline}} for refs which WP:REFLINKS doesn't expand, removed stub tag |
||
| Line 1: | Line 1: | ||
{{infobox road | {{infobox road | ||
|country= IND | | country = IND | ||
|name= | | name = Raipur-Visakhapatnam Expressway | ||
| map = | | map = | ||
| map_custom = | | map_custom = yes | ||
| map_notes = | | map_notes = | ||
|image = | | image = | ||
|length_km= 464 | | length_km = 464 | ||
|direction_a= | | direction_a = | ||
|direction_b= | | direction_b = | ||
|terminus_a= Kurud , [[Raipur]] | | terminus_a = Kurud, [[Raipur]] | ||
|junction= | | junction = | ||
|terminus_b= | | terminus_b = Vishakapatnam Port, [[Visakhapatnam]] | ||
|formed= | | formed = March 2024 (expected) | ||
|maint= | | maint = | ||
| photo_notes = Raipur-Visakhapatnam Expressway map | |||
}} | }} | ||
'''Raipur–Visakhapatnam Expressway''' ('''NH-130CD'''), part of '''Raipur–Visakhapatnam Economic Corridor (EC-15)''', is a planned greenfield, access-controlled, {{convert|464|km|mi|adj=on}} long, 6-lane expressway through [[Red corridor]] in [[Chhattisgarh]], [[Odisha]] and [[Andhra Pradesh]] states of central and east-central India. From Durg, it runs between [[National Highway 30 (India)|NH-30]] and [[National Highway 130C (India)|NH-130C]] till [[Boriguma]], then runs east of [[National Highway 26 (India)|NH-26]] till [[Sunabeda]] and then west of NH-26 till [[Visakhapatnam]] ([[Vizianagaram]]). Along the way it connects [[Raipur]], [[Kurud]], [[Dhamtari]], [[Kanker, Chhattisgarh|Kanker]], [[Kondagaon]], [[Koraput]], and [[Sabbavaram]] before terminating at [[Visakhapatnam Port]].<ref name=ec1>[https://themetrorailguy.com/nhai-raipur-visakhapatnam-economic-corridor-information-route-map-status/ Raipur – Visakhapatnam Economic Corridor – Information & Status], themetrorailguy.com.</ref> | |||
It is part of [[Bharatmala Pariyojana]] and it connects to [[East Coast Economic Corridor]] ([[Kolkata]] to [[Kanyakumari]]) at Vizianagaram. Sequentially interconnected existing [[National Highway 30 (India)|NH-30]]-[[National Highway 34 (India)|NH-34]]-[[National Highway 539 (India)|NH-539]]-[[National Highway 44 (India)|NH-44]]-[[Yamuna Expressway]] connect Raipur to central and north India such as [[Delhi]], [[Agra]], [[Gwalior]], [[Jhansi]], [[Damoh]], and [[Jabalpur]]. | |||
==Route == | |||
===Chhattisgarh=== | |||
{{see also | List of districts of Chhattisgarh }} | |||
In [[Chhattisgarh]] state it passes through 4 southeastern districts between [[National Highway 30 (India)|NH-30]] and [[National Highway 30 (India)|NH-130C]]:<ref name=ec1/> | |||
* [[Raipur district]] | |||
** [[Raipur]] (south of), begins at [[Abhanpur]] on intersection of NH-30, NH-130C and SH-22. | |||
* [[Dhamtari district]] | |||
** [[Kundel]]<!-- Per wikipedia guidelines, retaion the redlink to encourage creation of article. Thanks. --> | |||
* [[Kanker district]] | |||
** Kanker (northeast of), passes near [[Narharpur, Chhattisgarh|Naharpur]] | |||
** Kanker (immediate east of), passes through [[Sarona, Kanker|Sarona]]<!-- Per wikipedia guidelines, retaion the redlink to encourage creation of article. Thanks. --> on SH-6 Kanker-[[Mukundpur, Chhattisgarh|Mukundpur]]<!-- Per wikipedia guidelines, retaion the redlink to encourage creation of article. Thanks. --> Road. | |||
* [[Kondagaon district]] | |||
** [[Keskal]] (east of) | |||
** [[Salna]]<!-- Per wikipedia guidelines, retaion the redlink to encourage creation of article. Thanks. --> (immediate west of Kundel), enters Odisha here | |||
===Odisha=== | |||
