| Aqua Line | |||||
|---|---|---|---|---|---|
| Overview | |||||
| Status | Operational | ||||
| Locale | Nagpur | ||||
| Termini | Prajapati Nagar Hingna Mount View | ||||
| Stations | 20 | ||||
| Service | |||||
| Type | Rapid Transit | ||||
| System | Nagpur Metro | ||||
| Operator(s) | MahaMetro | ||||
| Rolling stock | CRRC Dalian | ||||
| History | |||||
| Opened | 28 January 2020 | ||||
| Technical | |||||
| Line length | 18.557 km | ||||
| Character | Elevated and Underground | ||||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) (Standard gauge) | ||||
| Electrification | 25 kV 50 Hz AC Overhead catenary | ||||
| |||||
The Aqua Line, also known as the East–west corridor, of the Nagpur Metro is a metro route of the mass rapid transit system in Nagpur, India. It was opened on 28 January 2020.[1]
The total length of the corridor is 18.557 km (11.531 mi).[2] with 21 stations from Prajapati Nagar to Hingna Mount View with a total distance of 18.557 km (11.531 mi).[2] All stations are elevated stations and Sitaburdi station is an Interchange Station. Average inter-station distance is 1.00 km (0.621 mi) approximately varying from 0.65 to 1.29 km (0.404 to 0.802 mi) depending upon the site, operational and traffic requirements. The entire corridor is elevated.
The DMRC in its Detailed Project Report (DPR) submitted to Nagpur Improvement Trust has suggested to start the construction work on both the routes simultaneously contradicting the prior suggestion of phase wise development.[3]
List of stations[edit | edit source]
Following is a list of stations on this route-
| Aqua Line | |||||||
|---|---|---|---|---|---|---|---|
| Stn. No. | Station Name | Opened | Chainage (in metre) | Distance from previous station | Connections | Layout | |
| English | Marathi | ||||||
| 1 | Lua error: expandTemplate: template "Nagpur Metro stations" does not exist. | प्रजापती नगर | 11 December 2022[4] | 0.0 | 0.0 | None | Elevated |
| 2 | Lua error: expandTemplate: template "Nagpur Metro stations" does not exist. | वैष्णोदेवी चौक | 11 December 2022[4] | 1229.3 | 1229.3 | None | Elevated |
| 3 | Lua error: expandTemplate: template "Nagpur Metro stations" does not exist. | आंबेडकर चौक | 11 December 2022[4] | 1947.9 | 718.6 | None | Elevated |
| 4 | Lua error: expandTemplate: template "Nagpur Metro stations" does not exist. | टेलिफोन एक्स्चेंज | 11 December 2022[4] | 3137.4 | 1189.5 | None | Elevated |
| 5 | Lua error: expandTemplate: template "Nagpur Metro stations" does not exist. | चितारओळी चौक | 11 December 2022[4] | 3950.2 | 812.8 | None | Elevated |
| 6 | Lua error: expandTemplate: template "Nagpur Metro stations" does not exist. | अग्रसेन चौक | 11 December 2022[4] | 4759.8 | 809.6 | None | Elevated |
| 7 | Lua error: expandTemplate: template "Nagpur Metro stations" does not exist. | दोसर वैश्य चौक | 11 December 2022[4] | 5590.4 | 830.6 | None | Elevated |
| 8 | Lua error: expandTemplate: template "Nagpur Metro stations" does not exist. | नागपूर रेल्वे स्थानक | 11 December 2022[4] | 6464.4 | 874.0 | Lua error in package.lua at line 80: module 'Module:Adjacent stations/Indian Railways' not found. Nagpur Junction | Underground |
| 9 | Lua error: expandTemplate: template "Nagpur Metro stations" does not exist. | कॉटन मार्केट | 21 September 2023 | None | Underground | ||
| 10 | Lua error: expandTemplate: template "Nagpur Metro stations" does not exist. | सिताबर्डी | 28 January 2020[5] | 7707.7 | 1243.3 | Lua error: expandTemplate: template "Nagpur Metro color" does not exist. | Underground |
