m Removed empty portal template using script |
m improved details based on references and updated info |
||
| Line 1: | Line 1: | ||
{{ | {{Short description|Indian government entity governing electricity generation}} | ||
{{Use Indian English|date=August 2016}} | {{Use Indian English|date=August 2016}} | ||
{{Use dmy dates|date=October 2020}} | {{Use dmy dates|date=October 2020}} | ||
{{Infobox company | {{Infobox company | ||
| name = NTPC | | name = NTPC Limited | ||
| logo = | | logo = National Thermal Power logo.svg | ||
| logo_size = | | logo_size = 200px | ||
| former_name = National Thermal Power Corporation | | former_name = National Thermal Power Corporation | ||
| type = [[ | | type = [[Public Sector Undertakings in India|Central Public Sector Undertaking]] | ||
| traded_as = {{Unbulleted list|{{BSE|532555}}|{{NSE|NTPC}}|[[BSE SENSEX|BSE SENSEX Constituent]]|[[NIFTY 50|NSE NIFTY 50 Constituent]]}} | | traded_as = {{Unbulleted list|{{BSE|532555}}|{{NSE|NTPC}}|[[BSE SENSEX|BSE SENSEX Constituent]]|[[NIFTY 50|NSE NIFTY 50 Constituent]]}} | ||
| ISIN = INE733E01010 | | ISIN = {{ISIN|sl=n|pl=y|INE733E01010}} | ||
| industry = [[Electric utility|Electricity]] | | industry = [[Electric utility|Electricity]] | ||
| founded = {{Start date and age|df=yes|1975|11|07}} | | founded = {{Start date and age|df=yes|1975|11|07}} | ||
| Line 15: | Line 15: | ||
| hq_location = | | hq_location = | ||
| hq_location_city = [[New Delhi]] | | hq_location_city = [[New Delhi]] | ||
| hq_location_country = | | hq_location_country = India<ref>{{cite web|url=http://www.ntpc.co.in/en/contact-us|title=Contact Us - NTPC|website=ntpc.co.in|access-date=8 March 2017|archive-date=16 April 2018|archive-url=https://web.archive.org/web/20180416075333/http://www.ntpc.co.in/en/contact-us|url-status=dead}}</ref> | ||
| area_served = India | | area_served = India | ||
| key_people = [[Gurdeep Singh (NTPC)|Gurdeep Singh]] <small>(Chairman & [[Managing Director|MD]])</small><ref>{{cite web|url=http://www.ntpc.co.in/en/about-us/board-of-directors|title=Board of Directors - NTPC|website=ntpc.co.in}}</ref> | | key_people = [[Gurdeep Singh (NTPC)|Gurdeep Singh]] <small>(Chairman & [[Managing Director|MD]])</small><ref>{{cite web|url=http://www.ntpc.co.in/en/about-us/board-of-directors|title=Board of Directors - NTPC|website=ntpc.co.in|access-date=8 March 2017|archive-date=25 August 2019|archive-url=https://web.archive.org/web/20190825074129/https://www.ntpc.co.in/en/about-us/board-of-directors|url-status=dead}}</ref> | ||
| products = | | products = | ||
| production = | | production = | ||
| production_year = <!-- Year of production data (if known) --> | | production_year = <!-- Year of production data (if known) --> | ||
| services = [[Electricity generation]] and [[electricity distribution|distribution]]<br>natural gas [[hydrocarbon exploration|exploration]], [[energy production|production]], transportation and distribution | | services = [[Electricity generation]] and [[electricity distribution|distribution]],<br> [[mining]]<br />natural gas [[hydrocarbon exploration|exploration]], [[energy production|production]], transportation and distribution | ||
| revenue ={{increase}}{{INRConvert| | | revenue = {{increase}}{{INRConvert|1.88|lc|lk=on}} (2025)<ref name="ntpc">{{cite web|url=https://www.bseindia.com/xml-data/corpfiling/AttachLive/d5ada13c-0cf1-4dae-a157-47537e83678c.pdf|archive-url=https://web.archive.org/web/20230519141025/https://www.bseindia.com/xml-data/corpfiling/AttachLive/a30bcea6-b0b1-434b-b820-4c8afdc897f5.pdf|archive-date=19 May 2023|title=NTPC Limited|website=www.bseindia.com}}</ref> | ||
| operating_income = {{increase}}{{INRConvert| | | operating_income = {{increase}} | ||
| profit ={{increase}} {{INRConvert| | {{INRConvert|59066|c}} (2025)<ref | ||
| assets ={{increase}} {{INRConvert| | name="ntpc"/> | ||
| equity ={{increase}} {{INRConvert| | | profit = {{increase}} {{INRConvert|23953|c}} (2025)<ref name="ntpc"/> | ||
| assets = {{increase}} {{INRConvert|5.24|lc}} (2025)<ref name="ntpc"/> | |||
| equity = {{increase}} {{INRConvert|1.911|lc}} (2025)<ref name="ntpc"/> | |||
| equity_year = <!-- Year of equity data (if known) --> | | equity_year = <!-- Year of equity data (if known) --> | ||
| owner = {{nowrap|[[Ministry of Power (India)|Ministry of Power]], [[Government of India]]<ref | | owner = {{nowrap|[[Ministry of Power (India)|Ministry of Power]], [[Government of India]]<ref>{{cite news |title=NTPC says Govt pares stake to 51.02% |url=https://www.business-standard.com/article/news-cm/ntpc-says-govt-pares-stake-to-51-02-120030500753_1.html |access-date=5 July 2022 |work=Business Standard India |date=5 March 2020}}</ref> }} | ||
| members = | | members = | ||
| members_year = <!-- Year of members data (if known) --> | | members_year = <!-- Year of members data (if known) --> | ||
| num_employees = | | num_employees = 18,786 | ||
| num_employees_year = | | num_employees_year = 2024<ref name="ntpc"/> | ||
| parent = | | parent = | ||
| divisions = | | divisions = | ||
| subsid = | | subsid = *[[THDC India Limited]] | ||
*[[THDC India Limited]] | * [[NSPCL]] | ||
*[[NSPCL]] | |||
| module = <!-- Used to embed other templates --> | | module = <!-- Used to embed other templates --> | ||
| website = {{URL| | | website = {{URL|https://ntpc.co.in/|ntpc.co.in}} | ||
| footnotes = | | footnotes = | ||
}} | }} | ||
'''NTPC Limited''', formerly known as '''National Thermal Power Corporation | '''NTPC Limited''', formerly known as '''National Thermal Power Corporation''', is an Indian [[Public sector undertakings in India|central Public Sector Undertaking]] (PSU) owned by the [[Ministry of Power (India)|Ministry of Power]] and the [[Government of India]], which is engaged in the [[Electricity generation|generation of electricity]] and other activities. The headquarters of the PSU are situated at [[New Delhi]]. NTPC's core function is the generation and distribution of electricity to State Electricity Boards in India. The body also undertakes consultancy and [[turnkey]] project contracts that involve engineering, project management, construction management, and operation and management of [[Power station|power plants]]. | ||
It is the largest power company in India, with an [[Nameplate capacity|installed capacity]] of 80,154.50 MW.<ref name="installed capacity as on 04.10.2024">{{cite web |url= https://ntpc.co.in/|title=| | NTPC wind projects }}</ref> Although the company has approximately 16% of the total national capacity, it contributes to over 25% of total power generation due to its focus on operating its power plants at higher efficiency levels (approximately 80.2% against the national [[Plant load factor|PLF]] rate of 64.5%). NTPC currently produces 25 billion units of electricity per month.{{Citation needed|date=July 2023}} | |||
NTPC currently operates 55 power stations | NTPC Mining Ltd (NML) has mined about 100 MMT coal in 2023-2024 FY, NML has Pakri Barwadih, Chatti Bariatu and Kerandari Coal Mines in Jharkhand, Dulanga Coal Mine in Odisha and Talaipalli Coal Mine in Chhattisgarh.<ref>{{cite news | url=https://timesofindia.indiatimes.com/city/ranchi/ntpc-mining-produces-34mmt-coal-in-23-24/articleshow/108986928.cms | title=NTPC Mining produces 34MMT coal in 23-24 | newspaper=The Times of India | date=3 April 2024 }}</ref> | ||
NTPC currently operates 55 power stations: 24 coal, seven combined cycle gas and liquid fuel, two hydro powered, one wind turbine, and 11 solar projects. Additionally, it has 9 coal and 1 gas station, owned by joint ventures or subsidiaries. | |||
It was founded by [[Government of India]] in 1975, which now holds | It was founded by [[Government of India]] in 1975, which now holds 51.10% of its equity shares<ref name="ReferenceA">{{cite web|url=http://www.ntpc.co.in/en/investors/shareholding-pattern|title=Shareholding Pattern - NTPC|website=ntpc.co.in|access-date=7 December 2015|archive-date=27 November 2020|archive-url=https://web.archive.org/web/20201127230444/https://www.ntpc.co.in/en/investors/shareholding-pattern|url-status=dead}}</ref> after [[divestment]] of its stake in 2004, 2010, 2013, 2014, 2016, and 2017. In May 2010, NTPC was conferred [[Maharatna]] status by the Union Government of India, one of only four companies to be awarded this status.<ref>{{cite web|url=http://www.indianexpress.com/news/4-psus-get-maharatna-status/621716/ |title=4 PSUs get maharatna status – Indian Express |date=21 May 2010 |access-date=17 August 2012}}</ref> It is ranked 433rd in the [[Forbes Global 2000]] for 2023.<ref name="Forbes profile">{{cite web |date= |title=NTPC Limited |url=https://www.ntpc.co.in/media/press-releases/ntpc-achieves-433rd-rank-climbing-52-positions-forbes-global-list-2023 |access-date=17 February 2015 |work=Forbes}}</ref> | ||
}}</ref> | |||
==History== | ==History== | ||
=== | ===1975–1994=== | ||
The company was founded on 7 November 1975 | The company was founded on 7 November 1975 by India's former [[Prime Minister of India|Prime Minister]] [[Indira Gandhi]] as National Thermal Power Corporation Private Limited. It started working on its first thermal power project in 1976 at [[Shaktinagar, Uttar Pradesh|Shaktinagar]]—named [[Singrauli Super Thermal Power Station|National Thermal Power Corporation Private Limited Singrauli]]—in [[Uttar Pradesh]].<ref name=History>{{cite web |url=http://www.ntpc.co.in/index.php?option=com_content&view=article&id=3&Itemid=73&lang=en |title=History of NTPC |publisher=NTPC Limited |access-date=12 October 2013 |archive-date=14 October 2013 |archive-url=https://web.archive.org/web/20131014105305/http://www.ntpc.co.in/index.php?option=com_content&view=article&id=3&Itemid=73&lang=en |url-status=dead }}</ref> In the same year, its name was changed to "National Thermal Power Corporation Limited". In 1983, NTPC began commercial operations and earned profits of INR 4.5 crores in FY 1982–83. By the end of 1985, it had achieved power generation capacity of 2000 MW.<br />In 1986, it completed synchronisation of its first 500 MW unit at Singrauli. In 1988, it commissioned two 500 MW units, one each in Rihand and [[Ramagundam]]. In 1989, it started a consultancy division. In 1992, it acquired Feroze Gandhi Unchahar Thermal Power Station from Uttar Pradesh Rajya Vidyut Utpadan Nigam of Uttar Pradesh.<ref name=ETHistory>{{cite news |url=http://economictimes.indiatimes.com/ntpc-ltd/infocompanyhistory/companyid-12316.cms |title=Company History - NTPC Ltd. |newspaper=The Economic Times |access-date=12 October 2013}}</ref> By the end of 1994, its installed capacity crossed 15,000 MW. | ||
In 1986, it completed synchronisation of its first 500 MW unit at Singrauli. In 1988, it commissioned two 500 MW units, one each in Rihand and [[Ramagundam]]. In 1989, it started a consultancy division. In 1992, it acquired Feroze Gandhi Unchahar Thermal Power Station | |||