{{see also | List of districts of Odisha}} | |||
In [[Odisha]] state it passes through 2 southwestern-most districts on eastern and western side of NH-26 in Nabarangpur and Koraput districts respectively:<ref name=ec1/> | |||
* [[Nabarangpur district]], runs along the eastern side of NH-26. | |||
** [[Sunapali]],<!-- Per wikipedia guidelines, retaion the redlink to encourage creation of article. Thanks. --> enters Odisha here. | |||
** [[Raighar]]<!-- Per wikipedia guidelines, retaion the redlink to encourage creation of article. Thanks. --> (west of) | |||
** [[Umerkote]] (west of) | |||
** [[Dabugaon]]<!-- Per wikipedia guidelines, retaion the redlink to encourage creation of article. Thanks. --> (west of) | |||
** [[Papadahandi]] (west of) | |||
** [[Nabarangpur|Nowrangpur]] (Nabarangpur) (west of) | |||
* [[Koraput district]], runs along the western side of NH-26. | |||
** [[Kotpad]] (east of) | |||
** [[Gaudaguda]],<!-- Per wikipedia guidelines, retaion the redlink to encourage creation of article. Thanks. --> moves from west to east side of NH-26. | |||
** [[Borigumma]] (east of) | |||
** [[Raniguda]]<!-- Per wikipedia guidelines, retaion the redlink to encourage creation of article. Thanks. --> (immediate east of) | |||
** [[Koraput]] (immediate east of) | |||
** [[Sunabeda]] (immediate east of), south of Sunabeda it moves from east to west side of NH-26. | |||
** [[Pottangi]] | |||
** [[Ondarangi]]<!-- Per wikipedia guidelines, retaion the redlink to encourage creation of article. Thanks. --> on the border of Odisha-Andhra Pradesh, exits Odisha and enters Andhra Pradesh. | |||
===Andhra Pradesh === | |||
{{see also | List of districts of Andhra Pradesh }} | |||
In [[Andhra Pradesh]] state is passes only through 1 district in northeast Andhra Pradesh on the western side of NH-26:<ref name=ec1/> | |||
* [[Vizianagaram district]] | |||
** [[Salur]] (west of) | |||
** [[Gajapathinagaram]] (west of) | |||
** [[Vizianagaram]] (west of) | |||
** [[Vizianagaram]] (west of) | |||
** between [[Sabbavaram]]-[[Anandapuram]], terminates here on SH-9 [[Anakapalle]]-[[Rajapulova]] Road. | |||
==Proposed future connectivity == | |||
Following additional connectivity has been proposed by constructing new links. | |||
===NCR CMC hubs of Bhatinda-Hisar-Jaipur-Gwalior === | |||
There is another proposal to link this corridor to northwestern India by a combination of constructing greenfield stretches and upgrading existing roads through [[National Capital Region (India)#Counter magnets|National Capital Region's Counter Magnet Cities]] (NCR CMC) of [[Bhatinda]]-[[Hisar (city)|Hisar]]-[[Jaipur]] (via [[Karauli]])-[[Gwalior]]. This requires the construction of a road-cum-rail bridge over the [[Chambal River]] between Karauli-[[Taintara]] and/or [[Sirmathura]]-[[Joura]]. | |||
* Connect to Bhatinda to connect to [[Pathankot–Ajmer Expressway]] and [[Amritsar–Jamnagar Expressway]]. | |||
* Bhatinda-Hisar: Greenfield alignment from Bhatinda - Kullan (between [[Ratia]] and [[Tohana]]) - between [[Bhuna]] and [[Uklanamandi]] - between [[Agroha (town)|Agroha]] and [[Barwala, Hisar|Barwala]], between Barwala and [[Hansi]], intersect with [[Trans–Haryana Expressway]] near [[Mundhal Khurd]] and [[Meham]]. As an independent project, it will continue to [[National Highway 9 (India)|NH-9]], [[Kalanaur, Haryana|Kalanaur]], north of Beri, [[Western Peripheral Expressway]] and [[Bahadurgarh]]. | |||
