Created by Ajay Kumar
Last edited March 5, 2026
Created a new article
Tag: nowiki added
 
Janni (talk | contribs)
m update structure as per guidelines and corrected details
 
Line 1: Line 1:
{{short description|Type of railway with speeds approaching but less than that of true high speed rail}}
{{Short description|Type of railway with speeds approaching but less than that of true high-speed rail}}
{{about|rail service that is of a higher speed than conventional inter-city rail|high-speed rail services with speeds more than {{cvt|200|km/h|mph|round=5}}|High-speed rail}}
{{About|rail service that is of a higher speed than conventional inter-city rail|high-speed rail services with speeds more than {{cvt|200|km/h|mph|round=5}}|High-speed rail}}
{{Use dmy dates|date=September 2020}}
{{Use dmy dates|date=January 2025}}
{{multiple image
{{multiple image
<!-- Essential parameters -->
<!-- Essential parameters -->| align            = right
| align            = right
| direction        = vertical
| direction        = vertical
| width            = 300
| width            = 250
 
<!-- Image 1 -->| image1            = Southwest Chief at Los Cerrillos, February 2020.jpg
<!-- Image 1 -->
| image1            = FXD1-J0010 at Guangqumen (20190203093259).jpg
| width1            =  
| width1            =  
| alt1              = China Railway CR200J
| alt1              = The Amtrak Southwest Chief
| caption1          = [[China Railway CR200J]] on [[Beijing–Shanghai railway]].
| caption1          = Amtrak's ''[[Southwest Chief]]'' in [[Los Cerrillos, New Mexico]].
 
<!-- Image 2 -->| image2            = Vande Bharat Express around Mumbai.jpg
<!-- Image 2 -->
| image2            = Vande Bharat Express around Mumbai.jpg
| imagesize        = 300px
| image_width      =
| caption2          = [[Vande Bharat Express]] in Mumbai.
 
<!-- Image 3 -->
| image3            = Southwest Chief at Los Cerrillos, February 2020.jpg
| width2            =  
| width2            =  
| alt3              = The Amtrak Southwest Chief
| alt2              = Vande Bharat Express
| caption3          = Amtrak's ''[[Southwest Chief]]'' east of [[Los Cerrillos, New Mexico]].
| caption2          = [[Vande Bharat Express]] near [[Chennai]].
| total_width      =
<!-- Image 3 -->| image3            = FXD1-J0010 at Guangqumen (20190203093259).jpg
| width3            =
| alt3              = China Railway CR200J
| caption3          = CR200J on [[Beijing–Shanghai railway]]
<!-- Image 4 -->| image4            = VIA_2311.jpg
| width4            =
| alt4              = Via Rail's Corridor service east of Toronto
| caption4          = [[Via Rail]]'s [[Quebec City–Windsor Corridor (Via Rail)|Corridor]] service, east of [[Toronto]]
}}
}}
'''Higher-speed rail''' ('''HrSR'''),<ref>{{cite news |last=Bowen |first=Douglas John |date=27 August 2012 |title=U.S. HSR accelerates |newspaper=Railway Age |url=http://www.railwayage.com/index.php/passenger/high-performance/us-hsr-accelerates.html#.UHT7PxVuSSo |url-status=live |access-date=10 October 2012 |archive-url=https://web.archive.org/web/20121001113636/http://www.railwayage.com/index.php/passenger/high-performance/us-hsr-accelerates.html#.UHT7PxVuSSo |archive-date=1 October 2012}}</ref> also known as '''high-performance rail''',<ref>"[http://thomas.loc.gov/cgi-bin/query/z?c112:H.R.4361.IH: H.R.4361 – National High Performance Passenger Rail Transportation-Oriented Development Act of 2012]{{Dead link|date=August 2021 |bot=InternetArchiveBot |fix-attempted=yes }}" 112th Congress of the United States. Retrieved 10 September 2013.