=== | ===1995–2004=== | ||
In 1995, it took over the Talcher Thermal Power Station from Orissa State Electricity Board.<ref name=History/> | In 1995, it took over the Talcher Thermal Power Station from Orissa State Electricity Board.<ref name=History/> In the year 1997, the [[Government of India]] conferred it with "Navratna" status. In that same year, it achieved a milestone of generating 100 billion units of electricity in a single year.<ref name=History/> In 1998, it commissioned its first Naptha-based plant at Kayamkulam with a capacity of 350 MW. In 1999, its plant in Dadri, which had the highest [[Capacity factor|plant load factor]] (PLF) in India of 96%, was certified with ISO-14001. During 2000, it started construction of its first hydro-electric power project, with 800 MW capacity, in Himachal Pradesh.<ref name=History/><br />In 2002, it incorporated 3 subsidiary companies: NTPC Electric Supply Company Limited for forward integration by entering into the business of distribution and trading of power; NTPC Vidyut Vyapar Nigam Limited for meeting the expected rise in energy trading; and NTPC Hydro Limited to carry out the business of implementing and operating small and medium hydropower projects.<ref>{{cite web |url=http://www.ntpc.co.in/annualreports/2002-03/chairman%20speech%2003.pdf |title=Chairman's statement in 27th Annual Report |publisher=NTPC |date=24 September 2003 |access-date=12 October 2013 |url-status=dead |archive-url=https://web.archive.org/web/20131014112132/http://www.ntpc.co.in/annualreports/2002-03/chairman%20speech%2003.pdf |archive-date=14 October 2013 }}</ref> Later in 2002, its installed capacity crossed 20,000 MW.<ref name=History/> | ||
In the year 1997, the Government of India conferred it with "Navratna" status. In | |||
In 2002, it incorporated 3 subsidiary companies: | |||
NTPC got listed on BSE and NSE on 5 November 2004. Against the issue price of ₹62 per share, it closed the first day of listing with ₹75.55 per share.<ref>{{cite news |url=https://m.timesofindia.com/business/india-business/NTPC-does-a-power-listing/articleshow/913865.cms |archive-url=https://web.archive.org/web/20131015114501/http://articles.timesofindia.indiatimes.com/2004-11-05/india-business/27170389_1_equity-shares-issue-price-public-issue |url-status=live |archive-date=15 October 2013 |title=NTPC does a power listing |date=5 November 2004 |newspaper=[[The Times of India]] |access-date=12 October 2013}}</ref> On the day of listing, it became the third largest company in India in terms of market capitalisation.<ref>{{cite news |url=http://www.hindu.com/2004/11/06/stories/2004110603941600.htm |archive-url=https://web.archive.org/web/20041119195239/http://www.hindu.com/2004/11/06/stories/2004110603941600.htm |url-status=dead |archive-date=19 November 2004 |title=Power major NTPC lists at premium |date=6 November 2004 |newspaper=[[The Hindu]] |access-date=12 October 2013}}</ref> | |||
=== | ===2005–present=== | ||
In October 2005, the company's name was changed from | In October 2005, the company's name was changed from National Thermal Power Corporation Limited to NTPC Limited. The primary reason for this change was the company's foray into [[Hydroelectricity|hydro]] and [[Nuclear power|nuclear]] based power generation along with backward integration of coal mining. In 2006, it entered into an agreement with the [[Government of Sri Lanka]] to set up two units of 250 MW each in [[Trincomalee]] in [[Sri Lanka]].<ref name=History/> During 2008 and 2011, NTPC entered into [[joint venture]]s with [[Bharat Heavy Electricals|BHEL]], [[Bharat Forge]], [[NHPC Limited|NHPC]], [[Coal India]], [[Steel Authority of India|SAIL]], [[National Mineral Development Corporation|NMDC]], and [[Nuclear Power Corporation of India|NPCIL]] to expand its business of power generation.<ref name=History/><ref name=ETHistory/> By the end of 2010, its installed capacity crossed 31,000 MW.<ref name=History/> | ||
During 2008 and 2011, NTPC entered into [[ | |||
The company in 2009 joined forces with other state enterprises [[Rashtriya Ispat Nigam]], [[Steel Authority of India]], [[Coal India]], National Minerals Development Corporation to invest in coal mining operations through a joint venture vehicle named International Coal Ventures Private Limited (ICVL). In July 2014 ICVL acquired a 65 percent stake in the [[Benga coal mine]] in [[Mozambique]] from the [[Rio Tinto Group]]<ref name="RioICVL">{{cite news|title=Indian JV to acquire Rio Tinto's Riversdale coal assets in Mozambique|url=http://www.indiagazette.com/index.php/sid/224277887/scat/701ee96610c884a6/ht/Indian-JV-to-acquire-Rio-Tintos-Riversdale-coal-assets-in-Mozambique|access-date=31 July 2014|work=India Gazette|archive-url=https://web.archive.org/web/20140810065801/http://www.indiagazette.com/index.php/sid/224277887/scat/701ee96610c884a6/ht/Indian-JV-to-acquire-Rio-Tintos-Riversdale-coal-assets-in-Mozambique|archive-date=10 August 2014|url-status=dead}}</ref> | The company in 2009 joined forces with other [[Public sector undertakings|state enterprises]] [[Rashtriya Ispat Nigam]], [[Steel Authority of India]], [[Coal India]], and [[National Mineral Development Corporation|National Minerals Development Corporation]] to invest in coal mining operations through a [[joint venture]] vehicle named International Coal Ventures Private Limited (ICVL). In July 2014, ICVL acquired a 65 percent stake in the [[Benga coal mine]] in [[Mozambique]] from the [[Rio Tinto Group]].<ref name="RioICVL">{{cite news|title=Indian JV to acquire Rio Tinto's Riversdale coal assets in Mozambique|url=http://www.indiagazette.com/index.php/sid/224277887/scat/701ee96610c884a6/ht/Indian-JV-to-acquire-Rio-Tintos-Riversdale-coal-assets-in-Mozambique|access-date=31 July 2014|work=India Gazette|archive-url=https://web.archive.org/web/20140810065801/http://www.indiagazette.com/index.php/sid/224277887/scat/701ee96610c884a6/ht/Indian-JV-to-acquire-Rio-Tintos-Riversdale-coal-assets-in-Mozambique|archive-date=10 August 2014|url-status=dead}}</ref> In December 2022, the [[market capitalization|market capitalisation]] of NTPC limited was ₹1,66,249.34 [[crore]].<ref>{{Cite web |title=Top 100 stocks by Market Capitalization {{!}} BSE Listed stocks Market Capitalization |url=https://www.bseindia.com/markets/equity/eqreports/topmarketcapitalization.aspx |access-date=2022-12-19 |website=www.bseindia.com}}</ref> | ||
==Operations== | ==Operations== | ||
NTPC operates from 70 locations in India, one location in Sri Lanka and | NTPC operates from 70 locations in India, one location in Sri Lanka and two locations in Bangladesh. In India, it has eight regional headquarters (HQ): | ||
{| class="wikitable sortable" style="background:#fff;" | {| class="wikitable sortable" style="background:#fff;" | ||
| Line 112: | Line 109: | ||
|} | |} | ||
=== Scheduling and generation dispatch === | |||
The scheduling and dispatch of all the generating stations owned by National Thermal Power Corporation are done by respective regional load dispatch centers, which are the apex body to ensure integrated operation of the power system grid in the respective region. All these load dispatch centers come under [[Power System Operation Corporation Limited]] (POSOCO). | |||
== | ==Subsidiaries== | ||
# [[Convergence Energy Services Limited]] | |||
# [[Energy Efficiency Services Limited]] | |||
# Green Valley Renewable Energy Limited (GVREL) | |||
# [[NTPC Mining Limited]] | |||
# [[NTPC Green Energy]] | |||
# [[NTPC Renewables Limited]] | |||
# [[National High Power Test Laboratory Private Limited]] (NHPTL) | |||
# [[North Eastern Electric Power Corporation Limited|NEEPCO]] | |||
# [[THDC India Limited]] | |||
# Tusco Ltd. | |||
===Thermal | ==Joint ventures== | ||
====Coal-based power plants( | # Aravali Power Company Pvt. Ltd. | ||
==Capacity of plants== | |||
The total installed capacity of the company is 72,304 MW (including 13,465 MW through JVs/subsidiaries) across the country, (26 Coal based stations, seven gas based stations, one hydro station, one [[small hydro]], 11 solar PV, and one wind based station) and 25 joint venture stations (nine coal based, four gas based, eight hydro-powered, one small hydro, two wind-powered, and one solar PV). | |||
===Thermal power=== | |||
====Coal-based power plants (own operational)==== | |||
{| class="wikitable sortable" | {| class="wikitable sortable" | ||
|- | |- | ||
| Line 127: | Line 140: | ||
! Units in [[Megawatt|MW]] | ! Units in [[Megawatt|MW]] | ||
! Status | ! Status | ||
|- | |- | ||
| 1 | | 1 | ||
| [[Singrauli Super Thermal Power Station]] | | [[Singrauli Super Thermal Power Station]] | ||
| [[Uttar Pradesh]] | | [[Uttar Pradesh]] | ||
| 2,000 | | 2,000 | ||
| 5x200, 2x500 | | 5x200, 2x500 | ||
| All units functional | | All units functional,2×800 MW unit under construction. | ||
|- | |- | ||
| 2 | | 2 | ||
| [[NTPC Korba]] | | [[NTPC Korba]] | ||
| Line 141: | Line 154: | ||
| 3x200, 4x500 | | 3x200, 4x500 | ||
| All units functional | | All units functional | ||
|- | |- | ||
| 3 | | 3 | ||
| [[NTPC Ramagundam]] | | [[NTPC Ramagundam]] | ||
| [[Telangana]] | | [[Telangana]] | ||
| 2,600 | | 2,600 | ||
| 3x200, 4x500 | | 3x200, 4x500 | ||
| All units functional. | | All units functional. | ||
|- | |- | ||
| Line 153: | Line 166: | ||
| [[West Bengal]] | | [[West Bengal]] | ||
| 2,100 | | 2,100 | ||
| 3x200, 3x500 | | 3x200, 3x500 | ||
| All units functional | | All units functional | ||
|- | |- | ||
| 5 | | 5 | ||
| [[Vindhyachal Super Thermal Power Station]] | | [[Vindhyachal Super Thermal Power Station]] | ||
| [[Madhya Pradesh]] | | [[Madhya Pradesh]] | ||
| 4, | | 4,783 | ||
| 6x210, 7x500 | | 6x210, 7x500, 2x4, 1x15 | ||
| All units functional. Largest Thermal Power Station in India | | All units functional. Largest Thermal Power Station in India. A small hydro of 8 MW and a PV Solar power station of 15 MW is also present. | ||
|- | |- | ||
| 6 | | 6 | ||
| [[Rihand Thermal Power Station]] | | [[Rihand Thermal Power Station]] | ||
| [[Uttar Pradesh]] | | [[Uttar Pradesh]] | ||
| 3,000 | | 3,000 | ||
| 6x500 | | 6x500 | ||
| All units functional | | All units functional | ||
|- | |- | ||
| 7 | | 7 | ||
| [[Kahalgaon Super Thermal Power Station]] | | [[Kahalgaon Super Thermal Power Station]] | ||
| [[Bihar]] | | [[Bihar]] | ||
| 2,340 | | 2,340 | ||
| 4x210, 3x500 | | 4x210, 3x500 | ||
| All units functional | | All units functional | ||
|- | |- | ||
| 8 | | 8 | ||
| [[NTPC Dadri]] | | [[NTPC Dadri]] | ||
| [[Uttar Pradesh]] | | [[Uttar Pradesh]] | ||
| 1,820 | | 1,820 | ||
| 4x210, 2x490 | | 4x210, 2x490 | ||
| All units functional | | All units functional | ||
|- | |- | ||
| 9 | | 9 | ||
