Nilgiri-class frigate (2019): Difference between revisions

Created by Prin'ce du Royaume des Ténèbres
Last edited March 22, 2026
robot: Create/update articles. If there is a mistake please report on my talk page.
improved article
 
Line 3: Line 3:
{{EngvarB|date=March 2014}}
{{EngvarB|date=March 2014}}
{{Use dmy dates|date=July 2022}}
{{Use dmy dates|date=July 2022}}
{|{{Infobox ship begin}}
{{Infobox ship
{{Infobox ship image
|section1={{Infobox ship/image
| image = P17A design 2.png
| image = INS Nilgiri (F33), Himgiri (F34) and Udaygiri (F35) sailing in unison.jpg
| Ship caption = An animated rendering of the ''Nilgiri''-class frigate.
| image_caption = INS ''Nilgiri'' (F33), ''Himgiri'' (F34) and ''Udaygiri'' (F35) sailing in formation
}}
 
|section2={{Infobox ship/class overview
| name = ''Nilgiri'' class
| builders = *[[Garden Reach Shipbuilders & Engineers]] (GRSE)
              *[[Mazagon Dock Limited]] (MDL)
| operators = {{navy|India}}
| class_before = {{sclass|Shivalik|frigate|4}}
| class_after = {{sclass2|Project 17B|frigate|4}}
| subclasses =
| cost = *{{INRConvert|4000|c|year=2020|lk=on}} per frigate (Estimated)<ref>{{Cite web|url=https://www.indiastrategic.in/keel-laid-for-the-third-project-17-stealth-frigate/|title=Keel laid for the third Project 17 stealth frigate|website=indiastrategic.in|date=September 2020|access-date=13 February 2022|archive-date=3 February 2022|archive-url=https://web.archive.org/web/20220203065528/https://www.indiastrategic.in/keel-laid-for-the-third-project-17-stealth-frigate/|url-status=dead}}</ref>
          *{{INRConvert|45000|c|year=2020}} (Total deal)<ref name=iex>{{cite web |url=http://www.indianexpress.com/news/Navy-seals-45-000-cr-deal--seven-warships/479132 |title=Navy seals 45,000-cr deal: seven warships |work=The Indian Express |date=20 June 2009 |access-date=21 February 2015 |url-status=live |archive-url=https://web.archive.org/web/20110115032307/http://www.indianexpress.com/news/Navy-seals-45-000-cr-deal--seven-warships/479132 |archive-date=15 January 2011 }}</ref>
| built_range = 2017 – ''present''
| in_service_range =
| in_commission_range = 2025 – ''present''
| total_ships_building = 2
| total_ships_planned = 7
| total_ships_completed = 5
| total_ships_canceled =
| total_ships_active = 3
| total_ships_retired =
| total_ships_preserved =
}}
 
|section3={{Infobox ship/characteristics
| hide_header =
| header_caption =
| class =
| type = [[Guided-missile frigate]]
| tonnage =
| displacement = {{cvt|6670|t|LT|lk=on}}
| length = {{convert|149|m|ftin|abbr=on}}
| beam = {{convert|17.8|m|ftin|abbr=on}}
| height =
| draught =
| draft = {{convert|5.22|m|ftin|abbr=on}}
| depth = {{convert|9.9|m|ftin|abbr=on}}
| hold_depth =
| decks =
| deck_clearance =
| ramps =
| ice_class =
| power = *2 × [[Hindustan Aeronautics Limited|HAL]] - [[General Electric LM2500]]+ (30,200 kW each)
          *2 × [[MAN Diesel]] 12V28/33D STC (6,000 kW each)
| propulsion = [[Combined diesel or gas|CODOG]]<ref>{{Cite web|url=https://www.pib.gov.in/PressReleseDetail.aspx?PRID=2160573&reg=3&lang=1|title = Nilgiri-Class (Project 17A) Guided-Missile Frigates, India|website=pib.gov.in}}</ref>
| sail_plan =
| speed = {{cvt|32|kn|km/h}}
| range = *{{cvt|2500|nmi|km}} at {{cvt|28|kn|km/h}}
          *{{cvt|5500|nmi|km}} at {{cvt|16|–|18|kn|km/h}}
| endurance =
| test_depth =
| boats = 2 × [[Rigid inflatable boat|RHIB]]
| capacity =
| troops =
| complement = 226 (35 officers + 191 sailors)
| time_to_activate =
| sensors = *'''Radar :-'''
            *[[Israel Aerospace Industries|IAI]] - [[Bharat Electronics Limited|BEL]] [[EL/M-2248 MF-STAR]] [[S band|S-Band]] [[Active Electronically Scanned Array|AESA]] [[radar]]
            * [[Indra Sistemas|Indra]] - [[Tata Advanced Systems|TASL]] [[:es:Radar LANZA|Lanza-N]] [[L-band]] air surveillance radar
            *'''Sonar :-'''
            *[[Bharat Electronics|BEL]] HUMSA-NG active/passive [[sonar]]
            *'''Combat Suite :-'''
            *"Combat Management System" (CMS-17A)
| EW = * [[DRDO]] "Shakti" [[Electronic warfare|EW suite]]<ref>{{cite news |title=Prime Minister to Formally Handover DRDO Designed and Developed Advanced Electronic Warfare Suite ‘Shakti’ for Indian Naval Ships to Chief of Naval Staff |url=https://pib.gov.in/Pressreleaseshare.aspx?PRID=1773020 |access-date=14 February 2025 |agency=Ministry of Defence, Government of India |publisher=Press Information Bureau |date=18 November 2021}}</ref> (equipped with [[Electronic warfare support measures|ESM]]/[[Electronic countermeasure|ECM]] and "Radar Finger Printing System" (RFPS))
        *'''Decoys :-'''
        *4 × [[Kavach (anti-missile system)|Kavach]] decoy launchers
        *2 × [[Maareech ATDS|NSTL Maareech]] [[Torpedo defence|torpedo-countermeasure]] systems
| armament = *'''Anti-air warfare :-'''
              *4 × 8-cell [[Vertical launching system|VLS]], for 32 [[Barak 8]] [[surface-to-air missile]]s
              *'''Anti-surface warfare :-'''
              *1 × 8-cell [[Vertical launching system|VLS]], for 8 [[BrahMos]] [[anti-ship missile]]s
              *'''Anti-submarine warfare :-'''
              *2 × [[Torpedo tube|triple-tube torpedo launchers]] for [[Torpedo Advanced Light Shyena]]
              *2 × [[RBU-6000]] [[Anti-submarine weapon|anti-submarine rocket launchers]] (72 rockets)
              *'''Guns :-'''
              *1 × [[BHEL]] - [[OTO Melara 76 mm]] [[OTO Melara 76 mm#Strales System|Strales]] [[Naval artillery|naval gun]]
              *2 × [[AK-630]]M [[Close-in weapon system|CIWS]]
              *Multiple [[Ordnance Factory Tiruchirappalli|OFT]] 12.7 mm M2 [[Remote controlled weapon station|Stabilized Remote Controlled Gun]]
| armour =
| armor =
| aircraft = 1 × [[HAL Dhruv]] (or) [[Westland Sea King|Sea King Mk. 42B]] helicopters
| aircraft_facilities = Enclosed helicopter [[hangar]] capable of accommodating one multi-role helicopters.
| notes = First major class of Indian-designed warships to be built using [[Modular building|integrated modular construction]].<ref>{{Cite web|url=https://www.shephardmedia.com/news/naval-warfare/indian-project-17a-frigate-programme-moves-forward/|title=Indian Project 17A frigate programme moves forward|website=shephardmedia.com|date=3 October 2019}}</ref>
}}
}}
}}
{{Infobox ship class overview
| Name = ''Nilgiri'' class
| Builders = *[[Garden Reach Shipbuilders & Engineers]] (GRSE)
*[[Mazagon Dock Limited]] (MDL)
| Operators = {{navy|India}}
| Class before = {{sclass|Shivalik|frigate|4}}
| Subclasses =
| Cost = *{{INRConvert|4000|c|year=2020|lk=on}} per frigate (Estimated)<ref>{{Cite web|url=https://www.indiastrategic.in/keel-laid-for-the-third-project-17-stealth-frigate/|title=Keel laid for the third Project 17 stealth frigate|website=indiastrategic.in|date=September 2020}}</ref>
*{{INRConvert|45000|c|year=2020}} (Total deal)<ref name=iex>{{cite web |url=http://www.indianexpress.com/news/Navy-seals-45-000-cr-deal--seven-warships/479132 |title=Navy seals 45,000-cr deal: seven warships |work=The Indian Express |date=20 June 2009 |access-date=21 February 2015 |url-status=live |archive-url=https://web.archive.org/web/20110115032307/http://www.indianexpress.com/news/Navy-seals-45-000-cr-deal--seven-warships/479132 |archive-date=15 January 2011 }}</ref>
| Built range =
| In service range =
| In commission range =
| Total ships building = 7
| Total ships planned = 7
| Total ships completed =
| Total ships cancelled =
| Total ships active = 0
| Total ships laid up =
| Total ships lost =
| Total ships retired =
| Total ships preserved =
}}
{{Infobox ship characteristics
| Hide header =
| Header caption =
| Ship class =
| Ship type = [[Guided-missile frigate]]
| Ship tonnage =
| Ship displacement = {{cvt|6670|t|LT|lk=on}}
| Ship length = {{convert|149|m|ftin|abbr=on}}
| Ship beam = {{convert|17.8|m|ftin|abbr=on}}
| Ship height =
| Ship draught =
| Ship draft = {{convert|5.22|m|ftin|abbr=on}}
| Ship depth = {{convert|9.9|m|ftin|abbr=on}}
| Ship hold depth =
| Ship decks =
| Ship deck clearance =
| Ship ramps =
| Ship ice class =
| Ship power = *2 x [[MAN Diesel]] 12V28/33D STC (6000 kW each)
*2 x [[General Electric LM2500]]
| Ship propulsion = [[Combined diesel and gas|CODAG]]<ref>{{Cite web|url=https://www.naval-technology.com/projects/nilgiri-class-project-17a-frigates/|title = Nilgiri-Class (Project 17A) Guided-Missile Frigates, India|website=Naval-technology.com}}</ref>
| Ship sail plan =
| Ship speed = {{cvt|32|kn|km/h}}
| Ship range = *{{cvt|2500|nmi|km}} at {{cvt|28|kn|km/h}}
*{{cvt|5500|nmi|km}} at {{cvt|16|–|18|kn|km/h}}
| Ship endurance =
| Ship test depth =
| Ship boats = 2 x [[Rigid inflatable boat|RHIB]]
| Ship capacity =
| Ship troops =
| Ship complement = 226 (Including 35 officers)
| Ship time to activate =
| Ship sensors = *'''Radar :-'''
*[[Israel Aerospace Industries|IAI]] [[EL/M-2248 MF-STAR]] [[S band|S-Band]] [[Active Electronically Scanned Array|AESA]] [[radar]]
*[[Indra Sistemas|Indra LTR-25 'Lanza']] [[L band|L-Band]] [[surface-search radar]]
*'''Sonar :-'''
*[[Bharat Electronics|BEL]] HUMSA-NG active/passive [[sonar]]
*'''Combat Suite :-'''
*"Combat Management System" (CMS-17A)
| Ship EW = * [[Defence Research and Development Organisation|DRDO]] "Shakti" [[Electronic warfare|EW suite]] (equipped with [[Electronic warfare support measures|ESM]]/[[Electronic countermeasure|ECM]] and "Radar Finger Printing System" (RFPS))
*'''Decoys :-'''
*4 x [[Kavach (anti-missile system)|Kavach]] decoy launchers
*2 x [[Maareech ATDS|NSTL Maareech]] [[Torpedo defence|torpedo-countermeasure]] systems
| Ship armament = *'''Anti-air warfare :-'''
*4 × 8-cell [[Vertical launching system|VLS]], for 32 [[Barak 8]]ER [[surface-to-air missile]]s
*'''Anti-surface warfare :-'''
*1 x 8-cell [[Vertical launching system|VLS]], for 8 [[BrahMos]] [[anti-ship missile]]s
*'''Anti-submarine warfare :-'''
*2 × [[Torpedo tube|triple-tube torpedo launchers]] [[Varunastra (torpedo)|Varunastra]]
*2 × [[RBU-6000]] [[Anti-submarine weapon|anti-submarine rocket launchers]] (72 rockets)
*'''Guns :-'''
*1 × [[OTO Melara 76 mm]] [[Naval artillery|naval gun]]
*2 × [[AK-630]]M [[Close-in weapon system|CIWS]]
| Ship armour =
| Ship armor =
| Ship aircraft = 2 × [[HAL Dhruv]] (or) [[Westland Sea King|Sea King Mk. 42B]] helicopters
| Ship aircraft facilities = Enclosed helicopter [[hangar]] capable of accommodating two multi-role helicopters.
| Ship notes = First major class of Indian-designed warships to be built using [[Modular building|integrated modular construction]].<ref>{{Cite web|url=https://www.shephardmedia.com/news/naval-warfare/indian-project-17a-frigate-programme-moves-forward/|title=Indian Project 17A frigate programme moves forward|website=shephardmedia.com|date=3 October 2019}}</ref>
}}
|}


The '''''Nilgiri''-class frigates''', formally classified as the '''Project-17 Alpha frigates (P-17A)''', are a series of stealth [[Frigate|guided-missile frigates]] currently being built by [[Mazagon Dock Shipbuilders]] (MDL) and [[Garden Reach Shipbuilders & Engineers]] (GRSE), for the [[Indian Navy]].<ref>{{Cite web|url=https://mazagondock.in/Naval-Ships.aspx|title=Mazagon Dock Shipbuilders Limited – Products – Naval Ships|website=mazagondock.in}}</ref><ref>{{Cite web|url=http://grse.in/index.php/product-profile/shipbuilding/2-uncategorised/81-frigate.html|title=Garden Reach Shipbuilders & Engineers Ltd. – Product Profile – Frigate|website=grse.in}}</ref>
The '''''Nilgiri''-class frigates''', formally classified as the '''Project-17 Alpha frigates (P-17A)''', are a series of multi-mission<ref>{{Cite tweet |number=1964948002595840027 |user=IN_HQENC |title=Multi-Mission stealth frigates... |date=2025-09-08 |access-date=2025-09-09}}</ref> stealth [[Frigate|guided-missile frigates]] currently being built by [[Mazagon Dock Shipbuilders]] (MDL) and [[Garden Reach Shipbuilders & Engineers]] (GRSE) for the [[Indian Navy]] (IN).<ref name="MDL">{{Cite web|url=https://mazagondock.in/Naval-Ships.aspx|title=Mazagon Dock Shipbuilders Limited – Products – Naval Ships|website=mazagondock.in}}</ref><ref name="GRSE">{{Cite web|url=http://grse.in/index.php/product-profile/shipbuilding/2-uncategorised/81-frigate.html|title=Garden Reach Shipbuilders & Engineers Ltd. – Product Profile – Frigate|website=grse.in}}</ref>
 
Designed by the [[Indian Navy|Warship Design Bureau]], the class is intended to serve as a complement to the currently-serving {{sclass|Shivalik|frigate|1}}s (P-17) with improved design portfolios, such as low [[radar cross-section]] (RCS) and reduced [[infrared signature]].<ref>{{Cite web|url=https://pib.gov.in/PressReleasePage.aspx?PRID=1948340|title=LAUNCH OF Y3024 (VINDHYAGIRI) ON 17 AUGUST 2023|website=pib.gov.in|date=13 August 2023}}</ref><ref name="ForceIndia.com">{{cite web|url=http://www.forceindia.net/NovFeatureReport7.aspx|title=CCNS finally kickstarts Indian Navy's Project 17A|last=Sengupta|first=Prasan K.|date=September 2012|publisher=ForceIndia.com|archive-url=https://web.archive.org/web/20150218093318/http://www.forceindia.net/NovFeatureReport7.aspx|archive-date=18 February 2015|url-status=dead|access-date=21 February 2015}}</ref>
 
With a total of seven vessels, the construction of the frigates are currently divided between MDL and GRSE.<ref name="MDL"/><ref name="GRSE"/> As of 2024, all seven frigates have been launched and are intended to enter service with the IN between 2024 and 2027.<ref>{{cite magazine |last1=Mohanan |first1=Kalesh |title=Indigenous Warship Building |magazine=Indian Defence Review |date=April–June 2012 |volume=27 |issue=2 |url=http://www.indiandefencereview.com/spotlights/indigenous-warship-building/}}</ref> The frigates will form a part of the [[Eastern Fleet (India)|Eastern Fleet]] as well as the future [[Carrier battle group|Carrier Battle Group]] (CBG) of {{INS|Vikrant|2013|6}}.<ref name="delh-rebase">{{cite web |last=Bhattacharjee |first=Sumit |date=2021-12-04 |title=Eastern Fleet will have Carrier Battle Group: Vice Admiral |url=https://www.thehindu.com/news/national/andhra-pradesh/eastern-fleet-will-have-carrier-battle-group-vice-admiral/article37833874.ece/ |work=The Hindu}}</ref><ref>{{Cite news |last= |first= |date=2025-06-22 |title=INS Nilgiri joins Eastern Naval Commamd in Visakhapatnam |url=https://www.thehindu.com/news/cities/Visakhapatnam/ins-nilgiri-joins-eastern-naval-commamd-in-visakhapatnam/article69724479.ece |access-date=2025-06-22 |work=The Hindu |language=en-IN |issn=0971-751X}}</ref>
 
