Created by Kkasthana
Last edited March 25, 2026


Aqua Line
Overview
StatusOperational
LocaleNagpur
TerminiPrajapati Nagar
Hingna Mount View
Stations20
Service
TypeRapid Transit
SystemNagpur Metro
Operator(s)MahaMetro
Rolling stockCRRC Dalian
History
Opened28 January 2020
Technical
Line length18.557 km
CharacterElevated and Underground
Track gauge1,435 mm (4 ft 8+12 in) (Standard gauge)
Electrification25 kV 50 Hz AC Overhead catenary
Route map
Template:Nagpur Metro East-West Line

The Aqua Line, also known as the East–west corridor, of the Nagpur Metro is a metro route of the mass rapid transit system in Nagpur, India. It was opened on 28 January 2020.[1]

The total length of the corridor is 18.557 km (11.531 mi).[2] with 21 stations from Prajapati Nagar to Hingna Mount View with a total distance of 18.557 km (11.531 mi).[2] All stations are elevated stations and Sitaburdi station is an Interchange Station. Average inter-station distance is 1.00 km (0.621 mi) approximately varying from 0.65 to 1.29 km (0.404 to 0.802 mi) depending upon the site, operational and traffic requirements. The entire corridor is elevated.

The DMRC in its Detailed Project Report (DPR) submitted to Nagpur Improvement Trust has suggested to start the construction work on both the routes simultaneously contradicting the prior suggestion of phase wise development.[3]

List of stations[edit | edit source]

Following is a list of stations on this route-

style="text-align:center; background:#Template:Rail color;" colspan="8" | Aqua Line
Stn. No. Station Name Opened Chainage (in metre) Distance from previous station Connections Layout
English Marathi
1 Template:Stl प्रजापती नगर 11 December 2022[4] 0.0 0.0 None Elevated
2 Template:Stl वैष्णोदेवी चौक 11 December 2022[4] 1229.3 1229.3 None Elevated
3 Template:Stl आंबेडकर चौक 11 December 2022[4] 1947.9 718.6 None Elevated
4 Template:Stl टेलिफोन एक्स्चेंज 11 December 2022[4] 3137.4 1189.5 None Elevated
5 Template:Stl चितारओळी चौक 11 December 2022[4] 3950.2 812.8 None Elevated
6 Template:Stl अग्रसेन चौक 11 December 2022[4] 4759.8 809.6 None Elevated
7 Template:Stl दोसर वैश्य चौक 11 December 2022[4] 5590.4 830.6 None Elevated
8 Template:Stl नागपूर रेल्वे स्थानक 11 December 2022[4] 6464.4 874.0 Template:Ric Nagpur Junction Underground
9 Template:Stl कॉटन मार्केट 21 September 2023 None Underground
10 Template:Stl सिताबर्डी 28 January 2020[5] 7707.7 1243.3 Template:Rcb Underground
11 Template:Stl झाशी राणी चौक 28 January 2020[5] 8354.0 646.3 None Underground
12 Template:Stl इन्स्टिट्युशन ऑफ इंजिनिअर्स 28 January 2020[5] 9117.2 763.2 None Underground
13 Template:Stl शंकर नगर चौक 9 December 2020[6][7] 10074.9 957.7 None Underground
14 Template:Stl एलएडी चौक 22 October 2020[8][9] 10873.1 798.2 None Elevated
15 Template:Stl धरमपेठ महाविद्यालय 6 April 2021[10] 12020.7 1147.6 None Elevated
16 Template:Stl सुभाष नगर 28 January 2020[5] 12947.1 926.4 None Elevated
17 Template:Stl रचना रिंग रोड जंक्शन 9 December 2020[6][7] 14201.1 1254.0 None Elevated
18 Template:Stl माधव नेत्रालय वासुदेव नगर 28 January 2020[5] 15173.9 972.8 None Elevated
19 Template:Stl बंसी नगर 23 September 2020 16131.6 957.7 None Elevated
20 Template:Stl लोकमान्य नगर 28 January 2020[5] 17792.6 1661.0 None Elevated

See also[edit | edit source]

Other Metro systems in India[edit | edit source]

References[edit | edit source]

  1. "Nagpur Metro's Aqua Line inaugurated today. Check new routes, timings". mint. 28 January 2020. Retrieved 25 November 2021.
  2. 2.0 2.1 "NMRCL - Milestone". www.metrorailnagpur.com. Archived from the original on 17 July 2025. Retrieved 24 September 2025.
  3. "Work on two routes to start together". The Times of India. 19 February 2013.
  4. 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 "PM Modi Inaugurates Nagpur Metro, Flags Off 6th Vande Bharat Train". NDTV. Retrieved 11 December 2022.
  5. 5.0 5.1 5.2 5.3 5.4 5.5 "[Pics] Nagpur Metro Aqua Line's 1st Section Inaugurated". The Metro Rail Guy. 29 January 2020. Retrieved 26 November 2021.
  6. 6.0 6.1 "Shankar Nagar, Rachna Ring Road Junction Metro station to be functional from tomorrow". The Live Nagpur. 8 December 2020. Archived from the original on 20 April 2021. Retrieved 26 November 2021.
  7. 7.0 7.1 "Shankar Nagar & Rachana Ring Road Junction Stations open for Public at Nagpur" (PDF). Pune Metro. Mahametro. Retrieved 26 November 2021.
  8. "CMRS gives safety node to launch metro services on four new stations in Nagpur". Urban Transport News. Retrieved 25 November 2021.
  9. "Nagpur Metro's Double Decker Viaduct Inaugurated". The Metro Rail Guy. 16 November 2020. Retrieved 26 November 2021.
  10. "4 new Metro stations operational from today". The Times of India. 6 April 2021. Retrieved 25 November 2021.