Bangur Nagar metro station
![]() | The topic of this article may not meet Bharatpedia's notability guideline for geographic features. |
Bangur Nagar | |||||
---|---|---|---|---|---|
Mumbai Metro station | |||||
Location | Bangur Nagar, Goregaon West, Mumbai, Maharashtra 400090 | ||||
Coordinates | 19°09′45″N 72°50′06″E / 19.16256°N 72.83487°E | ||||
Owned by | Mumbai Metropolitan Region Development Authority (MMRDA) | ||||
Operated by | Mumbai Metro One Pvt Ltd (MMOPL) | ||||
Line(s) | Yellow Line 2 | ||||
Platforms | Side platform Platform-1 → Dahisar East Platform-2 → Andheri West | ||||
Tracks | 2 | ||||
Construction | |||||
Structure type | Elevated | ||||
Parking | No | ||||
History | |||||
Opened | 19 January 2023 | ||||
Electrified | 25 kV 50 Hz AC through overhead catenary | ||||
Services | |||||
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Mumbai Metro' not found. | |||||
| |||||
Location | |||||
Bangur Nagar, formerly Pahadi Goregaon, is a metro station on the Yellow Line 2A of Mumbai Metro. This station is located in an elevated position on New Link Road in North Mumbai. This metro station was inaugurated on 19 January 2023.[1][2][3]
History[edit]
Trial runs on section of 2A from Dhanukarwadi to Dahisar East has started from 31 May 2021. Dahisar East commercial operations began on 3 April 2022 with First phase of line 2A.
The station was originally named Pahadi Goregaon. The MMRDA renamed the station as Bangur Nagar on 10 April 2023 due to public demand.[4]
Station Layout[edit]
G | Street Level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left ![]() | |
Platform 2 Southbound |
Towards → Andheri West next station is Goregaon West | |
Platform 1 Northbound |
Towards ← Dahisar East next station is Lower Malad | |
Side platform | Doors will open on the left ![]() | ||
L2 |
Power and Signaling System[edit]
Like all other stations and railways of Mumbai metro, Bangur Nagar station also uses 25,000 volt AC power system by overhead catenary to operate the trains.
References[edit]
- ↑ "Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here". DNA India. Retrieved 18 April 2023.
- ↑ "Mumbai Metro: These 2 lines to get operational today. Check route, other details". mint. Retrieved 18 April 2023.
- ↑ "Mumbai Metro's 2A & 7 Lines to Cover Andheri to Dahisar in Just 75 Minutes | Know Fare, Routes as Ops Begin Today". News18. Retrieved 18 April 2023.
- ↑ "Mumbai: Three Metro stations renamed on public demand". Free Press Journal. Retrieved 9 July 2023.