Upon entering service, the class is to be complemented by an additional series of seven or eight frigates, under the codename the [[Project 17B-class frigate|Project-17B]] series.<ref name="P-17B">{{Cite news |last=Pubby |first=Manu |date=2024-07-18 |title=Mazagon, Garden Reach Shipbuilders lead race for Defence Ministry's ₹70,000 crore warships order |url=https://economictimes.indiatimes.com/news/defence/defence-ministry-set-to-clear-70000-crore-frigates-order/articleshow/111817259.cms |access-date=2024-08-26 |work=The Economic Times |issn=0013-0389}}</ref><ref name="Follow">{{Cite web |last=Menon |first=Adithya Krishna |date=2023-08-13 |title=India Proceeds with New Submarines, Surface Ships Development |url=https://www.navalnews.com/naval-news/2023/08/india-proceeds-with-new-submarines-surface-ships-development/ |access-date=2024-08-26 |website=Naval News |language=en-US}}</ref>


== Design ==
== Design ==
===Development===
===Development===
[[File:P17A design 1.png|thumb|left|An animated depiction of the ''Nilgiri''-class frigate, showing its [[Port and starboard|starboard]].]]
[[File:P17A design 1.png|thumb|left|An animated depiction of the ''Nilgiri''-class frigate, showing its [[Port and starboard|starboard]].]]
The [[frigate]]s were designed by the Warship Design Bureau ( formerly Directorate of Naval Design ) – an internal establishment within the [[Indian Navy]] responsible for designing [[warship]]s; the organisation is also distinguished for having contributed to the designing of numerous Indian warships, including {{INS|Vikrant|2013|6}} – India's first indigenously-designed [[aircraft carrier]], the {{sclass|Arihant|submarine|1}}s – India's first indigenously-designed [[Ballistic missile submarine|nuclear-powered ballistic missile submarines]] and the {{sclass|Shivalik|frigate|1}}s – India's first indigenously designed frigates equipped with [[stealth technology]].<ref>{{Cite web|url=https://www.naval-technology.com/projects/project-17-a-nilgiri-class-frigates/|title=Project 17-A Nilgiri-Class Frigates|website=naval-technology.com|date=10 October 2019}}</ref>
The [[frigate]]s were designed by the Warship Design Bureau (formerly Directorate of Naval Design).<ref>{{Cite web|url=https://www.naval-technology.com/projects/project-17-a-nilgiri-class-frigates/|title=Project 17-A Nilgiri-Class Frigates|website=naval-technology.com|date=10 October 2019}}</ref>
 
The class' design was finalised by the DND in 2013; it was later unveiled to the public in April 2018, when MDL displayed a scale model of the frigate at the DefExpo 2018 military exhibition, held at [[Chennai]], India.<ref>{{Cite web|url=https://www.c4defence.com/en/p-17a-frigate-unveiled/|title=P-17A Frigate Unveiled|website=c4defence.com|date=26 April 2018}}</ref> The P17A ships are geo-symmetrically larger by 4.54 % vis-à-vis P17, or the ''Shivalik''-class frigates,<ref name=":32">{{Cite web |date=2025-07-01 |title=Project 17A Indigenous Stealth Frigate Udaygiri delivered to Indian Navy |url=https://www.pib.gov.in/PressReleasePage.aspx?PRID=2141259 |access-date=2025-07-01 |website=[[Press Information Bureau]]}}</ref> and also features 75% indigenous content.<ref name=":9" />
 
On 5 September 2018, [[Mazagon Dock Shipbuilders]] (MDL) and [[Garden Reach Shipbuilders & Engineers]] (GRSE) awarded [[Bharat Electronics]] (BEL) with a {{INRConvert|9200|c|lk=on|year=2018}} contract to supply seven [[Barak 8]] LR-SAM air defence systems for ''Nilgiri''-class frigates. In October 2018, Bharat Electronics signed a $777 million deal with Israel Aerospace Industries to help fulfil the Barak-8 order.<ref>{{Cite web |date=2018-09-05 |title=BEL Order Book Crosses 50,000 Crore landmark |url=https://pib.gov.in/PressReleaseIframePage.aspx?PRID=1545019 |access-date=2025-01-06 |website=[[Press Information Bureau]]}}</ref><ref name="iai-bel-order2">{{cite news |last1=Dominguez |first1=Gabriel |date=24 October 2018 |title=IAI wins USD777 million contract to supply additional Barak-8 LRSAM systems for Indian Navy |url=https://www.janes.com/article/84016/iai-wins-usd777-million-contract-to-supply-additional-barak-8-lrsam-systems-for-indian-navy/ |url-status=live |archive-url=https://web.archive.org/web/20181024175410/https://www.janes.com/article/84016/iai-wins-usd777-million-contract-to-supply-additional-barak-8-lrsam-systems-for-indian-navy/ |archive-date=24 October 2018 |work=Jane's Defence Weekly}}</ref>


The class' design was finalised by the DND in 2013; it was later unveiled to the public in April 2018 – when MDL displayed a scale model of the frigate at the "DEXEXPO 2018" defense exhibition, held at [[Chennai]], [[Tamil Nadu]], India.<ref>{{Cite web|url=https://www.c4defence.com/en/p-17a-frigate-unveiled/|title=P-17A Frigate Unveiled|website=c4defence.com|date=26 April 2018}}</ref>
On 28 November 2023, [[Bharat Heavy Electricals Limited]] (BHEL) received a contract worth {{INRConvert|2956.89|c|lk=on|year=2023}} to manufacture 16 Upgraded [[OTO Melara 76 mm|Super Rapid Gun Mounts]] (SRGMs) or Strales Systems for in-service ships as well as the under construction ''Nilgiri''-class frigates.<ref>{{Cite news |date=2023-11-28 |title=Defence ministry inks Rs 2,956 cr contract with BHEL to procure 16 super rapid gun mount for Navy |url=https://economictimes.indiatimes.com/news/defence/defence-ministry-inks-rs-2956-cr-contract-with-bhel-to-procure-16-super-rapid-gun-mount-for-navy/articleshow/105570635.cms?from=mdr |access-date=2025-01-18 |work=The Economic Times |issn=0013-0389}}</ref><ref>{{Cite web |last=Staff |first=Naval News |date=2023-11-29 |title=India procures 16 Upgraded Super Rapid Naval Gun Systems for Indian Navy |url=https://www.navalnews.com/naval-news/2023/11/india-procures-16-upgraded-super-rapid-naval-gun-systems-for-indian-navy/ |access-date=2025-01-18 |website=Naval News |language=en-US}}</ref>
 
The state-owned firm [[Steel Authority of India Limited]] (SAIL) is supplying around 4,000 tonnes of steel for each of these ships. The steel is being manufactured in [[Bokaro Steel Plant|Bokaro]], [[Bhilai Steel Plant|Bhilai]], and [[Rourkela Steel Plant|Rourkela]] plants.<ref name=":9" />


=== Features ===
=== Features ===
Line 109: Line 123:


====Modular profile====
====Modular profile====
The P-17A frigates are the first major class of Indian-designed warships to be built using the methodology of [[Modular building|integrated modular construction]] – a manufacturing process in which multiple modules (or "blocks") of a vessel's hull are pre-assembled/pre-outfitted independently, before being aggregated for final assembly.<ref>{{Cite web|url=https://www.defenseworld.net/news/28535/Indian_Navy___s_Project_17A_Stealth_Frigate_Launched#.YgUKu-pBzIU|title=Indian Navy’s Project 17A Stealth Frigate Launched|website=defenseworld.net|date=14 December 2020}}</ref>
The P-17A frigates are the first major class of Indian-designed warships to be built using the methodology of [[Modular building|integrated modular construction]] – a manufacturing process in which multiple modules (or "blocks") of a vessel's hull are pre-assembled/pre-outfitted independently, before being aggregated for final assembly.<ref>{{Cite web|url=https://www.defenseworld.net/news/28535/Indian_Navy___s_Project_17A_Stealth_Frigate_Launched#.YgUKu-pBzIU|title=Indian Navy's Project 17A Stealth Frigate Launched|website=defenseworld.net|date=14 December 2020}}</ref>


In December 2015, MDL contracted [[Fincantieri S.p.A.]] to provide technical assistance and essential expertise in the construction of the seven frigates using the "modular construction" methodology.<ref>{{Cite web|url=https://www.fincantieri.com/en/media/press-releases/2015/000701/|title=Fincantieri To Collaborate with the Indian Shipyards MDL and GRSE for the Navy's Frigates|website=fincantieri.com|date=21 December 2015}}</ref><ref>{{Cite web|url=https://www.defenseworld.net/news/15673/Mazagon_Dock_Teams_Up_With_Italian_Fincantieri_To_Build_Stealth_Frigates_For_Indian_Navy#.YgUzHepBzIU|title=Mazagon Dock Teams Up With Italian Fincantieri To Build Stealth Frigates For Indian Navy|website=defenseworld.net|date=24 March 2016}}</ref>
In December 2015, MDL contracted [[Fincantieri S.p.A.]] to provide technical assistance and essential expertise in the construction of the seven frigates using the "modular construction" methodology.<ref>{{Cite web|url=https://www.fincantieri.com/en/media/press-releases/2015/000701/|title=Fincantieri To Collaborate with the Indian Shipyards MDL and GRSE for the Navy's Frigates|website=fincantieri.com|date=21 December 2015}}</ref><ref>{{Cite web|url=https://www.defenseworld.net/news/15673/Mazagon_Dock_Teams_Up_With_Italian_Fincantieri_To_Build_Stealth_Frigates_For_Indian_Navy#.YgUzHepBzIU|title=Mazagon Dock Teams Up With Italian Fincantieri To Build Stealth Frigates For Indian Navy|website=defenseworld.net|date=24 March 2016}}</ref>


=== Naming ===
=== Naming ===
The P-17A frigates were christened after the former-{{sclass|Nilgiri|frigate|1||1972}}s, which served in the Indian Navy between 1972 and 2013; the first six ships of the series were allotted the names utilised by the older class, namely – {{INS|Nilgiri|2019|2}}, {{INS|Himgiri|2020|2}}, ''Taragiri'', {{INS|Udaygiri|2022|2}}, ''Dunagiri'', and ''Vindhyagiri''.<ref>{{Cite web|url=https://www.theweek.in/wire-updates/national/2019/09/21/elx1-navy-frigate-name.html|title=Navy to name 7th frigate in P17A series as 'Mahendragiri'|website=theweek.in|date=4 April 2020}}</ref> The seventh and final vessel of the P-17A series, which did not have a namesake from the older class, was given the new name of ''Mahendragiri''.<ref>{{Cite web|url=https://economictimes.indiatimes.com/news/defence/indian-navy-to-name-7th-frigate-in-p17a-series-as-mahendragiri/articleshow/71235000.cms|title=Indian Navy to name 7th frigate in P17A series as 'Mahendragiri'|website=economictimes.indiatimes.com|date=23 September 2019}}</ref>
The P-17A frigates were named after the former-{{sclass|Nilgiri|frigate|1||1972}}s, which served in the IN between 1972 and 2013; the first six ships of the series were allotted the names utilised by the older class, namely – {{INS|Nilgiri|2019|2}}, {{INS|Himgiri|2020|2}}, {{INS|Taragiri|2022|2}}, {{INS|Udaygiri|2022|2}}, {{INS|Dunagiri|2022|2}}, and {{INS|Vindhyagiri|2023|2}}.<ref>{{Cite web|url=https://www.theweek.in/wire-updates/national/2019/09/21/elx1-navy-frigate-name.html|title=Navy to name 7th frigate in P17A series as 'Mahendragiri'|website=theweek.in|date=4 April 2020}}</ref> The seventh and final vessel of the P-17A series, which did not have a namesake from the older class, was given the new name of ''Mahendragiri''. The ships are given names of mountain ranges in India.<ref>{{Cite web|url=https://economictimes.indiatimes.com/news/defence/indian-navy-to-name-7th-frigate-in-p17a-series-as-mahendragiri/articleshow/71235000.cms|title=Indian Navy to name 7th frigate in P17A series as 'Mahendragiri'|website=economictimes.indiatimes.com|date=23 September 2019}}</ref>


== Instrumentation ==
== Instrumentation ==
===Armament===
===Armament===
====Anti-surface warfare====
====Anti-surface warfare====
[[File:P17A design 5.png|thumb|A depiction of the frigate's bow, showing its future armament.]]
[[File:INS Nilgiri firing Brahmos.jpg|thumb|left|INS ''Nilgiri'' firing a Brahmos]]
As part of its [[anti-surface warfare]] (ASuW) capabilities, the class features eight [[BrahMos]] [[Anti-ship missile|anti-ship cruise missiles]], capable of speeds of up to [[Mach number|Mach 3]].<ref>{{Cite web|url=https://www.business-standard.com/article/defence/indigenously-designed-brahmos-to-equip-talwar-class-frigates-118120100769_1.html|title='Indigenously designed' BrahMos to equip Talwar-class frigates|website=business-standard.com|date=1 December 2018}}</ref> The BrahMos is widely regarded as one of the most formidable anti-ship missiles currently in service, given the missile's extreme versatility and manoeuvrability.<ref>{{Cite web|url=https://nationalinterest.org/feature/bull%E2%80%99s-eye-the-5-most-deadly-anti-ship-missiles-all-time-12411|title=Bullseye: The 5 Most Deadly Anti-Ship Missiles of All Time|website=nationalinterest.com|date=13 March 2015}}</ref>
As part of its [[anti-surface warfare]] (ASuW) capabilities, the class features eight [[Vertical launching system|VLS]]-launched [[BrahMos]] [[Anti-ship missile|anti-ship cruise missiles]], capable of speeds of up to [[Mach number|Mach 3]].<ref>{{Cite web|url=https://www.business-standard.com/article/defence/indigenously-designed-brahmos-to-equip-talwar-class-frigates-118120100769_1.html|title='Indigenously designed' BrahMos to equip Talwar-class frigates|website=business-standard.com|date=1 December 2018}}</ref> The BrahMos is widely regarded as one of the most formidable anti-ship missiles currently in service, given the missile's extreme versatility and manoeuvrability.<ref>{{Cite web|url=https://nationalinterest.org/feature/bull%E2%80%99s-eye-the-5-most-deadly-anti-ship-missiles-all-time-12411|title=Bullseye: The 5 Most Deadly Anti-Ship Missiles of All Time|website=nationalinterest.com|date=13 March 2015}}</ref>
 
The vessels are equipped with one upgraded [[OTO Melara 76 mm]] [[Naval artillery|naval gun]] for anti-missile/anti-aircraft roles. The upgraded guns manufactured by [[Bharat Heavy Electricals Limited]] (BHEL) features the [[OTO Melara 76 mm#Strales System|Strales system]] with [[OTO Melara 76 mm#DART|DART]] ammunition firing capability.<ref>{{Cite web |title=Defence and Aerospace {{!}} Official Website of Bharat Heavy Electricals Limited, New Delhi, India |url=https://www.bhel.com/defence-and-aerospace |archive-url=https://web.archive.org/web/20220930085122/https://www.bhel.com/defence-and-aerospace |archive-date=30 September 2022 |access-date=2025-01-18 |website=www.bhel.com |language=en |url-status=live }}</ref><ref name=":0232">{{Cite web |last=Menon |first=Adithya Krishna |date=2025-01-15 |title=Indian Navy Inducts New Destroyer, Frigate and Submarine |url=https://www.navalnews.com/naval-news/2025/01/indian-navy-inducts-new-destroyer-frigate-and-submarine/ |access-date=2025-01-18 |website=Naval News |language=en-US}}</ref> However, INS ''Udaygiri'' features the original, older Compact variant of the gun as noted during its commissioning.<ref name=":9">{{Cite web |last=Menon |first=Adithya Krishna |date=2025-08-27 |title=Indian Navy inducts two more Nilgiri-class frigates to Eastern Fleet |url=https://www.navalnews.com/naval-news/2025/08/indian-navy-inducts-two-more-nilgiri-class-frigates-to-eastern-fleet/ |access-date=2025-08-28 |website=Naval News |language=en-US}}</ref>


The vessels are equipped with one [[OTO Melara 76 mm]] [[Naval artillery|naval gun]]. Originally, the Indian Navy had planned to install the [[5"/54 caliber Mark 45 gun|Mk 45 {{cvt|127|mm|0}}]] naval gun, manufactured by [[BAE Systems Platforms & Services|BAE]]; however, this plan was later scrapped in 2021 on account of financial constraints.<ref>{{Cite web|url=https://theprint.in/defence/navy-to-scrap-plans-to-procure-guns-from-us-considering-make-in-india-route-now/706730/|title=Navy to scrap plans to procure guns from US, considering 'Make in India' route now|website=theprint.in|date=2 August 2021}}</ref>
Originally, there were plans to install the [[5-inch/54-caliber Mark 45 gun|Mk 45 {{cvt|127|mm|0}}]] naval gun, manufactured by [[BAE Systems Platforms & Services|BAE]]; however, this plan was later scrapped in 2021 on account of financial constraints.<ref>{{Cite web|url=https://theprint.in/defence/navy-to-scrap-plans-to-procure-guns-from-us-considering-make-in-india-route-now/706730/|title=Navy to scrap plans to procure guns from US, considering 'Make in India' route now|website=theprint.in|date=2 August 2021}}</ref>


