Raipur–Visakhapatnam Expressway: Difference between revisions

Created by IndianGeneralist
Last edited November 16, 2021
>IndianGeneralist
 
->BrownHairedGirl
{{Bare URL inline}} for refs which WP:REFLINKS doesn't expand, removed stub tag
 
Line 1: Line 1:
'''Raipur–Visakhapatnam Expressway''' is a {{convert|464|km|mi|adj=on}} planned and upcoming green field access controlled six lane expressway in [[Chhattisgarh]] and [[Andhra Pradesh]], India. The expressway will be part of [[Bharatmala Pariyojana]] and will pass from [[Raipur]] through [[Kurud]], [[Dhamtari]], [[Kanker, Chhattisgarh|Kanker]], [[Kondagaon]], [[Koraput]], [[Tumbiguda]], [[Sabbavaram]] before terminating at [[Visakhapatnam Port]].
{{infobox road
{{infobox road
|country= IND
| country = IND
|name= Raipur-Visakhapatnam Expressway  
| name = Raipur-Visakhapatnam Expressway
| map =  
| map =  
| map_custom =  
| map_custom = yes
| map_notes =  
| map_notes =  
|image =  
| image =  
|length_km= 464
| length_km = 464
|direction_a=  
| direction_a =  
|direction_b=  
| direction_b =  
|terminus_a= Kurud , [[Raipur]]
| terminus_a = Kurud, [[Raipur]]
|junction=
| junction =  
|terminus_b= Vizag port [[Visakhapatnam]]
| terminus_b = Vishakapatnam Port, [[Visakhapatnam]]
|formed=
| formed = March 2024 (expected)
|maint=
| maint =  
| photo_notes = Raipur-Visakhapatnam Expressway map
}}
}}
'''Raipur–Visakhapatnam Expressway''' ('''NH-130CD'''), part of '''Raipur–Visakhapatnam Economic Corridor (EC-15)''', is a planned greenfield, access-controlled, {{convert|464|km|mi|adj=on}} long, 6-lane expressway through [[Red corridor]] in [[Chhattisgarh]], [[Odisha]] and [[Andhra Pradesh]] states of central and east-central India. From Durg, it runs between [[National Highway 30 (India)|NH-30]] and [[National Highway 130C (India)|NH-130C]] till [[Boriguma]], then runs east of [[National Highway 26 (India)|NH-26]] till [[Sunabeda]] and then west of NH-26 till [[Visakhapatnam]] ([[Vizianagaram]]). Along the way it connects [[Raipur]], [[Kurud]], [[Dhamtari]], [[Kanker, Chhattisgarh|Kanker]], [[Kondagaon]], [[Koraput]], and [[Sabbavaram]] before terminating at [[Visakhapatnam Port]].<ref name=ec1>[https://themetrorailguy.com/nhai-raipur-visakhapatnam-economic-corridor-information-route-map-status/ Raipur – Visakhapatnam Economic Corridor – Information & Status], themetrorailguy.com.</ref>
It is part of [[Bharatmala Pariyojana]] and it connects to [[East Coast Economic Corridor]] ([[Kolkata]] to [[Kanyakumari]]) at Vizianagaram. Sequentially interconnected existing [[National Highway 30 (India)|NH-30]]-[[National Highway 34 (India)|NH-34]]-[[National Highway 539 (India)|NH-539]]-[[National Highway 44 (India)|NH-44]]-[[Yamuna Expressway]] connect Raipur to central and north India such as [[Delhi]], [[Agra]], [[Gwalior]], [[Jhansi]], [[Damoh]], and [[Jabalpur]].
==Route ==
===Chhattisgarh===
{{see also | List of districts of Chhattisgarh }}
In [[Chhattisgarh]] state it passes through 4 southeastern districts between [[National Highway 30 (India)|NH-30]] and [[National Highway 30 (India)|NH-130C]]:<ref name=ec1/>
* [[Raipur district]]
** [[Raipur]] (south of), begins at [[Abhanpur]] on intersection of NH-30, NH-130C and SH-22.
* [[Dhamtari district]]
