Eksar एकसर | |||||
|---|---|---|---|---|---|
| Location | Eksar Village, Eksar, Borivali, Mumbai, Maharashtra 400091 | ||||
| Coordinates | 19°14′26″N 72°50′37″E / 19.2404402°N 72.8434822°E | ||||
| Owned by | |||||
| Operated by | File:Mumbai Metro Line 1 logo.png Maha Mumbai Metro Operation Corporation Ltd. | ||||
| Line(s) | Lua error: expandTemplate: template "Mumbai Metro color" does not exist. | ||||
| Platforms | 2 side platforms | ||||
| Construction | |||||
| Structure type | Elevated | ||||
| Parking | No | ||||
| Other information | |||||
| Station code | <span style="background-color:#Lua error: expandTemplate: template "Mumbai Metro color" does not exist.">205 | ||||
| History | |||||
| Opened | 2 April 2022 | ||||
| Services | |||||
|
Template:Adjstn | |||||
| |||||
| Location | |||||
<mapframe>: The JSON content is not valid GeoJSON+simplestyle. The list below shows all attempts to interpret it according to the JSON Schema. Not all are errors.
| |||||
Eksar is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is located in Borivali, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 2 April 2022.[1][2]
History[edit | edit source]
J Kumar Infraprojects was awarded the contract to construct the station in June 2016.[3] The MMRDA announced that electrification of the line had been completed on 26 May 2020.[4]
Eksar was opened to the public on 2 April 2022, along with the first phase of Line 2A.[5][6]
Station layout[edit | edit source]
| 2nd Floor | ||
| <span style=background-color:#Lua error: expandTemplate: template "Mumbai Metro color" does not exist.>Platform 1 | towards
| |
| <span style=background-color:#Lua error: expandTemplate: template "Mumbai Metro color" does not exist.>Platform 2 | ← towards
| |
| 1st Floor | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| Ground | Street level | Exit/Entrance |
Power and signaling system[edit | edit source]
Like all other stations and railways of Mumbai metro, Eksar station also uses 25,000 volt AC power system by overhead catenary to operate the trains.
References[edit | edit source]
- ↑ "Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here". DNA India. Retrieved 18 April 2023.
- ↑ "Mumbai Metro's 2A & 7 Lines to Cover Andheri to Dahisar in Just 75 Minutes | Know Fare, Routes as Ops Begin Today". News18. 20 January 2023. Retrieved 18 April 2023.
- ↑ "Tainted J Kumar Infraporjects bags Dahisar-DN Nagar Metro 2A project". dna. 9 August 2016. Archived from the original on 15 October 2016. Retrieved 14 October 2016.
- ↑ "MMRDA to conduct test run for two elevated Metro lines next week". Mumbai Mirror. IANS. 26 May 2021. Retrieved 9 July 2023.
- ↑ "Mumbai: Phase 1 of Metro Line 2A and 7 opened for public". The Indian Express. 3 April 2022. Retrieved 9 July 2023.
- ↑ "Mumbai Metro: These 2 lines to get operational today. Check route, other details". mint. 19 January 2023. Retrieved 18 April 2023.