====Anti-air warfare====
====Anti-air warfare====
As part of its anti-air warfare (AAW) capabilities, the class features thirty-two [[Barak 8]]ER [[surface-to-air missile]]s, with sixteen missiles present in four "2 x 4" VLS configurations – with two placed at the [[Bow (ship)|bow]] and two placed aft.<ref>{{Cite web|url=https://economictimes.indiatimes.com/news/defence/indo-israeli-barak-8-missile-indian-navy-to-test-long-range-sam-soon/articleshow/47478457.cms?from=mdr|title=Indo-Israeli Barak 8 missile: Indian Navy to test long-range SAM soon|website=economictimes.indiatimes.com|date=14 July 2018}}</ref>
As part of its anti-air warfare (AAW) capabilities, the class features thirty-two [[Barak 8]] [[surface-to-air missile]]s, with eight missiles present in four 2×4 VLS configurations – with two placed at the [[Bow (watercraft)|bow]] and two placed aft.<ref>{{Cite web|url=https://economictimes.indiatimes.com/news/defence/indo-israeli-barak-8-missile-indian-navy-to-test-long-range-sam-soon/articleshow/47478457.cms?from=mdr|title=Indo-Israeli Barak 8 missile: Indian Navy to test long-range SAM soon|website=economictimes.indiatimes.com|date=14 July 2018}}</ref>
 
The LR-SAM is an extended-range variant of the original Barak 8 and is designed to neutralize various aerial threats, including [[fighter aircraft]], [[helicopter]]s, [[anti-ship missile]]s, [[cruise missile]]s, [[ballistic missile]]s and [[unmanned aerial vehicle]]s (UAV). This variant has a range of about {{cvt|100|km|mi}}.<ref>{{Cite web|url=https://www.indiatoday.in/education-today/gk-current-affairs/story/barak-8-missile-test-indian-navy-279676-2015-12-30|title=Indian Navy successfully tests Barak 8 interceptor missile: All you need to know|website=indiatoday.in|date=30 December 2015}}</ref>  


The Barak 8ER, also classified as the LR-SAM, is an "extended-range" variant of the original Barak 8 – designed to neutralize various aerial threats, including fighter aircraft, helicopters, anti-ship missiles, cruise missiles, ballistic missiles and [[unmanned aerial vehicle]]s (UAV); the new variant is expected to feature a range of about {{cvt|150|km|mi}}.<ref>{{Cite web|url=https://www.indiatoday.in/education-today/gk-current-affairs/story/barak-8-missile-test-indian-navy-279676-2015-12-30|title=Indian Navy successfully tests Barak 8 interceptor missile: All you need to know|website=indiatoday.in|date=30 December 2015}}</ref>
The ships are also equipped with two [[AK-630]] each for [[close-in weapon system]] (CIWS) roles as well as multiple [[Ordnance Factory Tiruchirappalli|OFT]]-manufactured 12.7 mm M2 [[Remote controlled weapon station|Stabilized Remote Controlled Gun]].<ref name=":9" />


====Anti-submarine warfare====
====Anti-submarine warfare====
As part of its [[anti-submarine warfare]] (ASW) capabilities, the class features two triple-tube lightweight [[Torpedo tube|torpedo launchers]] for firing ASW torpedoes. The class also features two [[RBU-6000]] (RPK-8) [[Anti-submarine weapon|anti-submarine rocket launchers]], capable of firing ASW projectiles to depths of up to {{cvt|1000|m|ftin}}.<ref>{{Cite web|url=http://www.indiandefensenews.in/2018/04/india-reveals-p-17a-frigate.html|title=India Reveals P-17A Configuration|website=indiandefensenews.in|date=27 April 2018}}</ref>
[[File:Shyena.png|thumb|TAL Shyena Torpedo]]
As part of its [[anti-submarine warfare]] (ASW) capabilities, the class features two 324 mm triple-tube lightweight [[Torpedo tube|torpedo launchers]] for firing [[Torpedo Advanced Light Shyena|TAL Shyena]] torpedoes.{{Citation needed|date=October 2025}}
 
The class also features two [[RBU-6000]] (RPK-8) [[Anti-submarine weapon|anti-submarine rocket launchers]], capable of firing ASW projectiles to depths of up to {{cvt|1000|m|ftin}}.<ref>{{Cite web|url=http://www.indiandefensenews.in/2018/04/india-reveals-p-17a-frigate.html|title=India Reveals P-17A Configuration|website=indiandefensenews.in|date=27 April 2018}}</ref> The launchers, designated Indigenous Rocket Launchers, have been manufactured indigenously by [[Larsen & Toubro]].<ref name=":9" />


====Decoys====
====Decoys====
During the class' unveiling in 2018, the frigate's design was noted to possess two anti-torpedo decoy systems and four decoy launchers – which presumably may be the [[Maareech ATDS|NSTL Maareech torpedo-countermeasure system]] and the [[Kavach (anti-missile system)|Kavach anti-missile decoy launchers]], respectively.<ref>{{Cite web|url=https://worldnavalnews.com/india-revealed-p-17a-frigate-configuration/|title=India Revealed P-17A Frigate Configuration At Defexpo 2018|website=worldnavalnews.com|date=30 November 2018}}</ref>
During the class' unveiling in 2018, the frigate's design was noted to possess two anti-torpedo decoy systems and four decoy launchers – which presumably may be the [[Maareech ATDS|NSTL Maareech torpedo-countermeasure system]] and the [[Kavach (anti-missile system)|Kavach anti-missile decoy launchers]], respectively.<ref>{{Cite web|url=https://worldnavalnews.com/india-revealed-p-17a-frigate-configuration/|title=India Revealed P-17A Frigate Configuration At Defexpo 2018|website=worldnavalnews.com|date=30 November 2018}}</ref><ref>{{Cite web |last=Menon |first=Adithya Krishna |date=2024-08-29 |title=India's First P17A Nilgiri-class Frigate Starts Sea Trials |url=https://www.navalnews.com/naval-news/2024/08/indias-first-p17a-nilgiri-class-frigate-starts-sea-trials/ |access-date=2024-08-30 |website=Naval News |language=en-US}}</ref>


====Aviation facilities====
====Aviation facilities====
[[File:Nilgiri class Frigate.webm|thumb|left|An animation of helicopter landing on frigate.]]
As part of its aviation facilities, the class is equipped with a flight-deck and an enclosed aviation hangar, capable of accommodating a single [[Military helicopter|naval helicopter]] – most likely the [[HAL Dhruv|ALH Dhruv MK-III]] maritime-reconnaissance helicopters, or the [[Westland Sea King|Westland Sea King Mk. 42B]] ASW/ASuW helicopters – both of which are operated by the [[Indian Naval Air Arm]].<ref>{{Cite web|url=https://twitter.com/sandeepunnithan/status/1174015087079649281?lang=en|title=Very Significant About The P-17A Frigates – Sandeep Unnithan|via=Twitter|date=17 September 2019}}</ref>
As part of its aviation facilities, the class is equipped with a flight-deck and an enclosed aviation hangar, capable of accommodating a single [[Military helicopter|naval helicopter]] – most likely the [[HAL Dhruv|ALH Dhruv MK-III]] maritime-reconnaissance helicopters, or the [[Westland Sea King|Westland Sea King Mk. 42B]] ASW/ASuW helicopters – both of which are operated by the [[Indian Naval Air Arm]].<ref>{{Cite web|url=https://twitter.com/sandeepunnithan/status/1174015087079649281?lang=en|title=Very Significant About The P-17A Frigates – Sandeep Unnithan|via=Twitter|date=17 September 2019}}</ref>


Line 147: Line 169:


====Sonar====
====Sonar====
The class is equipped with the [[Bharat Electronics Limited|BEL]] HUMSA-NG [[sonar]], developed by the [[Defence Research and Development Organisation|DRDO]]. The HUMSA-NG is a hull mounted "active cum passive" integrated sonar system capable of detecting, localizing, classifying and tracking sub-surface targets in both active and passive modes.<ref>{{Cite web|url=https://www.drdo.gov.in/humsa-ng|title=HUMSA NG|website=drdo.gov.in}}</ref>
The class is equipped with the [[Bharat Electronics Limited|BEL]] HUMSA-NG [[sonar]], developed by the [[Defence Research and Development Organisation|DRDO]]. The HUMSA-NG is a hull mounted "active cum passive" integrated sonar system capable of detecting, localizing, classifying and tracking sub-surface targets in both active and passive modes.<ref>{{Cite web|url=https://www.drdo.gov.in/humsa-ng|title=HUMSA NG|website=drdo.gov.in}}</ref><ref>{{Cite web |date=2024-07-02 |title=Fortifying Fleet: Significance of Nilgiri Class Frigates in Indian Naval Defence |url=https://bharatshakti.in/fortifying-fleet-significance-of-nilgiri-class-frigates-in-indian-naval-defence/ |access-date=2024-08-23 |website=Bharat Shakti |language=en-US}}</ref>


====Electronic warfare====
====Electronic warfare====
Line 153: Line 175:


=== Propulsion ===
=== Propulsion ===
Each frigate features two [[General Electric LM2500]] [[gas turbine]]s – manufactured by [[GE Aviation]] and two [[MAN Diesel|MAN]] 12V28/33D STC four-stroke engines – manufactured by [[MAN Energy Solutions|MAN Diesel & Turbo]], arranged in a [[combined diesel and gas]] (CODAG) propulsion configuration.<ref>{{Cite web|url=https://www.naval-technology.com/projects/nilgiri-class-project-17a-frigates/|title=Nilgiri-Class (Project 17A) Frigates|website=naval-technology.com|date=17 December 2020}}</ref>
Each frigate is powered by two [[General Electric LM2500]] [[gas turbine]]s – manufactured by [[GE Aviation]] and two [[MAN Diesel|MAN]] 12V28/33D STC four-stroke engines – manufactured by [[MAN Energy Solutions|MAN Diesel & Turbo]], arranged in a [[combined diesel and gas]] (CODAG) propulsion configuration.<ref>{{Cite web|url=https://www.naval-technology.com/projects/nilgiri-class-project-17a-frigates/|title=Nilgiri-Class (Project 17A) Frigates|website=naval-technology.com|date=17 December 2020}}</ref>


In December 2016, the Indian Navy contracted GE Aviation to supply fourteen LM2500 gas turbines for the seven frigates, which were [[Licensed production|license-assembled]] in India by the Industrial & Marine Gas Turbine Division (IMGT) of [[Hindustan Aeronautics Limited]] (HAL).<ref>{{Cite web|url=https://www.navaltoday.com/2016/12/08/lm2500-marine-gas-turbines-to-power-indian-navys-p17a-stealth-frigate/|title=LM2500 marine gas turbines to power Indian Navy’s P17A stealth frigate|website=navaltoday.com|date=8 December 2016}}</ref> Under the deal, HAL was additionally sanctioned to provide comprehensive services – including the supply of spare parts, maintenance inspections and equipment overhauls.<ref>{{Cite web|url=https://www.turbomachinerymag.com/view/ge-marine-to-provide-lm2500-gas-turbines-for-indian-navys-p17a-frigate|title=GE Marine to provide LM2500 gas turbines for Indian Navy|website=turbomachinerymag.com|date=1 January 2017}}</ref>
In December 2016, the IN contracted GE Aviation to supply fourteen LM2500 gas turbines for the seven frigates, which were [[Licensed production|license-assembled]] in India by the Industrial & Marine Gas Turbine Division (IMGT) of [[Hindustan Aeronautics Limited]] (HAL).<ref>{{Cite web|url=https://www.navaltoday.com/2016/12/08/lm2500-marine-gas-turbines-to-power-indian-navys-p17a-stealth-frigate/|title=LM2500 marine gas turbines to power Indian Navy's P17A stealth frigate|website=navaltoday.com|date=8 December 2016}}</ref> Under the deal, HAL was additionally sanctioned to provide comprehensive services – including the supply of spare parts, maintenance inspections and equipment overhauls.<ref>{{Cite web|url=https://www.turbomachinerymag.com/view/ge-marine-to-provide-lm2500-gas-turbines-for-indian-navys-p17a-frigate|title=GE Marine to provide LM2500 gas turbines for Indian Navy|website=turbomachinerymag.com|date=1 January 2017}}</ref>


At the time of the order, HAL had already delivered eleven LM2500 turbines to the Indian Navy; the turbines are specifically used on multiple Indian warships, most notably on the ''Shivalik''-class frigates.<ref>{{Cite web|url=https://hal-india.co.in/Product_Details.aspx?Mkey=54&lKey=&CKey=35|title=LM 2500|website=hal-india.com}}</ref>
At the time of the order, HAL had already delivered eleven LM2500 turbines to the IN; the turbines are specifically used on multiple Indian warships, most notably on the ''Shivalik''-class frigates.<ref>{{Cite web|url=https://hal-india.co.in/Product_Details.aspx?Mkey=54&lKey=&CKey=35|title=LM 2500|website=hal-india.com}}</ref>


In February 2019, MDL contracted GE to supply an assortment of auxiliary equipment to the Indian Navy to support the fourteen engines; under the agreement, GE also handled the design work of the frigate's auxiliary system and its fuel supply system.<ref>{{Cite web|url=https://seapowermagazine.org/ge-to-supply-lm2500-gas-turbine-auxiliary-equipment-for-indian-navys-p17a-frigates/|title=GE to Supply LM2500 Gas Turbine Auxiliary Equipment for Indian Navy’s P17A Frigates|website=seapowermagazine.org|date=8 February 2022}}</ref>
In February 2019, MDL contracted GE to supply an assortment of auxiliary equipment to the IN to support the fourteen engines; under the agreement, GE also handled the design work of the frigate's auxiliary system and its fuel supply system.<ref>{{Cite web|url=https://seapowermagazine.org/ge-to-supply-lm2500-gas-turbine-auxiliary-equipment-for-indian-navys-p17a-frigates/|title=GE to Supply LM2500 Gas Turbine Auxiliary Equipment for Indian Navy's P17A Frigates|website=seapowermagazine.org|date=8 February 2022}}</ref>


In May 2016, the Indian Navy contracted MAN Diesel & Turbo to supply fourteen MAN 12V28/33D STC four-stroke engines for the seven frigates; under the deal, the requisite parts needed for the engines were sourced from India, while the engines' final assembly and testing were conducted at MAN's facility in [[Aurangabad]], [[India]].<ref>{{Cite web|url=https://www.defenseworld.net/news/16091/Indian_Navy_Orders_MAN_Medium_Diesel_Engines_For_Stealth_Frigates#.YgHStOpBzIU|title=Indian Navy Orders MAN Medium Diesel Engines For Stealth Frigates|website=defenseworld.net|date=18 May 2016}}</ref>
In May 2016, the IN contracted MAN Diesel & Turbo to supply fourteen MAN 12V28/33D STC four-stroke engines for the seven frigates; under the deal, the requisite parts needed for the engines were sourced from India, while the engines' final assembly and testing were conducted at MAN's facility in [[Aurangabad]], [[India]].<ref>{{Cite web|url=https://www.defenseworld.net/news/16091/Indian_Navy_Orders_MAN_Medium_Diesel_Engines_For_Stealth_Frigates#.YgHStOpBzIU|title=Indian Navy Orders MAN Medium Diesel Engines For Stealth Frigates|website=defenseworld.net|date=18 May 2016}}</ref>


== History ==
== History ==


===Background===
===Background===
[[File:Nilgiri class Frigate.webm|thumb|left|Nilgiri class CG]]
[[File:P17A Nilgiri Class Frigate Design of Indian Navy.jpg|thumb|A rendering of the frigate's design]]
In June 2009, the Defence Acquisition Council (DAC) the main acquisition panel subordinate to India's [[Ministry of Defence (India)|Ministry of Defence]] (MoD), cleared a proposal for the procurement of seven stealth frigates at a cost of ₹45,000 crore – classified as "Project 17A" – on the lines of the Indian Navy's initiative of establishing a 160-ship fleet.<ref>{{Cite web|url=http://archive.indianexpress.com/news/navy-seals-45000cr-deal-seven-warships/479132/|title= Archive – Navy seals 45,000-cr deal: seven warships|website=archive.indianexpress.com|date=20 June 2009}}</ref>
On 19 June 2009, the Defence Acquisition Council (DAC) the main acquisition panel subordinate to India's [[Ministry of Defence (India)|Ministry of Defence]] (MoD) and chaired by the then [[Defence Minister of India]] [[A. K. Antony]] — cleared a proposal for the procurement of seven stealth frigates at a cost of {{INRConvert|45000|c|lk=on|year=2009}} under the designation Project 17A, as an advanced variant of {{Sclass|Shivalik|frigate}}s. The ships were to be constructed by [[Mazagon Dock Shipbuilders]] (MDL), Mumbai and [[Garden Reach Shipbuilders & Engineers]] (GRSE), Kolkata. The DAC also rejected the Navy's proposal of building two of the warships abroad. The construction of the warships will incorporate modular shipbuilding where 300-tonne prefabricated blocks would be put together similar to the construction style of {{INS|Vikrant|2013|6}}. Earlier, on 4 December 2006,<ref>{{Cite web |date=2006-12-04 |title=Indian Navy on modernisation drive, to build stealth frigates |url=https://www.indiatoday.in/magazine/indiascope/story/20061204-indian-navy-to-build-seven-stealth-frigates-to-shipyards-in-europe-and-russia-2006-784197-2006-12-03 |access-date=2025-07-21 |website=India Today |language=en}}</ref> the Navy had sent out a pre-tender [[Request for Information]] (RFI) to French [[DCNS (company)|DCNS]], Italian [[Fincantieri]], American firms [[Lockheed Martin]] and [[Northrop Grumman]] besides shipyards in Russia and Korea for the construction of the first two ships by one of the foreign shipyards so as to ensure the timely absorption of the technology by the Indian shipyards. The project is expected to start in 2011 after both MDL and GRSE completes an upgrade to allow the modular construction. The deliveries were to begin 3–4 years after start of construction. All the firgates are to be inducted by 2022.<ref>{{Cite web |date=2009-06-20 |title=Navy seals 45,000-cr deal: seven warships |url=https://indianexpress.com/article/news-archive/web/navy-seals-45000cr-deal-seven-warships/ |url-status=live |archive-url=https://web.archive.org/web/20250721083701/https://indianexpress.com/article/news-archive/web/navy-seals-45000cr-deal-seven-warships/?ref=archive_pg |archive-date=2025-07-21 |access-date=2025-07-21 |website=The Indian Express |language=en}}</ref>


