Created by CommonsDelinker
Last edited March 22, 2026


Purvanchal Expressway
<!-- No native name as per WP:NOINDICSCRIPTS -->
Route information
Maintained by Uttar Pradesh Expressways Industrial Development Authority (UPEIDA)
Length211.8 mi (340.8 km)
Existed16 November 2021–present
Major junctions
West endChand Saray village, Lucknow district
East endHaydaria village, NH-31, Ghazipur district
Highway system

Purvanchal Expressway<ref>"Purvanchal Expressway Inauguration Live Updates: पूर्वांचल एक्सप्रेस-वे की सौगात देकर बोले PM मोदी- सोचा नहीं था इस पर खुद विमान से उतरूंगा". Aaj Tak (in हिन्दी). Retrieved 16 November 2021.</ref> is a 340.8 km long, 6-lane wide (expandable to 8) access-controlled expressway in the state of Uttar Pradesh, India.<ref>"Purvanchal Expressway to be backbone of eastern UP economy: Yogi Adityanath". India Today. Press Trust of India. 13 November 2021. Retrieved 16 November 2021.</ref><ref name="foundation stone" /> The expressway connects Chand Saray village near Gosainganj in Lucknow district with Haydaria village on NH-31 in Ghazipur district. It is developed by the Uttar Pradesh Expressways Industrial Development Authority (UPEIDA). The Purvanchal Expressway has a 3.2&nbsp;km long airstrip at Akhalkiri Karwat village near Kurebhar in Sultanpur district for emergency landing of aircraft.<ref>"PM to inaugurate this UP expressway with an airstrip for fighter planes". The New Indian Express. 12 November 2021.</ref> The construction work was started by the UPEIDA on 10 October 2018 and was inaugurated and opened to the public on 16 November 2021.<ref>"आज 340 KM लंबे पूर्वांचल एक्सप्रेसवे का उद्घाटन करेंगे PM मोदी, देखें 100 खबरें". Aaj Tak (in हिन्दी). Retrieved 16 November 2021.</ref><ref>"सुल्तानपुर: प्रधानमंत्री 16 नवंबर को करेंगे पूर्वांचल एक्सप्रेस-वे का लोकार्पण, तैयारियों में जुटे अधिकारी". Amar Ujala (in हिन्दी). Retrieved 6 November 2021.</ref>

The project was announced and laid down by the then Chief Minister of Uttar Pradesh Akhilesh Yadav as Lucknow-Azamgarh-Ballia Samajwadi Purvanchal Expressway in May 2015.<ref>"UP CM lays foundation of Purvanchal expressway". India Today. 22 December 2016. Archived from the original on 26 December 2016.</ref><ref>"UP CM lays foundation of Samajwadi Purvanchal Expressway". The Times of India. 22 December 2016.</ref> Later, route was changed to Lucknow-Azamgarh-Ghazipur by the Yogi Adityanath government, and upon acquisition of around 95% of required land, foundation stone of Purvanchal Expressway was laid on 14 July 2018 by Prime Minister Narendra Modi.<ref>"PM Narendra Modi to lay foundation stone for India's longest Purvanchal Expressway in UP's Azamgarh". DNA India. 14 July 2018.</ref><ref>"PM Modi lays foundation stone of 340 km long Purvanchal Expressway". The Indian Express. 14 July 2018.</ref><ref>"PM lays foundation stone for Purvanchal Expressway in Azamgarh". The Times of India. 15 July 2018.</ref><ref name="PIB foundation">"PM lays Foundation Stone for Purvanchal Expressway in Azamgarh". Press Information Bureau. 14 July 2018.</ref><ref>"Purvanchal Expressway to take UP to great heights: PM Modi". ANI News. 14 July 2018.</ref><ref>"PM Modi lays foundation stone of 340 km-long Purvanchal Expressway". DD News. 15 July 2018.</ref> With a total project value of 22,494 crore, including the land acquisition cost, the Expressway was India's longest expressway at the time of completion.<ref>"22,500 करोड़ की लागत, 341 KM लंबाई, पूर्वांचल एक्सप्रेस-वे का उद्घाटन आज". Aaj Tak (in हिन्दी). Retrieved 16 November 2021.</ref><ref>"Details of Purvanchal Expressway project and updated status". UPEIDA. Retrieved 31 May 2021.</ref>

The expressway is to be linked with VaranasiAzamgarh highway through a separate link road. UPEIDA is also constructing the Gorakhpur Link Expressway, which will connect Jaitpur village in Gorakhpur district with Purvanchal Expressway at Salarpur village in Azamgarh district. Upon the completion of 17 km long, 4-lane wide Buxar–Ghazipur Elevated Road (Bharauli near Buxar to Haydaria in Ghazipur), Lucknow in Uttar Pradesh will be directly connected to Buxar, Arrah and Patna in Bihar by Purvanchal Expressway and NH-922.<ref>"Nitish Kumar urges Centre to extend Purvanchal Expressway till Buxar". Business Standard. 21 September 2020.</ref><ref>"Bihar: New Koilwar Bridge may open for traffic this month". Times of India. 5 September 2020.</ref>

