m Removed empty portal template using script |
m added info |
||
| Line 1: | Line 1: | ||
{{Short description|Chennai Metro's Green Line metro station}} | |||
{{Use dmy dates|date=January 2016}} | {{Use dmy dates|date=January 2016}} | ||
{{Use Indian English|date=January 2016}} | {{Use Indian English|date=January 2016}} | ||
{{Infobox station | {{Infobox station | ||
| name | | name = [[File:Chennai Metro logo.svg|50px]]<br />Arumbakkam | ||
| type | | type = {{Chennai Metro Infobox station line|line = Green|line2 = Inter}} | ||
| style | | style = Chennai Metro | ||
| image | | image = Arumbakkam metro station.jpg | ||
| image_caption = Arumbakkam metro station | | image_caption = Arumbakkam metro station | ||
| address | | address = Jawaharlal Nehru Rd, Vinayagapuram, Arumbakkam, Chennai, Tamil Nadu 600106 | ||
| coordinates | | coordinates = {{coord|13|3|44|N|80|12|42|E|display=inline,title}} | ||
| line | | line = {{rcb|Chennai Metro|Green|croute}} {{color box|#{{rail color|Chennai Metro|Green}}; font-size:100%|[[Green Line (Chennai Metro)#Inter Corridor Line|<span style="color:blue;">'''Inter Corridor Line'''</span>]]|}} | ||
| other | | other = | ||
| structure | | structure = [[Elevated]], [[Double-track railway|Double Track]] | ||
| platform | | platform = [[Side platform]]<br /> | ||
Platform-1 → [[St. Thomas Mount railway station#Integrated Terminus for suburban.2C MRTS .26 METRO|St. Thomas Mount]]<br />Platform-2 → [[ | Platform-1 → [[St. Thomas Mount railway station#Integrated Terminus for suburban.2C MRTS .26 METRO metro station|St. Thomas Mount]]<br />Platform-2 → [[Chennai Central metro station|M.G.R Chennai Central]] | ||
| depth | | depth = | ||
| levels | | levels = 2 | ||
| tracks | | tracks = 2 | ||
| parking | | parking = {{parking symbol}} Available | ||
| bicycle | | bicycle = Free Bicycle {{parking symbol}} Available | ||
| opened | | opened = {{start date and age|2015|June|29}} | ||
| closed | | closed = | ||
| rebuilt | | rebuilt = | ||
| electrified | | electrified = [[Single-phase electric power|Single-phase]] {{25 kV 50 Hz}} [[overhead catenary]] | ||
| | | accessible = Yes {{access icon}} | ||
| code | | code = SAR | ||
| owned | | owned = [[Chennai Metro]] | ||
| operator | | operator = Chennai Metro Rail Limited (CMRL) | ||
| zone | | zone = | ||
| smartcardname = | | smartcardname = | ||
| smartcardstatus = | | smartcardstatus = | ||
| former | | former = | ||
| passengers | | passengers = | ||
| pass_year | | pass_year = | ||
| pass_rank | | pass_rank = | ||
| pass_percent | | pass_percent = | ||
| pass_system | | pass_system = | ||
| mpassengers | | mpassengers = | ||
| services | | services = {{adjacent stations|system=Chennai Metro|line=Green|left=CMBT|right=Vadapalani|line2=Blue|left2=CMBT|to-left2=Chennai Central|note-mid2=''(Inter-Corridor Service)''|right2=Vadapalani|to-right2=Kilambakkam}} | ||
| route_map = {{Chennai Metro Green Line Route}} | |||
| | | map_state = collapsed | ||
| | | mapframe = yes | ||
| | | mapframe-marker = rail | ||
| route_map | | mapframe-marker-color = #{{rail color|Chennai Metro|Green}} | ||
| map_state | | mapframe-zoom = 14 | ||
}} | }} | ||
'''Arumbakkam | '''Arumbakkam''' is an elevated metro station on the South-East Corridor of the [[Green Line (Chennai Metro)|Green Line]] of [[Chennai Metro]] in [[Chennai]], India. This station will serve the neighbourhoods of [[Vinayagapuram]], [[Choolaimedu]] and [[MMDA Colony]]. | ||
==Construction history== | ==Construction history== | ||
[[File:Arumbakkam metro station 02.jpg|thumb|left|220px|A view of the platforms inside the station]] | |||
The station was constructed by Consolidated Constructed Consortium (CCCL). The station attained structural completion in September 2013. The consolidated cost of the station along with the stations of [[Koyambedu metro station|Koyambedu]], [[CMBT metro station|CMBT]], [[Vadapalani metro station|Vadapalani]] and [[Ashok Nagar metro station|Ashok Nagar]] was {{INR}} 1,395.4 million.