this file still exists, no need to remove it |
robot: Update article (please report if you notice any mistake or error in this edit) |
||
| Line 1: | Line 1: | ||
{{Short description|Rail transport in Uttar Pradesh, India}} | |||
{{Use Indian English|date=December 2014}} | {{Use Indian English|date=December 2014}} | ||
{{Use dmy dates|date=December 2014}} | {{Use dmy dates|date=December 2014}} | ||
| Line 13: | Line 14: | ||
==MEMU/EMU and passenger trains== | ==MEMU/EMU and passenger trains== | ||
===Barabanki to | ===Barabanki to Lucknow === | ||
====NR route==== | ====NR route==== | ||
Latest revision as of 00:11, 4 April 2022
Barabanki–Lucknow Suburban Railway is a commuter rail service operated by Northern Railways, North Central Railway and North Eastern Railway to connect Lucknow with Barabanki. These services are mostly run using EMU and MEMU rakes. However it does not have dedicated suburban tracks but share the tracks with long distance trains. Locally it is called BL meaning Barabanki Lucknow (while LC means Lucknow Cawnpore).
Distance and time[edit | edit source]
- Distance between Lucknow (LKO) and Barabanki Jn (BBK) is 28–29 km (NR route).
- Distance between Lucknow Jn (LJN) and Barabanki Jn (BBK) is 36–37 km (NER route).
- Most of the LSB trains cover the whole journey within 50 minutes via NR route (28–29 km) (NR route).
- Most of the LGB trains cover the whole journey within 1 hour 30 minutes via NER route (36–37 km) (NER route).
- Intercity and other Superfast trains take 40 minutes to 1 hour 10 minutes. (Amrapali Express takes exactly 40 minutes for whole journey while Ganga Sutlej Express takes exactly 1 hour 10 minutes.)
MEMU/EMU and passenger trains[edit | edit source]
Barabanki to Lucknow[edit | edit source]
NR route[edit | edit source]
| Stations | Distance from source | Event | 64231 |
|---|---|---|---|
| Barabanki Jn | 0 km | departure | 10:10 |
| Safedabad | 7 km | departure | 10:21 |
| Jugaur | 11 km | departure | 10:28 |
| Malhour | 16 km | departure | 10:35 |
| Lucknow | 28 km | Arrival | 11:00 |
NER route[edit | edit source]
| Stations | Distance from source | Event | 64271 |
|---|---|---|---|
| Barabanki Jn | 0 km | departure | 13:10 |
| Safedabad | 7 km | departure | 13:21 |
| Jugaur | 11 km | departure | 13:27 |
| Malhour | 17 km | departure | 13:37 |
| Gomati Nagar | 21 km | departure | 13:43 |
| Badshahnagar | 25 km | departure | 13:50 |
| Daliganj | 29 km | departure | 17:40 |
| Lucknow City | 31 km | departure | 13:58 |
| Aishbagh | 34 km | departure | 14:04 |
| Lucknow Jn | 36 km | Arrival | 14:45 |
Lucknow to Barabanki[edit | edit source]
NR route[edit | edit source]
| Stations | Event | 2LSB | 4LSB |
|---|---|---|---|
| Lucknow | departure | 11:05 | 13:40 |
| Malhour | departure | 11:26 | 14:03 |
| Jugaur | departure | 11:33 | 14:12 |
| Safedabad | departure | 11:39 | 14:20 |
| Barabanki Jn | Arrival | 11:38 | 14:35 |
NER route[edit | edit source]
| Stations | Event | 64274 |
|---|---|---|
| Lucknow Jn | departure | 18:15 |
| Aishbagh | departure | 18:26 |
| Lucknow City | departure | 18:40 |
| Daliganj | departure | 18:46 |
| Badshahnagar | departure | 19:07 |
| Gomati Nagar | departure | 19:15 |
| Malhour | departure | 19:24 |
| Jugaur | departure | 19:30 |
| Safedabad | departure | 19:36 |
| Barabanki Jn | Arrival | 19:45 |
See also[edit | edit source]
- Lucknow–Kanpur Suburban Railway
- Cawnpore–Barabanki Railway
- Barabanki Junction
- Lucknow Charbagh railway station
- Indian Railways
References[edit | edit source]
External links[edit | edit source]
- "Kanpur gets Memu train to Barabanki". The Times of India. 30 June 2013. Retrieved 1 July 2013.
{{cite web}}: CS1 maint: deprecated archival service (link)