Created by Harleen singh
Last edited March 23, 2026


Howrah–Jaynagar Express
Overview
Service typeExpress
Current operator(s)Eastern Railway
Route
StartHowrah Junction (HWH)
Stops117
EndJaynagar (JYG)
Distance travelled718 km (446 mi)
Average journey time25h
Service frequencyDaily [lower-alpha 1]
Train number(s)13031/13032
On-board services
Class(es)Unreserved
Seating arrangementsYes
Sleeping arrangementsNo
Catering facilitiesNo
Observation facilitiesICF coach
Entertainment facilitiesNo
Baggage facilitiesBelow the seats
Technical
Rolling stock4
Track gauge5 ft 6 in (1,676 mm)
ElectrificationNo
Operating speed29 km/h (18 mph) average with halts

Howrah–Jaynagar Express is an express train belonging to the Eastern Railway zone that runs between Howrah Junction and Jaynagar via Bandel, Bardhaman, Rampurhat, Bhagalpur. It is used to operate with 53041/53042 train numbers as a passenger train on a daily basis. But after corona pandemic, It is promoted to an express train with train number 13031/13032 keeping same halts. The train is also known as Dhuliyan Passenger.[1][2][3]

Average speed and frequency[edit | edit source]

The 13031/Howrah–Jaynagar Express runs with an average speed of 29 km/h and completes 718 km in 25h. The 13032/Jaynagar–Howrah Express runs with an average speed of 27 km/h and completes 718 km in 26h 40m

Route and halts[edit | edit source]

The important halts of the train are:

The other halts are including Serampore, Chandannagar, Chuchura, Pundooah, Memari.

Coach composite[edit | edit source]

The train has standard ICF rakes with max speed of 110 kmph. The train consists of 11 coaches:

  • 9 General Unreserved
  • 2 Seating cum Luggage Rake

Traction[edit | edit source]

Both trains are hauled by an Asansol Loco Shed-based WAG-5 or Santragachhi-based WAP-4 electric locomotive from Howrah to Jaynagar and vice versa.

Rake sharing[edit | edit source]

The train shares its rake with 13045/13046 Howrah–Deoghar Mayurakshi Express.

See also[edit | edit source]

Notes[edit | edit source]

  1. Runs seven days in a week for every direction.

References[edit | edit source]

  1. ""Will be run from 28th to 28th 'Train' will be completed by Oct 27" Vileg will be completed , Muzaffarpur–Bhagalpur Intercity Train". Archived from the original on 21 August 2017. Retrieved 21 August 2017.
  2. "In the short term, the distance of North Bihar will start from the beginning of the operation of trains on the Y-lag, the distance of North Bihar will be less than 3 hours in less time". Archived from the original on 21 August 2017. Retrieved 21 August 2017.
  3. "Many trains staying at different stations". Archived from the original on 21 August 2017. Retrieved 21 August 2017.

External links[edit | edit source]