* Hisar-[[Pilani]]-[[Jhunjhunu]] : Upgrade of Hisar (elevated from railway over-bridge near Mangali to Camp Chowk, Jat College and Thandi Sadak over-bridge)-[[Mangali]]-[[Saharwa]] (with a greenfield [[Siwani]]-Sahrwa-Dobeta-[[Kanwari]]-[[Bawani Khera]] spur ). Greenfield alignment from Sharwa to [[Bidhwan]]-[[Bahal, India|Bahal]] to [[Norangpura]] (west of Pilani) to Baragaon (south of Jhunjuhunu on Rajasthan SH-32). | |||
* Jhunjhunu-Jaipur: greenfield Baragaon-Raghunathpura, upgrade existing from Raghunathpura-[[Udaipurwati]]-Kotri Luharwas, greenfield from Kotri Luharwas to Khandela Mod bus stand, upgrade existing route from Khandela Mod bus stand to Srimadhopur-[[Reengus]] to connect it to [[National Highway 52 (India)|NH-52]]. From there greenfield alignment to [[Tonk, India|Tonk]] via Reengus-Hasteda-Gori Ka Bas-Lalpura-Bagru-Phagi-Galod-Tonk resulting in direct access to another NCR CMS city of [[Kota, Rajasthan|Kota]]. | |||
* Chambal River, this requires the construction of a greenfield highway and a road-cum-rail bridge over the Chambal River between Karauli-Taintara and/or Sirmathura-Joura with 2 spurs on eastern flank of Chambal - one each to connect to Gwalior and Datia. | |||
===NCR CMG hubs of Ludhiana-Patiala-Ambala-Narnaul-Alwar-=== | |||
There is another proposal to link this corridor to [[Trans–Haryana Expressway]] and beyond to [[Delhi–Amritsar–Katra Expressway]], [[Delhi–Mumbai Expressway]] and [[Delhi–Mumbai Industrial Corridor Project]] by a combination of constructing greenfield stretches and upgrading existing roads through [[Narnaul]]-[[Alwar]]-Karauli-[[Mohana]]-[[Datia]] (and/or Gwalior). Detailed routes will see the upgrade of existing State Highways (SH) to National Highways (NH) such as: | |||
* Rajasthan SH-14 Narnaul-Alwar-Mathura highway, with whole route between narnaul and Mathura to be upgraded for economic corridor and religious Krishna Yatra Circuit. | |||
* Rajasthan SH-25, Alwar-[[Rajgarh, Alwar|Rajgarh]] portion to be upgraded. | |||
* Dalalpura/Machari to Berkhera-Mahwa, greenfield alignment, alternatively the longer existing Rajasthan SH-35 Rajgarh-Mahwa portion can be upgraded. | |||
* Rajasthan SH-22, Mahwa-[[Hindaun|Hindon]]-Karauli portion to be upgraded. | |||
* Chambal River, this requires the construction of a greenfield highway and a road-cum-rail bridge over the Chambal River between Karauli-Taintara and/or Sirmathura-Joura with 2 spurs on eastern flank of Chambal - one each to connect to Gwalior and Datia. | |||
===Eastern Economic Corridor === | |||
There is a proposal to connect it to [[Eastern Economic Corridor (India)|Eastern Economic Corridor]] ([[Paradeep]] in Odisha to [[Raxaul]] on [[Bihar]]-[[Nepal]] border) by constructing either a spur or a loop in Chhattisgarh. | |||
==Status updates== | ==Status updates== | ||
* Feb 2020: The expressway was added to Bharatmala Pariyojana and approved.<ref>{{Cite web|url=https://www.patrika.com/kanker-news/green-field-economic-corridor-raipur-to-visakhapatnam-expressway-5741527/|title=ग्रीन फील्ड इकोनॉमिक कॉरीडोर को मिली मंजूरी, रायपुर-विशाखापट्टनम एक्सप्रेस-वे में जगदलपुर नहीं है शामिल|website=Patrika News}}</ref> | |||