5 industrial corridors will be set up alongside Purvanchal Expressway. As on Nov., 2023, the land has been identified and process for bainama is underway. In Ghazipur district, 25% bainama of land has been done till May, 2024.<ref>"Purvanchal Expressway - Route, Map, Toll Rates, Connectivity, News and Latest Updates - Infra Info Hub". 23 May 2025. Retrieved 30 May 2025.</ref>

In Ghazipur IMLC, 83.89% of Proposed Land has been acquired as on 24.02.2026.[1]

Route

The Purvanchal Expressway connects Chand Saray village near Gosainganj in Lucknow district with Haydaria village on MohammadabadBuxar highway (NH-31) in Ghazipur district. It passes through 9 districts of Uttar Pradesh i.e. (from west to east) Lucknow, Barabanki, Amethi, Sultanpur, Ayodhya, Ambedkar Nagar, Azamgarh, Mau and Ghazipur.<ref>"Purvanchal Expressway - Route, Map, Toll Rates, Connectivity, News and Latest Updates - Infra Info Hub". 23 May 2025. Retrieved 23 May 2025.</ref>

Entry/ Exits

The following entry/exit points are present in the expressway:<ref>"Traffic, Toll & Financial Studies - Purvanchal Expressway" (PDF). UPEIDA. 7 May 2018. Retrieved 1 June 2021.</ref>

Chainage Intersecting Road No Details of the Intersecting Road Project Structure
<nowiki>-0+270</nowiki> NH 56 (NH731) National Highway NH56/731 Trumpet Interchange
36+870 SH 13 Haidergarh - Barabanki Road Slip Roads with toll booth
58+380 SH 31 Inhauna - Rudauli Road Slip Roads with toll booth
81+900 SH 15 Raebareli - Faizabad Road Interchange with Toll Plaza
121+860 SH 9 Sultanpur - Faizabad Road Interchange with Toll Plaza
138+150 NH 232 (NH-128) Sultanpur - Akbarpur Road Interchange with Toll Plaza
161 MDR 113E Akbarpur - Dostpur Road slip Roads with Toll booth
182+360 SH 5 Akbarpur - Jaunpur Road Slip Roads with toll booth
191 TRUMPET INTERCHANGE Gorakhpur Link Expressway ENTRY AND EXIT POINT
203 SH 124 AHIRAULA-BUDHANPUR ROAD SLIPS ROAD WITH TOLL BOOTH
234+650 NH 233 (NH-28) Azamgarh - Tanda Road Interchange with Toll Plaza
253+850 SH 34 Azamgarh - Mau Road Slip Roads with toll booth
294+200 SH 34 Mau - Ghazipur Road Interchange with Toll Plaza
329+500 Ballia Link Ballia Link Road (future) Slip Roads with toll booth
340+500 NH 19 (NH-31) National Highway Road NH19 Trumpet Interchange

Construction

The UPEIDA divided the construction work of 340.8&nbsp;km long Purvanchal Expressway into 8 packages, which were awarded to 5 different contractors.<ref name="Tender" /> The design work was done by Egis India Consulting Engineers (Package 1 to 4) and Ayesa India (Package 5 to 8).

22 Flyovers, 7 Railway-over-bridges (ROB), 7 major bridges, 114 minor bridges, 6 Toll Plazas, 45 vehicular-underpasses (VUP), 139 Light VUP, 87 pedestrian underpass and 525 Box culverts has been constructed.<ref>"Details of Purvanchal Expressway by Project Monitoring Group (PMG)" (PDF). UPEIDA. Retrieved 4 August 2021.</ref> Total construction cost (excluding the cost of Land) is around 11,216 crores.

Following is the list of contractors:

Sr. No. Package Length in km Contractor
1. Chand Saray (Lucknow)–Sansara (Barabanki) 40.4 Gayatri Projects<ref>"Gayatri Projects Ltd bags Rs 2,759 crores worth road projects in UP". The Economic Times. 20 July 2018.</ref>
2. Sansara (Barabanki)–Jarai Kalan (Amethi) 39.7 Gayatri Projects
3. Jarai Kalan (Amethi)–Siddhi Ganeshpur (Sultanpur) 41.7 Apco Infratech
4. Siddhi Ganeshpur (Sultanpur)–Sansarpur (Sultanpur) 42.7 GR Infraprojects
5. Sansarpur (Sultanpur)–Govindpur (Azamgarh) 54.0 PNC Infratech<ref>"PNC Infratech bags 2 EPC packages of Purvanchal Expressway for Rs 2,520 crores". Business Standard. 9 July 2018.</ref>
6. Govindpur (Azamgarh)–Mojrapur (Azamgarh) 28.2 PNC Infratech
7. Mojrapur (Azamgarh)–Bijaura (Ghazipur) 46.0 GR Infraprojects
8. Bijaura (Ghazipur)–Haydaria (Ghazipur) 48.0 Oriental Structural Engineers