** [[Kundel]]<!-- Per wikipedia guidelines, retaion the redlink to encourage creation of article. Thanks. -->
* [[Kanker district]]
** Kanker (northeast of), passes near [[Narharpur, Chhattisgarh|Naharpur]]
** Kanker (immediate east of), passes through [[Sarona, Kanker|Sarona]]<!-- Per wikipedia guidelines, retaion the redlink to encourage creation of article. Thanks. --> on SH-6 Kanker-[[Mukundpur, Chhattisgarh|Mukundpur]]<!-- Per wikipedia guidelines, retaion the redlink to encourage creation of article. Thanks. --> Road.
* [[Kondagaon district]]
** [[Keskal]] (east of)
** [[Salna]]<!-- Per wikipedia guidelines, retaion the redlink to encourage creation of article. Thanks. --> (immediate west of Kundel), enters Odisha here
===Odisha===
{{see also | List of districts of Odisha}}
In [[Odisha]] state it passes through 2 southwestern-most districts on eastern and western side of NH-26 in Nabarangpur and Koraput districts respectively:<ref name=ec1/>
* [[Nabarangpur district]], runs along the eastern side of NH-26.
** [[Sunapali]],<!-- Per wikipedia guidelines, retaion the redlink to encourage creation of article. Thanks. --> enters Odisha here.
** [[Raighar]]<!-- Per wikipedia guidelines, retaion the redlink to encourage creation of article. Thanks. --> (west of)
** [[Umerkote]] (west of)
** [[Dabugaon]]<!-- Per wikipedia guidelines, retaion the redlink to encourage creation of article. Thanks. --> (west of)
** [[Papadahandi]] (west of)
** [[Nabarangpur|Nowrangpur]] (Nabarangpur) (west of)
* [[Koraput district]], runs along the western side of NH-26.
** [[Kotpad]] (east of)
** [[Gaudaguda]],<!-- Per wikipedia guidelines, retaion the redlink to encourage creation of article. Thanks. --> moves from west to east side of NH-26.
** [[Borigumma]] (east of)
** [[Raniguda]]<!-- Per wikipedia guidelines, retaion the redlink to encourage creation of article. Thanks. --> (immediate east of)
** [[Koraput]] (immediate east of)
** [[Sunabeda]] (immediate east of), south of Sunabeda it moves from east to west side of NH-26.
** [[Pottangi]]
** [[Ondarangi]]<!-- Per wikipedia guidelines, retaion the redlink to encourage creation of article. Thanks. --> on the border of Odisha-Andhra Pradesh, exits Odisha and enters Andhra Pradesh.
===Andhra Pradesh ===
{{see also | List of districts of Andhra Pradesh }}
In [[Andhra Pradesh]] state is passes only through 1 district in northeast Andhra Pradesh on the western side of NH-26:<ref name=ec1/>
* [[Vizianagaram district]]
** [[Salur]] (west of)
** [[Gajapathinagaram]] (west of)
** [[Vizianagaram]] (west of)
** [[Vizianagaram]] (west of)
** between [[Sabbavaram]]-[[Anandapuram]], terminates here on SH-9 [[Anakapalle]]-[[Rajapulova]] Road.
==Proposed future connectivity ==
Following additional connectivity has been proposed by constructing new links.
===NCR CMC hubs of Bhatinda-Hisar-Jaipur-Gwalior ===
There is another proposal to link this corridor to northwestern India by a combination of constructing greenfield stretches and upgrading existing roads through [[National Capital Region (India)#Counter magnets|National Capital Region's Counter Magnet Cities]] (NCR CMC) of [[Bhatinda]]-[[Hisar (city)|Hisar]]-[[Jaipur]] (via [[Karauli]])-[[Gwalior]]. This requires the construction of a road-cum-rail bridge over the [[Chambal River]] between Karauli-[[Taintara]] and/or [[Sirmathura]]-[[Joura]].