| [[Talcher Super Thermal Power Station]] | | [[Talcher Super Thermal Power Station]] | ||
| [[Odisha]] | | [[Odisha]] | ||
| 3, | | 3,010 | ||
| 6x500 | | 6x500, 1x10 | ||
| All units functional | | All units functional | ||
|- | |- | ||
| 10 | | 10 | ||
| [[Feroze Gandhi Unchahar Thermal Power Station]] | | [[Feroze Gandhi Unchahar Thermal Power Station]] | ||
| Line 197: | Line 210: | ||
| 5x210, 1×500 | | 5x210, 1×500 | ||
| All units functional | | All units functional | ||
|- | |- | ||
| 11 | | 11 | ||
| [[Talcher Thermal Power Station]] | | [[Talcher Thermal Power Station]] | ||
| Line 203: | Line 216: | ||
| 460 | | 460 | ||
| 2x110, 4x60 | | 2x110, 4x60 | ||
| All units retired and shut down, will be replaced by | | All units retired and shut down, will be replaced by 2×660 MW Unit<ref>{{cite web | url=https://www.downtoearth.org.in/news/energy/talcher-thermal-power-plant-shuts-down-ntpc-says-modern-unit-will-replace-it-76269 | title=Talcher thermal power plant shuts down, NTPC says modern unit will replace it | date=2 April 2021 }}</ref> | ||
|- | |- | ||
| 12 | | 12 | ||
| [[Simhadri Super Thermal Power Station]] | | [[Simhadri Super Thermal Power Station]] | ||
| [[Andhra Pradesh]] | | [[Andhra Pradesh]] | ||
| 2,000 | | 2,000 | ||
| 4x500 | | 4x500 | ||
| All units functional | | All units functional | ||
|- | |- | ||
| 13 | | 13 | ||
| [ | | <span class="anchor" id="Tanda thermal power plant">NTPC Tanda</span><ref>[https://ntpc.co.in/tanda NTPC Tanda]</ref> | ||
| [[Uttar Pradesh]] | | [[Uttar Pradesh]] | ||
| 1,760 | | 1,760 | ||
| 4x110, 2×660 | | 4x110, 2×660 | ||
| | | All units functional | ||
|- | |- | ||
| 14 | | 14 | ||
| Line 225: | Line 238: | ||
| 2x500, 3x660 | | 2x500, 3x660 | ||
| All units functional | | All units functional | ||
|- | |- | ||
| 15 | | 15 | ||
| [[Mauda Super Thermal Power Station]] | | [[Mauda Super Thermal Power Station]] | ||
| [[Maharashtra]] | | [[Maharashtra]] | ||
| 2,320 | | 2,320 | ||
| 2x500, 2x660 | | 2x500, 2x660 | ||
| All units functional | | All units functional | ||
|- | |- | ||
| 16 | | 16 | ||
| [[Barh Super Thermal Power Station]] | | [[Barh Super Thermal Power Station]] | ||
| [[Bihar]] | | [[Bihar]] | ||
| 3,300 | | 3,300 | ||
| 3×660, 2x660 | | 3×660, 2x660 | ||
| | | All units functional | ||
|- | |- | ||
| 17 | | 17 | ||
| [[Kudgi Super Thermal Power Station]] | | [[Kudgi Super Thermal Power Station]] | ||
| [[Karnataka]] | | [[Karnataka]] | ||
| 2,400 | | 2,400 | ||
|3x800 | |3x800 | ||
| All units functional | | All units functional | ||
|- | |- | ||
| 18 | | 18 | ||
| [[NTPC Bongaigaon]] | | [[NTPC Bongaigaon]] | ||
| [[Assam]] | | [[Assam]] | ||
| 750 | | 750 | ||
| 3x250 | | 3x250 | ||
| All units functional | | All units functional | ||
|- | |- | ||
| 19 | | 19 | ||
| [[LARA Super Thermal Power Station]] | | [[LARA Super Thermal Power Station]] | ||
| [[Chhattisgarh]] | | [[Chhattisgarh]] | ||
| | | 1600 | ||
| 2x800, | | 2x800, 2x800 | ||
| | | 2×800 MW unit functional, 2×800 MW unit under construction. | ||
|- | |- | ||
| 20 | | 20 | ||
| [[Solapur Super Thermal Power Station]] | | [[Solapur Super Thermal Power Station]] | ||
| [[Maharashtra]] | | [[Maharashtra]] | ||
| 1,320 | | 1,320 | ||
| 2x660 | | 2x660 | ||
| All units functional. | | All units functional. | ||
| Line 271: | Line 284: | ||
| [[Gadarwara Super Thermal Power Station]] | | [[Gadarwara Super Thermal Power Station]] | ||
| [[Madhya Pradesh]] | | [[Madhya Pradesh]] | ||
| | |1,600 | ||
| 2×800, 2×800 | | 2×800, 2×800 | ||
| | | 2×800 MW unit functional, 2×800 MW unit under construction | ||
|- | |- | ||
| 22 | | 22 | ||
| [[North Karanpura Thermal Power Station]] | | [[North Karanpura Thermal Power Station]] | ||
| [[Jharkhand]] | | [[Jharkhand]] | ||
| 1,980 | | 1,980 | ||
| 3×660 | | 3×660 | ||
| | | 2 units functional, 1 under construction | ||
|- | |- | ||
| 23 | | 23 | ||
| [[Darlipali Super Thermal Power Station]] | | [[Darlipali Super Thermal Power Station]] | ||
| [[Odisha]] | | [[Odisha]] | ||
| 1,600 | | 1,600 | ||
| 2×800 | | 2×800 | ||
| | | 2×800 MW unit functional, 1×800 MW unit under construction. | ||
|- | |- | ||
| 24 | | 24 | ||
| [[Khargone Super Thermal Power Station]] | | [[Khargone Super Thermal Power Station]] | ||
| [[Madhya Pradesh]] | | [[Madhya Pradesh]] | ||
| 1,320 | | 1,320 | ||
| 2×660 | | 2×660 | ||
| | | All unit functional. | ||
|- | |- | ||
| 25 | | 25 | ||
| [[Telangana Super Thermal Power Project]] | | [[Telangana Super Thermal Power Project]] | ||
| [[Telangana]] | | [[Telangana]] | ||
| 1,600 | | 1,600 | ||
| 2×800 | | 2×800 | ||
| | | all units functional | ||
|- | |- | ||
| 26 | | 26 | ||
| [[Barauni Thermal Power Station]] | | [[Barauni Thermal Power Station]] | ||
| [[Bihar]] | | [[Bihar]] | ||
| 720 | | 720 | ||
| 2×110, 2×250 | | 2×110, 2×250 | ||
| | | Stage 1 2×110 MW retired 2*250 functional <ref>{{Cite web|url=https://energy.economictimes.indiatimes.com/news/power/ntpc-acquires-720-mw-barauni-thermal-power-plant-in-bihar/67115504|title = NTPC acquires 720 Mw Barauni thermal power plant in Bihar - ET EnergyWorld}}</ref><ref>{{Cite web|url=https://www.indiainfoline.com/article/news-top-story/ntpc-acquires-barauni-thermal-power-station-118121600028_1.html|title = NTPC acquires Barauni Thermal Power Station}}</ref> | ||
|- | |- | ||
|} | |} | ||
====Coal-based (JV/ | ====Coal-based (JV/subsidiary)==== | ||
{| class="wikitable sortable" style="background:#fff;" | {| class="wikitable sortable" style="background:#fff;" | ||
|- | |- | ||
| Line 347: | Line 360: | ||
| 5 | | 5 | ||
| [[Muzaffarpur Thermal Power Station]] (MTPS). Wholly owned subsidiary of NTPC. | | [[Muzaffarpur Thermal Power Station]] (MTPS). Wholly owned subsidiary of NTPC. | ||
| [[Kanti]] | | [[Kanti, Muzaffarpur|Kanti]] | ||
| [[Bihar]] | | [[Bihar]] | ||
| 610 | | 610 | ||
|- style="text-align:left;" | |- style="text-align:left;" | ||
| 6 | | 6 | ||
| [[Nabinagar Thermal Power Project|BRBCL]] Joint venture with [[Indian Railways]]. | | [[Nabinagar Thermal Power Project|BRBCL]]. Joint venture with [[Indian Railways]]. | ||
| [[Nabinagar]] | | [[Nabinagar]] | ||
| [[Bihar]] | | [[Bihar]] | ||
| Line 367: | Line 380: | ||
| [[Chennai]] | | [[Chennai]] | ||
| [[Tamil Nadu]] | | [[Tamil Nadu]] | ||
| 1500 | | 1500 | ||
|- style="text-align:left;"| | |- style="text-align:left;"| | ||
| 9 | | 9 | ||
| [[Meja Thermal Power Station|Meja Thermal Power Station JV with NTPC & UPRVUNL]] | | [[Meja Thermal Power Station|Meja Thermal Power Station JV with NTPC & UPRVUNL]] | ||
| [[Allahabad]] | | [[Allahabad|Prayagraj]] | ||
| [[Uttar Pradesh]] | | [[Uttar Pradesh]] | ||
| 1320 | | 1320 | ||
3*800 mw planned at meja, 2*800mw planned at obra, 2*800mw planned at anpara under MVUNL | |||
|- style="text-align:left;"| | |- style="text-align:left;"| | ||
| 10 | | 10 | ||
| [[Patratu Super Thermal Power Project|PUVNL(Patratu)]] | | [[Patratu Super Thermal Power Project|PUVNL (Patratu)]] joint venture with Jharkhand State Electricity Board. | ||
| [[Patratu]] | | [[Patratu]] | ||
| [[Jharkhand]] | | [[Jharkhand]] | ||
| Line 382: | Line 396: | ||
|- style="text-align:left;"| | |- style="text-align:left;"| | ||
| 11 | | 11 | ||
|[[Khurja Super Thermal Power Plant|Khurja-THDC]] | |[[Khurja Super Thermal Power Plant|Khurja-THDC]] | ||
|[[Bulandshahr district|Bulandshahr]] | |[[Bulandshahr district|Bulandshahr]] | ||
|[[Uttar Pradesh]] | |[[Uttar Pradesh]] | ||
| Line 388: | Line 402: | ||
|} | |} | ||
====Gas-based power plants( | ====Gas-based power plants (own operational)==== | ||
{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
| Line 395: | Line 409: | ||
| 1 | | 1 | ||
| [[Anta Thermal Power Station|Anta]] | | [[Anta Thermal Power Station|Anta]] | ||
| [[Rajasthan]] | | [[Rajasthan]] | ||
| 419.33 | | 419.33 | ||
| 3×88, 1×149 | | 3×88, 1×149 | ||
| All unit | | All unit running | ||
|- | |- | ||
| 2 | | 2 | ||
| [[Auraiya Thermal Power Station|Auraiya]] | | [[Auraiya Thermal Power Station|Auraiya]] | ||
| [[Uttar Pradesh]] | | [[Uttar Pradesh]] | ||
| 663.36 | | 663.36 | ||
| 4×110, 2×106 | | 4×110, 2×106 | ||
| All unit | | All unit running | ||
|- | |- | ||
|3 | |3 | ||
| [[Kawas Thermal Power Station|Kawas]] | | [[Kawas Thermal Power Station|Kawas]] | ||
| [[Gujarat]] | | [[Gujarat]] | ||
| 656.20 | | 656.20 | ||
| 2×110.5, 4×106 | | 2×110.5, 4×106 | ||
| All unit | | All unit running | ||
|- | |- | ||
| 4 | | 4 | ||
| [[NTPC Dadri|Dadri]] | | [[NTPC Dadri|Dadri]] | ||
| [[Uttar Pradesh]] | | [[Uttar Pradesh]] | ||
| 829.78 | | 829.78 | ||
| 4×130.19,2×154.51 | | 4×130.19,2×154.51 | ||
| All unit | | All unit running | ||
|- | |- | ||
| 5 | | 5 | ||
| [[Jhanor-Gandhar Thermal Power Station|Jhanor-Gandhar]] | | [[Jhanor-Gandhar Thermal Power Station|Jhanor-Gandhar]] | ||
| [[Gujarat]] | | [[Gujarat]] | ||
| 657.39 | | 657.39 | ||
| 3×131, 1×155 | | 3×131, 1×155 | ||
| All unit | | All unit running | ||
|- | |- | ||
| 6 | | 6 | ||
| [[Rajiv Gandhi Combined Cycle Power Plant|Kayamkulam]] | | [[Rajiv Gandhi Combined Cycle Power Plant|Kayamkulam]], [[Haripad]] | ||
| [[Kerala]] | | [[Kerala]] | ||
| 359.58 | | 359.58 | ||
| 2x115.2 + 1x129.177 | | 2x115.2 + 1x129.177 | ||
| All unit | | All unit running | ||
|- | |- | ||
| 7 | | 7 | ||
| [[Faridabad Thermal Power Plant|Faridabad]] | | [[Faridabad Thermal Power Plant|Faridabad]] | ||
| [[Haryana]] | | [[Haryana]] | ||
| 431.59 | | 431.59 | ||
| 2×143, 1×144 | | 2×143, 1×144 | ||
| All unit | | All unit running | ||
|} | |} | ||
====Gas-based (JV/ | ====Gas-based (JV/subsidiary)==== | ||
{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
| Line 449: | Line 463: | ||
|- | |- | ||
| 1 | | 1 | ||
| [[Ratnagiri Gas and Power Private Limited]] ( | | [[Ratnagiri Gas and Power Private Limited]] (RGPPL) | ||
| [[Maharashtra]] | | [[Maharashtra]] | ||
| 1967 | | 1967 | ||
|- | |- | ||
| 2 | | 2 | ||
| [[Assam Gas based power plant]] | | [[Assam Gas based power plant]] | ||
| [[Assam]] | | [[Assam]] | ||
| 291 | | 291 | ||
|- | |- | ||
|3 | |3 | ||
| [[Agartala GT CCPP]] | | [[Agartala GT CCPP]] | ||
| [[Tripura]] | | [[Tripura]] | ||
| 135 | | 135 | ||
|- | |- | ||
| 4 | | 4 | ||
| [[Tripura Gas based CCPP]] | | [[Tripura Gas based CCPP]] | ||
| [[Tripura]] | | [[Tripura]] | ||
| 101 | | 101 | ||
|- | |- | ||
|} | |} | ||
===Hydro | ===Hydro power=== | ||
The company has also stepped up its hydroelectric power (hydel) project implementation. Some of these projects are: | The company has also stepped up its [[Hydroelectricity|hydroelectric power]] (hydel) project implementation. Some of these projects are: | ||
====Hydro-electric power plants( | ====Hydro-electric power plants (own operational)==== | ||
{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