<ref name="Hindu_ArukbnakkamStnAlmostComplete">{{cite news| title = Arumbakkam metro station almost complete| newspaper = The Hindu| location = Chennai | date = 10 September 2013|url =http://www.thehindu.com/news/cities/chennai/arumbakkam-metro-station-almost-complete/article5110276.ece| access-date = 2 Feb 2015}}</ref> | The station was constructed by Consolidated Constructed Consortium (CCCL). The station attained structural completion in September 2013. The consolidated cost of the station along with the stations of [[Koyambedu metro station|Koyambedu]], [[CMBT metro station|CMBT]], [[Vadapalani metro station|Vadapalani]] and [[Ashok Nagar metro station|Ashok Nagar]] was {{INR}} 1,395.4 million.<ref name="Hindu_ArukbnakkamStnAlmostComplete">{{cite news| title = Arumbakkam metro station almost complete| newspaper = The Hindu| location = Chennai | date = 10 September 2013|url =http://www.thehindu.com/news/cities/chennai/arumbakkam-metro-station-almost-complete/article5110276.ece| access-date = 2 Feb 2015}}</ref> | ||
| Line 54: | Line 56: | ||
The station is being constructed as an elevated station on the arterial [[Inner Ring Road, Chennai|Inner Ring Road]]. The station will have ground, concourse and platform levels. The station will have four entry and exit points, four lifts and eight escalators; there will also be a ramp to facilitate the movement of disabled people from the ground level to the concourse level.<ref name="Hindu_ArukbnakkamStnAlmostComplete"/> Elevation of the platforms will be about 15 m from the ground level and the total length of the platforms will be 140 m.<ref name="TOI_AllRoadsLeadToMetro">{{cite news| last = Hemalatha| first = Karthikeyan| author2 = V Ayyappan| title = All roads to lead to metro stations| newspaper = The Times of India| location = Chennai| publisher = The Times Group| date = 17 January 2013| url = http://epaper.timesofindia.com/Default/Scripting/ArticleWin.asp?From=Archive&Source=Page&Skin=TOINEW&BaseHref=TOICH/2013/01/17&PageLabel=2&EntityId=Ar00200&ViewMode=HTML| access-date = 18 Jan 2013| archive-url = https://web.archive.org/web/20150201161554/http://epaper.timesofindia.com/Default/Scripting/ArticleWin.asp?From=Archive&Source=Page&Skin=TOINEW&BaseHref=TOICH%2F2013%2F01%2F17&PageLabel=2&EntityId=Ar00200&ViewMode=HTML| archive-date = 1 February 2015| url-status = dead}}</ref> | The station is being constructed as an elevated station on the arterial [[Inner Ring Road, Chennai|Inner Ring Road]]. The station will have ground, concourse and platform levels. The station will have four entry and exit points, four lifts and eight escalators; there will also be a ramp to facilitate the movement of disabled people from the ground level to the concourse level.<ref name="Hindu_ArukbnakkamStnAlmostComplete"/> Elevation of the platforms will be about 15 m from the ground level and the total length of the platforms will be 140 m.<ref name="TOI_AllRoadsLeadToMetro">{{cite news| last = Hemalatha| first = Karthikeyan| author2 = V Ayyappan| title = All roads to lead to metro stations| newspaper = The Times of India| location = Chennai| publisher = The Times Group| date = 17 January 2013| url = http://epaper.timesofindia.com/Default/Scripting/ArticleWin.asp?From=Archive&Source=Page&Skin=TOINEW&BaseHref=TOICH/2013/01/17&PageLabel=2&EntityId=Ar00200&ViewMode=HTML| access-date = 18 Jan 2013| archive-url = https://web.archive.org/web/20150201161554/http://epaper.timesofindia.com/Default/Scripting/ArticleWin.asp?From=Archive&Source=Page&Skin=TOINEW&BaseHref=TOICH%2F2013%2F01%2F17&PageLabel=2&EntityId=Ar00200&ViewMode=HTML| archive-date = 1 February 2015| url-status = dead}}</ref> | ||
=== | ===Station layout=== | ||
{{Routemap | {{stack|{{Routemap | ||
| title = Arumbakkam track layout | | title = Arumbakkam track layout | ||
|title-bg=#{{Chennai Metro | | title-bg = #{{rail color|Chennai Metro|Green}} | ||
| title-color = white | |||
| legend = track | | legend = track | ||
| collapsible = no | | collapsible = no | ||
| map = | | map = vCONTgfa | ||
vCONTgfa | cPLT\vSTR\cPLT ~~ ~~ ~~ to [[CMBT metro station|Jayalalithaa CMBT]] | ||
*'''P1'''\cPLT\vSTR\cPLT\*'''P2''' | |||
cPLT\vSTR\cPLT ~~ ~~ ~~ to [[Vadapalani metro station|Vadapalani]] | |||
vCONTgfe | vCONTgfe | ||
| bottom = <div style="width: | | bottom = <div style="width:23.5em;text-align:center">Station with two tracks and two side platforms</div> | ||
}} | }}}} | ||
{|table border=0 cellspacing=0 cellpadding=3 | {|table border=0 cellspacing=0 cellpadding=3 | ||
