Indora Square | |||||
|---|---|---|---|---|---|
| Template:Nagpur Metro Infobox station line | |||||
| Location | Kamptee Rd, New Indora, Nagpur, Maharashtra 440002 | ||||
| Coordinates | 21°10′25″N 79°06′02″E / 21.17349°N 79.10056°E | ||||
| Owned by | Maharashtra Metro Rail Corporation Limited (MAHA-METRO) | ||||
| Operated by | Nagpur Metro | ||||
| Line(s) | Template:Rcb | ||||
| Platforms | Side platform Platform-1 → Automative Square Platform-2 → Khapri | ||||
| Tracks | 2 | ||||
| Construction | |||||
| Structure type | Elevated, Double track | ||||
| Platform levels | 2 | ||||
| Disabled access | Yes | ||||
| Other information | |||||
| Status | Operational | ||||
| History | |||||
| Opening | 12 December 2022 | ||||
| Electrified | 750 V DC third rail | ||||
| Services | |||||
|
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Nagpur Metro' not found. | |||||
| |||||
| Location | |||||
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | |||||
Indora Square is an elevated metro station on the North-South Corridor of the Orange Line of Nagpur Metro in Nagpur, India.[1] This metro station was inaugurated on 11 December 2022 by Prime Minister Narendra Modi and was opened to the public on 12 December 2022.[2][3]
Station Layout[edit | edit source]
| style="color:white;background:#Template:Rail color;text-align:center;padding:5px"| Indora Square track layout | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
| ||||||||||||||||||||||||||||||||||||||||||
| G | Street level | Exit/Entrance |
| L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| L2 | Side platform | Doors will open on the left | |
| Platform 2 Southbound |
Towards → Khapri next station is Kadvi Square | |
| Platform 1 Northbound |
Towards ← Automotive Square next station is Nari Road | |
| Side platform | Doors will open on the left | ||
| L2 | ||
Entry/Exit[edit | edit source]
This section is empty. You can help by adding to it. (August 2023) |
See also[edit | edit source]
References[edit | edit source]
- ↑ "PM Modi Inaugurates Nagpur Metro, Flags Off 6th Vande Bharat Train". NDTV.com. Retrieved 12 August 2023.
- ↑ "PM Modi to launch remaining routes in Nagpur Metro phase-I on December 11". The Indian Express. 5 December 2022. Retrieved 12 August 2023.
- ↑ "PM Modi inaugurates Phase-I of Nagpur Metro, takes a ride". Business Today. 11 December 2022. Retrieved 12 August 2023.