</ref> '''higher-performance rail''',<ref>{{cite news|last=Clayton|first=Mark|title=Obama plan for high-speed rail, after hitting a bump, chugs forward again|url=http://www.csmonitor.com/USA/2012/0821/Obama-plan-for-high-speed-rail-after-hitting-a-bump-chugs-forward-again|access-date=10 October 2012|newspaper=Christian Science Monitor|date=21 August 2012|archive-date=9 October 2012|archive-url=https://web.archive.org/web/20121009064741/http://www.csmonitor.com/USA/2012/0821/Obama-plan-for-high-speed-rail-after-hitting-a-bump-chugs-forward-again|url-status=live}}</ref> '''semi-high-speed rail''' or '''almost-high-speed rail''',<ref>[http://railway-news.com/railway-industry-news/high-speed-rail-in-fly-over-country-americas-aspirations-for-high-speed-rail] {{dead link|date=November 2021}}</ref> is the [[jargon]] used to describe [[Inter-city rail|inter-city passenger rail]] services that have top speeds of more than conventional rail but are not high enough to be called [[high-speed rail]] services.<ref name=Borges/> The term is also used by planners to identify the incremental rail improvements to increase train speeds and reduce travel time as alternatives to larger efforts to create or expand the high-speed rail networks.<ref>{{cite report|title=Safety of High Speed Ground Transportation Systems|date=December 1994|publisher=Federal Railroad Administration|url=http://ntl.bts.gov/lib/42000/42600/42666/ord9505.pdf|access-date=3 July 2014|archive-date=3 March 2016|archive-url=https://web.archive.org/web/20160303234324/http://ntl.bts.gov/lib/42000/42600/42666/ord9505.pdf|url-status=live}}</ref>
'''Higher-speed rail''' ('''HrSR'''){{efn|Also known as '''high-performance rail''',<ref>"[http://thomas.loc.gov/cgi-bin/query/z?c112:H.R.4361.IH: H.R.4361 – National High Performance Passenger Rail Transportation-Oriented Development Act of 2012]{{Dead link|date=August 2021 |bot=InternetArchiveBot |fix-attempted=yes }}" 112th Congress of the United States. Retrieved 10 September 2013.</ref> '''higher-performance rail''',<ref>{{cite news|last=Clayton|first=Mark|title=Obama plan for high-speed rail, after hitting a bump, chugs forward again|url=https://www.csmonitor.com/USA/2012/0821/Obama-plan-for-high-speed-rail-after-hitting-a-bump-chugs-forward-again|access-date=10 October 2012|newspaper=Christian Science Monitor|date=21 August 2012|archive-date=9 October 2012|archive-url=https://web.archive.org/web/20121009064741/http://www.csmonitor.com/USA/2012/0821/Obama-plan-for-high-speed-rail-after-hitting-a-bump-chugs-forward-again|url-status=live}}</ref> '''semi-high-speed rail''', or '''almost-high-speed rail'''.<ref>[http://railway-news.com/railway-industry-news/high-speed-rail-in-fly-over-country-americas-aspirations-for-high-speed-rail] {{dead link|date=November 2021}}</ref>}} is used to describe [[Inter-city rail|inter-city passenger rail]] services that have top speeds higher than conventional rail but not fast enough to be called [[high-speed rail]] services.<ref>{{cite news |last=Bowen |first=Douglas John |date=27 August 2012 |title=U.S. HSR accelerates |newspaper=Railway Age |url=http://www.railwayage.com/index.php/passenger/high-performance/us-hsr-accelerates.html#.UHT7PxVuSSo |url-status=live |access-date=10 October 2012 |archive-url=https://web.archive.org/web/20121001113636/http://www.railwayage.com/index.php/passenger/high-performance/us-hsr-accelerates.html#.UHT7PxVuSSo |archive-date=1 October 2012}}</ref><ref name=Borges/> The term is also used by planners to identify the incremental rail improvements to increase train speeds and reduce travel time as alternatives to larger efforts to create or expand the high-speed rail networks.<ref>{{cite report|title=Safety of High Speed Ground Transportation Systems|date=December 1994|publisher=Federal Railroad Administration|url=http://ntl.bts.gov/lib/42000/42600/42666/ord9505.pdf|access-date=3 July 2014|archive-date=3 March 2016|archive-url=https://web.archive.org/web/20160303234324/http://ntl.bts.gov/lib/42000/42600/42666/ord9505.pdf|url-status=live}}</ref>