In September 2012, the [[Cabinet Committee on Security]] (CCS) – India's top decision-making institution on matters related to defense and national security, green-lighted the proposal for the "development cum construction" of the seven frigates.<ref>{{Cite web |url=http://www.forceindia.net/NovFeatureReport7.aspx |title=CCNS finally kickstarts Indian Navy’s Project 17A |website=webarchive.org |date=September 2012 |archive-url=https://web.archive.org/web/20150218093318/http://www.forceindia.net/NovFeatureReport7.aspx |archive-date=18 February 2015 |url-status=dead}}</ref> Initially, the Indian Navy favoured a proposal of building the first two frigates at a foreign shipyard – seeking to minimize the project's overall construction timeline; however, this suggestion was overruled by India's [[Ministry of Defence (India)|Ministry of Defence]] (MoD) – which favoured indigenous production of the frigates.<ref>{{Cite web|url=https://www.ajaishukla.com/2009/07/project-17-all-seven-new-stealth.html|title=Project 17-A : All seven frigates to be built in India|website=ajaishukla.com|date=20 January 2013}}</ref>
As reported on 5 August 2013, the design of the Project 17A frigates along with Project 15B destroyers (now, {{Sclass|Visakhapatnam|destroyer}}s) were completed by the Directorate of Naval Design (DND) of the Indian Navy. Additionally, the cost negotiations for the construction of the seven vessels had been completed. As part of the project, MDL and GRSE will construct four and three frigates, respectively. Now, the Navy was awaiting clearance from the government.<ref>{{Cite web |date=2013-08-05 |title=Navy designs India's largest ever ship, focuses on stealth and futuristic frigates |url=https://www.indiatoday.in/india/story/indigenous-aircraft-carrier-ins-vikramaditya-directorate-of-naval-design-ak-antony-talwar-class-shivalik-class-172819-2013-08-04 |access-date=2025-07-21 |website=India Today |language=en}}</ref>


The seven frigates were envisioned as a "follow-on series" to the ''Shivalik''-class frigates (Project 17), which were also being built for the Indian Navy at the time, but equipped with more sophisticated capabilities.<ref>{{Cite web|url=https://timesofindia.indiatimes.com/india/govt-approves-construction-of-7-stealth-frigates-6-nuclear-powered-submarines/articleshow/46281364.cms|title=Government approves construction of seven stealth frigates, 6 nuclear-powered submarines|website=The Times of India|date=18 February 2015}}</ref> The designing-process of the seven frigates was completed in mid-2013.<ref>{{Cite web|url=https://www.indiatoday.in/india/story/indigenous-aircraft-carrier-ins-vikramaditya-directorate-of-naval-design-a.k.-antony-talwar-class-shivalik-class-172819-2013-08-05|title=Navy designs India's largest ever ship, focuses on stealth and futuristic frigates|date=5 August 2013}}</ref>
On 18 February 2015, the [[Cabinet Committee on Security]] (CCS) — India's top decision-making institution on matters related to defense and national security chaired by [[Prime Minister of India|Prime Minister]] [[Narendra Modi]] — green-lighted the proposal for the Project 17A frigates at a cost of {{INRConvert|45381|c|lk=|year=2015}}. The contract would be signed in the same month with an initial payment of {{INRConvert|4000|c|lk=|year=2015}}. The project is the follow-on of the ''Shivalik''-class or Project 17 frigates and the first ship by each the shipyards is expected to be delivered in 2022.<ref name=":4">{{Cite web |last=Shukla |first=Ajai |date=18 February 2015 |title=Rs 50k-cr naval project gets Cabinet nod |url=https://www.business-standard.com/article/economy-policy/rs-50k-cr-naval-project-gets-cabinet-nod-115021800042_1.html |access-date=21 July 2025 |website=Business Standard}}</ref><ref>{{Cite web|url=https://timesofindia.indiatimes.com/india/govt-approves-construction-of-7-stealth-frigates-6-nuclear-powered-submarines/articleshow/46281364.cms|title=Government approves construction of seven stealth frigates, 6 nuclear-powered submarines|website=The Times of India|date=18 February 2015}}</ref>
The project – consisting of the construction of the seven designated frigates over a span of five years – was formally approved by the CCS in February 2015.<ref>{{Cite web|url=https://www.business-standard.com/article/economy-policy/rs-50k-cr-naval-project-gets-cabinet-nod-115021800042_1.html|title=Rs 50k-cr naval project gets Cabinet nod|website=business-standard.com|date=18 February 2015}}</ref>


===Construction===
===Construction===
The seven frigates are to be jointly constructed by two [[Public sector undertakings in India|public-sector shipyards]], namely, [[Mazagon Dock Shipbuilders|Mazagon Dock Shipbuilders Limited]] (MDL) and [[Garden Reach Shipbuilders and Engineers]] (GRSE), with four of the frigates allotted to MDL and the remaining three allotted to GRSE.<ref>{{Cite web|url=https://www.navyrecognition.com/index.php/naval-news/naval-news-archive/year-2015-news/april-2015-navy-naval-forces-defense-industry-technology-maritime-security-global-news/2657-indian-navy-orders-7-new-project-17a-stealth-frigates-from-local-shipyards-mdl-and-grse.html|title=Indian Navy Orders Seven New Project 17A Stealth Frigates From Local Shipyards MDL and GRSE|website=navyrecognition.com|date=11 February 2022}}</ref>
====Garden Reach Shipbuilders & Engineers====
====Garden Reach Shipbuilders & Engineers====
[[File:INS Himgiri during its launch ceremony.jpg|thumb|The launch of {{INS|Himgiri|2020|6}}, the first ship of the batch being built by GRSE.]]
[[File:INS Himgiri.jpg|thumb|The sea trials of {{INS|Himgiri|2020|6}}, the first ship of the batch being built by GRSE.]]
In February 2015, the Indian Navy contracted Garden Reach Shipbuilders & Engineers (GRSE), a [[Kolkata]]-based public-sector shipyard, to build three P-17A frigates at an estimated cost of ₹19,294 crore.<ref>{{Cite web|url=https://www.defenseworld.net/news/12774/GRSE_Wins__3_1_Billion_Indian_Navy___s_Frigate_Order#.YgZ1uupBzIV|title=GRSE Wins $3.1 Billion Indian Navy’s Frigate Order|website=defenseworld.net|date=23 April 2015}}</ref> According to the terms of the contract, GRSE is slated to deliver the three frigates in 2023, 2024 and 2025, respectively. In preparation for the order, GRSE re-augmented its infrastructure by establishing newer "modular" shipyards along with a [[Samson and Goliath (cranes)|Goliath gantry crane]], meant for enabling the construction of the frigates in a short time frame.<ref>{{Cite web|url=https://timesofindia.indiatimes.com/india/india-finalizing-mega-stealth-frigates-project-for-over-rs-50000-crore/articleshow/14783631.cms|title=India finalizing mega stealth frigates' project for over Rs 50,000 crore|website=The Times of India|date=9 July 2012}}</ref>
On 20 February 2015, the Indian Navy signed the contract with the [[Garden Reach Shipbuilders & Engineers]] (GRSE), a [[Kolkata]]-based public-sector shipyard, to build three frigates under Project 17 Alpha at an estimated cost of {{INRConvert|19294|c|lk=on|year=2015}}.<ref>{{Cite web |last=admin |date=2015-04-22 |title=GRSE wins $3.17bn Indian Navy contract to build three new stealth frigates |url=https://www.naval-technology.com/news/newsgrse-wins-317bn-indian-navy-contract-to-build-three-new-stealth-frigates-4560669/ |access-date=2025-07-21 |website=Naval Technology |language=en-US}}</ref> According to the terms of the contract, GRSE is slated to deliver the three frigates in 2023, 2024 and 2025, respectively.<ref>{{Cite web |date=2015-04-23 |title=GRSE Wins $3.1 Billion Indian Navy’s Frigate Order |url=https://www.defensemirror.com/news/12774/GRSE_Wins__3_1_Billion_Indian_Navy___s_Frigate_Order |access-date=2025-07-21 |website=www.defensemirror.com}}</ref> The frigates would be constructed with "Integrated Construction Methodology" in partnership with Italy's [[Fincantieri]].<ref>{{Cite web |title=Frigate - Official website of Garden Reach Shipbuilders and Engineers Limited - A Government of India undertaking, Ministry of Defence |url=https://grse.in/frigate/index.php |url-status=live |archive-url=https://web.archive.org/web/20250721165817/https://grse.in/frigate/index.php |archive-date=2025-07-21 |access-date=2025-07-21 |website=grse.in}}</ref> In preparation for the order, GRSE re-augmented its infrastructure by establishing newer, modular shipyards along with a [[Samson and Goliath (cranes)|Goliath gantry crane]], meant for enabling the construction of the frigates in a short time frame.<ref>{{Cite web|url=https://timesofindia.indiatimes.com/india/india-finalizing-mega-stealth-frigates-project-for-over-rs-50000-crore/articleshow/14783631.cms|title=India finalizing mega stealth frigates' project for over Rs 50,000 crore|website=The Times of India|date=9 July 2012}}</ref>


A significant proportion of the hull's blocks needed for the vessel's construction was procured from smaller shipyards and metal fabrication shops in and around Kolkata, while the construction/fabrication of additional infrastructure was done at GRSE's [[Rajabagan]] shipyard.<ref>{{Cite web|url=https://www.janes.com/defence-news/news-detail/first-grse-built-p17a-frigate-enters-water|title=First GRSE-built frigate enters water|website=janes.com|date=15 December 2020}}</ref>
A significant proportion of the hull's blocks needed for the vessel's construction was procured from smaller shipyards and metal fabrication shops in and around Kolkata, while the construction/fabrication of additional infrastructure was done at GRSE's [[Rajabagan]] shipyard.<ref>{{Cite web|url=https://www.janes.com/defence-news/news-detail/first-grse-built-p17a-frigate-enters-water|title=First GRSE-built frigate enters water|website=janes.com|date=15 December 2020}}</ref>


The construction of the first frigate began in November 2018, while work on the second and third frigates began in January 2020 and March 2021, respectively.<ref>{{Cite web|url=https://www.navaltoday.com/2018/11/13/grse-starts-construction-of-their-first-project-17a-frigate-for-indian-navy/|title=GRSE Starts Construction of Their First P17A Frigate for the Indian Navy|website=navyrecognition.com|date=13 November 2018}}</ref> The first of the three frigates, ''Himgiri'', was [[Ceremonial ship launching|launched]] on 14 December 2020, with its delivery slated to occur for August 2023.<ref>{{Cite web|url=https://www.deccanherald.com/national/grse-built-stealth-frigate-himgiri-launched-general-bipin-rawat-calls-it-a-historic-moment-927390.html|title=GRSE-built stealth frigate Himgiri launched; General Bipin Rawat calls it a 'historic moment'|website=deccanherald.com|date=14 December 2020}}</ref> The second frigate, ''Dunagiri'', was launched on 15 June 2022, with its delivery slated to occur in 2024.<ref name="Dunagiri">{{Cite web|url=https://pib.gov.in/PressReleasePage.aspx?PRID=1841774|title=Raksha Mantri launches Y- 3023 Dunagiri, Project 17A frigate at GRSE Ltd, Kolkata|website=www.pib.gov.in|date=15 July 2022}}</ref>
Construction reached a hiatus in April 2018, when the shipyard's Goliath crane, having failed to withstand strong cyclonic winds which had been travelling at around {{cvt|100|km/h|lk=on}}.<ref>{{Cite web|url=http://www.millenniumpost.in/kolkata/accident-at-psu-ship-builder-grse-hits-operations-company-says-work-not-affected-297465|title=Accident at PSU ship-builder GRSE hits operations, company says work not affected|website=milleniumpost.in|date=2 May 2018}}</ref> The accident rendered the crane permanently inoperable, whilst the module hall - which was to have fabricated the modular blocks for the future frigates, was rendered unusable.<ref>{{Cite web|url= https://www.business-standard.com/article/news-ians/accident-at-psu-ship-builder-grse-hits-operations-company-says-work-not-affected-118050200292_1.html|title= Accident at PSU ship-builder GRSE hits operations, company says work not affected|website=business-standard.com|date=2 May 2018}}</ref> However, no damage was reported to have been inflicted on the vessels that were being built by the shipyard, according to representatives from the IN and GRSE.<ref>{{Cite web|url=http://www.bharatdefencekavach.com/news/avi_ation/accident-at-psu-ship-builder-grse-hits-operations-company-says-work-not-affected/65000.html|title=Accident at PSU ship-builder GRSE hits operations, company says work not affected|website=bharatdefencekavach.com|date=2 May 2018}}</ref>
 
The mishap forced GRSE to modify the project's timeline, by prioritizing the construction of the modular blocks at its other facilities, rather resuming constructing post-repairs to the shipyard.<ref>{{Cite web|url=https://www.ndtv.com/india-news/exclusive-despite-major-shipyard-mishap-new-frigate-to-be-delivered-on-time-1849718|title=Exclusive : Despite Major Shipyard Mishap, New Frigates To Be Delivered On Time|website=ndtv.com|date=9 May 2018}}</ref> With the loss of the crane, GRSE resorted to building smaller 50 t and 100 t blocks (instead of the regular 250 t blocks) with the shipyard’s smaller cranes.<ref>{{Cite web|url=https://www.thehindubusinessline.com/news/crane-collapse-at-grse-may-hurt-warship-work/article23740931.ece|title=Crane collapse at GRSE may hurt warship work|website=thehindubusinessline.com|date=1 May 2018}}</ref> In 2021, GRSE installed a Goliath crane that had purchased from [[South Korea]], with a lifting capacity of 250 t, thus resuming regular construction operations.<ref>{{Cite web|url=https://www.aeromagonline.com/2021/06/22/grse-commissioned-new-250-ton-goliath-crane/|title=GRSE Commissioned New 250 Ton Goliath Crane|website=aeromagonline.com|date=22 June 2021}}</ref>
 
The construction of the first frigate began in November 2018, while work on the second and third frigates began in January 2020 and March 2021, respectively.<ref>{{Cite web|url=https://www.navaltoday.com/2018/11/13/grse-starts-construction-of-their-first-project-17a-frigate-for-indian-navy/|title=GRSE Starts Construction of Their First P17A Frigate for the Indian Navy|website=navyrecognition.com|date=13 November 2018}}</ref> The first of the three frigates, {{INS|Himgiri|2020|2}}, was [[Ceremonial ship launching|launched]] on 14 December 2020, with its delivery slated to occur in August 2023.<ref name="himgirilaunch" /><ref name=":7">{{Cite web |date=2020-12-14 |title=GRSE-built stealth frigate Himgiri launched; General Bipin Rawat calls it a 'historic moment' |url=https://www.deccanherald.com/india/grse-built-stealth-frigate-himgiri-launched-general-bipin-rawat-calls-it-a-historic-moment-927390.html |access-date=2025-08-11 |website=Deccan Herald |language=en}}</ref> The second frigate, ''{{INS|Dunagiri|2022|2}}'', was launched on 15 June 2022, with its delivery expected in 2024.<ref name="Dunagiri">{{Cite press release |title=Raksha Mantri launches Y3023 Dunagiri, Project 17A frigate at GRSE Ltd, Kolkata |date=2022-07-15 |publisher=[[Press Information Bureau]] |url=https://www.pib.gov.in/PressReleasePage.aspx?PRID=1841774 |access-date=2025-08-11}}</ref> The final frigate, ''{{INS|Vindhyagiri|2023|2}}'', was launched in August 2023.<ref name=":8" /><ref>{{Cite press release |title=Launch of Y3024 (Vindhyagiri) |date=2023-08-17 |publisher=[[Press Information Bureau]] |url=https://www.pib.gov.in/PressReleasePage.aspx?PRID=1949974 |access-date=2025-08-11}}</ref>
 