* Aug 2020: The target date for completion of expressway is set as March 2024.<ref>{{Cite web|url=https://timesofindia.indiatimes.com/india/23-expressways-new-highways-coming-up-in-next-5-years/articleshow/77526921.cms|title=23 new expressways and highways coming up in next 5 years | India News - Times of India|website=The Times of India}}</ref> | * '''Feb 2020:''' The expressway was added to [[Bharatmala Pariyojana]] and approved.<ref>{{Cite web|url=https://www.patrika.com/kanker-news/green-field-economic-corridor-raipur-to-visakhapatnam-expressway-5741527/|title=ग्रीन फील्ड इकोनॉमिक कॉरीडोर को मिली मंजूरी, रायपुर-विशाखापट्टनम एक्सप्रेस-वे में जगदलपुर नहीं है शामिल|website=Patrika News}}</ref> | ||
* Mar 2021: Detailed Project Report completed. <ref>https://www.thehindu.com/news/national/andhra-pradesh/raipur-visakhapatnam-nh-project-will-be-completed-by-2024-25-gadkari/article34075917.ece</ref> | * '''Aug 2020:''' The target date for completion of expressway is set as March 2024.<ref>{{Cite web|url=https://timesofindia.indiatimes.com/india/23-expressways-new-highways-coming-up-in-next-5-years/articleshow/77526921.cms|title=23 new expressways and highways coming up in next 5 years | India News - Times of India|website=The Times of India}}</ref> | ||
* Apr 2021: Tendering process ongoing. <ref>https://themetrorailguy.com/nhai-raipur-visakhapatnam-economic-corridor-information-route-map-status/</ref> | * '''Mar 2021:''' [[Detailed Project Report]] (DPR) completed.<ref>https://www.thehindu.com/news/national/andhra-pradesh/raipur-visakhapatnam-nh-project-will-be-completed-by-2024-25-gadkari/article34075917.ece {{Bare URL inline|date=November 2021}}</ref> | ||
* '''Apr 2021:''' Tendering process ongoing.<ref>{{Cite web|title=Raipur - Visakhapatnam Economic Corridor – Information & Status|url=https://themetrorailguy.com/nhai-raipur-visakhapatnam-economic-corridor-information-route-map-status/|access-date=2021-10-30|website=The Metro Rail Guy|language=en-US}}</ref> | |||
*'''Oct 2021:''' HG Infra wins 2 packages in [[Odisha]] worth over ₹ 2,297 crores for developing the 44 km long, six-lane Kaliagura-Baunsaguar section in Odisha. | |||
==See also == | |||
* [[Expressways of India]] | |||
* [[Industrial corridor]] | |||
* [[Eastern Economic Corridor (India)]] | |||
* [[East Coast Economic Corridor]] | |||
==References== | ==References== | ||
{{reflist}} | {{reflist}} | ||
{{DEFAULTSORT:Raipur-Visakhapatnam Expressway}} | |||
[[Category:Proposed expressways in India]] | [[Category:Proposed expressways in India]] | ||
[[Category:Visakhapatnam]] | [[Category:Visakhapatnam]] | ||
Latest revision as of 19:20, 16 November 2021
| Raipur-Visakhapatnam Expressway | |
|---|---|
| Route information | |
| Length | 464 km (288 mi) |
| Existed | March 2024 (expected)–present |
| Major junctions | |
| From | Kurud, Raipur |
| To | Vishakapatnam Port, Visakhapatnam |
| Highway system | |
|
| |
Raipur–Visakhapatnam Expressway (NH-130CD), part of Raipur–Visakhapatnam Economic Corridor (EC-15), is a planned greenfield, access-controlled, 464-kilometre (288 mi) long, 6-lane expressway through Red corridor in Chhattisgarh, Odisha and Andhra Pradesh states of central and east-central India. From Durg, it runs between NH-30 and NH-130C till Boriguma, then runs east of NH-26 till Sunabeda and then west of NH-26 till Visakhapatnam (Vizianagaram). Along the way it connects Raipur, Kurud, Dhamtari, Kanker, Kondagaon, Koraput, and Sabbavaram before terminating at Visakhapatnam Port.[1]
It is part of Bharatmala Pariyojana and it connects to East Coast Economic Corridor (Kolkata to Kanyakumari) at Vizianagaram. Sequentially interconnected existing NH-30-NH-34-NH-539-NH-44-Yamuna Expressway connect Raipur to central and north India such as Delhi, Agra, Gwalior, Jhansi, Damoh, and Jabalpur.