Though the definition of higher-speed rail varies from country to country, most countries refer to rail services operating at speeds up to {{cvt|200|km/h|mph|round=5}}.<ref name="india" />
Though the definition of higher-speed rail varies from country to country, most countries use the term to refer to rail services operating at speeds of up to {{cvt|200|km/h|mph|round=5}}.<ref name="India" />


The concept is usually viewed as stemming from efforts to upgrade a legacy railway line to high speed railway standards (speeds in excess of {{cvt|250|km/h|mph|disp=or}}), but usually falling short on the intended speeds. The faster speeds are achieved through various means including new rolling stock such as tilting trains, upgrades to tracks including shallower curves, electrification, in-cab signalling, and less frequent halts/stops.<ref>{{cite news|title=India-China to collaborate on building semi-high speed rail|url=http://articles.economictimes.indiatimes.com/2014-03-29/news/48684245_1_fuel-adjustment-component-rail-tariff-authority-arunendra-kumar|access-date=4 July 2014|publisher=The Economic Times|date=29 March 2014|archive-date=27 July 2014|archive-url=https://web.archive.org/web/20140727072024/http://articles.economictimes.indiatimes.com/2014-03-29/news/48684245_1_fuel-adjustment-component-rail-tariff-authority-arunendra-kumar|url-status=live}}</ref>
The concept is usually viewed as stemming from efforts to upgrade a legacy railway line to high speed railway standards (speeds in excess of {{cvt|250|km/h|mph|disp=or|round=5}}), but usually falling short on the intended speeds. The faster speeds are achieved through various means including new rolling stock such as tilting trains, upgrades to tracks including shallower curves, electrification, in-cab signalling, and less frequent halts/stops.<ref>{{cite news|title=India-China to collaborate on building semi-high speed rail|url=http://articles.economictimes.indiatimes.com/2014-03-29/news/48684245_1_fuel-adjustment-component-rail-tariff-authority-arunendra-kumar|access-date=4 July 2014|publisher=The Economic Times|date=29 March 2014|archive-date=27 July 2014|archive-url=https://web.archive.org/web/20140727072024/http://articles.economictimes.indiatimes.com/2014-03-29/news/48684245_1_fuel-adjustment-component-rail-tariff-authority-arunendra-kumar|url-status=dead}}</ref>


==Definitions by country==
==Definitions by country==
Line 37: Line 33:


* In Canada, according to the Surface Transportation Policy, [[Transport Canada|Department of Transport]], the speed range for higher-speed rail is between {{cvt|160|and|240|km/h|mph|round=5}}.<ref name=Borges>{{cite web|title=Ms. Helena Borges (Director General, Surface Transportation Policy, Department of Transport) at the Transport, Infrastructure and Communities Committee|url=https://openparliament.ca/committees/transport/40-2/18/helena-borges-1/only/|publisher=Canada Parliament|access-date=31 August 2013|date=12 May 2009|archive-date=21 September 2013|archive-url=https://web.archive.org/web/20130921055357/http://openparliament.ca/committees/transport/40-2/18/helena-borges-1/only/|url-status=live}}</ref>