On 3 March 2025, GRSE completed the Contractor Sea Trials (CST) of INS ''Himgiri'' was completed by GRSE along with [[Anti-Submarine Warfare Shallow Water Craft|INS ''Androth'']]. As per a press release, "CST is considered the final stage of construction, when a vessel’s seaworthiness is tested".<ref name=":3">{{Cite news |date=2025-03-17 |title=GRSE completes Contractor Sea Trials of two warships simultaneously |url=https://pib.gov.in/PressReleasePage.aspx?PRID=2112067 |access-date=2025-03-19 |work=[[Press Information Bureau]]}}</ref>
 
''Himgiri'' was delivered to the Indian Navy on 31 July 2025<ref name=X-310725>{{cite tweet|url=https://x.com/OfficialGRSE/status/1950858469550276705|number=1950858469550276705|title=GRSE Delivers its 801st Vessel—‘Himgiri’, an Advanced P17A Frigate to Indian Navy|user=OfficialGRSE|date=2025-07-31}}</ref> and was commissioned simultaneously with MDL's ''Udaygiri'' on 26 August 2025.<ref name=":5">{{Cite press release |title=Multi-mission stealth frigates - INS Udaygiri & INS Himgiri - commissioned into Indian Navy in the presence of Raksha Mantri in Vizag |date=2025-08-26 |publisher=[[Press Information Bureau]] |url=https://www.pib.gov.in/PressReleasePage.aspx?PRID=2160941 |access-date=2025-08-26}}</ref><ref name=":6">{{Cite news |date=2025-08-26 |title=Maritime milestone: Indian Navy commissions INS Udaygiri and Himgiri; twin induction for first time |url=https://timesofindia.indiatimes.com/india/maritime-milestone-indian-navy-commissions-twin-stealth-frigates-ins-udaygiri-and-himgiri-why-is-it-important/articleshow/123522962.cms |access-date=2025-08-26 |work=The Times of India |issn=0971-8257}}</ref>


====Mazagon Dock Shipbuilders Limited====
====Mazagon Dock Shipbuilders Limited====
[[File:INS Nilgiri in Mumbai on September 28, 2019.jpg|thumb|left|The launch of {{INS|Nilgiri|2019|6}}, the lead vessel of the class.]]
[[File:INS Udaygiri during sea trials.jpg|thumb|INS ''Udaygiri'', the second ship from MDL, during sea trials]]
In February 2015, the Indian Navy contracted Mazagon Dock Shipbuilders Limited (MDL), a [[Mumbai]]-based public-sector shipyard, to build four P-17A frigates at an estimated cost of over ₹21,000 crore.<ref>{{Cite web|url=https://www.hdfcsec.com/hsl.research.pdf/Mazagon_Final.pdf|title=Mazagon Dock Shipbuilders Limited|website=hdfcsec.com|date=15 July 2021}}</ref><ref>{{Cite web|url=https://pib.gov.in/PressReleasePage.aspx?PRID=1595028|title=More than 180 contracts valued over Rs 1,96,000 crore signed with Indian Defense Industry since 2014|website=pib.gov.in|date=5 December 2019}}</ref> According to the terms of the contract, MDL is to deliver the four frigates in 2022, 2023, 2024 and 2025, respectively.<ref>{{Cite web|url=https://thediplomat.com/2021/08/a-tale-of-2-navies-india-and-chinas-current-carrier-and-escort-procurement/|title=A Tale of Two Navies: India and China’s Current Carrier and Escort Procurement|website=thediplomat.com|date=4 August 2021}}</ref>
In February 2015, the IN contracted Mazagon Dock Shipbuilders Limited (MDL), a [[Mumbai]]-based public-sector shipyard, to build four P-17A frigates at an estimated cost of over ₹21,000 crore.<ref>{{Cite web|url=https://www.hdfcsec.com/hsl.research.pdf/Mazagon_Final.pdf|title=Mazagon Dock Shipbuilders Limited|website=hdfcsec.com|date=15 July 2021}}</ref><ref>{{Cite web|url=https://pib.gov.in/PressReleasePage.aspx?PRID=1595028|title=More than 180 contracts valued over Rs 1,96,000 crore signed with Indian Defense Industry since 2014|website=pib.gov.in|date=5 December 2019}}</ref> According to the terms of the contract, MDL is to deliver the four frigates in 2022, 2023, 2024 and 2025, respectively.<ref>{{Cite web|url=https://thediplomat.com/2021/08/a-tale-of-2-navies-india-and-chinas-current-carrier-and-escort-procurement/|title=A Tale of Two Navies: India and China's Current Carrier and Escort Procurement|website=thediplomat.com|date=4 August 2021}}</ref>
 
The four frigates were built at different locations, namely, at MDL's main shipbuilding facility in Mumbai, at MDL's subordinate facility in [[Navi Mumbai|Nhava]], at a smaller shipbuilding facility also operated by MDL in Mumbai, at an MSE shipyard in [[Gujarat]] and at another shipyard in [[Goa]].<ref>{{Cite web|url=https://maritimeindia.org/wp-content/uploads/2020/11/Making-Waves_26-Oct-01-Nov-2020_Web-Upload_OLIVER.pdf|title=Making Waves|website=maritimeindia.org|date=31 October 2020}}</ref> Similarly to GRSE, MDL also upgraded its existing infrastructure; the shipyard augmenting its existing facilities with newer equipment, including a "Goliath" gantry crane, a module workshop, a [[Retention basin|wet basin]] and a "cradle assembly" shop, meant to facilitate modular construction.<ref>{{Cite web|url=https://pib.gov.in/newsite/PrintRelease.aspx?relid=136912|title=Modernization and Security of Shipyards|website=pib.gov.in|date=26 February 2016}}</ref>
 
The construction of the first frigate began in December 2017, while work on the second, third and fourth frigates began in May 2019, September 2020 and June 2022, respectively.<ref>{{Cite web |date=11 September 2020 |title=Construction Begins on Indian Navy's Third P17A Class Stealth Frigate |url=https://www.naval-technology.com/news/construction-begins-on-indian-navys-third-p17a-class-stealth-frigate/ |url-status=live |archive-url=https://web.archive.org/web/20250811043628/https://www.naval-technology.com/news/construction-begins-on-indian-navys-third-p17a-class-stealth-frigate/ |archive-date=2025-08-11 |access-date=2025-08-11 |website=naval-technology.com}}</ref><ref>{{Cite web |date=30 January 2020 |title=MDL commences production of Y-12654, fourth ship of P17A |url=https://www.freepressjournal.in/corporate-corner/mazagon-dock-shipbuilders-limited-mdl/mdl-commences-production-of-y-12654-fourth-ship-of-p17a |url-status=live |archive-url=https://web.archive.org/web/20250811043611/https://www.freepressjournal.in/mazagon-dock-shipbuilders-limited-mdl/mdl-commences-production-of-y-12654-fourth-ship-of-p17a |archive-date=2025-08-11 |access-date=2025-08-11 |website=freepressjournal.in}}</ref> The first of the four frigates, ''Nilgiri'', was launched on 28 September 2019, and began its sea trials five years later, in August 2024.<ref name=":1">{{Cite web |last=Team |first=IADN Editorial |date=2024-08-25 |title=INS Nilgiri Undergoes Sea-trials - IADN |url=https://iadnews.in/ins-nilgiri-undergoes-sea-trials/ |access-date=2024-08-26 |website=- IADN |language=en-GB}}</ref> The second frigate, ''Udaygiri'', was launched on 17 May 2022, in a ceremony coinciding with the launch of {{INS|Surat|D69|6}}, a {{sclass|Visakhapatnam|destroyer}}.<ref>{{Cite web|url=https://www.rediff.com/news/report/ins-surat-ins-udaygiri-ready-to-protect-india/20220517.htm|title=INS Surat, INS Udaygiri Ready To Protect India|website=rediff.com|date=17 May 2022}}</ref> The third frigate, ''Taragiri'', was launched on 11 September 2022, and is scheduled to be delivered by 2025.<ref>{{Cite web|url=https://www.thehindu.com/news/national/indian-navy-launches-stealth-frigate-taragiri/article65878683.ece|title=Third stealth frigate of project 17A 'Taragiri' launched|website=www.thehindu.com|date=12 September 2022}}</ref>


The four frigates were built at different locations, namely, at MDL's main shipbuilding facility in Mumbai, at MDL's subordinate facility in [[Navi Mumbai|Nhava]], at a smaller shipbuilding facility also operated by MDL in Mumbai, at an MSE shipyard in [[Gujarat]] and at another shipyard in [[Goa]].<ref>{{Cite web|url=https://maritimeindia.org/wp-content/uploads/2020/11/Making-Waves_26-Oct-01-Nov-2020_Web-Upload_OLIVER.pdf|title=Making Waves|website=maritimeindia.org|date=31 October 2020}}</ref> Similarly to GRSE, MDL also upgraded its existing infrastructure; the shipyard augmenting its existing facilities with newer equipment, including a "Goliath" gantry crane, a module workshop, a [[Retention basin|wet basin]] and a "cradle assembly" shop, meant to facilitate modular construction.<ref>{{Cite web|url=https://pib.gov.in/newsite/PrintRelease.aspx?relid=136912|title=Modernization and Security of Shipyards|website=pib.gov.in|date=26 February 2016}}</ref>
''Nilgiri'' was commissioned into the Indian Navy service on 15 January 2025.<ref name=":2" /> The second ship, ''Udaygiri'', was delivered to the Indian Navy on 1 July 2025<ref name="TW-010725">{{cite tweet |number=1940013079590576578 |user=indiannavy |title=Udaygiri, the second warship of the Project P17A Nilgiri Class stealth frigates... |date=2025-07-01 |access-date=2025-07-01 |url=https://x.com/indiannavy/status/1940013079590576578}}</ref><ref name=":32" /> and was commissioned simultaneously with GRSE's ''Himgiri'' on 26 August 2025.<ref name=":5" /><ref name=":6" />


The construction of the first frigate began in December 2017, while work on the second, third and fourth frigates began in May 2019, September 2020 and June 2022, respectively.<ref>{{Cite web|url=https://www.naval-technology.com/news/construction-begins-on-indian-navys-third-p17a-class-stealth-frigate/|title=Construction Begins on Indian Navy's Third P17A Class Stealth Frigate|website=naval-technology.com|date=11 September 2020}}</ref><ref>{{Cite web|url=https://www.freepressjournal.in/corporate-corner/mazagon-dock-shipbuilders-limited-mdl/mdl-commences-production-of-y-12654-fourth-ship-of-p17a|title=MDL commences production of Y-12654, fourth ship of P17A|website=freepressjournal.in|date=30 January 2020}}</ref> The first of the four frigates, ''Nilgiri'', was launched on 28 September 2019, with its delivery slated to occur in August 2022.<ref>{{Cite web|url=https://www.defenseworld.net/news/25576/India_Launches____INS_Nilgiri____Stealth_Frigate#.YgcrEupBzIU|title=India Launches 'INS Nilgiri' Stealth Frigate|website=defenseworld.net|date=28 September 2019}}</ref> The second frigate of the four frigates, ''Udaygiri'', was launched on 17 May 2022, in a ceremony coinciding with the launch of {{INS|Surat|D69|6}}, a {{sclass|Visakhapatnam|destroyer}}.<ref>{{Cite web|url=https://www.rediff.com/news/report/ins-surat-ins-udaygiri-ready-to-protect-india/20220517.htm|title=INS Surat, INS Udaygiri Ready To Protect India|website=rediff.com|date=17 May 2022}}</ref> The third frigate, ''Taragiri'', was launched on 11 September 2022, and is scheduled to be delivered in 2025.<ref>{{Cite web|url=https://www.thehindu.com/news/national/indian-navy-launches-stealth-frigate-taragiri/article65878683.ece|title=Third stealth frigate of project 17A ‘Taragiri’ launched|website=www.thehindu.com|date=12 September 2022}}</ref>
The third ship, ''Taragiri'', was delivered to the Indian Navy on 28 November 2025.<ref name=":10">{{Cite press release|title=Delivery of 'Taragiri', the fourth Nilgiri class (Project 17A) indigenous advanced stealth frigate|date=2025-11-29|publisher=[[Press Information Bureau]]|url=https://www.pib.gov.in/PressReleasePage.aspx?PRID=2196229&reg=3&lang=1|access-date=2025-11-29}}</ref>  