|style="border-bottom:solid 1px gray;border-top:solid 1px gray;" width=50 valign=top|'''G''' | |style="border-bottom:solid 1px gray;border-top:solid 1px gray;" width=50 valign=top|'''G''' | ||
| Line 79: | Line 80: | ||
|- | |- | ||
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=50 rowspan=4 valign=top|'''L2''' | |style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=50 rowspan=4 valign=top|'''L2''' | ||
|style="border-top:solid 1px gray;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" colspan=2|<small>[[Side platform]] | |style="border-top:solid 1px gray;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" colspan=2|<small>[[Side platform]] | Doors will open on the left {{access icon}}</small> | ||
|- | |- | ||
|style="border-bottom:solid 1px gray;" width=100|<span style=color:#{{Chennai Metro | |style="border-bottom:solid 1px gray;" width=100|<span style=color:#{{rail color|Chennai Metro|Green}}>'''Platform 2'''<br/>'''Northbound'''</span> | ||
|style="border-bottom:solid 1px gray;" width=500|Towards →[[ | |style="border-bottom:solid 1px gray;" width=500|Towards → [[Chennai Central metro station|Chennai Central]]<br><small>'''Next Station:''' [[CMBT metro station|Puratchi Thalaivi Dr. J.Jayalalithaa CMBT]]</small> | ||
|- | |- | ||
|<span style=color:#{{Chennai Metro | |<span style=color:#{{rail color|Chennai Metro|Green}}>'''Platform 1'''<br/>'''Southbound'''</span> | ||
|<span style=color:white> | |<span style=color:white></span>Towards ← [[St. Thomas Mount railway station#Integrated Terminus for suburban.2C MRTS .26 METRO|St. Thomas Mount]]<br><small>'''Next Station:''' [[Vadapalani metro station|Vadapalani]]</small> | ||
|- | |- | ||
|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;text-align:center;" colspan=2|<small>[[Side platform]] | |style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;text-align:center;" colspan=2|<small>[[Side platform]] | Doors will open on the left {{access icon}}</small> | ||
|- | |- | ||
|style="border-bottom:solid 1px gray;" width=50 rowspan=2 valign=top|'''L2''' | |style="border-bottom:solid 1px gray;" width=50 rowspan=2 valign=top|'''L2''' | ||
| Line 102: | Line 103: | ||
==Commercial hub== | ==Commercial hub== | ||
[[File:Arumbakkam Metro Station.jpg|thumb|Entrance of the Arumbakkam Metro Station]] | |||
Arumbakkam station is one of the five stations in the first phase of the Chennai Metro project identified to be converted into commercial hubs, the others being [[CMBT metro station|CMBT]], [[Alandur metro station|Alandur]], [[Ekkattuthangal metro station|Ekkattuthangal]], and [[Ashok Nagar metro station|Ashok Nagar]]. Two nine-floor buildings, measuring 51,379 sq ft and 32,721 sq ft, are proposed to be built at the Arumbakkam station.<ref>{{cite news| last = TNN | title = In less than a year, you can park, shop and ride at metro rail stations | newspaper = The Times of India | location = Chennai | Arumbakkam station is one of the five stations in the first phase of the Chennai Metro project identified to be converted into commercial hubs, the others being [[CMBT metro station|CMBT]], [[Alandur metro station|Alandur]], [[Ekkattuthangal metro station|Ekkattuthangal]], and [[Ashok Nagar metro station|Ashok Nagar]]. Two nine-floor buildings, measuring 51,379 sq ft and 32,721 sq ft, are proposed to be built at the Arumbakkam station.<ref>{{cite news| last = TNN | title = In less than a year, you can park, shop and ride at metro rail stations | newspaper = The Times of India | location = Chennai | ||
| publisher = The Times Group | date = 23 September 2014 | url = http://timesofindia.indiatimes.com/city/chennai/In-less-than-a-year-you-can-park-shop-and-ride-at-metro-rail-stations/articleshow/43194300.cms| access-date = 3 February 2015}}</ref> | | publisher = The Times Group | date = 23 September 2014 | url = http://timesofindia.indiatimes.com/city/chennai/In-less-than-a-year-you-can-park-shop-and-ride-at-metro-rail-stations/articleshow/43194300.cms| access-date = 3 February 2015}}</ref> | ||
==See also== | ==See also== | ||
{{stack|}} | {{stack|{{Portal|India|Trains}}}} | ||
{{columns-list|colwidth=22em| | {{columns-list|colwidth=22em| | ||
* [[List of Chennai metro stations]] | * [[List of Chennai metro stations]] | ||
| Line 137: | Line 133: | ||
{{Chennai Topics}} | {{Chennai Topics}} | ||
{{Chennai Metro}} | {{Chennai Metro|green line=yes}} | ||
