Andheri (West) अंधेरी (पश्चिम) | |||||
|---|---|---|---|---|---|
![]() Andheri (West) metro station as seen from New Link Rd | |||||
| Location | Sahakar Nagar, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053 | ||||
| Coordinates | 19°07′45″N 72°49′53″E / 19.1291337°N 72.8314307°E | ||||
| Owned by | |||||
| Operated by | File:Mumbai Metro Line 1 logo.png Maha Mumbai Metro Operation Corporation Ltd. | ||||
| Line(s) | Lua error: expandTemplate: template "Mumbai Metro color" does not exist. | ||||
| Platforms | 2 side platforms | ||||
| Connections | |||||
| Construction | |||||
| Structure type | Elevated | ||||
| Parking | No | ||||
| Other information | |||||
| Station code | <span style="background-color:#Lua error: expandTemplate: template "Mumbai Metro color" does not exist.; color:#000">217 | ||||
| History | |||||
| Opened | 19 January 2023 | ||||
| Passengers | |||||
| 2023 | 18,500 daily[1] | ||||
| Services | |||||
|
Template:Adjstn | |||||
| |||||
| Location | |||||
<mapframe>: The JSON content is not valid GeoJSON+simplestyle. The list below shows all attempts to interpret it according to the JSON Schema. Not all are errors.
| |||||
Andheri (West) is the elevated southern terminal station on the north–south corridor of the Yellow Line 2A of the Mumbai Metro in Mumbai, India. This station is located in Andheri, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 19 January 2023.[2][3]
History[edit | edit source]
It was opened to the public on 19 January 2023, along with the second phase of Line 2A.[4][5]
Station layout[edit | edit source]
| 2nd Floor | ||
| <span style=background-color:#Lua error: expandTemplate: template "Mumbai Metro color" does not exist.>Platform 1 | towards
(Lower Oshiwara) → | |
| <span style=background-color:#Lua error: expandTemplate: template "Mumbai Metro color" does not exist.>Platform 2 | Alighting only | |
| 1st Floor | Mezzanine | Fare control, station agent, Metro QR ticket vending machines, crossover, walkway to <span style="background-color:#Lua error: expandTemplate: template "Mumbai Metro color" does not exist.; border:0.1em solid #Lua error: expandTemplate: template "Mumbai Metro color" does not exist.;"> 1 |
| Ground | Street level | Exit/Entrance |
Power and signaling system[edit | edit source]
Like all other stations and railways of Mumbai metro, Andheri West station also uses 25,000 volt AC power system by overhead catenary to operate the trains.
References[edit | edit source]
- ↑ "Metro-7, 2A make in-roads as ridership crosses 3 crore mark". Hindustan Times. 12 June 2023. Archived from the original on 9 July 2023. Retrieved 9 July 2023.
- ↑ "Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here". DNA India. Archived from the original on 18 April 2023. Retrieved 18 April 2023.
- ↑ "Mumbai Metro: These 2 lines to get operational today. Check route, other details". mint. 19 January 2023. Archived from the original on 18 April 2023. Retrieved 18 April 2023.
- ↑ "Mumbai: Phase 1 of Metro Line 2A and 7 opened for public". The Indian Express. 3 April 2022. Retrieved 9 July 2023.
- ↑ "Mumbai Metro: These 2 lines to get operational today. Check route, other details". mint. 19 January 2023. Retrieved 18 April 2023.