== Ships in the class ==
== Ships in the class ==
Line 201: Line 232:
!Builder
!Builder
!Laid Down
!Laid Down
![[Ceremonial ship launching|Launched]]
!Launched
!Commissioning
!Commissioning
!Status
!Status
|-
!colspan='8'|{{navy|India}}
|-
|-
|[[INS Nilgiri (2019)|''Nilgiri'']]
|[[INS Nilgiri (2019)|''Nilgiri'']]
|
|F33
|12651
|12651
| rowspan="4" |[[Mazagon Dock Shipbuilders|Mazagon Dock Shipbuilders Limited]] (MDL)
| rowspan="4" |[[Mazagon Dock Shipbuilders|Mazagon Dock Shipbuilders Limited]] (MDL)
| 28 December 2017<ref name="mdl_p17a">{{cite news |url=https://www.mid-day.com/articles/construction-of-p17a-class-stealth-frigates-begins/18867199 |title=Construction of P17A class stealth frigates begins |work=Mid Day |date=29 December 2017 |archive-url=https://web.archive.org/web/20171229110312/https://www.mid-day.com/articles/construction-of-p17a-class-stealth-frigates-begins/18867199 |archive-date=29 December 2017}}</ref>
| 28 December 2017<ref name="mdl_p17a">{{cite news |url=https://www.mid-day.com/articles/construction-of-p17a-class-stealth-frigates-begins/18867199 |title=Construction of P17A class stealth frigates begins |work=Mid Day |date=29 December 2017 |archive-url=https://web.archive.org/web/20171229110312/https://www.mid-day.com/articles/construction-of-p17a-class-stealth-frigates-begins/18867199 |archive-date=29 December 2017}}</ref>
|28 September 2019<ref>{{cite news|title=Rajnath Singh launches warship Nilgiri in Mumbai |url=https://timesofindia.indiatimes.com/india/rajnath-singh-launches-warship-nilgiri-in-mumbai/articleshow/71347085.cms|work=The Times of India|agency=Asian News international|date=28 September 2019|language=en}}</ref>
|28 September 2019<ref>{{cite news|title=Rajnath Singh launches warship Nilgiri in Mumbai |url=https://timesofindia.indiatimes.com/india/rajnath-singh-launches-warship-nilgiri-in-mumbai/articleshow/71347085.cms|work=The Times of India|agency=Asian News international|date=28 September 2019|language=en}}</ref><ref>{{Cite web |date=29 September 2019 |title=Indian Navy has launched first stealth P-17A Nilgiri-class frigate INS Nilgiri |url=https://www.armyrecognition.com/archives/archives-naval-defense/naval-defense-2019/navy-of-india-has-launched-its-first-stealth-p-17a-nilgiri-class-frigate-ins-nilgiri |website=navyrecognition.com}}</ref>
| 2023 (expected)
| 15 January 2025<ref name=":2">{{Cite web |date=15 January 2025 |title=Prime Minister Shri Narendra Modi dedicates frontline naval combatants INS Surat, INS Nilgiri & INS Vaghsheer to the nation |url=https://pib.gov.in/PressReleasePage.aspx?PRID=2092999 |website=Press Information Bureau}}</ref>
| Launched<ref>{{Cite web|url=https://www.navyrecognition.com/index.php/naval-news/naval-news-archive/2019/september/7526-navy-of-india-has-launched-its-first-stealth-p-17a-nilgiri-class-frigate-ins-nilgiri.html|title=Indian Navy has launched first stealth P-17A Nilgiri-class frigate INS Nilgiri|website=navyrecognition.com|date=29 September 2019}}</ref>
| rowspan="2" | Active
|-
|-
|''[[INS Udaygiri (2022)|Udaygiri]]''
|''[[INS Udaygiri (2022)|Udaygiri]]''
|
|F35
|12652
|12652
|7 May 2019<ref name="mod-2019-review-report">{{cite web|url=https://pib.gov.in/newsite/PrintRelease.aspx?relid=196160|title=Year End Review – 2019 Ministry of Defence|date=2019-12-27|quote=Keel laying ceremony of Yard 12652 (Second ship of Project 17A at M/s MDL) was held on 7 May at M/s MDL, Mumbai.}}</ref>
|7 May 2019<ref name="mod-2019-review-report">{{cite web|url=https://pib.gov.in/newsite/PrintRelease.aspx?relid=196160|title=Year End Review – 2019 Ministry of Defence|date=2019-12-27|quote=Keel laying ceremony of Yard 12652 (Second ship of Project 17A at M/s MDL) was held on 7 May at M/s MDL, Mumbai.}}</ref>
|17 May 2022<ref>{{Cite web|url=https://www.businesstoday.in/latest/story/rajnath-singh-launches-frontline-warships-ins-surat-ins-udaygiri-333915-2022-05-17|title=Rajnath Singh launches frontline warships INS Surat, INS Udaygiri|website=businesstoday.in/|date=17 May 2022}}</ref>
|17 May 2022<ref>{{Cite web|url=https://www.businesstoday.in/latest/story/rajnath-singh-launches-frontline-warships-ins-surat-ins-udaygiri-333915-2022-05-17|title=Rajnath Singh launches frontline warships INS Surat, INS Udaygiri|website=businesstoday.in/|date=17 May 2022}}</ref><ref>{{Cite web |date=17 May 2022 |title=CURTAIN RAISER: LAUNCH OF YD 12707(SURAT) & YD 12652 (UDAYGIRI) |url=https://pib.gov.in/PressReleaseIframePage.aspx?PRID=1825683 |website=pib.gov.in}}</ref>
|2024 (expected)<ref>{{Cite web|url=https://www.hindustantimes.com/india-news/rajnath-singh-launches-two-warships-in-atmanirbhar-bharat-push-101652783857728-amp.html|title=Rajnath Singh launches two warships in Atmanirbhar Bharat push|website=hindustantimes.com|date=17 May 2022}}</ref>
|26 August 2025<ref name=":5" />
|Launched<ref>{{Cite web|url=https://pib.gov.in/PressReleaseIframePage.aspx?PRID=1825683|title=CURTAIN RAISER: LAUNCH OF YD 12707(SURAT) & YD 12652 (UDAYGIRI)|website=pib.gov.in|date=17 May 2022}}</ref>
|-
|-
|''Taragiri''
|''[[INS Taragiri (2022)|Taragiri]]''
|
|F41
|12653
|12653
|10 September 2020<ref>{{cite web|url=https://pib.gov.in/PressReleasePage.aspx?PRID=1653068|title= Keel laid for the third stealth frigate of Project 17A|publisher=PIB|access-date=10 September 2020}}</ref>
|10 September 2020<ref>{{cite web|url=https://pib.gov.in/PressReleasePage.aspx?PRID=1653068|title= Keel laid for the third stealth frigate of Project 17A|publisher=PIB|access-date=10 September 2020}}</ref>
|11 September 2022 <ref>{{cite web |title=India Launches Stealth Frigate "Taragiri" |url=https://www.ndtv.com/india-news/indian-navy-launches-stealth-frigate-taragiri-3335050 |access-date=11 September 2022}}</ref>
|11 September 2022<ref>{{cite web |title=India Launches Stealth Frigate "Taragiri" |url=https://www.ndtv.com/india-news/indian-navy-launches-stealth-frigate-taragiri-3335050 |access-date=11 September 2022}}</ref>
|August 2025 (expected)<ref>{{Cite web|url=https://www.navalnews.com/naval-news/2022/09/indias-mdl-launches-5th-nilgiri-class-p17a-frigate/|title=India’s MDL Launches 5th Nilgiri-Class P17A Frigate|website=www.navalnews.com|date=11 September 2022}}</ref>
|{{font color||#ADE2B8|3 April 2026}}<ref>{{Cite web |date=15 March 2026 |title=India’s latest homegrown stealth frigate INS Taragiri to join Navy next month |url=https://www.newindianexpress.com/nation/2026/Mar/13/indias-latest-homegrown-stealth-frigate-ins-taragiri-to-join-navy-next-month |access-date=15 March 2026 |website=The New Indian Express |language=English|last=Rana|first=Javier|url-status=live}}</ref>
|Launched<ref>{{cite web |title=Commencement of Production of Third Ship of Project – 17A |url=http://www.psuconnect.in/news/commencement-of-production-of-third-ship-of-project---17a/17340 |website=psuconnect.in |access-date=11 May 2019}}</ref>
|Delivered<ref name=":10" />
|-
|-
|
|''[[INS Mahendragiri|Mahendragiri]]''
|
|F38
|12654
|12654
|28 June 2022<ref>{{cite web|url=https://pib.gov.in/PressReleasePage.aspx?PRID=1837625|title= KEEL LAYING – SEVENTH PROJECT 17A (P17A) SHIP|publisher=PIB|access-date=28 June 2022}}</ref>
|28 June 2022<ref>{{cite web|url=https://pib.gov.in/PressReleasePage.aspx?PRID=1837625|title= KEEL LAYING – SEVENTH PROJECT 17A (P17A) SHIP|publisher=PIB|access-date=28 June 2022}}</ref>
|
|1 September 2023<ref>{{cite web|url=https://www.livemint.com/news/warship-mahendragiri-with-advanced-weapons-sensors-launched-all-you-need-to-know-11693566582282.html|title=Warship Mahendragiri with advanced weapons, sensors launched: Top points|publisher=Livemint|date=1 September 2023|access-date=1 September 2023}}</ref><ref>{{cite tweet|number=1693938529116782709|user=MazagonDockLtd|title=Let the countdown begin as we sail closer to the historic launch of the fourth frigate of P17A by #MDL|date=2023-08-22}}</ref><ref>{{cite web |date=2023-09-01 |title=Indian Navy's stealth frigate Mahendragiri launched |url=https://timesofindia.indiatimes.com/india/indian-navys-stealth-frigate-mahendragiri-launched/articleshow/103273894.cms |publisher=Times of India}}</ref>
|February 2025 (expected)
|{{font color||#ADE2B8|Q1 2026}}<ref>{{cite web |url=https://www.youtube.com/watch?v=t2ad54JxYiE|title=Final Stealth Frigate INS Mahendragiri to boost Navy’s edge in Indian Ocean with advanced firepower|date=2025-07-09}}</ref>
|Under construction<ref>{{cite magazine|author=<!--Staff writer(s); no by-line.--> |title= SP's Naval Force Roundup  |url=http://www.spsnavalforces.com/e-magazine/?magid=70&Name=sp_s_naval_forces_1-2020&Info=SP%27s%20Naval%20Forces%20Issue%201%20-%202020&year=2020 |magazine= SP's Naval Force |location= India |publisher=SP Guide Publication |access-date= 1 March 2020}}</ref>
|Launched
|-
|-
|[[INS Himgiri (2020)|''Himgiri'']]
|{{INS|Himgiri|2020|2}}
|  
| F34
| 3022
| 3022
| rowspan="3" |[[Garden Reach Shipbuilders & Engineers]] (GRSE)
| rowspan="3" |[[Garden Reach Shipbuilders & Engineers]] (GRSE)
|10 November 2018<ref>{{cite news |last1=Dominguez |first1=Gabriel |title=GRSE lays keel for Indian Navy's second Project 17A frigate |url=https://www.janes.com/article/84579/grse-lays-keel-for-indian-navy-s-second-project-17a-frigate |work=IHS Jane's Defence Weekly |date=14 November 2018 |archive-url=https://web.archive.org/web/20181114194943/https://www.janes.com/article/84579/grse-lays-keel-for-indian-navy-s-second-project-17a-frigate |archive-date=14 November 2018}}</ref>
|10 November 2018<ref>{{cite news |last1=Dominguez |first1=Gabriel |title=GRSE lays keel for Indian Navy's second Project 17A frigate |url=https://www.janes.com/article/84579/grse-lays-keel-for-indian-navy-s-second-project-17a-frigate |work=IHS Jane's Defence Weekly |date=14 November 2018 |archive-url=https://web.archive.org/web/20181114194943/https://www.janes.com/article/84579/grse-lays-keel-for-indian-navy-s-second-project-17a-frigate |archive-date=14 November 2018}}</ref>
|14 December 2020<ref name="himgirilaunch">{{cite web|url=https://pib.gov.in/PressReleasePage.aspx?PRID=1680561|title= LAUNCH OF 2nd PROJECT 17A SHIP 'HIMGIRI'|publisher=PIB|date=14 December 2020}}</ref>  
|14 December 2020<ref name="himgirilaunch">{{Cite press release |title=Launch of 2nd Project 17A Ship ‘Himgiri’ |date=2020-12-14 |publisher=[[Press Information Bureau]] |url=https://www.pib.gov.in/PressReleasePage.aspx?PRID=1680561 |access-date=2025-08-11}}</ref><ref name=":7" />
|August 2023 (expected)
| 26 August 2025<ref name=":5" />
|Launched<ref>{{Cite web|url=https://navalpost.com/india-launches-2nd-project-17a-frigate-himgiri/|title=India launches 2nd Project 17A frigate "Himgiri"|website=navalpost.com|date=15 December 2020}}</ref>
|Active
|-
|-
| ''[[INS Dunagiri (2022)|''Dunagiri'']]''
|''{{INS|Dunagiri|2022|2}}''
|
|F36
| 3023
| 3023
|24 January 2020<ref>{{Cite web|url=https://psuwatch.com/project-17a-grse-starts-building-2nd-advanced-stealth-frigate/|title=Project 17A: GRSE starts building 2nd Advanced Stealth Frigate
|24 January 2020<ref>{{Cite web|url=https://psuwatch.com/project-17a-grse-starts-building-2nd-advanced-stealth-frigate/|title=Project 17A: GRSE starts building 2nd Advanced Stealth Frigate
|website=psuwatch.com|date=24 January 2020}}</ref>
|website=psuwatch.com|date=24 January 2020}}</ref>
|15 July 2022<ref>{{cite web|url=http://www.grse.in/images/press_news/EQUITYBULL20S.jpg|title=Garden Reach Shipbuilders & Engineers – Q4FY21 – ICICI Securities|publisher=GRSE|access-date=2021-06-05}}</ref>
|15 July 2022<ref>{{cite web|url=http://www.grse.in/images/press_news/EQUITYBULL20S.jpg|title=Garden Reach Shipbuilders & Engineers – Q4FY21 – ICICI Securities|publisher=GRSE|access-date=2021-06-05}}</ref><ref name="Dunagiri" />
|August 2024 (expected)
|{{font color||#ADE2B8|Q1 2026}}<ref name=":0">{{Cite news |date=21 March 2024 |title=GRSE Analyst meet-March 2024 |url=https://www.grse.in/investor-presentations/files/Transcript_of_Analyst_Meet_Con_Call_for_Q3FY_23_24_GRSE.pdf}}</ref>  
|Launched<ref name="Dunagiri"/>
| rowspan="2" |Launched
|-
|-
|
|''{{INS|Vindhyagiri|2023|2}}''
|
|F42
|3024
|3024
|5 March 2021<ref>{{cite tweet|user=OfficialGRSE|number=1367777711096164358|title=Garden Reach Shipbuilders and Engineers Limited (GRSE) achieved a major milestone with 'laying of the Keel' of Yard 3024 a ship of the Advanced Stealth Frigate Project, P 17A.|date=5 March 2021}}</ref>
|5 March 2021<ref>{{cite tweet|user=OfficialGRSE|number=1367777711096164358|title=Garden Reach Shipbuilders and Engineers Limited (GRSE) achieved a major milestone with 'laying of the Keel' of Yard 3024 a ship of the Advanced Stealth Frigate Project, P 17A.|date=5 March 2021}}</ref>
|
|17 August 2023<ref name=":8">{{Cite web |last=Vavasseur |first=Xavier |date=2023-08-17 |title=Indian Navy’s 6th Nilgiri-class P17A Frigate Launched by GRSE |url=https://www.navalnews.com/naval-news/2023/08/indian-navys-6th-nilgiri-class-p17a-frigate-launched-by-grse/ |access-date=2025-08-11 |website=Naval News |language=en-US}}</ref>
|August 2025 (expected)
|{{font color||#ADE2B8|Q3 2026}}<ref name=":0" />
|Under construction
|}
|}
{{legend|#ADE2B8|either scheduled or estimated dates}}
<!--Please keep the legend description until all the ships are commissioned. Thank you.-->
==Export==
In August 2024, the Mazagon Dock Shipbuilders offered to the [[Brazilian Navy]], the project for a joint construction of up to six Project-17 Alpha frigates, to attend the [[Future Brazilian Destroyer concept|requirement]] of Brazil for a new class of 6,000 tons vessels, to operate in conjunction with the newest [[Tamandaré-class frigate|''Tamandaré''-class]] frigates.<ref>{{Cite news|url=https://www.infodefensa.com/texto-diario/mostrar/4966972/marina-brasilena-conexion-india-pakistan-tecnologias-navales-criticas-compartidas|title=La Marina de Brasil y la conexión India-Pakistán: tecnologías navales críticas compartidas|date=23 August 2024|website=Infodefensa|language=es}}</ref><ref>{{Cite news|url=https://www.infodefensa.com/texto-diario/mostrar/4934808/acerca-botadura-primera-fragata-clase-tamandare-legado-clase-niteroi|title=El legado de la Clase Niterói: Brasil está a un paso de la botadura de la primera fragata clase Tamandaré|date=19 July 2024|website=Infodefensa|language=es}}</ref>
== Gallery ==
<gallery>
File:INS Nilgiri in Mumbai on September 28, 2019.jpg|The launch of INS ''Nilgiri'', the lead vessel of the class.
File:INS Nilgiri, INS Surat and INS Vagsheer during commissioning ceremony.jpg|INS ''Nilgiri'' during commissioning ceremony
File:INS Udaygiri (F35) during sea trials.jpg|''Udaygiri'' during sea trials
File:INS Udaygiri, the second ship of Project 17A stealth frigate.jpg|INS ''Udaygiri'' during commissioning ceremony in July 2025
File:INS Taragiri top view.jpg|INS Taragiri top view
</gallery>


==See also==
==See also==
===Frigates of comparable configurations and capabilities===
===Frigates of comparable configurations and capabilities===
* [[FREMM multipurpose frigate]] – A series of multi-purpose frigates, operated by the [[French Navy]], the [[Italian Navy]], the [[Royal Moroccan Navy]], the [[Egyptian Navy]] and currently being built for the [[United States Navy]] and the [[Indonesian Navy]].
* [[FREMM multipurpose frigate]] – A series of multi-purpose frigates, operated by the [[French Navy]], the [[Italian Navy]], the [[Royal Moroccan Navy]], the [[Egyptian Navy]] and currently being built for the [[United States Navy]] and the [[Indonesian Navy]].
* [[Type 054B frigate]] – A class of multi-purpose frigates operated by the [[People's Liberation Army Navy]] of [[China]].
* [[Type 26 frigate]] – A class of frigates ordered by the [[Royal Navy]], the [[Royal Canadian Navy]] and the [[Royal Australian Navy]].
* [[Type 26 frigate]] – A class of frigates ordered by the [[Royal Navy]], the [[Royal Canadian Navy]] and the [[Royal Australian Navy]].
* [[MKS 180 frigate]] – A planned class of frigates that are to be built for the [[German Navy]].
* [[MKS 180 frigate]] – A planned class of frigates that are to be built for the [[German Navy]].
Line 273: Line 319:
* {{sclass2|F110|frigate|1}} – A planned class of multi-purpose frigates that are to be built for the [[Spanish Navy]].
* {{sclass2|F110|frigate|1}} – A planned class of multi-purpose frigates that are to be built for the [[Spanish Navy]].
* {{sclass|Admiral Gorshkov|frigate|1}} – A class of guided-missile frigates operated by the [[Russian Navy]].
* {{sclass|Admiral Gorshkov|frigate|1}} – A class of guided-missile frigates operated by the [[Russian Navy]].
* {{sclass|Constellation|frigate|1}} – A series of multi-purpose frigates currently being built for the [[United States Navy]].


===Other references to the Indian Navy===
===Other references to the Indian Navy===
Line 282: Line 329:


==External links==
==External links==
*[http://www.bharat-rakshak.com/NAVY/Ships/Active/190-Project-17.html Project 17A frigate at Bharat-rakshak.com]
*[http://www.bharat-rakshak.com/NAVY/Ships/Active/190-Project-17.html Project 17A frigate at Bharat-rakshak.com] {{Webarchive|url=https://web.archive.org/web/20120202114032/http://www.bharat-rakshak.com/NAVY/Ships/Active/190-Project-17.html |date=2 February 2012 }}


{{Ship classes of the Indian Navy}}
{{Ship classes of the Indian Navy}}
{{Frigates of the Indian Navy}}
{{Frigates of the Indian Navy}}


[[Category:Frigates of the Indian Navy]]
[[Category:Nilgiri-class frigates (2019)|*]]
[[Category:Frigate classes]]
[[Category:Frigate classes]]
[[Category:Proposed ships]]

Latest revision as of 09:29, 22 March 2026


Template:Infobox ship

The Nilgiri-class frigates, formally classified as the Project-17 Alpha frigates (P-17A), are a series of multi-mission[1] stealth guided-missile frigates currently being built by Mazagon Dock Shipbuilders (MDL) and Garden Reach Shipbuilders & Engineers (GRSE) for the Indian Navy (IN).[2][3]

Designed by the Warship Design Bureau, the class is intended to serve as a complement to the currently-serving -class frigates (P-17) with improved design portfolios, such as low radar cross-section (RCS) and reduced infrared signature.[4][5]

With a total of seven vessels, the construction of the frigates are currently divided between MDL and GRSE.[2][3] As of 2024, all seven frigates have been launched and are intended to enter service with the IN between 2024 and 2027.[6] The frigates will form a part of the Eastern Fleet as well as the future Carrier Battle Group (CBG) of INS Vikrant.[7][8]

Upon entering service, the class is to be complemented by an additional series of seven or eight frigates, under the codename the Project-17B series.[9][10]

Design[edit | edit source]

Development[edit | edit source]

An animated depiction of the Nilgiri-class frigate, showing its starboard.