{{Transport in Chennai}} | {{Transport in Chennai}} | ||
[[Category:Railway stations in India opened in 2015]] | |||
[[Category:Chennai Metro stations]] | [[Category:Chennai Metro stations]] | ||
[[Category:Railway stations in Chennai]] | [[Category:Railway stations in Chennai]] | ||
Latest revision as of 00:05, 7 January 2026
| Template:Chennai Metro Infobox station line | |||||
![]() Arumbakkam metro station | |||||
| Location | Jawaharlal Nehru Rd, Vinayagapuram, Arumbakkam, Chennai, Tamil Nadu 600106 | ||||
| Coordinates | 13°3′44″N 80°12′42″E / 13.06222°N 80.21167°E | ||||
| Owned by | Chennai Metro | ||||
| Operated by | Chennai Metro Rail Limited (CMRL) | ||||
| Line(s) | Template:Rcb Inter Corridor Line | ||||
| Platforms | Side platform Platform-1 → St. Thomas Mount Platform-2 → M.G.R Chennai Central | ||||
| Tracks | 2 | ||||
| Construction | |||||
| Structure type | Elevated, Double Track | ||||
| Platform levels | 2 | ||||
| Parking | |||||
| Bicycle facilities | Free Bicycle | ||||
| Other information | |||||
| Station code | SAR | ||||
| History | |||||
| Opened | June 29, 2015 | ||||
| Electrified | Single-phase Template:25 kV 50 Hz overhead catenary | ||||
| Services | |||||
|
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Chennai Metro' not found. | |||||
| |||||
| Location | |||||
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | |||||
Arumbakkam is an elevated metro station on the South-East Corridor of the Green Line of Chennai Metro in Chennai, India. This station will serve the neighbourhoods of Vinayagapuram, Choolaimedu and MMDA Colony.
Construction history[edit | edit source]

The station was constructed by Consolidated Constructed Consortium (CCCL). The station attained structural completion in September 2013. The consolidated cost of the station along with the stations of Koyambedu, CMBT, Vadapalani and Ashok Nagar was ₹ 1,395.4 million.[1]
The station[edit | edit source]
The station is being constructed as an elevated station on the arterial Inner Ring Road. The station will have ground, concourse and platform levels. The station will have four entry and exit points, four lifts and eight escalators; there will also be a ramp to facilitate the movement of disabled people from the ground level to the concourse level.[1] Elevation of the platforms will be about 15 m from the ground level and the total length of the platforms will be 140 m.[2]
Station layout[edit | edit source]
| style="color:white;background:#Template:Rail color;text-align:center;padding:5px"| Arumbakkam track layout | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
| ||||||||||||||||||||||||||||||||||||||||||
| G | Street Level | Exit/Entrance |
| L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| L2 | Side platform | Doors will open on the left | |
| Platform 2 Northbound |
Towards → Chennai Central Next Station: Puratchi Thalaivi Dr. J.Jayalalithaa CMBT | |
| Platform 1 Southbound |
Towards ← St. Thomas Mount Next Station: Vadapalani | |
| Side platform | Doors will open on the left | ||
| L2 | ||
Facilities[edit | edit source]
- Elevator
- Ticket booking Machines
- Refreshmentaries
- Atm
Commercial hub[edit | edit source]

Arumbakkam station is one of the five stations in the first phase of the Chennai Metro project identified to be converted into commercial hubs, the others being CMBT, Alandur, Ekkattuthangal, and Ashok Nagar. Two nine-floor buildings, measuring 51,379 sq ft and 32,721 sq ft, are proposed to be built at the Arumbakkam station.[3]
See also[edit | edit source]
References[edit | edit source]
- ↑ 1.0 1.1 "Arumbakkam metro station almost complete". The Hindu. Chennai. 10 September 2013. Retrieved 2 February 2015.
- ↑ Hemalatha, Karthikeyan; V Ayyappan (17 January 2013). "All roads to lead to metro stations". The Times of India. Chennai: The Times Group. Archived from the original on 1 February 2015. Retrieved 18 January 2013.
- ↑ TNN (23 September 2014). "In less than a year, you can park, shop and ride at metro rail stations". The Times of India. Chennai: The Times Group. Retrieved 3 February 2015.
External links[edit | edit source]
- UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.
- Google. "Arumbakkam metro station" (Map). Google Maps. Google.
{{cite map}}:|author=has generic name (help)

