Bangalore–Mysore Infrastructure Corridor: Difference between revisions

From Bharatpedia, an open encyclopedia
>Sanjeevengineer
(Added Gallery #WFWF)
 
->Ptrnext
 
Line 1: Line 1:
{{Use dmy dates|date=June 2016}}
{{Use dmy dates|date=June 2016}}
{{Use Indian English|date=June 2016}}
{{Use Indian English|date=June 2016}}
{{refimprove|date=July 2011}}
{{more citations needed|date=July 2011}}
{{infobox road
{{infobox road
|type=Expressway
|type=Expressway
Line 33: Line 33:
}}
}}


The '''Nandi Infrastructure Corridor Enterprises Road''', commonly known as '''NICE Road''' and officially called '''Bengaluru–Mysuru Infrastructure Corridor''' (BMIC), is a proposed 4 to 6 lane [[private highway|private]] [[toll road|tolled]] [[Indian Expressways|expressway]] in Karnataka, that intends to connect the two important cities [[Bengaluru]] and [[Mysuru]] in the [[India]]n [[States and territories of India|state]] of [[Karnataka]]. This is being constructed by Nandi Infrastructure Corridor Enterprises (NICE) chaired by [[Ashok Kheny]] on a Build-Own-Operate-Transfer (BOOT) basis.<ref>[http://www.indiatogether.org/campaigns/bmic/bmicfaq.htm FAQ]</ref><ref>{{Cite web |url=http://bmicapa.org/ |title=Bangalore Mysore Infrastructure Corridor Area Planning Authority |access-date=7 July 2011 |archive-url=https://web.archive.org/web/20110621095048/http://www.bmicapa.org/ |archive-date=21 June 2011 |url-status=dead }}</ref>
The '''Nandi Infrastructure Corridor Enterprises Road''', commonly known as '''NICE Road''' and officially called '''Bengaluru–Mysuru Infrastructure Corridor''' (BMIC), is a proposed 4 to 6 lane [[private highway|private]] [[toll road|tolled]] [[Expressways of India|expressway]] in Karnataka, that intends to connect the two important cities [[Bengaluru]] and [[Mysuru]] in the [[India]]n [[States and territories of India|state]] of [[Karnataka]]. This is being constructed by Nandi Infrastructure Corridor Enterprises (NICE) chaired by [[Ashok Kheny]] on a Build-Own-Operate-Transfer (BOOT) basis.<ref>[http://www.indiatogether.org/campaigns/bmic/bmicfaq.htm FAQ]</ref><ref>{{Cite web |url=http://bmicapa.org/ |title=Bangalore Mysore Infrastructure Corridor Area Planning Authority |access-date=7 July 2011 |archive-url=https://web.archive.org/web/20110621095048/http://www.bmicapa.org/ |archive-date=21 June 2011 |url-status=dead }}</ref>


As of May 2017, around 8,00,000 vehicles use the road daily, in its presently operation section starting from [[Electronic City]] ending at [[Tumkur]] Road.<ref>{{cite web|title=Now, BMRCL chalks out a 'NICE' plan for Namma Metro - The Economic Times|url=http://economictimes.indiatimes.com/news/industry/transportation/railways/now-bmrcl-chalks-out-a-nice-plan-for-namma-metro/articleshow/58570205.cms|website=The Economic Times|access-date=8 May 2017}}</ref>
As of May 2017, around 8,00,000 vehicles use the road daily, in its presently operation section starting from [[Electronic City]] ending at [[Tumkur]] Road.<ref>{{cite news|title=Now, BMRCL chalks out a 'NICE' plan for Namma Metro - The Economic Times|url=http://economictimes.indiatimes.com/news/industry/transportation/railways/now-bmrcl-chalks-out-a-nice-plan-for-namma-metro/articleshow/58570205.cms|website=The Economic Times|access-date=8 May 2017|last1=Yadav|first1=Umesh}}</ref>


==History==
==History==
Line 46: Line 46:


