Created by BanglaBlog
Last edited March 26, 2026


Aarey JVLR

आरे जे.वी.एल.आर.
The station exterior
LocationGanesh Nagar, Goregaon, Mumbai, Maharashtra 400065
Coordinates19°07′51″N 72°53′04″E / 19.130699°N 72.884309°E / 19.130699; 72.884309
Owned by Mumbai Metro Rail Corporation Ltd.
Operated by Delhi Metro Rail Corporation[1]
Line(s)Template:Rcb
Platforms1 side platform, 1 island platform[2]
ConnectionsFile:Mumbai Metro Line 1 logo.png Template:Rcb at Template:Stl (Under–construction)
Construction
Structure typeAt-grade
Parking(TBC)
Other information
StatusStaffed, Operational
Station codeARYJ
History
Opened5 October 2024; 21 months ago (2024-10-05)
Services
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Mumbai Metro' not found.
Location
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).

Aarey JVLR is an At-Grade terminal metro station serving the Ganesh Nagar neighbourhood of Goregaon on the north–south corridor of the Aqua Line 3 of Mumbai Metro in Mumbai, India.

This metro station was inaugurated on October 5, 2024, by Prime Minister Narendra Modi, followed by the commencement of the metro service from October 7, 2024.[3][4][5][6]

Station layout[edit | edit source]

Platforms 1, 2 and 3 are located at ground level. One platform is designated for boarding, while the others are designated for alighting.

style="color:white;background:#Template:Rail color;text-align:center;padding:5px"|
Aarey JVLR track layout
P2 to Train Terminates Here **
P3 to Train Terminates Here **
Station with three tracks, one island and one side platforms
UG Subway Underground subway connecting Platforms 2 and 3 to Platform 1, providing access to exit A1/B1
G
Platforms
Depot Aarey Depot
Platform 3 Alighting only →
Island platform Disabled access
Platform 2 Alighting only →
Platform 1 ← Towards Template:Ltl (Template:Stl)
Side platform Disabled access
Exits Exit A1/B1

Connections[edit | edit source]

The Aarey JVLR station will provide connectivity to the under construction Metro line 6 via SEEPZ station.

Entry/Exit[edit | edit source]

See also[edit | edit source]

References[edit | edit source]

  1. "DMRC wins contract to operate Mumbai Metro's Line 3: Officials". The Economic Times. 12 April 2023. Retrieved 12 May 2025.
  2. 2.0 2.1 "Aarey JVLR Station Details". MMRCL. Retrieved 13 May 2025.
  3. "Mumbai Metro Line 3 Opens: Check Stations, Route, Fare, Timings And More". NDTV Profit. 7 October 2024. Retrieved 6 November 2024.
  4. "Mumbai Metro-3 Second Phase On Track: Aarey-BKC Services Begin, Link To Cuffe Parade May Be Ready by 2025". News18. Retrieved 6 November 2024.
  5. "Mumbai's first underground metro route 'line 3' opens for public today". The Times of India. 7 October 2024. ISSN 0971-8257. Retrieved 6 November 2024.
  6. "Mumbai's first underground metro line from Aarey to BKC now open for public – Check stations, timings, fares for Mumbai Metro Line 3 here". Financialexpress. 7 October 2024. Retrieved 6 November 2024.

External links[edit | edit source]