Route[edit | edit source]
Chhattisgarh[edit | edit source]
In Chhattisgarh state it passes through 4 southeastern districts between NH-30 and NH-130C:[1]
Odisha[edit | edit source]
In Odisha state it passes through 2 southwestern-most districts on eastern and western side of NH-26 in Nabarangpur and Koraput districts respectively:[1]
- Nabarangpur district, runs along the eastern side of NH-26.
- Sunapali, enters Odisha here.
- Raighar (west of)
- Umerkote (west of)
- Dabugaon (west of)
- Papadahandi (west of)
- Nowrangpur (Nabarangpur) (west of)
- Koraput district, runs along the western side of NH-26.
- Kotpad (east of)
- Gaudaguda, moves from west to east side of NH-26.
- Borigumma (east of)
- Raniguda (immediate east of)
- Koraput (immediate east of)
- Sunabeda (immediate east of), south of Sunabeda it moves from east to west side of NH-26.
- Pottangi
- Ondarangi on the border of Odisha-Andhra Pradesh, exits Odisha and enters Andhra Pradesh.
Andhra Pradesh[edit | edit source]
In Andhra Pradesh state is passes only through 1 district in northeast Andhra Pradesh on the western side of NH-26:[1]
- Vizianagaram district
- Salur (west of)
- Gajapathinagaram (west of)
- Vizianagaram (west of)
- Vizianagaram (west of)
- between Sabbavaram-Anandapuram, terminates here on SH-9 Anakapalle-Rajapulova Road.
Proposed future connectivity[edit | edit source]
Following additional connectivity has been proposed by constructing new links.
NCR CMC hubs of Bhatinda-Hisar-Jaipur-Gwalior[edit | edit source]
There is another proposal to link this corridor to northwestern India by a combination of constructing greenfield stretches and upgrading existing roads through National Capital Region's Counter Magnet Cities (NCR CMC) of Bhatinda-Hisar-Jaipur (via Karauli)-Gwalior. This requires the construction of a road-cum-rail bridge over the Chambal River between Karauli-Taintara and/or Sirmathura-Joura.
- Connect to Bhatinda to connect to Pathankot–Ajmer Expressway and Amritsar–Jamnagar Expressway.
- Bhatinda-Hisar: Greenfield alignment from Bhatinda - Kullan (between Ratia and Tohana) - between Bhuna and Uklanamandi - between Agroha and Barwala, between Barwala and Hansi, intersect with Trans–Haryana Expressway near Mundhal Khurd and Meham. As an independent project, it will continue to NH-9, Kalanaur, north of Beri, Western Peripheral Expressway and Bahadurgarh.
- Hisar-Pilani-Jhunjhunu : Upgrade of Hisar (elevated from railway over-bridge near Mangali to Camp Chowk, Jat College and Thandi Sadak over-bridge)-Mangali-Saharwa (with a greenfield Siwani-Sahrwa-Dobeta-Kanwari-Bawani Khera spur ). Greenfield alignment from Sharwa to Bidhwan-Bahal to Norangpura (west of Pilani) to Baragaon (south of Jhunjuhunu on Rajasthan SH-32).