==Status updates==
==Status updates==
* Mar 2019: 4 km of expressway is completed, besides this 41 km of peripheral road and 8.5 km of link road is also constructed.
* Mar 2019: 4&nbsp;km of expressway is completed, besides this 41&nbsp;km of peripheral road and 8.5&nbsp;km of link road is also constructed.<ref>{{Cite web|url=https://www.deccanherald.com/state/cm-mum-nice-project-he-once-703265.html|title = Kumaraswamy mum on NICE project he once opposed|date = 16 November 2018}}</ref>
*<ref>https://www.deccanherald.com/state/cm-mum-nice-project-he-once-703265.html</ref>


== Gallery ==
== Gallery ==
Line 56: Line 55:
==See also==
==See also==
* [[Bengaluru-Mysuru Expressway]], an upcoming project.
* [[Bengaluru-Mysuru Expressway]], an upcoming project.
* [[Expressway (India)]]
* [[Expressways of India]]
* [[Infrastructure in Bangalore]]
* [[Infrastructure in Bangalore]]
* [[Outer Ring Road (Bangalore)]]
* [[Outer Ring Road (Bangalore)]]

Latest revision as of 06:33, 27 December 2021

Bengaluru–Mysuru Infrastructure Corridor
Nandi Infrastructure Corridor Enterprises Road, Bengaluru-Mysuru Expressway
BMIC-Mallasandra-flyover.jpg
Route information
Maintained by Nandi Infrastructure Corridor Enterprises Road
Length111 km (69 mi)
Existed1996–present
Major junctions
North endBengaluru
 
South endMysuru
Location
StatesKarnataka
Highway system

The Nandi Infrastructure Corridor Enterprises Road, commonly known as NICE Road and officially called Bengaluru–Mysuru Infrastructure Corridor (BMIC), is a proposed 4 to 6 lane private tolled expressway in Karnataka, that intends to connect the two important cities Bengaluru and Mysuru in the Indian state of Karnataka. This is being constructed by Nandi Infrastructure Corridor Enterprises (NICE) chaired by Ashok Kheny on a Build-Own-Operate-Transfer (BOOT) basis.[1][2]

As of May 2017, around 8,00,000 vehicles use the road daily, in its presently operation section starting from Electronic City ending at Tumkur Road.[3]

History[edit]

NICE Road toll plaza

In conjunction with a 1995 Trade Mission to India sponsored by the then Governor of Massachusetts, William Weld, a memorandum of understanding was signed by Consortium members, Indian officials, including then Karnataka Chief Minister, H.D. Deve Gowda, and U.S. officials, which set the stage for launching the Bangalore Mysore Infrastructure Corridor project. The Consortium, Nandi Infrastructure Corridor Enterprises (NICE), comprises the Kalyani Group of Companies, VHB International LTD. and SAB International LTD. to develop the Bangalore Mysore Infrastructure Corridor.

The project has been in controversy since the day of planning. In October 2012, the Karnataka Lokayukta ordered a probe into several former chief ministers in matters relating to irregularities in land acquisition for the project.[4]

Once fully constructed, it is planned to go through Mysuru, Srirangapattana, Pandavapura, Mandya, Maddur, Channapattana, Ramanagara, Kengeri and Bengaluru. The presently completed part of NICE road consists of a half-circle around the city of Bangalore, starting from Electronic City Ending at Tumkur Road. It has access points at Electronic City , Bannergatta Road, Kanakapura Road, Mysore Road, Magadi Road and Tumkur Road

Status updates[edit]

  • Mar 2019: 4 km of expressway is completed, besides this 41 km of peripheral road and 8.5 km of link road is also constructed.[5]

Gallery[edit]

See also[edit]

References[edit]

  1. FAQ
  2. "Bangalore Mysore Infrastructure Corridor Area Planning Authority". Archived from the original on 21 June 2011. Retrieved 7 July 2011.
  3. Yadav, Umesh. "Now, BMRCL chalks out a 'NICE' plan for Namma Metro - The Economic Times". The Economic Times. Retrieved 8 May 2017.
  4. Chaturvedi, Amit (25 October 2012). "Mysore infrastructure corridor project: Probe ordered against former Karnataka chief ministers". Bangalore. NDTV. Retrieved 25 October 2012.
  5. "Kumaraswamy mum on NICE project he once opposed". 16 November 2018.

External links[edit]