The frigates were designed by the Warship Design Bureau (formerly Directorate of Naval Design).[11]

The class' design was finalised by the DND in 2013; it was later unveiled to the public in April 2018, when MDL displayed a scale model of the frigate at the DefExpo 2018 military exhibition, held at Chennai, India.[12] The P17A ships are geo-symmetrically larger by 4.54 % vis-à-vis P17, or the Shivalik-class frigates,[13] and also features 75% indigenous content.[14]

On 5 September 2018, Mazagon Dock Shipbuilders (MDL) and Garden Reach Shipbuilders & Engineers (GRSE) awarded Bharat Electronics (BEL) with a 9,200 crore (equivalent to 99 billion or US$1.4 billion in 2019) contract to supply seven Barak 8 LR-SAM air defence systems for Nilgiri-class frigates. In October 2018, Bharat Electronics signed a $777 million deal with Israel Aerospace Industries to help fulfil the Barak-8 order.[15][16]

On 28 November 2023, Bharat Heavy Electricals Limited (BHEL) received a contract worth 2,956.89 crore (US$410 million) to manufacture 16 Upgraded Super Rapid Gun Mounts (SRGMs) or Strales Systems for in-service ships as well as the under construction Nilgiri-class frigates.[17][18]

The state-owned firm Steel Authority of India Limited (SAIL) is supplying around 4,000 tonnes of steel for each of these ships. The steel is being manufactured in Bokaro, Bhilai, and Rourkela plants.[14]

Features[edit | edit source]

Stealth[edit | edit source]

The frigate's design incorporates a significant degree of stealth and low radar-observability – through the utility of composite materials, radar-absorbent coatings and low-observable/radar-transparent technologies; the usage of the aforementioned materials assists the vessel in maintaining a low radar cross-section (RCS).[19]

The vessel's physical profile also features a substantial level of stealth through the application of different physical forms – including an enclosed mooring deck, flush deck-mounted weapon systems and a reduced number of antennae.[20]

The frigate's infrared signature, most specifically emissions from its propulsion exhaust and power generation machinery, are reduced through the application of Venturi effect and fluid injection, which helps to reduce the plume and hot metal temperatures of exhaust.[21] To maintain acoustic silence, the frigate is equipped with propellers designed to have onset of cavitation at higher speeds to reduce hydrodynamic noise.[21] In addition to the propellers, the vessel's hull also features special acoustic enclosures for some of the machinery to reduce the emission air-borne noise.[21]

Modular profile[edit | edit source]

The P-17A frigates are the first major class of Indian-designed warships to be built using the methodology of integrated modular construction – a manufacturing process in which multiple modules (or "blocks") of a vessel's hull are pre-assembled/pre-outfitted independently, before being aggregated for final assembly.[22]

In December 2015, MDL contracted Fincantieri S.p.A. to provide technical assistance and essential expertise in the construction of the seven frigates using the "modular construction" methodology.[23][24]

Naming[edit | edit source]

The P-17A frigates were named after the former--class frigates, which served in the IN between 1972 and 2013; the first six ships of the series were allotted the names utilised by the older class, namely – Nilgiri, Himgiri, Taragiri, Udaygiri, Dunagiri, and Vindhyagiri.[25] The seventh and final vessel of the P-17A series, which did not have a namesake from the older class, was given the new name of Mahendragiri. The ships are given names of mountain ranges in India.[26]

Instrumentation[edit | edit source]

Armament[edit | edit source]

Anti-surface warfare[edit | edit source]

INS Nilgiri firing a Brahmos

As part of its anti-surface warfare (ASuW) capabilities, the class features eight VLS-launched BrahMos anti-ship cruise missiles, capable of speeds of up to Mach 3.[27] The BrahMos is widely regarded as one of the most formidable anti-ship missiles currently in service, given the missile's extreme versatility and manoeuvrability.[28]

The vessels are equipped with one upgraded OTO Melara 76 mm naval gun for anti-missile/anti-aircraft roles. The upgraded guns manufactured by Bharat Heavy Electricals Limited (BHEL) features the Strales system with DART ammunition firing capability.[29][30] However, INS Udaygiri features the original, older Compact variant of the gun as noted during its commissioning.[14]

Originally, there were plans to install the Mk 45 127 mm (5 in) naval gun, manufactured by BAE; however, this plan was later scrapped in 2021 on account of financial constraints.[31]

Anti-air warfare[edit | edit source]

As part of its anti-air warfare (AAW) capabilities, the class features thirty-two Barak 8 surface-to-air missiles, with eight missiles present in four 2×4 VLS configurations – with two placed at the bow and two placed aft.[32]

The LR-SAM is an extended-range variant of the original Barak 8 and is designed to neutralize various aerial threats, including fighter aircraft, helicopters, anti-ship missiles, cruise missiles, ballistic missiles and unmanned aerial vehicles (UAV). This variant has a range of about 100 km (62 mi).[33]

The ships are also equipped with two AK-630 each for close-in weapon system (CIWS) roles as well as multiple OFT-manufactured 12.7 mm M2 Stabilized Remote Controlled Gun.[14]

Anti-submarine warfare[edit | edit source]

TAL Shyena Torpedo

As part of its anti-submarine warfare (ASW) capabilities, the class features two 324 mm triple-tube lightweight torpedo launchers for firing TAL Shyena torpedoes.[citation needed]

The class also features two RBU-6000 (RPK-8) anti-submarine rocket launchers, capable of firing ASW projectiles to depths of up to 1,000 m (3,280 ft 10 in).[34] The launchers, designated Indigenous Rocket Launchers, have been manufactured indigenously by Larsen & Toubro.[14]

Decoys[edit | edit source]

During the class' unveiling in 2018, the frigate's design was noted to possess two anti-torpedo decoy systems and four decoy launchers – which presumably may be the NSTL Maareech torpedo-countermeasure system and the Kavach anti-missile decoy launchers, respectively.[35][36]

Aviation facilities[edit | edit source]

An animation of helicopter landing on frigate.

As part of its aviation facilities, the class is equipped with a flight-deck and an enclosed aviation hangar, capable of accommodating a single naval helicopter – most likely the ALH Dhruv MK-III maritime-reconnaissance helicopters, or the Westland Sea King Mk. 42B ASW/ASuW helicopters – both of which are operated by the Indian Naval Air Arm.[37]

Sensors[edit | edit source]

Radar[edit | edit source]

The class features the EL/M-2248 MF-STAR active electronically scanned array (AESA) radar as its primary radar suite.[38] The EL/M-2248 is a multi-function, phased-array radar system featuring an azimuth of 360o, with the capability to track both aerial and surface targets, at a range of over 450 km (280 mi).[39]

The class also features the Indra LTR-25 'Lanza' surface-search radar, as its secondary radar suite.[40] The LTR-25 is a solid-state, three-dimensional (3D), long-range radar capable of operating in a dense electronic environment and features a range of over 250 nmi (460 km; 290 mi), with the capability to track various aerial targets – including fighter aircraft and ballistic missiles.[41]

The frigates are also equipped with an advanced combat management system, classified as "CMS-17A", which is reportedly equipped with sophisticated data links for high, efficient interoperability with other naval vessels.[42]

Sonar[edit | edit source]

The class is equipped with the BEL HUMSA-NG sonar, developed by the DRDO. The HUMSA-NG is a hull mounted "active cum passive" integrated sonar system capable of detecting, localizing, classifying and tracking sub-surface targets in both active and passive modes.[43][44]

Electronic warfare[edit | edit source]

The frigates feature the Shakti electronic warfare (EW) suite – developed by the Defence Electronics Research Laboratory (DLRL), for defense against anti-ship missiles and for the interception, detection, classification, identification and jamming of conventional radars.[45] Shakti is equipped with wide-band electronic-support measures (ESM), electronic countermeasures (ECM), an integrated "Radar Finger Printing System (RFPS)" and a data-recording replay feature for "post-mission analysis".[46][47]

Propulsion[edit | edit source]

Each frigate is powered by two General Electric LM2500 gas turbines – manufactured by GE Aviation and two MAN 12V28/33D STC four-stroke engines – manufactured by MAN Diesel & Turbo, arranged in a combined diesel and gas (CODAG) propulsion configuration.[48]

In December 2016, the IN contracted GE Aviation to supply fourteen LM2500 gas turbines for the seven frigates, which were license-assembled in India by the Industrial & Marine Gas Turbine Division (IMGT) of Hindustan Aeronautics Limited (HAL).[49] Under the deal, HAL was additionally sanctioned to provide comprehensive services – including the supply of spare parts, maintenance inspections and equipment overhauls.[50]

At the time of the order, HAL had already delivered eleven LM2500 turbines to the IN; the turbines are specifically used on multiple Indian warships, most notably on the Shivalik-class frigates.[51]

In February 2019, MDL contracted GE to supply an assortment of auxiliary equipment to the IN to support the fourteen engines; under the agreement, GE also handled the design work of the frigate's auxiliary system and its fuel supply system.[52]

In May 2016, the IN contracted MAN Diesel & Turbo to supply fourteen MAN 12V28/33D STC four-stroke engines for the seven frigates; under the deal, the requisite parts needed for the engines were sourced from India, while the engines' final assembly and testing were conducted at MAN's facility in Aurangabad, India.[53]

History[edit | edit source]

Background[edit | edit source]

A rendering of the frigate's design

On 19 June 2009, the Defence Acquisition Council (DAC) — the main acquisition panel subordinate to India's Ministry of Defence (MoD) and chaired by the then Defence Minister of India A. K. Antony — cleared a proposal for the procurement of seven stealth frigates at a cost of 45,000 crore (equivalent to 910 billion or US$13 billion in 2019) under the designation Project 17A, as an advanced variant of -class frigates. The ships were to be constructed by Mazagon Dock Shipbuilders (MDL), Mumbai and Garden Reach Shipbuilders & Engineers (GRSE), Kolkata. The DAC also rejected the Navy's proposal of building two of the warships abroad. The construction of the warships will incorporate modular shipbuilding where 300-tonne prefabricated blocks would be put together similar to the construction style of INS Vikrant. Earlier, on 4 December 2006,[54] the Navy had sent out a pre-tender Request for Information (RFI) to French DCNS, Italian Fincantieri, American firms Lockheed Martin and Northrop Grumman besides shipyards in Russia and Korea for the construction of the first two ships by one of the foreign shipyards so as to ensure the timely absorption of the technology by the Indian shipyards. The project is expected to start in 2011 after both MDL and GRSE completes an upgrade to allow the modular construction. The deliveries were to begin 3–4 years after start of construction. All the firgates are to be inducted by 2022.[55]

As reported on 5 August 2013, the design of the Project 17A frigates along with Project 15B destroyers (now, -class destroyers) were completed by the Directorate of Naval Design (DND) of the Indian Navy. Additionally, the cost negotiations for the construction of the seven vessels had been completed. As part of the project, MDL and GRSE will construct four and three frigates, respectively. Now, the Navy was awaiting clearance from the government.[56]

On 18 February 2015, the Cabinet Committee on Security (CCS) — India's top decision-making institution on matters related to defense and national security chaired by Prime Minister Narendra Modi — green-lighted the proposal for the Project 17A frigates at a cost of 45,381 crore (equivalent to 550 billion or US$7.7 billion in 2019). The contract would be signed in the same month with an initial payment of 4,000 crore (equivalent to 49 billion or US$680 million in 2019). The project is the follow-on of the Shivalik-class or Project 17 frigates and the first ship by each the shipyards is expected to be delivered in 2022.[57][58]

Construction[edit | edit source]

Garden Reach Shipbuilders & Engineers[edit | edit source]

The sea trials of INS Himgiri, the first ship of the batch being built by GRSE.

On 20 February 2015, the Indian Navy signed the contract with the Garden Reach Shipbuilders & Engineers (GRSE), a Kolkata-based public-sector shipyard, to build three frigates under Project 17 Alpha at an estimated cost of 19,294 crore (equivalent to 230 billion or US$3.3 billion in 2019).[59] According to the terms of the contract, GRSE is slated to deliver the three frigates in 2023, 2024 and 2025, respectively.[60] The frigates would be constructed with "Integrated Construction Methodology" in partnership with Italy's Fincantieri.[61] In preparation for the order, GRSE re-augmented its infrastructure by establishing newer, modular shipyards along with a Goliath gantry crane, meant for enabling the construction of the frigates in a short time frame.[62]

A significant proportion of the hull's blocks needed for the vessel's construction was procured from smaller shipyards and metal fabrication shops in and around Kolkata, while the construction/fabrication of additional infrastructure was done at GRSE's Rajabagan shipyard.[63]

Construction reached a hiatus in April 2018, when the shipyard's Goliath crane, having failed to withstand strong cyclonic winds which had been travelling at around 100 km/h (62 mph).[64] The accident rendered the crane permanently inoperable, whilst the module hall - which was to have fabricated the modular blocks for the future frigates, was rendered unusable.[65] However, no damage was reported to have been inflicted on the vessels that were being built by the shipyard, according to representatives from the IN and GRSE.[66]

The mishap forced GRSE to modify the project's timeline, by prioritizing the construction of the modular blocks at its other facilities, rather resuming constructing post-repairs to the shipyard.[67] With the loss of the crane, GRSE resorted to building smaller 50 t and 100 t blocks (instead of the regular 250 t blocks) with the shipyard’s smaller cranes.[68] In 2021, GRSE installed a Goliath crane that had purchased from South Korea, with a lifting capacity of 250 t, thus resuming regular construction operations.[69]

The construction of the first frigate began in November 2018, while work on the second and third frigates began in January 2020 and March 2021, respectively.[70] The first of the three frigates, Himgiri, was launched on 14 December 2020, with its delivery slated to occur in August 2023.[71][72] The second frigate, Dunagiri, was launched on 15 June 2022, with its delivery expected in 2024.[73] The final frigate, Vindhyagiri, was launched in August 2023.[74][75]

On 3 March 2025, GRSE completed the Contractor Sea Trials (CST) of INS Himgiri was completed by GRSE along with INS Androth. As per a press release, "CST is considered the final stage of construction, when a vessel’s seaworthiness is tested".[76]

Himgiri was delivered to the Indian Navy on 31 July 2025[77] and was commissioned simultaneously with MDL's Udaygiri on 26 August 2025.[78][79]

Mazagon Dock Shipbuilders Limited[edit | edit source]

INS Udaygiri, the second ship from MDL, during sea trials

In February 2015, the IN contracted Mazagon Dock Shipbuilders Limited (MDL), a Mumbai-based public-sector shipyard, to build four P-17A frigates at an estimated cost of over ₹21,000 crore.[80][81] According to the terms of the contract, MDL is to deliver the four frigates in 2022, 2023, 2024 and 2025, respectively.[82]

The four frigates were built at different locations, namely, at MDL's main shipbuilding facility in Mumbai, at MDL's subordinate facility in Nhava, at a smaller shipbuilding facility also operated by MDL in Mumbai, at an MSE shipyard in Gujarat and at another shipyard in Goa.[83] Similarly to GRSE, MDL also upgraded its existing infrastructure; the shipyard augmenting its existing facilities with newer equipment, including a "Goliath" gantry crane, a module workshop, a wet basin and a "cradle assembly" shop, meant to facilitate modular construction.[84]

The construction of the first frigate began in December 2017, while work on the second, third and fourth frigates began in May 2019, September 2020 and June 2022, respectively.[85][86] The first of the four frigates, Nilgiri, was launched on 28 September 2019, and began its sea trials five years later, in August 2024.[87] The second frigate, Udaygiri, was launched on 17 May 2022, in a ceremony coinciding with the launch of INS Surat, a -class destroyer.[88] The third frigate, Taragiri, was launched on 11 September 2022, and is scheduled to be delivered by 2025.[89]

Nilgiri was commissioned into the Indian Navy service on 15 January 2025.[90] The second ship, Udaygiri, was delivered to the Indian Navy on 1 July 2025[91][13] and was commissioned simultaneously with GRSE's Himgiri on 26 August 2025.[78][79]

The third ship, Taragiri, was delivered to the Indian Navy on 28 November 2025.[92]

Ships in the class[edit | edit source]

Name Pennant Yard Number Builder Laid Down Launched Commissioning Status
 Indian Navy
Nilgiri F33 12651 Mazagon Dock Shipbuilders Limited (MDL) 28 December 2017[93] 28 September 2019[94][95] 15 January 2025[90] Active
Udaygiri F35 12652 7 May 2019[96] 17 May 2022[97][98] 26 August 2025[78]
Taragiri F41 12653 10 September 2020[99] 11 September 2022[100] 3 April 2026[101] Delivered[92]
Mahendragiri F38 12654 28 June 2022[102] 1 September 2023[103][104][105] Q1 2026[106] Launched
Himgiri F34 3022 Garden Reach Shipbuilders & Engineers (GRSE) 10 November 2018[107] 14 December 2020[71][72] 26 August 2025[78] Active
Dunagiri F36 3023 24 January 2020[108] 15 July 2022[109][73] Q1 2026[110] Launched
Vindhyagiri F42 3024 5 March 2021[111] 17 August 2023[74] Q3 2026[110]
  either scheduled or estimated dates

Export[edit | edit source]