Inauguration

Prime Minister Narendra Modi arrived at the inauguration site in the C-130 Hercules and later touch and go exercise was also performed on the expressway by the Indian Air Force (IAF).<ref>"पूर्वांचल एक्सप्रेस वे: हरक्यूलिस प्लेन पर सवार होकर उद्घाटन करने पहुंचेंगे मोदी, देखें प्लान". Aaj Tak (in हिन्दी). Retrieved 16 November 2021.</ref><ref>"अब यूपी के पूर्वांचल एक्सप्रेसवे पर उतरेंगे लड़ाकू विमान, 'टच एंड गो' के लिए पहुंचे 3 फाइटर जेट". Aaj Tak (in हिन्दी). 12 November 2021. Retrieved 16 November 2021.</ref> Indian Air Force fighter jets performed the 'touch and go' operation, under which 30 fighter planes touched the Purvanchal expressway airstrip and then took off. Fighter jets including Mirage 2000, AN-32, Jaguar, and Sukhoi performed touch and go operations and showcased a landing on the expressway. The Indian aircraft showcased tricolor in the sky.<ref>"Video: पूर्वांचल एक्सप्रेस-वे का उद्घाटन, आसमान में फाइटर प्लेन का शक्ति‍ प्रदर्शन". Aaj Tak (in हिन्दी). Retrieved 16 November 2021.</ref>

Delhi–Lucknow–Patna connectivity

The Purvanchal Expressway is a part of Government of Uttar Pradesh's initiative to connect Lucknow with Ghazipur in order to improve transportation facilities and trade & commerce activities in East UP and Bihar.<ref>"Government committed to improving the road network in Bihar". Times of India. 1 September 2019.</ref><ref>"Highway projects worth Rs 30,000 crores underway in Bihar: Nitin Gadkari". HT Mint. 10 December 2020.</ref> Upon the completion of 4-lane wide Buxar–Ghazipur Elevated Road (Bharauli near Buxar to Haydaria in Ghazipur), people can also travel from New Delhi to Patna in Bihar via Agra and Lucknow in Uttar Pradesh by using following route:

Sr. No. Name of Road from to Distance in km
1 DND Flyway New Delhi Noida 6.0
2 Noida–Greater Noida Expressway Noida Greater Noida 24.5
3 Yamuna Expressway Greater Noida Agra 165.5
4 Agra Ring Road Kuberpur (Agra) Hingot Kheria (Agra) ~10
5 Agra–Lucknow Expressway Agra Lucknow 302.2
6 Lucknow Ring Road Sarosa Bharosa (Lucknow) Chand Saray (Lucknow) 40
7 Purvanchal Expressway Lucknow Ghazipur 340.8
8 Ghazipur–Buxar Elevated Road Ghazipur Buxar 17.0
9 Buxar–Arrah–Patna (NH-922) (Including the entire stretch of the upcoming Danapur-Bihta Elevated Road) Buxar Patna 125.0

Note: Union Minister Nitin Gadkari announced on 28 August 2021 that the Government of India will construct GhazipurArrahPatna Expressway at an event in Arrah, Bihar.<ref>"Ghazipur-Arrah-Patna Greenfield Expressway soon: Nitin Gadkari". The Times of India. 29 August 2021.</ref><ref>"Arrah to be connected by Ghazipur-Patna Greenfield Expressway". Hindustan. 29 August 2021.</ref>

Status updates

Controversies and Criticism

The first seasonal rains in October 2022 caused wide stretches of road caving deep in, some extending to even 15 feet deep. Accidents were reported at several places, with multiple injuries and damage to numerous cars garnering significant coverage in media. The much proclaimed dream project of Yogi Adityanath, built over a whopping 22000 crore expense by the Yogi government and inaugurated by Prime Minister Narendra Modi in November 2021, faced subsequent backlash and criticism for the alleged irregularities and corruption in construction of the expressway which couldn't withstand the first few hours of rain within a year following its inauguration.<ref>"15 feet pothole in Purvanchal Expressway". Aaj Tak. 22 October 2022.</ref><ref>"Purvanchal Expressway collapses". NBT. 7 October 2022.</ref><ref>"Purvanchal Expressway road cave-in". Hindustan. 7 October 2022.</ref><ref>"Purvanchal Expressway caves in within one year of inauguration". Jansatta. 7 October 2022.</ref><ref>"Potholes in rain on Purvanchal Expressway". Aaj Tak. 7 October 2022.</ref><ref>"Many injured after getting stuck in potholes at Purvanchal Expressway". Jagran. 8 October 2022.</ref><ref>"Portion of expressway caves in at Sultanpur". The Indian Express. 7 October 2022.</ref><ref>"Portion of Purvanchal Expressway caves in, Opposition attacks". Times Now. 7 October 2022.</ref>

See also

References

External links