Created by RosariaE70
Last edited March 8, 2026

Dahanukarwadi

डहाणूकरवाडी
LocationKandivli, Mahatma Gandhi Nagar, Kandivli West, Mumbai, Maharashtra 400067
Coordinates19°12′22″N 72°50′05″E / 19.20624°N 72.83476°E / 19.20624; 72.83476
Owned by Mumbai Metropolitan Region Development Authority
Operated byFile:Mumbai Metro Line 1 logo.png Maha Mumbai Metro Operation Corporation Ltd.
Line(s)Lua error: expandTemplate: template "Mumbai Metro color" does not exist.
Platforms2 side platforms
Tracks3
Construction
Structure typeElevated
Other information
Station code<span style="background-color:#Lua error: expandTemplate: template "Mumbai Metro color" does not exist.">209
History
Opened2 April 2022; 4 years ago (2022-04-02)
Services
Template:Adjstn
Location
Lua error in package.lua at line 80: module 'Module:Infobox dim' not found.

Dahanukarwadi is an elevated metro station serving the Dahanukarwadi neighbourhood of Kandivli on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA) and was inaugurated on 2 April 2022.[1][2]

History[edit | edit source]

J Kumar Infraprojects was awarded the contract to construct the station in June 2016.[3] The MMRDA announced that electrification of the line had been completed on 26 May 2020.[4] Dahanukarwadi was opened to the public on 2 April 2022, along with the first phase of Line 2A.[5][6]

Station layout[edit | edit source]

2nd Floor <span style=background-color:#Lua error: expandTemplate: template "Mumbai Metro color" does not exist.>Platform 1A → Pocket track toward Charkop depot →

Side platform Disabled access

<span style=background-color:#Lua error: expandTemplate: template "Mumbai Metro color" does not exist.>Platform 1 → toward
  1. redirect Template:Line terminus link (Lua error: expandTemplate: template "Mumbai Metro stations" does not exist.) →
<span style=background-color:#Lua error: expandTemplate: template "Mumbai Metro color" does not exist.>Platform 2 ← toward
  1. redirect Template:Line terminus link (Lua error: expandTemplate: template "Mumbai Metro stations" does not exist.)

Side platform Disabled access

1st Floor Mezzanine Fare control, station agent, Metro Card vending machines, crossover
G Street level Exit/Entrance

Power and signaling system[edit | edit source]

Like all other stations and railways of Mumbai metro, Dahanaukarwadi station also uses 25,000 volt AC power system by overhead catenary to operate the trains.

References[edit | edit source]

  1. ↑ "Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here". DNA India. Retrieved 18 April 2023.
  2. ↑ "Mumbai Metro's 2A & 7 Lines to Cover Andheri to Dahisar in Just 75 Minutes | Know Fare, Routes as Ops Begin Today". News18. 20 January 2023. Retrieved 18 April 2023.
  3. ↑ "Tainted J Kumar Infraporjects bags Dahisar-DN Nagar Metro 2A project". dna. 9 August 2016. Archived from the original on 15 October 2016. Retrieved 14 October 2016.
  4. ↑ "MMRDA to conduct test run for two elevated Metro lines next week". Mumbai Mirror. IANS. 26 May 2021. Retrieved 9 July 2023.
  5. ↑ "Mumbai: Phase 1 of Metro Line 2A and 7 opened for public". The Indian Express. 3 April 2022. Retrieved 9 July 2023.
  6. ↑ "Mumbai Metro: These 2 lines to get operational today. Check route, other details". mint. 19 January 2023. Retrieved 18 April 2023.