! Sr.No. !! Power project !! State !!Capacity [[Megawatt|MW]] !! Unit in [[Megawatt|MW]] !! Status | ! Sr.No. !! Power project !! State !!Capacity [[Megawatt|MW]] !! Unit in [[Megawatt|MW]] !! Status | ||
|- | |- | ||
| 1 | | 1 | ||
| [[Koldam Dam]] | | [[Koldam Dam]] | ||
| [[Himachal Pradesh]] | | [[Himachal Pradesh]] | ||
| 800 | | 800 | ||
| | | 4×200 MW | ||
| All | | All four units commissioned | ||
|- | |- | ||
| 2 | | 2 | ||
| [[Tapovan Vishnugad Hydropower Plant|Tapovan Vishnugad]] | | [[Tapovan Vishnugad Hydropower Plant|Tapovan Vishnugad]] | ||
| [[Uttarakhand]] | | [[Uttarakhand]] | ||
| 520 | | 520 | ||
| | | 4×130 MW | ||
| Under | | Under construction | ||
|- | |- | ||
|- | |- | ||
| 3 | | 3 | ||
| [[Lata Tapovan]] | | [[Lata Tapovan]] | ||
| [[Uttarakhand]] | | [[Uttarakhand]] | ||
|171 | |171 | ||
| 3 | | 3 × 57 MW | ||
| Under | | Under construction | ||
|- | |- | ||
|4 | |4 | ||
| [[Rammam Hydro]] | | [[Rammam Hydro]] | ||
| [[West Bengal]] | | [[West Bengal]] | ||
| 120 | | 120 | ||
| 3 | | 3 × 40 MW | ||
| Under | | Under construction | ||
|} | |} | ||
====Hydro-electric power plants(JV/ Subsidiary)==== | ====Hydro-electric power plants (JV/Subsidiary)==== | ||
{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
| Line 515: | Line 529: | ||
| 1 | | 1 | ||
|[[Tehri Dam|Tehri HPP]] ([[THDC Ltd|THDC]]) | |[[Tehri Dam|Tehri HPP]] ([[THDC Ltd|THDC]]) | ||
| [[Uttarakhand]] | | [[Uttarakhand]] | ||
|1000 | |1000 | ||
|- | |- | ||
| 2 | | 2 | ||
|[[Tehri PSP]] ([[THDC Ltd|THDC]]) | |[[Tehri PSP]] ([[THDC Ltd|THDC]]) | ||
| [[Uttarakhand]] | | [[Uttarakhand]] | ||
|1000 | |1000 | ||
|- | |- | ||
| Line 543: | Line 557: | ||
| 75 | | 75 | ||
|- | |- | ||
| 7 | | 7 | ||
|[[Pare HEP]] ([[North Eastern Electric Power Corporation Limited|NEEPCO]]) | |[[Pare HEP]] ([[North Eastern Electric Power Corporation Limited|NEEPCO]]) | ||
| [[Arunachal]] | | [[Arunachal]] | ||
|110 | |110 | ||
|- | |- | ||
| 8 | | 8 | ||
| [[Tuirial HEP]] ([[North Eastern Electric Power Corporation Limited|NEEPCO]]) | | [[Tuirial HEP]] ([[North Eastern Electric Power Corporation Limited|NEEPCO]]) | ||
| [[Mizoram]] | | [[Mizoram]] | ||
| 60 | | 60 | ||
|- | |- | ||
| 9 | | 9 | ||
| [[Kopili Hydro Electric Project|Kopili HEP]] ([[North Eastern Electric Power Corporation Limited|NEEPCO]]) | | [[Kopili Hydro Electric Project|Kopili HEP]] ([[North Eastern Electric Power Corporation Limited|NEEPCO]]) | ||
| [[Assam]] | | [[Assam]] | ||
| 275 | | 275 | ||
|- | |- | ||
| 10 | | 10 | ||
| [[Kameng HEP]] ([[North Eastern Electric Power Corporation Limited|NEEPCO]]) | | [[Kameng HEP]] ([[North Eastern Electric Power Corporation Limited|NEEPCO]]) | ||
| [[Arunachal]] | | [[Arunachal]] | ||
| 600 | | 600 | ||
|} | |} | ||
===Renewable | ===Renewable energy=== | ||
NTPC | NTPC's current renewable power plants in solar and wind include: | ||
====Solar photovoltaic power plants( | ====Solar photovoltaic power plants (own operational)==== | ||
{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
| Line 573: | Line 587: | ||
|- | |- | ||
| 1 | | 1 | ||
| Dadri Solar PV | | [[NTPC Dadri Solar Power Plant|Dadri Solar PV]] | ||
| [[Uttar Pradesh]] | | [[Uttar Pradesh]] | ||
| 05 MW | | 05 MW | ||
|- | |- | ||
| 2 | | 2 | ||
| | | [[NTPC Port Blair Solar Power Plant|Port Blair Solar PV]] | ||
| [[Andaman & Nicobar Island]] | | [[Andaman & Nicobar Island]] | ||
| 05 MW | | 05 MW | ||
|- | |- | ||
| 3 | | 3 | ||
| [[Ramagundam]] | | [[NTPC Ramagundam Floating Solar Power Plant|Ramagundam Solar PV]] | ||
| [[Telangana]] | | [[Telangana]] | ||
| | | 110 MW | ||
|- | |- | ||
| 4 | | 4 | ||
| Talcher Kaniha | | Talcher Kaniha | ||
| [[Odisha]] | | [[Odisha]] | ||
| 10 MW | | 10 MW | ||
|- | |- | ||
| 5 | | 5 | ||
| Faridabad Solar PV | | Faridabad Solar PV | ||
| [[Haryana]] | | [[Haryana]] | ||
| 05 MW | | 05 MW | ||
|- | |- | ||
| 6 | | 6 | ||
| Unchahar Solar PV | | Unchahar Solar PV | ||
| [[Uttar Pradesh]] | | [[Uttar Pradesh]] | ||
| 10 MW | | 10 MW | ||
|- | |- | ||
| 7 | | 7 | ||
| Rajgarh Solar PV | | [[NTPC Rajgarh Solar Power Plant|Rajgarh Solar PV]] | ||
| [[Madhya Pradesh]] | | [[Madhya Pradesh]] | ||
| 50 MW | | 50 MW | ||
|- | |- | ||
| 8 | | 8 | ||
| Singrauli Solar PV | | Singrauli Solar PV | ||
| [[Uttar Pradesh]] | | [[Uttar Pradesh]] | ||
| 15 MW | | 15 MW | ||
|- | |- | ||
| 9 | | 9 | ||
| [[NP Kunta Ultra Mega Solar Park|Ananthpuram Solar PV]] | | [[NP Kunta Ultra Mega Solar Park|Ananthpuram Solar PV]] | ||
| [[Andhra Pradesh]] | | [[Andhra Pradesh]] | ||
| 250 MW | | 250 MW | ||
|- | |- | ||
| 10 | | 10 | ||
| [[Bhadla Solar | | [[NTPC Bhadla Solar Power Plant|Bhadla-Solar PV]] | ||
| [[Rajasthan]] | | [[Rajasthan]] | ||
| 260 MW | | 260 MW | ||
|- | |- | ||
| 11 | | 11 | ||
| [[Mandsaur]] | | [[NTPC Mandsaur Solar Power Plant|Mandsaur Solar PV]] | ||
| [[Madhya Pradesh]] | | [[Madhya Pradesh]] | ||
| 250 MW | | 250 MW | ||
|- | |- | ||
| | |12 | ||
|[[Bishrampur, Chhattisgarh|Bishrampur Solar PV]] | |||
|[[Chhattisgarh]] | |||
|20 MW | |||
|- | |||
|13 | |||
|[[Bhatgaon, Surajpur|Bhatgaon Solar PV]] | |||
|[[Chhattisgarh]] | |||
|20 MW | |||
|- | |||
|14 | |||
|[[NTPC Fatehgarh Solar Power Plant|Fatehgarh Solar PV]] | |||
|[[Rajasthan]] | |||
|296 MW | |||
|- | |||
|15 | |||
|Simhadri Floating Solar | |||
|[[Andhra Pradesh]] | |||
|25 MW | |||
|- | |||
|16 | |||
|[[NTPC Haripad Floating Solar Power Plant]] | |||
|[[Kerala]] | |||
|92 MW | |||
|- | |||
| | |||
| Total | | Total | ||
| | | | ||
| | | 1443 MW | ||
|} | |} | ||
====Solar photovoltaic power plants(JV/ | ====Solar photovoltaic power plants (JV/subsidiary)==== | ||
{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
| Line 640: | Line 679: | ||
| 1 | | 1 | ||
| Solar TGBPP Tripura ([[NEEPCO]]) | | Solar TGBPP Tripura ([[NEEPCO]]) | ||
| Tripura | | Tripura | ||
| 05 MW | | 05 MW | ||
|} | |} | ||
====Wind Power( | ====Wind Power (own operational)==== | ||
{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
| Line 650: | Line 689: | ||
|- | |- | ||
| 1 | | 1 | ||
| Rojmal | | Rojmal | ||
| [[Gujarat]] | | [[Gujarat]] | ||
| 50 MW | | 50 MW | ||
|} | |} | ||
====Wind Power(JV/ | ====Wind Power (JV/subsidiary)==== | ||
{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
| Line 661: | Line 700: | ||
|- | |- | ||
| 1 | | 1 | ||
| Patan Wind Power Project([[THDC Ltd|THDC]]) | | Patan Wind Power Project ([[THDC Ltd|THDC]]) | ||
| [[Gujarat]] | | [[Gujarat]] | ||
| 50 MW | | 50 MW | ||
|- | |- | ||
| 2 | | 2 | ||
| Devbhumi Dwarka Wind Power Project([[THDC Ltd|THDC]]) | | Devbhumi Dwarka Wind Power Project ([[THDC Ltd|THDC]]) | ||
| [[Gujarat]] | | [[Gujarat]] | ||
| 63 MW | | 63 MW | ||
|} | |} | ||
====Small | ====Small hydro==== | ||
* Singrauli CW Discharge ( | * Singrauli CW Discharge (small hydro) 8 (4x2) MW is on the discharge canal of the [[Singrauli Super Thermal Power Station]] in [[Uttar Pradesh]]. All units of this project are under commercial operation. | ||
* NTPC-THDC has installed 24(8x3) MW Small Hydro Project at Dhukwan on Betwa river in [[Jhansi]] district of [[Uttar Pradesh]]. | * NTPC-THDC has installed 24(8x3) MW Small Hydro Project at Dhukwan on Betwa river in [[Jhansi]] district of [[Uttar Pradesh]]. | ||
==Future goals== | ==Future goals== | ||
The company has developed a long-term plan to become a | The company has developed a long-term plan to become a 1,28,000 MW company by 2032. NTPC Limited is on an expansion spree to meet the power requirements of the country—the company has targeted to add 14,058 MW in 12th Plan (from FY13 to FY 17) of which it had already added 4,170 MW in 2012–2013, 1835 MW in 2013–2014, 1290 MW in 2014–2015, and 1150 MW from April–30 November 2015. | ||
As of 30 November 2015, the company has | As of 30 November 2015, the company has 23,004 MW under construction. NTPC is diversifying its capacity mix with much emphasis on renewable energy. As on 30 November 2015, NTPC has 110 MW Solar PV capacity under operation, 250 MW under construction, and 1260 MW under tendering. The company intends to add 10,000 MW of Solar PV capacity in the next five years. On 18 July 2015, NTPC declared commercial its first Hydro Power plant at Koldam in the state of [[Himachal Pradesh]]. The company has a long-term plan to reduce its fossil fuel capacity mix to 56% by 2032. | ||
NTPC is diversifying its capacity mix with much emphasis on renewable energy. As on 30 November 2015, NTPC has 110 MW Solar PV capacity under operation, 250 MW under construction, and 1260 MW under tendering. The company intends to add | |||
NTPC also plans to go global. The public sector company has signed a memorandum of agreement with the Government of [[Sri Lanka]] and [[Ceylon Electricity Board]] for setting up a 500 MW (2x250) coal-based thermal power plant in the island nation. An MoU has also been signed with Kyushu Electric Power Co. Inc., | NTPC also plans to go global. The public sector company has signed a [[Memorandum of understanding|memorandum of agreement]] (MoU) with the Government of [[Sri Lanka]] and [[Ceylon Electricity Board]] for setting up a 500 MW (2x250) coal-based thermal power plant in the island nation. An MoU has also been signed with Kyushu Electric Power Co. Inc., Japan, for establishing an alliance for exchange of information and experts from different areas of the business. The company is also in the process of finalising an MoU with [[Nigeria]] for setting up power plants against the allocation of LNG on a long-term basis for NTPC plants in India. NTPC is also developing a joint-venture coal-based power plant 1,320 MW (2x660) with the [[Bangladesh Power Development Board]] known as [[Rampal Power Station (Proposed)|Bangladesh India Friendship Power Company]] in [[Rampal Power Station (Proposed)|Ramp]] [[Bangladesh]], which is facing tremendous opposition from the people of [[Bangladesh]] owing to the plant's dangerously close proximity to the [[Sundarbans]].<ref>{{cite web|url=http://www.dhakatribune.com/bangladesh/2016/08/23/power-plant-like-rampal-never-allowed-india/|title=' A power plant like Rampal would never be allowed in India' - Dhaka Tribune|website=dhakatribune.com|date=23 August 2016}}</ref> | ||
<ref>{{cite web|url=http://www.dhakatribune.com/bangladesh/2016/08/23/power-plant-like-rampal-never-allowed-india/|title=' A power plant like Rampal would never be allowed in India' - Dhaka Tribune|website=dhakatribune.com|date=23 August 2016}}</ref> | |||