* In Canada, according to the Surface Transportation Policy, [[Transport Canada|Department of Transport]], the speed range for higher-speed rail is between {{cvt|160|and|240|km/h|mph|round=5}}.<ref name=Borges>{{cite web|title=Ms. Helena Borges (Director General, Surface Transportation Policy, Department of Transport) at the Transport, Infrastructure and Communities Committee|url=https://openparliament.ca/committees/transport/40-2/18/helena-borges-1/only/|publisher=Canada Parliament|access-date=31 August 2013|date=12 May 2009|archive-date=21 September 2013|archive-url=https://web.archive.org/web/20130921055357/http://openparliament.ca/committees/transport/40-2/18/helena-borges-1/only/|url-status=live}}</ref>
* In India, according to the [[Ministry of Railways (India)|Ministry of Railways]], the speed range for India's higher-speed rail will be between {{cvt|160|and|200|km/h|mph|round=5}}.<ref name="india">{{cite news|title=Railway Minister Launches High Speed Rail Corporation of India Limited (HSRC)|url=http://www.orissadiary.com/CurrentNews.asp?id=45261|access-date=13 November 2013|newspaper=Disha Diary|date=29 October 2013|archive-url=https://web.archive.org/web/20131113050712/http://www.orissadiary.com/CurrentNews.asp?id=45261|archive-date=13 November 2013|url-status=dead}}</ref>
* In India, according to the [[Ministry of Railways (India)|Ministry of Railways]], the speed range for India's higher-speed rail will be between {{cvt|160|and|200|km/h|mph|round=5}}.<ref name="India">{{cite news|title=Railway Minister Launches High Speed Rail Corporation of India Limited (HSRC)|url=http://www.orissadiary.com/CurrentNews.asp?id=45261|access-date=13 November 2013|newspaper=Disha Diary|date=29 October 2013|archive-url=https://web.archive.org/web/20131113050712/http://www.orissadiary.com/CurrentNews.asp?id=45261|archive-date=13 November 2013|url-status=dead}}</ref>
* In the United Kingdom, the term higher-speed rail is used for upgraded tracks with train speeds up to {{cvt|125|mph|round=5}}<ref>{{cite web|title=Written evidence from Paul Atkins (HSR 07)|url=https://publications.parliament.uk/pa/cm201012/cmselect/cmtran/1185/1185vw09.htm|publisher=UK House of Commons – Transport Committee|access-date=11 January 2015|archive-date=11 January 2015|archive-url=https://web.archive.org/web/20150111080043/http://www.publications.parliament.uk/pa/cm201012/cmselect/cmtran/1185/1185vw09.htm|url-status=live}}</ref>
* In the United Kingdom, the term higher-speed rail is used for upgraded tracks with train speeds up to {{cvt|125|mph|round=5}}<ref>{{cite web|title=Written evidence from Paul Atkins (HSR 07)|url=https://publications.parliament.uk/pa/cm201012/cmselect/cmtran/1185/1185vw09.htm|publisher=UK House of Commons – Transport Committee|access-date=11 January 2015|archive-date=11 January 2015|archive-url=https://web.archive.org/web/20150111080043/http://www.publications.parliament.uk/pa/cm201012/cmselect/cmtran/1185/1185vw09.htm|url-status=live}}</ref>
* In the United States, the term "higher-speed rail", as opposed to "[[High-speed rail in the United States|high-speed rail]]", is used by regional planners in many [[U.S. state]]s to describe inter-city passenger rail services with top speeds of between {{cvt|90|mph|round=5}}<ref>{{cite news|last=Lind|first=William|title=Run a Train That's Fast Enough|url=http://enr.construction.com/opinions/viewpoint/2011/0511-RunTranThatsFastEnough.asp|access-date=10 October 2012|newspaper=Engineering News-Record|date=11 May 2011|archive-date=22 January 2013|archive-url=https://web.archive.org/web/20130122112618/http://enr.construction.com/opinions/viewpoint/2011/0511-RunTranThatsFastEnough.asp|url-status=live}}</ref> and {{cvt|110|mph|round=5}}.