* Connect to Bhatinda to connect to [[Pathankot–Ajmer Expressway]] and [[Amritsar–Jamnagar Expressway]].
* Bhatinda-Hisar: Greenfield alignment from Bhatinda - Kullan (between [[Ratia]] and [[Tohana]]) - between [[Bhuna]] and [[Uklanamandi]] - between [[Agroha (town)|Agroha]] and [[Barwala, Hisar|Barwala]], between Barwala and [[Hansi]], intersect with [[Trans–Haryana Expressway]] near [[Mundhal Khurd]] and [[Meham]]. As an independent project, it will continue to [[National Highway 9 (India)|NH-9]], [[Kalanaur, Haryana|Kalanaur]], north of Beri, [[Western Peripheral Expressway]] and [[Bahadurgarh]].
* Hisar-[[Pilani]]-[[Jhunjhunu]] : Upgrade of Hisar (elevated from railway over-bridge near Mangali to Camp Chowk, Jat College and Thandi Sadak over-bridge)-[[Mangali]]-[[Saharwa]] (with a greenfield [[Siwani]]-Sahrwa-Dobeta-[[Kanwari]]-[[Bawani Khera]] spur ). Greenfield alignment from Sharwa to [[Bidhwan]]-[[Bahal, India|Bahal]] to [[Norangpura]] (west of Pilani) to Baragaon (south of Jhunjuhunu on Rajasthan SH-32).
* Jhunjhunu-Jaipur: greenfield Baragaon-Raghunathpura, upgrade existing from Raghunathpura-[[Udaipurwati]]-Kotri Luharwas, greenfield from Kotri Luharwas to Khandela Mod bus stand, upgrade existing route from Khandela Mod bus stand to Srimadhopur-[[Reengus]] to connect it to [[National Highway 52 (India)|NH-52]]. From there greenfield alignment to [[Tonk, India|Tonk]] via Reengus-Hasteda-Gori Ka Bas-Lalpura-Bagru-Phagi-Galod-Tonk resulting in direct access to another NCR CMS city of [[Kota, Rajasthan|Kota]].
* Chambal River, this requires the construction of a greenfield highway and a road-cum-rail bridge over the Chambal River between Karauli-Taintara and/or Sirmathura-Joura with 2 spurs on eastern flank of Chambal - one each to connect to Gwalior and Datia.
===NCR CMG hubs of Ludhiana-Patiala-Ambala-Narnaul-Alwar-===
There is another proposal to link this corridor to [[Trans–Haryana Expressway]] and beyond to [[Delhi–Amritsar–Katra Expressway]], [[Delhi–Mumbai Expressway]] and [[Delhi–Mumbai Industrial Corridor Project]] by a combination of constructing greenfield stretches and upgrading existing roads through [[Narnaul]]-[[Alwar]]-Karauli-[[Mohana]]-[[Datia]] (and/or Gwalior). Detailed routes will see the upgrade of existing State Highways (SH) to National Highways (NH) such as:
* Rajasthan SH-14 Narnaul-Alwar-Mathura highway, with whole route between narnaul and Mathura to be upgraded for economic corridor and religious Krishna Yatra Circuit.
* Rajasthan SH-25, Alwar-[[Rajgarh, Alwar|Rajgarh]] portion to be upgraded.
* Dalalpura/Machari to Berkhera-Mahwa, greenfield alignment, alternatively the longer existing Rajasthan SH-35 Rajgarh-Mahwa portion can be upgraded.
* Rajasthan SH-22, Mahwa-[[Hindaun|Hindon]]-Karauli portion to be upgraded.
* Chambal River, this requires the construction of a greenfield highway and a road-cum-rail bridge over the Chambal River between Karauli-Taintara and/or Sirmathura-Joura with 2 spurs on eastern flank of Chambal - one each to connect to Gwalior and Datia.
===Eastern Economic Corridor ===
There is a proposal to connect it to [[Eastern Economic Corridor (India)|Eastern Economic Corridor]] ([[Paradeep]] in Odisha to [[Raxaul]] on [[Bihar]]-[[Nepal]] border) by constructing either a spur or a loop in Chhattisgarh.