NTPC has also been allotted coal blocks namely | NTPC has also been allotted coal blocks, namely Pakri Barwadih, Chatti Bariatu, and Kerandari in [[Jharkhand]] as well as Talipalli, Chhattisgarh, and Dulanga in [[Odisha]]. Except for Pakri Barwadih, all other blocks were canceled by a decision of the [[Supreme Court of India]] on 24 September 2014. However, the company was again allotted canceled block under Section 5 of Coal Mines (Special Provision Act 2015)<ref>[http://www.indiacode.nic.in/acts-in-pdf/2015/201511.pdf 5618GI1.p65<!-- Bot generated title -->]</ref> Besides these blocks, the Ministry of Coal has according to its press release dated 3 July 2013 allotted four more blocks namely, Banai and Bhalmuda in Chhattisgarh, Chandrabila and Kudanli Laburi in Odisha. Two more blocks namely Mandakini-II and Banhardih are expected to be allotted to NTPC soon. All these mines are having estimated geological reserves of 6.7 billion tonnes. NTPC has appointed Mining Cum Development Operator (MDO) for its Pakri Barwadih mine.<ref>{{Cite web |url=http://www.coalpost.in/thriveni-sainik-appointed-as-mdo-for-ntpcs-pakri-barwadih-coal-block-of-jharkhand/ |title=Thriveni-Sainik appointed as MDO for NTPC's Pakri-Barwadih coal block of Jharkhand * Coal Power Steel<!-- Bot generated title --> |access-date=7 December 2015 |archive-date=30 September 2015 |archive-url=https://web.archive.org/web/20150930172507/http://www.coalpost.in/thriveni-sainik-appointed-as-mdo-for-ntpcs-pakri-barwadih-coal-block-of-jharkhand/ |url-status=dead }}</ref> | ||
==Listings and shareholding== | ==Listings and shareholding== | ||
The equity shares of NTPC are listed on the [[Bombay Stock Exchange]],<ref>{{cite web |url=http://www.bseindia.com/stock-share-price/ntpc-ltd/ntpc/532555/ |title=NTPC LTD. |publisher=BSEindia.com |access-date=12 October 2013}}</ref> where it is a constituent of the [[BSE SENSEX]] index,<ref>{{cite web |url=http://www.bseindia.com/indices/IndicesWatch_Weight.aspx?iname=BSE30&index_Code=16 |title=Scripwise Weightages in S&P BSE SENSEX |publisher=BSE India |access-date=11 October 2013}}</ref> and the [[National Stock Exchange of India]],<ref>{{cite web |url=http://www.nseindia.com/live_market/dynaContent/live_watch/get_quote/GetQuote.jsp?symbol=NTPC |title=NTPC Limited |publisher=NSE India |access-date=11 October 2013}}</ref> where it is a constituent of the [[ | The equity shares of NTPC are listed on the [[Bombay Stock Exchange]],<ref>{{cite web |url=http://www.bseindia.com/stock-share-price/ntpc-ltd/ntpc/532555/ |title=NTPC LTD. |publisher=BSEindia.com |access-date=12 October 2013}}</ref> where it is a constituent of the [[BSE SENSEX]] index,<ref>{{cite web |url=http://www.bseindia.com/indices/IndicesWatch_Weight.aspx?iname=BSE30&index_Code=16 |title=Scripwise Weightages in S&P BSE SENSEX |publisher=BSE India |access-date=11 October 2013 |archive-date=1 December 2015 |archive-url=https://web.archive.org/web/20151201094728/http://www.bseindia.com/indices/IndicesWatch_Weight.aspx?iname=BSE30&index_Code=16 |url-status=dead }}</ref> and the [[National Stock Exchange of India]],<ref>{{cite web |url=http://www.nseindia.com/live_market/dynaContent/live_watch/get_quote/GetQuote.jsp?symbol=NTPC |title=NTPC Limited |publisher=NSE India |access-date=11 October 2013}}</ref> where it is a constituent of the [[Nifty 50]].<ref>{{cite web |url=http://www.nseindia.com/content/indices/ind_niftylist.csv |title=Download List of CNX Nifty stocks (.csv) |publisher=NSE India |access-date=12 October 2013}}</ref> | ||
In | In September 2015, the Government of India held around 74.96% equity shares in NTPC. Over 6,80,000 individual shareholders hold approx. 1.92% of its shares. Life Insurance Corporation of India is the largest non-promoter shareholder in the company with 10.03% shareholding.<ref>{{Cite web |url=http://www.ntpc.co.in/download/shareholdig-pattern-31032015-ntpc |title=Archived copy |access-date=7 December 2015 |archive-date=4 March 2016 |archive-url=https://web.archive.org/web/20160304195543/http://www.ntpc.co.in/download/shareholdig-pattern-31032015-ntpc |url-status=dead }}</ref> | ||
In August 2017, the | In August 2017, the GoI divested further its 5% stake in NTPC through OFS (Stock Exchange Mechanism) and reduced the holding of GOI in NTPC to 5,76,83,41,760 shares i.e. 64.96% out of total 8,24,54,64,400 shares. | ||
The balance is held by public, FIIs, Mutual Funds, and Banks. | The balance is held by public, FIIs, Mutual Funds, and Banks. | ||
| Line 700: | Line 737: | ||
|- | |- | ||
| Promoters: Government of India | | Promoters: Government of India | ||
| | | 51.10% | ||
|- | |||
| DII | |||
| 18.20% | |||
|- | |- | ||
| Foreign Institutional Investors | | Foreign Institutional Investors | ||
| | | 14.54% | ||
|- | |- | ||
| | |Body Corporate & Insurance Companies | ||
| | |12.88% | ||
|- | |- | ||
| Individuals/HUFs | | Individuals/HUFs | ||
| | | 2.20% | ||
|- | |- | ||
| Others | | Others | ||
| | | 1.08% | ||
|- | |- | ||
| Total | | Total | ||
| Line 720: | Line 760: | ||
==Employees== | ==Employees== | ||
As of 31 March 2015, the company had 24,067 employees. The attrition rate for the FY | As of 31 March 2015, the company had 24,067 employees. The attrition rate for the FY 2014–2015, including the trainee employees and employees working for subsidiaries and JVs, was 1.35%. Man MW Ratio of the company has fallen from 0.77 in the FY11 to 0.61 in FY 15. NTPC has been awarded continuously as great places to work for in PSUs category. | ||
NTPC was ranked second among the 250 largest power producer energy traders in the world by [[Platts]] in 2015. On overall basis NTPC ranked 56th amongst Platts 250 companies.<ref>{{cite web|url=http://top250.platts.com/Top250Rankings/2015/Region/IndependentPowerProducersandEnergyTraders|title=Platts Top 250 Rankings|website=top250.platts.com}}</ref> In 2009, it received ICSI National Award for Excellence in Corporate Governance.<ref>{{cite web |url=http://www.icsi.edu/WebModules/Programmes/CGAward/2009/cga2007wiiners.htm |title=ICSI National Awards for Excellence in Corporate Governance for 2009 |publisher=ICSI |date=21 December 2009 |access-date=12 October 2013}}</ref> | |||
==Criticism== | ==Criticism== | ||
=== Land acquisition in tribal areas === | |||
The company (and other PSUs in India) has been allotted land for setting power plants and related infrastructure in rural or tribal areas across the country by Central Government and various state governments. Some of these lands have been allotted to NTPC (and other PSUs in India) through Land Acquisition Acts passed by Central and State Governments. Wherever a land acquisition law is enacted, it also places a liability on the PSUs or governments to take actions for proper rehabilitation of displaced residents of that rural or tribal area. Governments or PSUs are criticised if they do not fulfill their liability towards displaced residents. In many areas where land acquisition is proposed through land acquisition laws, local residents oppose the forcible acquisition, as they are not sure of proper rehabilitation. | |||
=== Future growth === | |||
Draft National Electricity Plan (2016), prepared by GoI, states that India does not need additional coal-fired power plants until 2027 with the commissioning of various coal-based power plants which are presently under construction.<ref>{{cite web| title=Draft National Electricity Plan, 2016, CEA| url=http://www.cea.nic.in/reports/committee/nep/nep_dec.pdf| access-date=11 December 2016| archive-date=20 December 2016| archive-url=https://web.archive.org/web/20161220133152/http://www.cea.nic.in/reports/committee/nep/nep_dec.pdf| url-status=dead}}</ref> India is not facing regular power shortages to purchase electricity at high prices, offering higher profit margins to the competing power generating companies. With the help of assured power purchase agreements (PPA) from the state-owned DisComs, NTPC was able to sell its power at higher margins on the deployed capital and higher overhead costs. Moreover, its main expertise of generating power from coal-fired stations is becoming obsolete in terms of technology and economics against non-conventional power generation like wind, solar, etc.<ref>{{cite news|url=http://economictimes.indiatimes.com/industry/energy/power/ntpc-may-drop-further-expansion-plans-of-kudgi-thermal-project-in-karnataka/articleshow/57859308.cms |title= NTPC may drop further expansion plans of Kudgi thermal project in Karnataka|newspaper= The Economic Times|access-date=28 March 2016}}</ref> In the future, for the satisfactory growth mainly from wind and solar power projects, NTPC is ready to slash all its extra profit margins on capital deployed to bring down the power sale price at par with the IPPs to secure the projects in open competitive bidding. | |||
Government has decided to scrap the coal fired power stations which are more than 25 years old to reduce the pollution.<ref>{{cite web |url=http://energy.economictimes.indiatimes.com/news/power/ntpc-to-phase-out-11000-mw-old-power-plants-in-five-years-piyush-goyal/55983681| title=NTPC to phase out 11000 MW old power plants in five years - Piyush Goyal|access-date=26 February 2017}}</ref> Instead of scrapping old pulverised coal fired units, NTPC should replace coal with [[Torrefaction|torrefied]] crops waste/biomass as fuel in these units (nearly 11,000 MW) to make them profitable and productive assets without contributing to pollution.<ref>{{cite web|url=http://www.biomasscofiring.ca/images/stories/PDFs/WoodPelletCo-firingOverviewFutureMetrics.pdf|title=Overview of Wood Pellet Co-firing|access-date=26 February 2017|archive-url=https://web.archive.org/web/20170227062520/http://www.biomasscofiring.ca/images/stories/PDFs/WoodPelletCo-firingOverviewFutureMetrics.pdf|archive-date=27 February 2017|url-status=dead}}</ref> | Government has decided to scrap the coal-fired power stations which are more than 25 years old to reduce the pollution.<ref>{{cite web |url=http://energy.economictimes.indiatimes.com/news/power/ntpc-to-phase-out-11000-mw-old-power-plants-in-five-years-piyush-goyal/55983681| title=NTPC to phase out 11000 MW old power plants in five years - Piyush Goyal|access-date=26 February 2017}}</ref> Instead of scrapping old pulverised coal-fired units, NTPC should replace coal with [[Torrefaction|torrefied]] crops waste/biomass as fuel in these units (nearly 11,000 MW) to make them profitable and productive assets without contributing to pollution.<ref>{{cite web|url=http://www.biomasscofiring.ca/images/stories/PDFs/WoodPelletCo-firingOverviewFutureMetrics.pdf|title=Overview of Wood Pellet Co-firing|access-date=26 February 2017|archive-url=https://web.archive.org/web/20170227062520/http://www.biomasscofiring.ca/images/stories/PDFs/WoodPelletCo-firingOverviewFutureMetrics.pdf|archive-date=27 February 2017|url-status=dead}}</ref> | ||
To | To utilise its proven O&M expertise, NTPC may venture on a major scale to implement the [[concentrated solar power|solar thermal storage power]] as they can offer clean and cheaper electricity than fossil fuel-fired power generation plants.<ref>{{cite web |url=http://helioscsp.com/dispatchable-solar-concentrated-solar-power-broke-price-records-in-2017/ |title=Dispatchable Concentrated Solar Power Broke Price Records in 2017 |work=HELIOSCSP |access-date= 22 September 2017}}</ref> | ||