In August 2024, the Mazagon Dock Shipbuilders offered to the Brazilian Navy, the project for a joint construction of up to six Project-17 Alpha frigates, to attend the requirement of Brazil for a new class of 6,000 tons vessels, to operate in conjunction with the newest Tamandaré-class frigates.[112][113]

Gallery[edit | edit source]

See also[edit | edit source]

Frigates of comparable configurations and capabilities[edit | edit source]

Other references to the Indian Navy[edit | edit source]

References[edit | edit source]

  1. @IN_HQENC (8 September 2025). "Multi-Mission stealth frigates..." (Tweet). Retrieved 9 September 2025 – via Twitter.
  2. 2.0 2.1 "Mazagon Dock Shipbuilders Limited – Products – Naval Ships". mazagondock.in.
  3. 3.0 3.1 "Garden Reach Shipbuilders & Engineers Ltd. – Product Profile – Frigate". grse.in.
  4. "LAUNCH OF Y3024 (VINDHYAGIRI) ON 17 AUGUST 2023". pib.gov.in. 13 August 2023.
  5. Sengupta, Prasan K. (September 2012). "CCNS finally kickstarts Indian Navy's Project 17A". ForceIndia.com. Archived from the original on 18 February 2015. Retrieved 21 February 2015.
  6. Mohanan, Kalesh (April–June 2012). "Indigenous Warship Building". Indian Defence Review. Vol. 27, no. 2.
  7. Bhattacharjee, Sumit (4 December 2021). "Eastern Fleet will have Carrier Battle Group: Vice Admiral". The Hindu.
  8. "INS Nilgiri joins Eastern Naval Commamd in Visakhapatnam". The Hindu. 22 June 2025. ISSN 0971-751X. Retrieved 22 June 2025.
  9. Pubby, Manu (18 July 2024). "Mazagon, Garden Reach Shipbuilders lead race for Defence Ministry's ₹70,000 crore warships order". The Economic Times. ISSN 0013-0389. Retrieved 26 August 2024.
  10. Menon, Adithya Krishna (13 August 2023). "India Proceeds with New Submarines, Surface Ships Development". Naval News. Retrieved 26 August 2024.
  11. "Project 17-A Nilgiri-Class Frigates". naval-technology.com. 10 October 2019.
  12. "P-17A Frigate Unveiled". c4defence.com. 26 April 2018.
  13. 13.0 13.1 "Project 17A Indigenous Stealth Frigate Udaygiri delivered to Indian Navy". Press Information Bureau. 1 July 2025. Retrieved 1 July 2025.
  14. 14.0 14.1 14.2 14.3 14.4 Menon, Adithya Krishna (27 August 2025). "Indian Navy inducts two more Nilgiri-class frigates to Eastern Fleet". Naval News. Retrieved 28 August 2025.
  15. "BEL Order Book Crosses 50,000 Crore landmark". Press Information Bureau. 5 September 2018. Retrieved 6 January 2025.
  16. Dominguez, Gabriel (24 October 2018). "IAI wins USD777 million contract to supply additional Barak-8 LRSAM systems for Indian Navy". Jane's Defence Weekly. Archived from the original on 24 October 2018.
  17. "Defence ministry inks Rs 2,956 cr contract with BHEL to procure 16 super rapid gun mount for Navy". The Economic Times. 28 November 2023. ISSN 0013-0389. Retrieved 18 January 2025.
  18. Staff, Naval News (29 November 2023). "India procures 16 Upgraded Super Rapid Naval Gun Systems for Indian Navy". Naval News. Retrieved 18 January 2025.
  19. "India's second Project P17A Nilgiri-class guided missile frigate launched". asiapacificdefensejournal.com. 31 December 2020.
  20. "INS 'Himgiri', Indian Navy's advanced P17A-class stealth frigate, launched at GRSE yard – here's all you need to know". freepressjournal.com. 14 December 2020.
  21. 21.0 21.1 21.2 "MDL Augmented To Build 11 Submarines And 10 Ships at Any Given Time: R-Admiral AK Saxena, Director, Mazagon Dock". businessworld.com. 31 October 2020.
  22. "Indian Navy's Project 17A Stealth Frigate Launched". defenseworld.net. 14 December 2020.
  23. "Fincantieri To Collaborate with the Indian Shipyards MDL and GRSE for the Navy's Frigates". fincantieri.com. 21 December 2015.
  24. "Mazagon Dock Teams Up With Italian Fincantieri To Build Stealth Frigates For Indian Navy". defenseworld.net. 24 March 2016.
  25. "Navy to name 7th frigate in P17A series as 'Mahendragiri'". theweek.in. 4 April 2020.
  26. "Indian Navy to name 7th frigate in P17A series as 'Mahendragiri'". economictimes.indiatimes.com. 23 September 2019.
  27. "'Indigenously designed' BrahMos to equip Talwar-class frigates". business-standard.com. 1 December 2018.
  28. "Bullseye: The 5 Most Deadly Anti-Ship Missiles of All Time". nationalinterest.com. 13 March 2015.
  29. "Defence and Aerospace | Official Website of Bharat Heavy Electricals Limited, New Delhi, India". www.bhel.com. Archived from the original on 30 September 2022. Retrieved 18 January 2025.
  30. Menon, Adithya Krishna (15 January 2025). "Indian Navy Inducts New Destroyer, Frigate and Submarine". Naval News. Retrieved 18 January 2025.
  31. "Navy to scrap plans to procure guns from US, considering 'Make in India' route now". theprint.in. 2 August 2021.
  32. "Indo-Israeli Barak 8 missile: Indian Navy to test long-range SAM soon". economictimes.indiatimes.com. 14 July 2018.
  33. "Indian Navy successfully tests Barak 8 interceptor missile: All you need to know". indiatoday.in. 30 December 2015.
  34. "India Reveals P-17A Configuration". indiandefensenews.in. 27 April 2018.
  35. "India Revealed P-17A Frigate Configuration At Defexpo 2018". worldnavalnews.com. 30 November 2018.
  36. Menon, Adithya Krishna (29 August 2024). "India's First P17A Nilgiri-class Frigate Starts Sea Trials". Naval News. Retrieved 30 August 2024.
  37. "Very Significant About The P-17A Frigates – Sandeep Unnithan". 17 September 2019 – via Twitter.
  38. "Indian launches new Project 17A class frigates". guardingindia.com. 14 December 2020.
  39. "ELM-2248 MF-STAR Multi-Function Digital AESA Radar". iai.co.il.
  40. "Kolkata shipbuilder to launch high-tech stealth warship next week". theweek.in. 11 December 2020.
  41. "Lanza Radar LTR-25" (PDF). indracompany.com.
  42. "Project 17 A: Know about ambitious project to indigenously build advanced stealth frigates". financialexpress.com. 20 September 2019.
  43. "HUMSA NG". drdo.gov.in.
  44. "Fortifying Fleet: Significance of Nilgiri Class Frigates in Indian Naval Defence". Bharat Shakti. 2 July 2024. Retrieved 23 August 2024.
  45. "SHAKTI". vajiramias.com. 29 November 2019.
  46. "Prime Minister to Formally Handover DRDO Designed and Developed Advanced Electronic Warfare Suite 'Shakti' for Indian Naval Ships to Chief of Naval Staff". pib.gov.in. 18 November 2021.
  47. "PM Modi to handover DRDO designed advanced electronic warfare suite to Navy today". aninews.in. 19 November 2021.
  48. "Nilgiri-Class (Project 17A) Frigates". naval-technology.com. 17 December 2020.
  49. "LM2500 marine gas turbines to power Indian Navy's P17A stealth frigate". navaltoday.com. 8 December 2016.
  50. "GE Marine to provide LM2500 gas turbines for Indian Navy". turbomachinerymag.com. 1 January 2017.
  51. "LM 2500". hal-india.com.
  52. "GE to Supply LM2500 Gas Turbine Auxiliary Equipment for Indian Navy's P17A Frigates". seapowermagazine.org. 8 February 2022.
  53. "Indian Navy Orders MAN Medium Diesel Engines For Stealth Frigates". defenseworld.net. 18 May 2016.
  54. "Indian Navy on modernisation drive, to build stealth frigates". India Today. 4 December 2006. Retrieved 21 July 2025.
  55. "Navy seals 45,000-cr deal: seven warships". The Indian Express. 20 June 2009. Archived from the original on 21 July 2025. Retrieved 21 July 2025.
  56. "Navy designs India's largest ever ship, focuses on stealth and futuristic frigates". India Today. 5 August 2013. Retrieved 21 July 2025.
  57. Shukla, Ajai (18 February 2015). "Rs 50k-cr naval project gets Cabinet nod". Business Standard. Retrieved 21 July 2025.
  58. "Government approves construction of seven stealth frigates, 6 nuclear-powered submarines". The Times of India. 18 February 2015.
  59. admin (22 April 2015). "GRSE wins $3.17bn Indian Navy contract to build three new stealth frigates". Naval Technology. Retrieved 21 July 2025.
  60. "GRSE Wins $3.1 Billion Indian Navy's Frigate Order". www.defensemirror.com. 23 April 2015. Retrieved 21 July 2025.
  61. "Frigate - Official website of Garden Reach Shipbuilders and Engineers Limited - A Government of India undertaking, Ministry of Defence". grse.in. Archived from the original on 21 July 2025. Retrieved 21 July 2025.
  62. "India finalizing mega stealth frigates' project for over Rs 50,000 crore". The Times of India. 9 July 2012.
  63. "First GRSE-built frigate enters water". janes.com. 15 December 2020.
  64. "Accident at PSU ship-builder GRSE hits operations, company says work not affected". milleniumpost.in. 2 May 2018.
  65. "Accident at PSU ship-builder GRSE hits operations, company says work not affected". business-standard.com. 2 May 2018.
  66. "Accident at PSU ship-builder GRSE hits operations, company says work not affected". bharatdefencekavach.com. 2 May 2018.
  67. "Exclusive : Despite Major Shipyard Mishap, New Frigates To Be Delivered On Time". ndtv.com. 9 May 2018.
  68. "Crane collapse at GRSE may hurt warship work". thehindubusinessline.com. 1 May 2018.
  69. "GRSE Commissioned New 250 Ton Goliath Crane". aeromagonline.com. 22 June 2021.
  70. "GRSE Starts Construction of Their First P17A Frigate for the Indian Navy". navyrecognition.com. 13 November 2018.
  71. 71.0 71.1 "Launch of 2nd Project 17A Ship 'Himgiri'" (Press release). Press Information Bureau. 14 December 2020. Retrieved 11 August 2025.
  72. 72.0 72.1 "GRSE-built stealth frigate Himgiri launched; General Bipin Rawat calls it a 'historic moment'". Deccan Herald. 14 December 2020. Retrieved 11 August 2025.
  73. 73.0 73.1 "Raksha Mantri launches Y3023 Dunagiri, Project 17A frigate at GRSE Ltd, Kolkata" (Press release). Press Information Bureau. 15 July 2022. Retrieved 11 August 2025.
  74. 74.0 74.1 Vavasseur, Xavier (17 August 2023). "Indian Navy's 6th Nilgiri-class P17A Frigate Launched by GRSE". Naval News. Retrieved 11 August 2025.
  75. "Launch of Y3024 (Vindhyagiri)" (Press release). Press Information Bureau. 17 August 2023. Retrieved 11 August 2025.
  76. "GRSE completes Contractor Sea Trials of two warships simultaneously". Press Information Bureau. 17 March 2025. Retrieved 19 March 2025.
  77. @OfficialGRSE (31 July 2025). "GRSE Delivers its 801st Vessel—'Himgiri', an Advanced P17A Frigate to Indian Navy" (Tweet) – via Twitter.
  78. 78.0 78.1 78.2 78.3 "Multi-mission stealth frigates - INS Udaygiri & INS Himgiri - commissioned into Indian Navy in the presence of Raksha Mantri in Vizag" (Press release). Press Information Bureau. 26 August 2025. Retrieved 26 August 2025.
  79. 79.0 79.1 "Maritime milestone: Indian Navy commissions INS Udaygiri and Himgiri; twin induction for first time". The Times of India. 26 August 2025. ISSN 0971-8257. Retrieved 26 August 2025.
  80. "Mazagon Dock Shipbuilders Limited" (PDF). hdfcsec.com. 15 July 2021.
  81. "More than 180 contracts valued over Rs 1,96,000 crore signed with Indian Defense Industry since 2014". pib.gov.in. 5 December 2019.
  82. "A Tale of Two Navies: India and China's Current Carrier and Escort Procurement". thediplomat.com. 4 August 2021.
  83. "Making Waves" (PDF). maritimeindia.org. 31 October 2020.
  84. "Modernization and Security of Shipyards". pib.gov.in. 26 February 2016.
  85. "Construction Begins on Indian Navy's Third P17A Class Stealth Frigate". naval-technology.com. 11 September 2020. Archived from the original on 11 August 2025. Retrieved 11 August 2025.
  86. "MDL commences production of Y-12654, fourth ship of P17A". freepressjournal.in. 30 January 2020. Archived from the original on 11 August 2025. Retrieved 11 August 2025.
  87. Team, IADN Editorial (25 August 2024). "INS Nilgiri Undergoes Sea-trials - IADN". - IADN. Retrieved 26 August 2024.
  88. "INS Surat, INS Udaygiri Ready To Protect India". rediff.com. 17 May 2022.
  89. "Third stealth frigate of project 17A 'Taragiri' launched". www.thehindu.com. 12 September 2022.
  90. 90.0 90.1 "Prime Minister Shri Narendra Modi dedicates frontline naval combatants INS Surat, INS Nilgiri & INS Vaghsheer to the nation". Press Information Bureau. 15 January 2025.
  91. @indiannavy (1 July 2025). "Udaygiri, the second warship of the Project P17A Nilgiri Class stealth frigates..." (Tweet). Retrieved 1 July 2025 – via Twitter.
  92. 92.0 92.1 "Delivery of 'Taragiri', the fourth Nilgiri class (Project 17A) indigenous advanced stealth frigate" (Press release). Press Information Bureau. 29 November 2025. Retrieved 29 November 2025.
  93. "Construction of P17A class stealth frigates begins". Mid Day. 29 December 2017. Archived from the original on 29 December 2017.
  94. "Rajnath Singh launches warship Nilgiri in Mumbai". The Times of India. Asian News international. 28 September 2019.
  95. "Indian Navy has launched first stealth P-17A Nilgiri-class frigate INS Nilgiri". navyrecognition.com. 29 September 2019.
  96. "Year End Review – 2019 Ministry of Defence". 27 December 2019. Keel laying ceremony of Yard 12652 (Second ship of Project 17A at M/s MDL) was held on 7 May at M/s MDL, Mumbai.
  97. "Rajnath Singh launches frontline warships INS Surat, INS Udaygiri". businesstoday.in/. 17 May 2022.
  98. "CURTAIN RAISER: LAUNCH OF YD 12707(SURAT) & YD 12652 (UDAYGIRI)". pib.gov.in. 17 May 2022.
  99. "Keel laid for the third stealth frigate of Project 17A". PIB. Retrieved 10 September 2020.
  100. "India Launches Stealth Frigate "Taragiri"". Retrieved 11 September 2022.
  101. Rana, Javier (15 March 2026). "India's latest homegrown stealth frigate INS Taragiri to join Navy next month". The New Indian Express. Retrieved 15 March 2026.{{cite web}}: CS1 maint: url-status (link)
  102. "KEEL LAYING – SEVENTH PROJECT 17A (P17A) SHIP". PIB. Retrieved 28 June 2022.
  103. "Warship Mahendragiri with advanced weapons, sensors launched: Top points". Livemint. 1 September 2023. Retrieved 1 September 2023.
  104. @MazagonDockLtd (22 August 2023). "Let the countdown begin as we sail closer to the historic launch of the fourth frigate of P17A by #MDL" (Tweet) – via Twitter.
  105. "Indian Navy's stealth frigate Mahendragiri launched". Times of India. 1 September 2023.
  106. "Final Stealth Frigate INS Mahendragiri to boost Navy's edge in Indian Ocean with advanced firepower". 9 July 2025.
  107. Dominguez, Gabriel (14 November 2018). "GRSE lays keel for Indian Navy's second Project 17A frigate". IHS Jane's Defence Weekly. Archived from the original on 14 November 2018.
  108. "Project 17A: GRSE starts building 2nd Advanced Stealth Frigate". psuwatch.com. 24 January 2020.
  109. "Garden Reach Shipbuilders & Engineers – Q4FY21 – ICICI Securities". GRSE. Retrieved 5 June 2021.
  110. 110.0 110.1 "GRSE Analyst meet-March 2024" (PDF). 21 March 2024.
  111. @OfficialGRSE (5 March 2021). "Garden Reach Shipbuilders and Engineers Limited (GRSE) achieved a major milestone with 'laying of the Keel' of Yard 3024 a ship of the Advanced Stealth Frigate Project, P 17A" (Tweet) – via Twitter.
  112. "La Marina de Brasil y la conexión India-Pakistán: tecnologías navales críticas compartidas". Infodefensa (in español). 23 August 2024.
  113. "El legado de la Clase Niterói: Brasil está a un paso de la botadura de la primera fragata clase Tamandaré". Infodefensa (in español). 19 July 2024.

External links[edit | edit source]