| 11 | Lua error: expandTemplate: template "Nagpur Metro stations" does not exist. | झाशी राणी चौक | 28 January 2020[5] | 8354.0 | 646.3 | None | Underground |
| 12 | Lua error: expandTemplate: template "Nagpur Metro stations" does not exist. | इन्स्टिट्युशन ऑफ इंजिनिअर्स | 28 January 2020[5] | 9117.2 | 763.2 | None | Underground |
| 13 | Lua error: expandTemplate: template "Nagpur Metro stations" does not exist. | शंकर नगर चौक | 9 December 2020[6][7] | 10074.9 | 957.7 | None | Underground |
| 14 | Lua error: expandTemplate: template "Nagpur Metro stations" does not exist. | एलएडी चौक | 22 October 2020[8][9] | 10873.1 | 798.2 | None | Elevated |
| 15 | Lua error: expandTemplate: template "Nagpur Metro stations" does not exist. | धरमपेठ महाविद्यालय | 6 April 2021[10] | 12020.7 | 1147.6 | None | Elevated |
| 16 | Lua error: expandTemplate: template "Nagpur Metro stations" does not exist. | सुभाष नगर | 28 January 2020[5] | 12947.1 | 926.4 | None | Elevated |
| 17 | Lua error: expandTemplate: template "Nagpur Metro stations" does not exist. | रचना रिंग रोड जंक्शन | 9 December 2020[6][7] | 14201.1 | 1254.0 | None | Elevated |
| 18 | Lua error: expandTemplate: template "Nagpur Metro stations" does not exist. | माधव नेत्रालय वासुदेव नगर | 28 January 2020[5] | 15173.9 | 972.8 | None | Elevated |
| 19 | Lua error: expandTemplate: template "Nagpur Metro stations" does not exist. | बंसी नगर | 23 September 2020 | 16131.6 | 957.7 | None | Elevated |
| 20 | Lua error: expandTemplate: template "Nagpur Metro stations" does not exist. | लोकमान्य नगर | 28 January 2020[5] | 17792.6 | 1661.0 | None | Elevated |
See also[edit | edit source]
- List of Nagpur Metro stations
- Maharashtra Metro Rail Corporation Limited
- Nagpur Metro
- Orange Line (Nagpur Metro)
Other Metro systems in India[edit | edit source]
- List of Ahmedabad Metro stations
- List of Chennai Metro stations
- List of Delhi Metro stations
- List of Gurugram Metro stations
- List of Hyderabad Metro stations
- List of Jaipur Metro stations
- List of Kochi Metro stations
- List of Kolkata Metro stations
- List of Lucknow Metro stations
- List of Mumbai Metro stations
- List of Namma Metro stations
- List of Noida Metro stations
References[edit | edit source]
- ↑ "Nagpur Metro's Aqua Line inaugurated today. Check new routes, timings". mint. 28 January 2020. Retrieved 25 November 2021.
- ↑ 2.0 2.1 "NMRCL - Milestone". www.metrorailnagpur.com. Archived from the original on 17 July 2025. Retrieved 24 September 2025.
- ↑ "Work on two routes to start together". The Times of India. 19 February 2013.
- ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 "PM Modi Inaugurates Nagpur Metro, Flags Off 6th Vande Bharat Train". NDTV. Retrieved 11 December 2022.
- ↑ 5.0 5.1 5.2 5.3 5.4 5.5 "[Pics] Nagpur Metro Aqua Line's 1st Section Inaugurated". The Metro Rail Guy. 29 January 2020. Retrieved 26 November 2021.
- ↑ 6.0 6.1 "Shankar Nagar, Rachna Ring Road Junction Metro station to be functional from tomorrow". The Live Nagpur. 8 December 2020. Archived from the original on 20 April 2021. Retrieved 26 November 2021.
- ↑ 7.0 7.1 "Shankar Nagar & Rachana Ring Road Junction Stations open for Public at Nagpur" (PDF). Pune Metro. Mahametro. Retrieved 26 November 2021.
- ↑ "CMRS gives safety node to launch metro services on four new stations in Nagpur". Urban Transport News. Retrieved 25 November 2021.
- ↑ "Nagpur Metro's Double Decker Viaduct Inaugurated". The Metro Rail Guy. 16 November 2020. Retrieved 26 November 2021.
- ↑ "4 new Metro stations operational from today". The Times of India. 6 April 2021. Retrieved 25 November 2021.