Rather than install emissions-cutting technologies, NTPC has chosen to lobby the government to extend pollution reduction deadlines.<ref>{{Cite news|url=https://www.reuters.com/article/us-india-ntpc-emissions-exclusive/exclusive-indias-ntpc-snubs-foreign-emissions-tech-shuts-out-ge-others-from-2-billion-orders-idUSKBN1YN0G1?il=0|title=Exclusive: India's NTPC snubs foreign emissions tech, shuts out GE, others from $2 billion orders|newspaper=Reuters|date=19 December 2019|last1=Varadhan|first1=Sudarshan}}</ref> | Rather than install emissions-cutting technologies, NTPC has chosen to lobby the government to extend pollution reduction deadlines.<ref>{{Cite news|url=https://www.reuters.com/article/us-india-ntpc-emissions-exclusive/exclusive-indias-ntpc-snubs-foreign-emissions-tech-shuts-out-ge-others-from-2-billion-orders-idUSKBN1YN0G1?il=0|title=Exclusive: India's NTPC snubs foreign emissions tech, shuts out GE, others from $2 billion orders|newspaper=Reuters|date=19 December 2019|last1=Varadhan|first1=Sudarshan}}</ref> | ||
=== Controversies with projects === | |||
[[Loharinag Pala Hydro Power Project]] by NTPC Ltd: Loharinag Pala Hydro Power Project (600 MW i.e. 150 MW × 4 units) is located on the river [[Bhagirathi]] (a tributary of the Ganges) in [[Uttarkashi district|Uttarkashi]] district of [[Uttarakhand]] state. This is the first project downstream from the origin of the [[Ganges]] at [[Gangotri]]. The project was at the advanced stage of construction when it was discontinued by the Government of India in August 2010. | |||
Rupasiyabagar Khasiabara HPP, 261 MW in Pithoragarh, [[Uttarakhand]] State, near China Border, is yet to be given investment approval.. | |||
[[Badarpur Thermal Power Station]] has been permanently closed due to pollution issues in [[Delhi]] [[National Capital Region (India)|NCR]]. The total installed capacity of all of its units was 705 [[Megawatt|MW]], which has been retired and fully closed since 15 October 2018.<ref>{{Cite web|url=https://www.hindustantimes.com/delhi-news/badarpur-power-plant-shut-action-plan-to-tackle-air-pollution-in-delhi-ncr-comes-into-force/story-Exu4ZryrjCEYZN2Wzpgs9H.html|title = Badarpur power plant shut, action plan to tackle air pollution in Delhi-NCR comes into force| work=Hindustan Times |date = 16 October 2018}}</ref><ref>{{Cite web|url=https://www.hindustantimes.com/delhi-news/badarpur-thermal-plant-delhi-s-biggest-power-generator-to-shut-down-from-october-15/story-6r1DhoDjb7G0yr48iv8IqI.html|title=Badarpur thermal plant, Delhi's biggest power generator, to shut down from October 15|date=5 October 2018|access-date=3 July 2020|archive-date=21 April 2019|archive-url=https://web.archive.org/web/20190421060942/https://www.hindustantimes.com/delhi-news/badarpur-thermal-plant-delhi-s-biggest-power-generator-to-shut-down-from-october-15/story-6r1DhoDjb7G0yr48iv8IqI.html|url-status=dead}}</ref> | |||
==See also== | ==See also== | ||
{{Portal|Companies|Energy}} | |||
* [[Electricity in India]] | * [[Electricity in India]] | ||
* [[Energy in India]] | * [[Energy in India]] | ||
| Line 751: | Line 795: | ||
==References== | ==References== | ||
{{ | {{reflist}} | ||
==External links== | ==External links== | ||
* {{Official website}} | * {{Official website}} | ||
{{NTPC Power Stations}} | {{NTPC Power Stations}} | ||
| Line 765: | Line 804: | ||
{{Public Sector Undertakings in India}} | {{Public Sector Undertakings in India}} | ||
{{Energy Ministries and Departments of India}} | {{Energy Ministries and Departments of India}} | ||
{{Power Plants of Gujarat}} | |||
{{ | {{Authority control}} | ||
[[Category:Companies based in New Delhi]] | [[Category:Companies based in New Delhi]] | ||
Latest revision as of 21:19, 28 February 2026
Formerly | National Thermal Power Corporation |
|---|---|
| Traded as | |
| ISIN | Template:ISIN |
| Industry | Electricity |
| Founded | 7 November 1975 |
| Headquarters | , India[1] |
Area served | India |
Key people | Gurdeep Singh (Chairman & MD)[2] |
| Services | Electricity generation and distribution, mining natural gas exploration, production, transportation and distribution |
| Revenue | |
| Total assets | |
| Total equity | |
| Owner | Ministry of Power, Government of India[4] |
Number of employees | 18,786 (2024[3]) |
| Subsidiaries | |
| Website | ntpc.co.in |
NTPC Limited, formerly known as National Thermal Power Corporation, is an Indian central Public Sector Undertaking (PSU) owned by the Ministry of Power and the Government of India, which is engaged in the generation of electricity and other activities. The headquarters of the PSU are situated at New Delhi. NTPC's core function is the generation and distribution of electricity to State Electricity Boards in India. The body also undertakes consultancy and turnkey project contracts that involve engineering, project management, construction management, and operation and management of power plants.
It is the largest power company in India, with an installed capacity of 80,154.50 MW.[5] Although the company has approximately 16% of the total national capacity, it contributes to over 25% of total power generation due to its focus on operating its power plants at higher efficiency levels (approximately 80.2% against the national PLF rate of 64.5%). NTPC currently produces 25 billion units of electricity per month.[citation needed]
NTPC Mining Ltd (NML) has mined about 100 MMT coal in 2023-2024 FY, NML has Pakri Barwadih, Chatti Bariatu and Kerandari Coal Mines in Jharkhand, Dulanga Coal Mine in Odisha and Talaipalli Coal Mine in Chhattisgarh.[6] NTPC currently operates 55 power stations: 24 coal, seven combined cycle gas and liquid fuel, two hydro powered, one wind turbine, and 11 solar projects. Additionally, it has 9 coal and 1 gas station, owned by joint ventures or subsidiaries.
It was founded by Government of India in 1975, which now holds 51.10% of its equity shares[7] after divestment of its stake in 2004, 2010, 2013, 2014, 2016, and 2017. In May 2010, NTPC was conferred Maharatna status by the Union Government of India, one of only four companies to be awarded this status.[8] It is ranked 433rd in the Forbes Global 2000 for 2023.[9]
History[edit | edit source]
1975–1994[edit | edit source]
The company was founded on 7 November 1975 by India's former Prime Minister Indira Gandhi as National Thermal Power Corporation Private Limited. It started working on its first thermal power project in 1976 at Shaktinagar—named National Thermal Power Corporation Private Limited Singrauli—in Uttar Pradesh.[10] In the same year, its name was changed to "National Thermal Power Corporation Limited". In 1983, NTPC began commercial operations and earned profits of INR 4.5 crores in FY 1982–83. By the end of 1985, it had achieved power generation capacity of 2000 MW.
In 1986, it completed synchronisation of its first 500 MW unit at Singrauli. In 1988, it commissioned two 500 MW units, one each in Rihand and Ramagundam. In 1989, it started a consultancy division. In 1992, it acquired Feroze Gandhi Unchahar Thermal Power Station from Uttar Pradesh Rajya Vidyut Utpadan Nigam of Uttar Pradesh.[11] By the end of 1994, its installed capacity crossed 15,000 MW.
1995–2004[edit | edit source]
In 1995, it took over the Talcher Thermal Power Station from Orissa State Electricity Board.[10] In the year 1997, the Government of India conferred it with "Navratna" status. In that same year, it achieved a milestone of generating 100 billion units of electricity in a single year.[10] In 1998, it commissioned its first Naptha-based plant at Kayamkulam with a capacity of 350 MW. In 1999, its plant in Dadri, which had the highest plant load factor (PLF) in India of 96%, was certified with ISO-14001. During 2000, it started construction of its first hydro-electric power project, with 800 MW capacity, in Himachal Pradesh.[10]
In 2002, it incorporated 3 subsidiary companies: NTPC Electric Supply Company Limited for forward integration by entering into the business of distribution and trading of power; NTPC Vidyut Vyapar Nigam Limited for meeting the expected rise in energy trading; and NTPC Hydro Limited to carry out the business of implementing and operating small and medium hydropower projects.[12] Later in 2002, its installed capacity crossed 20,000 MW.[10]
NTPC got listed on BSE and NSE on 5 November 2004. Against the issue price of ₹62 per share, it closed the first day of listing with ₹75.55 per share.[13] On the day of listing, it became the third largest company in India in terms of market capitalisation.[14]
2005–present[edit | edit source]
In October 2005, the company's name was changed from National Thermal Power Corporation Limited to NTPC Limited. The primary reason for this change was the company's foray into hydro and nuclear based power generation along with backward integration of coal mining. In 2006, it entered into an agreement with the Government of Sri Lanka to set up two units of 250 MW each in Trincomalee in Sri Lanka.[10] During 2008 and 2011, NTPC entered into joint ventures with BHEL, Bharat Forge, NHPC, Coal India, SAIL, NMDC, and NPCIL to expand its business of power generation.[10][11] By the end of 2010, its installed capacity crossed 31,000 MW.[10]
The company in 2009 joined forces with other state enterprises Rashtriya Ispat Nigam, Steel Authority of India, Coal India, and National Minerals Development Corporation to invest in coal mining operations through a joint venture vehicle named International Coal Ventures Private Limited (ICVL). In July 2014, ICVL acquired a 65 percent stake in the Benga coal mine in Mozambique from the Rio Tinto Group.[15] In December 2022, the market capitalisation of NTPC limited was ₹1,66,249.34 crore.[16]
Operations[edit | edit source]
NTPC operates from 70 locations in India, one location in Sri Lanka and two locations in Bangladesh. In India, it has eight regional headquarters (HQ):
| Sr. No. | Headquarters | City |
|---|---|---|
| 1 | NCRHQ | Delhi |
| 2 | ER-I HQ | Patna |
| 3 | ER-II HQ | Bhubaneshwar |
| 4 | NRHQ | Lucknow |
| 5 | SRHQ | Secunderabad |
| 6 | WR-I HQ | Mumbai |
| 7 | WR-II HQ | Raipur |
| 8 | Hydro HQ | Delhi |
Scheduling and generation dispatch[edit | edit source]
The scheduling and dispatch of all the generating stations owned by National Thermal Power Corporation are done by respective regional load dispatch centers, which are the apex body to ensure integrated operation of the power system grid in the respective region. All these load dispatch centers come under Power System Operation Corporation Limited (POSOCO).