<ref>{{cite web|title=Higher Speed Rail in North Carolina and Virginia: Lengthening and Strengthening the Northeast Corridor (NEC) |url=http://www.letsgetmoving.org/images/uploads/pages/RTA-bkfst-final.pdf |publisher=Regional Transportation Alliance |access-date=10 October 2012 |url-status=dead |archive-url=https://web.archive.org/web/20120514183014/http://www.letsgetmoving.org/images/uploads/pages/RTA-bkfst-final.pdf |archive-date=14 May 2012 }}</ref><ref>{{cite web|title=FAQ |url=http://cascadiahighspeedrail.org/faq/default.html |publisher=The Cascadia High Speed Rail |access-date=10 October 2012 |url-status=dead |archive-url=https://web.archive.org/web/20130824210123/http://cascadiahighspeedrail.org/faq/default.html |archive-date=24 August 2013 }}</ref><ref name=drpt>{{cite web|title=Tier I Draft Environmental Impact Statement: Open House and Public Hearing|url=http://www.rich2hrrail.info/downloads/RHRPublicHearing%20Exhibits-ProjectInformation.pdf|publisher=Virginia Department of Rail and Public Transportation|access-date=10 October 2012|archive-date=24 October 2013|archive-url=https://web.archive.org/web/20131024214450/http://www.rich2hrrail.info/downloads/RHRPublicHearing%20Exhibits-ProjectInformation.pdf|url-status=live}}</ref> This is the equivalent of the definition of "Emerging High-Speed Rail" as defined by the [[Federal Railroad Administration]].<ref name=hsrstrategicplan>{{cite web|url=http://www.fra.dot.gov/eLib/Details/L02833|format=PDF|title=High-Speed Rail Strategic Plan|publisher=Federal Railroad Administration|date=April 2009|page=10|access-date=16 April 2009|archive-date=7 January 2013|archive-url=https://web.archive.org/web/20130107143104/http://www.fra.dot.gov/eLib/Details/L02833|url-status=live}}</ref> However, the [[Congressional Research Service]] defines "Higher Speed Rail" as rail services with speeds up to {{cvt|150|mph|round=5}} and defines rail services on dedicated tracks with speeds over {{cvt|150|mph|round=5}} as "Very High Speed Rail".<ref name=crs>{{cite web|title=The Development of High Speed Rail in the United States: Issues and Recent Events|url=http://www.fas.org/sgp/crs/misc/R42584.pdf|publisher=Congressional Research Service|access-date=10 October 2012|archive-date=8 May 2013|archive-url=https://web.archive.org/web/20130508174004/https://www.fas.org/sgp/crs/misc/R42584.pdf|url-status=live}}</ref>{{paragraph}}[[List of U.S. state and insular area departments of transportation|State-level departments of transportation]] and [[council of governments]] may use different definitions. Below is the list of known definitions of higher-speed rail which use some of the 5 speed levels, {{cvt|80|mph|round=5}}, {{cvt|90|mph|round=5}}, {{cvt|110|mph|round=5}}, {{cvt|125|mph|round=5}} and {{cvt|150|mph|round=5}}:
* In the United States, the term "higher-speed rail", as opposed to "[[High-speed rail in the United States|high-speed rail]]", is used by regional planners in many [[U.S. state]]s to describe inter-city passenger rail services with top speeds of between {{cvt|90|mph|round=5}}<ref>{{cite news|last=Lind|first=William|title=Run a Train That's Fast Enough|url=http://enr.construction.com/opinions/viewpoint/2011/0511-RunTranThatsFastEnough.asp|access-date=10 October 2012|newspaper=Engineering News-Record|date=11 May 2011|archive-date=22 January 2013|archive-url=https://web.archive.org/web/20130122112618/http://enr.construction.com/opinions/viewpoint/2011/0511-RunTranThatsFastEnough.asp|url-status=live}}</ref> and {{cvt|110|mph|round=5}}.