Kadvi Square metro station
Kadvi Square is an elevated metro station on the North-South Corridor of the Orange Line of Nagpur Metro in Nagpur, India.[1] This metro station was inaugurated on 11 December 2022 by Prime Minister Narendra Modi and was opened to the public on 12 December 2022.[2][3]
Kadvi Square | |||||
---|---|---|---|---|---|
Template:Nagpur Metro Infobox station line | |||||
Location | Dobi Nagar, Nagpur, Maharashtra 440014 | ||||
Coordinates | 21°10′07″N 79°05′33″E / 21.16860°N 79.09240°ECoordinates: 21°10′07″N 79°05′33″E / 21.16860°N 79.09240°E | ||||
Owned by | Maharashtra Metro Rail Corporation Limited (MAHA-METRO) | ||||
Operated by | Nagpur Metro | ||||
Line(s) | Template:Rcb | ||||
Platforms | Side platform Platform-1 → Automative Square Platform-2 → Khapri | ||||
Tracks | 2 | ||||
Construction | |||||
Structure type | Elevated, Double track | ||||
Platform levels | 2 | ||||
Disabled access | Yes ![]() | ||||
Other information | |||||
Status | Operational | ||||
History | |||||
Opening | 12 December 2022 | ||||
Electrified | 750 V DC third rail | ||||
Services | |||||
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Nagpur Metro' not found. | |||||
| |||||
Location | |||||
Lua error in Module:Mapframe at line 764: attempt to index field 'wikibase' (a nil value). |
Station LayoutEdit
style="color:white;background:#Template:Rail color;text-align:center;padding:5px"| Kadvi Square track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
|
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 2 Southbound |
Towards → Khapri next station is Gaddi Godam Square | |
Platform 1 Northbound |
Towards ← Automotive Square next station is Indora Square | |
Side platform | Doors will open on the left | ||
L2 |
Entry/ExitEdit
This section is empty. You can help by adding to it. (August 2023) |
See alsoEdit
ReferencesEdit
- ↑ "PM Modi Inaugurates Nagpur Metro, Flags Off 6th Vande Bharat Train". NDTV.com. Retrieved 12 August 2023.
- ↑ "PM Modi to launch remaining routes in Nagpur Metro phase-I on December 11". The Indian Express. 5 December 2022. Retrieved 12 August 2023.
- ↑ "PM Modi inaugurates Phase-I of Nagpur Metro, takes a ride". Business Today. 11 December 2022. Retrieved 12 August 2023.