==Status updates==
==Status updates==
* Feb 2020: The expressway was added to Bharatmala Pariyojana and approved.<ref>{{Cite web|url=https://www.patrika.com/kanker-news/green-field-economic-corridor-raipur-to-visakhapatnam-expressway-5741527/|title=ग्रीन फील्ड इकोनॉमिक कॉरीडोर को मिली मंजूरी, रायपुर-विशाखापट्टनम एक्सप्रेस-वे में जगदलपुर नहीं है शामिल|website=Patrika News}}</ref>
 
* Aug 2020: The target date for completion of expressway is set as March 2024.<ref>{{Cite web|url=https://timesofindia.indiatimes.com/india/23-expressways-new-highways-coming-up-in-next-5-years/articleshow/77526921.cms|title=23 new expressways and highways coming up in next 5 years &#124; India News - Times of India|website=The Times of India}}</ref>
* '''Feb 2020:''' The expressway was added to [[Bharatmala Pariyojana]] and approved.<ref>{{Cite web|url=https://www.patrika.com/kanker-news/green-field-economic-corridor-raipur-to-visakhapatnam-expressway-5741527/|title=ग्रीन फील्ड इकोनॉमिक कॉरीडोर को मिली मंजूरी, रायपुर-विशाखापट्टनम एक्सप्रेस-वे में जगदलपुर नहीं है शामिल|website=Patrika News}}</ref>
* Mar 2021: Detailed Project Report completed. <ref>https://www.thehindu.com/news/national/andhra-pradesh/raipur-visakhapatnam-nh-project-will-be-completed-by-2024-25-gadkari/article34075917.ece</ref>
* '''Aug 2020:''' The target date for completion of expressway is set as March 2024.<ref>{{Cite web|url=https://timesofindia.indiatimes.com/india/23-expressways-new-highways-coming-up-in-next-5-years/articleshow/77526921.cms|title=23 new expressways and highways coming up in next 5 years &#124; India News - Times of India|website=The Times of India}}</ref>
* Apr 2021: Tendering process ongoing. <ref>https://themetrorailguy.com/nhai-raipur-visakhapatnam-economic-corridor-information-route-map-status/</ref>
* '''Mar 2021:''' [[Detailed Project Report]] (DPR) completed.<ref>https://www.thehindu.com/news/national/andhra-pradesh/raipur-visakhapatnam-nh-project-will-be-completed-by-2024-25-gadkari/article34075917.ece {{Bare URL inline|date=November 2021}}</ref>
* '''Apr 2021:''' Tendering process ongoing.<ref>{{Cite web|title=Raipur - Visakhapatnam Economic Corridor – Information & Status|url=https://themetrorailguy.com/nhai-raipur-visakhapatnam-economic-corridor-information-route-map-status/|access-date=2021-10-30|website=The Metro Rail Guy|language=en-US}}</ref>
*'''Oct 2021:''' HG Infra wins 2 packages in [[Odisha]] worth over ₹ 2,297 crores for developing the 44&nbsp;km long, six-lane Kaliagura-Baunsaguar section in Odisha.
 
==See also ==
* [[Expressways of India]]
* [[Industrial corridor]]
* [[Eastern Economic Corridor (India)]]
* [[East Coast Economic Corridor]]


==References==
==References==
{{reflist}}
{{reflist}}


{{DEFAULTSORT:Raipur-Visakhapatnam Expressway}}
[[Category:Proposed expressways in India]]
[[Category:Proposed expressways in India]]
[[Category:Visakhapatnam]]
[[Category:Visakhapatnam]]
{{India-road-stub}}

Latest revision as of 19:20, 16 November 2021

Raipur-Visakhapatnam Expressway
Route information
Length464 km (288 mi)
ExistedMarch 2024 (expected)–present
Major junctions
FromKurud, Raipur
ToVishakapatnam Port, Visakhapatnam
Highway system

Raipur–Visakhapatnam Expressway (NH-130CD), part of Raipur–Visakhapatnam Economic Corridor (EC-15), is a planned greenfield, access-controlled, 464-kilometre (288 mi) long, 6-lane expressway through Red corridor in Chhattisgarh, Odisha and Andhra Pradesh states of central and east-central India. From Durg, it runs between NH-30 and NH-130C till Boriguma, then runs east of NH-26 till Sunabeda and then west of NH-26 till Visakhapatnam (Vizianagaram). Along the way it connects Raipur, Kurud, Dhamtari, Kanker, Kondagaon, Koraput, and Sabbavaram before terminating at Visakhapatnam Port.[1]

It is part of Bharatmala Pariyojana and it connects to East Coast Economic Corridor (Kolkata to Kanyakumari) at Vizianagaram. Sequentially interconnected existing NH-30-NH-34-NH-539-NH-44-Yamuna Expressway connect Raipur to central and north India such as Delhi, Agra, Gwalior, Jhansi, Damoh, and Jabalpur.