Subsidiaries[edit | edit source]
- Convergence Energy Services Limited
- Energy Efficiency Services Limited
- Green Valley Renewable Energy Limited (GVREL)
- NTPC Mining Limited
- NTPC Green Energy
- NTPC Renewables Limited
- National High Power Test Laboratory Private Limited (NHPTL)
- NEEPCO
- THDC India Limited
- Tusco Ltd.
Joint ventures[edit | edit source]
- Aravali Power Company Pvt. Ltd.
Capacity of plants[edit | edit source]
The total installed capacity of the company is 72,304 MW (including 13,465 MW through JVs/subsidiaries) across the country, (26 Coal based stations, seven gas based stations, one hydro station, one small hydro, 11 solar PV, and one wind based station) and 25 joint venture stations (nine coal based, four gas based, eight hydro-powered, one small hydro, two wind-powered, and one solar PV).
Thermal power[edit | edit source]
Coal-based power plants (own operational)[edit | edit source]
| Sr. No. | Project | State | Capacity in MW | Units in MW | Status |
|---|---|---|---|---|---|
| 1 | Singrauli Super Thermal Power Station | Uttar Pradesh | 2,000 | 5x200, 2x500 | All units functional,2×800 MW unit under construction. |
| 2 | NTPC Korba | Chhattisgarh | 2,600 | 3x200, 4x500 | All units functional |
| 3 | NTPC Ramagundam | Telangana | 2,600 | 3x200, 4x500 | All units functional. |
| 4. | Farakka Super Thermal Power Station | West Bengal | 2,100 | 3x200, 3x500 | All units functional |
| 5 | Vindhyachal Super Thermal Power Station | Madhya Pradesh | 4,783 | 6x210, 7x500, 2x4, 1x15 | All units functional. Largest Thermal Power Station in India. A small hydro of 8 MW and a PV Solar power station of 15 MW is also present. |
| 6 | Rihand Thermal Power Station | Uttar Pradesh | 3,000 | 6x500 | All units functional |
| 7 | Kahalgaon Super Thermal Power Station | Bihar | 2,340 | 4x210, 3x500 | All units functional |
| 8 | NTPC Dadri | Uttar Pradesh | 1,820 | 4x210, 2x490 | All units functional |
| 9 | Talcher Super Thermal Power Station | Odisha | 3,010 | 6x500, 1x10 | All units functional |
| 10 | Feroze Gandhi Unchahar Thermal Power Station | Uttar Pradesh | 1,550 | 5x210, 1×500 | All units functional |
| 11 | Talcher Thermal Power Station | Odisha | 460 | 2x110, 4x60 | All units retired and shut down, will be replaced by 2×660 MW Unit[17] |
| 12 | Simhadri Super Thermal Power Station | Andhra Pradesh | 2,000 | 4x500 | All units functional |
| 13 | NTPC Tanda[18] | Uttar Pradesh | 1,760 | 4x110, 2×660 | All units functional |
| 14 | Sipat Thermal Power Station | Chhattisgarh | 2,980 | 2x500, 3x660 | All units functional |
| 15 | Mauda Super Thermal Power Station | Maharashtra | 2,320 | 2x500, 2x660 | All units functional |
| 16 | Barh Super Thermal Power Station | Bihar | 3,300 | 3×660, 2x660 | All units functional |
| 17 | Kudgi Super Thermal Power Station | Karnataka | 2,400 | 3x800 | All units functional |
| 18 | NTPC Bongaigaon | Assam | 750 | 3x250 | All units functional |
| 19 | LARA Super Thermal Power Station | Chhattisgarh | 1600 | 2x800, 2x800 | 2×800 MW unit functional, 2×800 MW unit under construction. |
| 20 | Solapur Super Thermal Power Station | Maharashtra | 1,320 | 2x660 | All units functional. |
| 21 | Gadarwara Super Thermal Power Station | Madhya Pradesh | 1,600 | 2×800, 2×800 | 2×800 MW unit functional, 2×800 MW unit under construction |
| 22 | North Karanpura Thermal Power Station | Jharkhand | 1,980 | 3×660 | 2 units functional, 1 under construction |
| 23 | Darlipali Super Thermal Power Station | Odisha | 1,600 | 2×800 | 2×800 MW unit functional, 1×800 MW unit under construction. |
| 24 | Khargone Super Thermal Power Station | Madhya Pradesh | 1,320 | 2×660 | All unit functional. |
| 25 | Telangana Super Thermal Power Project | Telangana | 1,600 | 2×800 | all units functional |
| 26 | Barauni Thermal Power Station | Bihar | 720 | 2×110, 2×250 | Stage 1 2×110 MW retired 2*250 functional [19][20] |
Coal-based (JV/subsidiary)[edit | edit source]
| Sr. No. | Name of the JV | Location | State | Capacity in MW |
|---|---|---|---|---|
| 1 | NSPCL. Joint venture with SAIL. | Durgapur | West Bengal | 160 |
| 2 | NSPCL. Joint venture with SAIL. | Rourkela | Odisha | 370 |
| 3 | NSPCL. Joint venture with SAIL. | Bhilai | Chhattisgarh | 574 |
| 4 | NPGC. Wholly owned subsidiary of NTPC. | Aurangabad | Bihar | 1980 |
| 5 | Muzaffarpur Thermal Power Station (MTPS). Wholly owned subsidiary of NTPC. | Kanti | Bihar | 610 |
| 6 | BRBCL. Joint venture with Indian Railways. | Nabinagar | Bihar | 1000 |
| 7 | Aravali Power CPL JV with HPGCL & IPGCL | Jhajjar | Haryana | 1500 |
| 8 | NTECL JV with NTPC & TNEB | Chennai | Tamil Nadu | 1500 |
| 9 | Meja Thermal Power Station JV with NTPC & UPRVUNL | Prayagraj | Uttar Pradesh | 1320
3*800 mw planned at meja, 2*800mw planned at obra, 2*800mw planned at anpara under MVUNL |
| 10 | PUVNL (Patratu) joint venture with Jharkhand State Electricity Board. | Patratu | Jharkhand | 4000 |
| 11 | Khurja-THDC | Bulandshahr | Uttar Pradesh | 1320 |
Gas-based power plants (own operational)[edit | edit source]
| Sr.No. | Power project | State | Capacity MW | Unit Size MW | Status |
|---|---|---|---|---|---|
| 1 | Anta | Rajasthan | 419.33 | 3×88, 1×149 | All unit running |
| 2 | Auraiya | Uttar Pradesh | 663.36 | 4×110, 2×106 | All unit running |
| 3 | Kawas | Gujarat | 656.20 | 2×110.5, 4×106 | All unit running |
| 4 | Dadri | Uttar Pradesh | 829.78 | 4×130.19,2×154.51 | All unit running |
| 5 | Jhanor-Gandhar | Gujarat | 657.39 | 3×131, 1×155 | All unit running |
| 6 | Kayamkulam, Haripad | Kerala | 359.58 | 2x115.2 + 1x129.177 | All unit running |
| 7 | Faridabad | Haryana | 431.59 | 2×143, 1×144 | All unit running |
Gas-based (JV/subsidiary)[edit | edit source]
| Sr.No. | Power project | State | Capacity MW |
|---|---|---|---|
| 1 | Ratnagiri Gas and Power Private Limited (RGPPL) | Maharashtra | 1967 |
| 2 | Assam Gas based power plant | Assam | 291 |
| 3 | Agartala GT CCPP | Tripura | 135 |
| 4 | Tripura Gas based CCPP | Tripura | 101 |
Hydro power[edit | edit source]
The company has also stepped up its hydroelectric power (hydel) project implementation. Some of these projects are:
Hydro-electric power plants (own operational)[edit | edit source]
| Sr.No. | Power project | State | Capacity MW | Unit in MW | Status |
|---|---|---|---|---|---|
| 1 | Koldam Dam | Himachal Pradesh | 800 | 4×200 MW | All four units commissioned |
| 2 | Tapovan Vishnugad | Uttarakhand | 520 | 4×130 MW | Under construction |
| 3 | Lata Tapovan | Uttarakhand | 171 | 3 × 57 MW | Under construction |
| 4 | Rammam Hydro | West Bengal | 120 | 3 × 40 MW | Under construction |
Hydro-electric power plants (JV/Subsidiary)[edit | edit source]
| Sr.No. | Project | State/UT | Capacity MW |
|---|---|---|---|
| 1 | Tehri HPP (THDC) | Uttarakhand | 1000 |
| 2 | Tehri PSP (THDC) | Uttarakhand | 1000 |
| 3 | Koteshwar HPP (THDC) | Uttarakhand | 400 |
| 4 | Vishnugad Pipalkoti HEP(THDC) | Uttarakhand | 444 |
| 5 | Ranganadi HEP (NEEPCO) | Arunachal | 405 |
| 6 | Doyang HEP (NEEPCO) | Nagaland | 75 |
| 7 | Pare HEP (NEEPCO) | Arunachal | 110 |
| 8 | Tuirial HEP (NEEPCO) | Mizoram | 60 |
| 9 | Kopili HEP (NEEPCO) | Assam | 275 |
| 10 | Kameng HEP (NEEPCO) | Arunachal | 600 |
Renewable energy[edit | edit source]
NTPC's current renewable power plants in solar and wind include:
Solar photovoltaic power plants (own operational)[edit | edit source]
| Sr.No. | Project | State/UT | Capacity |
|---|---|---|---|
| 1 | Dadri Solar PV | Uttar Pradesh | 05 MW |
| 2 | Port Blair Solar PV | Andaman & Nicobar Island | 05 MW |
| 3 | Ramagundam Solar PV | Telangana | 110 MW |
| 4 | Talcher Kaniha | Odisha | 10 MW |
| 5 | Faridabad Solar PV | Haryana | 05 MW |
| 6 | Unchahar Solar PV | Uttar Pradesh | 10 MW |
| 7 | Rajgarh Solar PV | Madhya Pradesh | 50 MW |
| 8 | Singrauli Solar PV | Uttar Pradesh | 15 MW |
| 9 | Ananthpuram Solar PV | Andhra Pradesh | 250 MW |
| 10 | Bhadla-Solar PV | Rajasthan | 260 MW |
| 11 | Mandsaur Solar PV | Madhya Pradesh | 250 MW |
| 12 | Bishrampur Solar PV | Chhattisgarh | 20 MW |
| 13 | Bhatgaon Solar PV | Chhattisgarh | 20 MW |
| 14 | Fatehgarh Solar PV | Rajasthan | 296 MW |
| 15 | Simhadri Floating Solar | Andhra Pradesh | 25 MW |
| 16 | NTPC Haripad Floating Solar Power Plant | Kerala | 92 MW |
| Total | 1443 MW |
Solar photovoltaic power plants (JV/subsidiary)[edit | edit source]
| Sr.No. | Project | State/UT | Capacity |
|---|---|---|---|
| 1 | Solar TGBPP Tripura (NEEPCO) | Tripura | 05 MW |
Wind Power (own operational)[edit | edit source]
| Sr.No. | Project | State/UT | Capacity |
|---|---|---|---|
| 1 | Rojmal | Gujarat | 50 MW |
Wind Power (JV/subsidiary)[edit | edit source]
| Sr.No. | Project | State/UT | Capacity |
|---|---|---|---|
| 1 | Patan Wind Power Project (THDC) | Gujarat | 50 MW |
| 2 | Devbhumi Dwarka Wind Power Project (THDC) | Gujarat | 63 MW |
Small hydro[edit | edit source]
- Singrauli CW Discharge (small hydro) 8 (4x2) MW is on the discharge canal of the Singrauli Super Thermal Power Station in Uttar Pradesh. All units of this project are under commercial operation.
- NTPC-THDC has installed 24(8x3) MW Small Hydro Project at Dhukwan on Betwa river in Jhansi district of Uttar Pradesh.