- Jhunjhunu-Jaipur: greenfield Baragaon-Raghunathpura, upgrade existing from Raghunathpura-Udaipurwati-Kotri Luharwas, greenfield from Kotri Luharwas to Khandela Mod bus stand, upgrade existing route from Khandela Mod bus stand to Srimadhopur-Reengus to connect it to NH-52. From there greenfield alignment to Tonk via Reengus-Hasteda-Gori Ka Bas-Lalpura-Bagru-Phagi-Galod-Tonk resulting in direct access to another NCR CMS city of Kota.
- Chambal River, this requires the construction of a greenfield highway and a road-cum-rail bridge over the Chambal River between Karauli-Taintara and/or Sirmathura-Joura with 2 spurs on eastern flank of Chambal - one each to connect to Gwalior and Datia.
NCR CMG hubs of Ludhiana-Patiala-Ambala-Narnaul-Alwar-[edit | edit source]
There is another proposal to link this corridor to Trans–Haryana Expressway and beyond to Delhi–Amritsar–Katra Expressway, Delhi–Mumbai Expressway and Delhi–Mumbai Industrial Corridor Project by a combination of constructing greenfield stretches and upgrading existing roads through Narnaul-Alwar-Karauli-Mohana-Datia (and/or Gwalior). Detailed routes will see the upgrade of existing State Highways (SH) to National Highways (NH) such as:
- Rajasthan SH-14 Narnaul-Alwar-Mathura highway, with whole route between narnaul and Mathura to be upgraded for economic corridor and religious Krishna Yatra Circuit.
- Rajasthan SH-25, Alwar-Rajgarh portion to be upgraded.
- Dalalpura/Machari to Berkhera-Mahwa, greenfield alignment, alternatively the longer existing Rajasthan SH-35 Rajgarh-Mahwa portion can be upgraded.
- Rajasthan SH-22, Mahwa-Hindon-Karauli portion to be upgraded.
- Chambal River, this requires the construction of a greenfield highway and a road-cum-rail bridge over the Chambal River between Karauli-Taintara and/or Sirmathura-Joura with 2 spurs on eastern flank of Chambal - one each to connect to Gwalior and Datia.
Eastern Economic Corridor[edit | edit source]
There is a proposal to connect it to Eastern Economic Corridor (Paradeep in Odisha to Raxaul on Bihar-Nepal border) by constructing either a spur or a loop in Chhattisgarh.
Status updates[edit | edit source]
- Feb 2020: The expressway was added to Bharatmala Pariyojana and approved.[2]
- Aug 2020: The target date for completion of expressway is set as March 2024.[3]
- Mar 2021: Detailed Project Report (DPR) completed.[4]
- Apr 2021: Tendering process ongoing.[5]
- Oct 2021: HG Infra wins 2 packages in Odisha worth over ₹ 2,297 crores for developing the 44 km long, six-lane Kaliagura-Baunsaguar section in Odisha.
See also[edit | edit source]
- Expressways of India
- Industrial corridor
- Eastern Economic Corridor (India)
- East Coast Economic Corridor
References[edit | edit source]
- ↑ 1.0 1.1 1.2 1.3 Raipur – Visakhapatnam Economic Corridor – Information & Status, themetrorailguy.com.
- ↑ "ग्रीन फील्ड इकोनॉमिक कॉरीडोर को मिली मंजूरी, रायपुर-विशाखापट्टनम एक्सप्रेस-वे में जगदलपुर नहीं है शामिल". Patrika News.
- ↑ "23 new expressways and highways coming up in next 5 years | India News - Times of India". The Times of India.
- ↑ https://www.thehindu.com/news/national/andhra-pradesh/raipur-visakhapatnam-nh-project-will-be-completed-by-2024-25-gadkari/article34075917.ece [bare URL]
- ↑ "Raipur - Visakhapatnam Economic Corridor – Information & Status". The Metro Rail Guy. Retrieved 2021-10-30.