Route[edit | edit source]

Chhattisgarh[edit | edit source]

In Chhattisgarh state it passes through 4 southeastern districts between NH-30 and NH-130C:[1]

Odisha[edit | edit source]

In Odisha state it passes through 2 southwestern-most districts on eastern and western side of NH-26 in Nabarangpur and Koraput districts respectively:[1]

Andhra Pradesh[edit | edit source]

In Andhra Pradesh state is passes only through 1 district in northeast Andhra Pradesh on the western side of NH-26:[1]

Proposed future connectivity[edit | edit source]

Following additional connectivity has been proposed by constructing new links.

NCR CMC hubs of Bhatinda-Hisar-Jaipur-Gwalior[edit | edit source]

There is another proposal to link this corridor to northwestern India by a combination of constructing greenfield stretches and upgrading existing roads through National Capital Region's Counter Magnet Cities (NCR CMC) of Bhatinda-Hisar-Jaipur (via Karauli)-Gwalior. This requires the construction of a road-cum-rail bridge over the Chambal River between Karauli-Taintara and/or Sirmathura-Joura.

NCR CMG hubs of Ludhiana-Patiala-Ambala-Narnaul-Alwar-[edit | edit source]

There is another proposal to link this corridor to Trans–Haryana Expressway and beyond to Delhi–Amritsar–Katra Expressway, Delhi–Mumbai Expressway and Delhi–Mumbai Industrial Corridor Project by a combination of constructing greenfield stretches and upgrading existing roads through Narnaul-Alwar-Karauli-Mohana-Datia (and/or Gwalior). Detailed routes will see the upgrade of existing State Highways (SH) to National Highways (NH) such as:

  • Rajasthan SH-14 Narnaul-Alwar-Mathura highway, with whole route between narnaul and Mathura to be upgraded for economic corridor and religious Krishna Yatra Circuit.
  • Rajasthan SH-25, Alwar-Rajgarh portion to be upgraded.
  • Dalalpura/Machari to Berkhera-Mahwa, greenfield alignment, alternatively the longer existing Rajasthan SH-35 Rajgarh-Mahwa portion can be upgraded.
  • Rajasthan SH-22, Mahwa-Hindon-Karauli portion to be upgraded.
  • Chambal River, this requires the construction of a greenfield highway and a road-cum-rail bridge over the Chambal River between Karauli-Taintara and/or Sirmathura-Joura with 2 spurs on eastern flank of Chambal - one each to connect to Gwalior and Datia.

Eastern Economic Corridor[edit | edit source]

There is a proposal to connect it to Eastern Economic Corridor (Paradeep in Odisha to Raxaul on Bihar-Nepal border) by constructing either a spur or a loop in Chhattisgarh.

Status updates[edit | edit source]

  • Feb 2020: The expressway was added to Bharatmala Pariyojana and approved.[2]
  • Aug 2020: The target date for completion of expressway is set as March 2024.[3]
  • Mar 2021: Detailed Project Report (DPR) completed.[4]
  • Apr 2021: Tendering process ongoing.[5]
  • Oct 2021: HG Infra wins 2 packages in Odisha worth over ₹ 2,297 crores for developing the 44 km long, six-lane Kaliagura-Baunsaguar section in Odisha.

See also[edit | edit source]

References[edit | edit source]

  1. 1.0 1.1 1.2 1.3 Raipur – Visakhapatnam Economic Corridor – Information & Status, themetrorailguy.com.
  2. "ग्रीन फील्ड इकोनॉमिक कॉरीडोर को मिली मंजूरी, रायपुर-विशाखापट्टनम एक्सप्रेस-वे में जगदलपुर नहीं है शामिल". Patrika News.
  3. "23 new expressways and highways coming up in next 5 years | India News - Times of India". The Times of India.
  4. https://www.thehindu.com/news/national/andhra-pradesh/raipur-visakhapatnam-nh-project-will-be-completed-by-2024-25-gadkari/article34075917.ece [bare URL]
  5. "Raipur - Visakhapatnam Economic Corridor – Information & Status". The Metro Rail Guy. Retrieved 2021-10-30.