Future goals[edit | edit source]
The company has developed a long-term plan to become a 1,28,000 MW company by 2032. NTPC Limited is on an expansion spree to meet the power requirements of the country—the company has targeted to add 14,058 MW in 12th Plan (from FY13 to FY 17) of which it had already added 4,170 MW in 2012–2013, 1835 MW in 2013–2014, 1290 MW in 2014–2015, and 1150 MW from April–30 November 2015.
As of 30 November 2015, the company has 23,004 MW under construction. NTPC is diversifying its capacity mix with much emphasis on renewable energy. As on 30 November 2015, NTPC has 110 MW Solar PV capacity under operation, 250 MW under construction, and 1260 MW under tendering. The company intends to add 10,000 MW of Solar PV capacity in the next five years. On 18 July 2015, NTPC declared commercial its first Hydro Power plant at Koldam in the state of Himachal Pradesh. The company has a long-term plan to reduce its fossil fuel capacity mix to 56% by 2032.
NTPC also plans to go global. The public sector company has signed a memorandum of agreement (MoU) with the Government of Sri Lanka and Ceylon Electricity Board for setting up a 500 MW (2x250) coal-based thermal power plant in the island nation. An MoU has also been signed with Kyushu Electric Power Co. Inc., Japan, for establishing an alliance for exchange of information and experts from different areas of the business. The company is also in the process of finalising an MoU with Nigeria for setting up power plants against the allocation of LNG on a long-term basis for NTPC plants in India. NTPC is also developing a joint-venture coal-based power plant 1,320 MW (2x660) with the Bangladesh Power Development Board known as Bangladesh India Friendship Power Company in Ramp Bangladesh, which is facing tremendous opposition from the people of Bangladesh owing to the plant's dangerously close proximity to the Sundarbans.[21]
NTPC has also been allotted coal blocks, namely Pakri Barwadih, Chatti Bariatu, and Kerandari in Jharkhand as well as Talipalli, Chhattisgarh, and Dulanga in Odisha. Except for Pakri Barwadih, all other blocks were canceled by a decision of the Supreme Court of India on 24 September 2014. However, the company was again allotted canceled block under Section 5 of Coal Mines (Special Provision Act 2015)[22] Besides these blocks, the Ministry of Coal has according to its press release dated 3 July 2013 allotted four more blocks namely, Banai and Bhalmuda in Chhattisgarh, Chandrabila and Kudanli Laburi in Odisha. Two more blocks namely Mandakini-II and Banhardih are expected to be allotted to NTPC soon. All these mines are having estimated geological reserves of 6.7 billion tonnes. NTPC has appointed Mining Cum Development Operator (MDO) for its Pakri Barwadih mine.[23]
[edit | edit source]
The equity shares of NTPC are listed on the Bombay Stock Exchange,[24] where it is a constituent of the BSE SENSEX index,[25] and the National Stock Exchange of India,[26] where it is a constituent of the Nifty 50.[27]
In September 2015, the Government of India held around 74.96% equity shares in NTPC. Over 6,80,000 individual shareholders hold approx. 1.92% of its shares. Life Insurance Corporation of India is the largest non-promoter shareholder in the company with 10.03% shareholding.[28]
In August 2017, the GoI divested further its 5% stake in NTPC through OFS (Stock Exchange Mechanism) and reduced the holding of GOI in NTPC to 5,76,83,41,760 shares i.e. 64.96% out of total 8,24,54,64,400 shares.
The balance is held by public, FIIs, Mutual Funds, and Banks.
| Shareholders | Shareholding[7][29] |
|---|---|
| Promoters: Government of India | 51.10% |
| DII | 18.20% |
| Foreign Institutional Investors | 14.54% |
| Body Corporate & Insurance Companies | 12.88% |
| Individuals/HUFs | 2.20% |
| Others | 1.08% |
| Total | 100.0% |
Employees[edit | edit source]
As of 31 March 2015, the company had 24,067 employees. The attrition rate for the FY 2014–2015, including the trainee employees and employees working for subsidiaries and JVs, was 1.35%. Man MW Ratio of the company has fallen from 0.77 in the FY11 to 0.61 in FY 15. NTPC has been awarded continuously as great places to work for in PSUs category.
NTPC was ranked second among the 250 largest power producer energy traders in the world by Platts in 2015. On overall basis NTPC ranked 56th amongst Platts 250 companies.[30] In 2009, it received ICSI National Award for Excellence in Corporate Governance.[31]
Criticism[edit | edit source]
Land acquisition in tribal areas[edit | edit source]
The company (and other PSUs in India) has been allotted land for setting power plants and related infrastructure in rural or tribal areas across the country by Central Government and various state governments. Some of these lands have been allotted to NTPC (and other PSUs in India) through Land Acquisition Acts passed by Central and State Governments. Wherever a land acquisition law is enacted, it also places a liability on the PSUs or governments to take actions for proper rehabilitation of displaced residents of that rural or tribal area. Governments or PSUs are criticised if they do not fulfill their liability towards displaced residents. In many areas where land acquisition is proposed through land acquisition laws, local residents oppose the forcible acquisition, as they are not sure of proper rehabilitation.
Future growth[edit | edit source]
Draft National Electricity Plan (2016), prepared by GoI, states that India does not need additional coal-fired power plants until 2027 with the commissioning of various coal-based power plants which are presently under construction.[32] India is not facing regular power shortages to purchase electricity at high prices, offering higher profit margins to the competing power generating companies. With the help of assured power purchase agreements (PPA) from the state-owned DisComs, NTPC was able to sell its power at higher margins on the deployed capital and higher overhead costs. Moreover, its main expertise of generating power from coal-fired stations is becoming obsolete in terms of technology and economics against non-conventional power generation like wind, solar, etc.[33] In the future, for the satisfactory growth mainly from wind and solar power projects, NTPC is ready to slash all its extra profit margins on capital deployed to bring down the power sale price at par with the IPPs to secure the projects in open competitive bidding.
Government has decided to scrap the coal-fired power stations which are more than 25 years old to reduce the pollution.[34] Instead of scrapping old pulverised coal-fired units, NTPC should replace coal with torrefied crops waste/biomass as fuel in these units (nearly 11,000 MW) to make them profitable and productive assets without contributing to pollution.[35]
To utilise its proven O&M expertise, NTPC may venture on a major scale to implement the solar thermal storage power as they can offer clean and cheaper electricity than fossil fuel-fired power generation plants.[36]
Rather than install emissions-cutting technologies, NTPC has chosen to lobby the government to extend pollution reduction deadlines.[37]
Controversies with projects[edit | edit source]
Loharinag Pala Hydro Power Project by NTPC Ltd: Loharinag Pala Hydro Power Project (600 MW i.e. 150 MW × 4 units) is located on the river Bhagirathi (a tributary of the Ganges) in Uttarkashi district of Uttarakhand state. This is the first project downstream from the origin of the Ganges at Gangotri. The project was at the advanced stage of construction when it was discontinued by the Government of India in August 2010.
Rupasiyabagar Khasiabara HPP, 261 MW in Pithoragarh, Uttarakhand State, near China Border, is yet to be given investment approval..
Badarpur Thermal Power Station has been permanently closed due to pollution issues in Delhi NCR. The total installed capacity of all of its units was 705 MW, which has been retired and fully closed since 15 October 2018.[38][39]
See also[edit | edit source]
- Electricity in India
- Energy in India
- List of companies of India
- List of public sector undertakings in India
- 2017 NTPC power plant explosion
References[edit | edit source]
- ↑ "Contact Us - NTPC". ntpc.co.in. Archived from the original on 16 April 2018. Retrieved 8 March 2017.
- ↑ "Board of Directors - NTPC". ntpc.co.in. Archived from the original on 25 August 2019. Retrieved 8 March 2017.
- ↑ 3.0 3.1 3.2 3.3 3.4 3.5 "NTPC Limited" (PDF). www.bseindia.com. Archived from the original (PDF) on 19 May 2023.
- ↑ "NTPC says Govt pares stake to 51.02%". Business Standard India. 5 March 2020. Retrieved 5 July 2022.
- ↑ "| | NTPC wind projects".
- ↑ "NTPC Mining produces 34MMT coal in 23-24". The Times of India. 3 April 2024.
- ↑ 7.0 7.1 "Shareholding Pattern - NTPC". ntpc.co.in. Archived from the original on 27 November 2020. Retrieved 7 December 2015.
- ↑ "4 PSUs get maharatna status – Indian Express". 21 May 2010. Retrieved 17 August 2012.
- ↑ "NTPC Limited". Forbes. Retrieved 17 February 2015.
- ↑ 10.0 10.1 10.2 10.3 10.4 10.5 10.6 10.7 "History of NTPC". NTPC Limited. Archived from the original on 14 October 2013. Retrieved 12 October 2013.
- ↑ 11.0 11.1 "Company History - NTPC Ltd". The Economic Times. Retrieved 12 October 2013.
- ↑ "Chairman's statement in 27th Annual Report" (PDF). NTPC. 24 September 2003. Archived from the original (PDF) on 14 October 2013. Retrieved 12 October 2013.
- ↑ "NTPC does a power listing". The Times of India. 5 November 2004. Archived from the original on 15 October 2013. Retrieved 12 October 2013.
- ↑ "Power major NTPC lists at premium". The Hindu. 6 November 2004. Archived from the original on 19 November 2004. Retrieved 12 October 2013.
- ↑ "Indian JV to acquire Rio Tinto's Riversdale coal assets in Mozambique". India Gazette. Archived from the original on 10 August 2014. Retrieved 31 July 2014.
- ↑ "Top 100 stocks by Market Capitalization | BSE Listed stocks Market Capitalization". www.bseindia.com. Retrieved 19 December 2022.
- ↑ "Talcher thermal power plant shuts down, NTPC says modern unit will replace it". 2 April 2021.
- ↑ NTPC Tanda
- ↑ "NTPC acquires 720 Mw Barauni thermal power plant in Bihar - ET EnergyWorld".
- ↑ "NTPC acquires Barauni Thermal Power Station".
- ↑ "' A power plant like Rampal would never be allowed in India' - Dhaka Tribune". dhakatribune.com. 23 August 2016.
- ↑ 5618GI1.p65
- ↑ "Thriveni-Sainik appointed as MDO for NTPC's Pakri-Barwadih coal block of Jharkhand * Coal Power Steel". Archived from the original on 30 September 2015. Retrieved 7 December 2015.
- ↑ "NTPC LTD". BSEindia.com. Retrieved 12 October 2013.
- ↑ "Scripwise Weightages in S&P BSE SENSEX". BSE India. Archived from the original on 1 December 2015. Retrieved 11 October 2013.
- ↑ "NTPC Limited". NSE India. Retrieved 11 October 2013.
- ↑ "Download List of CNX Nifty stocks (.csv)". NSE India. Retrieved 12 October 2013.
- ↑ "Archived copy". Archived from the original on 4 March 2016. Retrieved 7 December 2015.
{{cite web}}: CS1 maint: archived copy as title (link) - ↑ "Shareholding Pattern - NTPC". ntpc.co.in.
- ↑ "Platts Top 250 Rankings". top250.platts.com.
- ↑ "ICSI National Awards for Excellence in Corporate Governance for 2009". ICSI. 21 December 2009. Retrieved 12 October 2013.
- ↑ "Draft National Electricity Plan, 2016, CEA" (PDF). Archived from the original (PDF) on 20 December 2016. Retrieved 11 December 2016.
- ↑ "NTPC may drop further expansion plans of Kudgi thermal project in Karnataka". The Economic Times. Retrieved 28 March 2016.
- ↑ "NTPC to phase out 11000 MW old power plants in five years - Piyush Goyal". Retrieved 26 February 2017.
- ↑ "Overview of Wood Pellet Co-firing" (PDF). Archived from the original (PDF) on 27 February 2017. Retrieved 26 February 2017.
- ↑ "Dispatchable Concentrated Solar Power Broke Price Records in 2017". HELIOSCSP. Retrieved 22 September 2017.
- ↑ Varadhan, Sudarshan (19 December 2019). "Exclusive: India's NTPC snubs foreign emissions tech, shuts out GE, others from $2 billion orders". Reuters.
- ↑ "Badarpur power plant shut, action plan to tackle air pollution in Delhi-NCR comes into force". Hindustan Times. 16 October 2018.
- ↑ "Badarpur thermal plant, Delhi's biggest power generator, to shut down from October 15". 5 October 2018. Archived from the original on 21 April 2019. Retrieved 3 July 2020.
External links[edit | edit source]
{{URL|example.com|optional display text}}