<ref>{{cite web|title=Higher Speed Rail in North Carolina and Virginia: Lengthening and Strengthening the Northeast Corridor (NEC) |url=http://www.letsgetmoving.org/images/uploads/pages/RTA-bkfst-final.pdf |publisher=Regional Transportation Alliance |access-date=10 October 2012 |url-status=dead |archive-url=https://web.archive.org/web/20120514183014/http://www.letsgetmoving.org/images/uploads/pages/RTA-bkfst-final.pdf |archive-date=14 May 2012 }}</ref><ref>{{cite web|title=FAQ |url=http://cascadiahighspeedrail.org/faq/default.html |publisher=The Cascadia High Speed Rail |access-date=10 October 2012 |url-status=dead |archive-url=https://web.archive.org/web/20130824210123/http://cascadiahighspeedrail.org/faq/default.html |archive-date=24 August 2013 }}</ref><ref name=drpt>{{cite web|title=Tier I Draft Environmental Impact Statement: Open House and Public Hearing|url=http://www.rich2hrrail.info/downloads/RHRPublicHearing%20Exhibits-ProjectInformation.pdf|publisher=Virginia Department of Rail and Public Transportation|access-date=10 October 2012|archive-date=24 October 2013|archive-url=https://web.archive.org/web/20131024214450/http://www.rich2hrrail.info/downloads/RHRPublicHearing%20Exhibits-ProjectInformation.pdf|url-status=live}}</ref> This is the equivalent of the definition of "Emerging High-Speed Rail" as defined by the [[Federal Railroad Administration]].<ref name=hsrstrategicplan>{{cite web|url=https://railroads.dot.gov/elibrary/high-speed-rail-strategic-plan|format=PDF|title=High-Speed Rail Strategic Plan|publisher=Federal Railroad Administration|date=April 2009|page=10|access-date=16 April 2009|archive-date=7 January 2013|archive-url=https://web.archive.org/web/20130107143104/http://www.fra.dot.gov/eLib/Details/L02833|url-status=live}}</ref> The [[Congressional Research Service]] defines rail services on dedicated tracks with speeds over {{cvt|150|mph|round=5}} as "Very High Speed Rail".<ref name=crs>{{cite web|title=The Development of High Speed Rail in the United States: Issues and Recent Events|url=http://www.fas.org/sgp/crs/misc/R42584.pdf|publisher=Congressional Research Service|access-date=10 October 2012|archive-date=8 May 2013|archive-url=https://web.archive.org/web/20130508174004/https://www.fas.org/sgp/crs/misc/R42584.pdf|url-status=live}}</ref>{{paragraph}}[[List of U.S. state and insular area departments of transportation|State-level departments of transportation]] and [[council of governments]] may use different definitions. Below is the list of known definitions of higher-speed rail which use some of the 5 speed levels, {{cvt|80|mph|round=5}}, {{cvt|90|mph|round=5}}, {{cvt|110|mph|round=5}}, {{cvt|125|mph|round=5}} and {{cvt|150|mph|round=5}}:
{| class="wikitable"
{| class="wikitable"
|-
|-
Line 74: Line 70:
In Canada, the assumption about grade crossing is that operating higher-speed rail services between {{convert|160|and|200|km/h|abbr=on}} would require "improved levels of protection in acceptable areas".<ref name="qohsrps">{{cite web|title=Deliverable No. 12 – Review of Impacts of HSR on the Transportation System within the Corridor |url=http://www.mto.gov.on.ca/english/pubs/high-speed-rail/impacts/QOHSR%20Del%2012%20Nov9E%20Final.pdf |work=Updated Feasibility Study of a High Speed Rail Service in the Québec City – Windsor Corridor |publisher=Ministère des Transports du Québec, Ontario Ministry of Transportation, and Transport Canada |access-date=17 November 2012 |date=November 2010 |url-status=dead |archive-url=https://web.archive.org/web/20121030014908/http://www.mto.gov.on.ca/english/pubs/high-speed-rail/impacts/QOHSR%20Del%2012%20Nov9E%20Final.pdf |archive-date=30 October 2012 }}</ref>
In Canada, the assumption about grade crossing is that operating higher-speed rail services between {{convert|160|and|200|km/h|abbr=on}} would require "improved levels of protection in acceptable areas".<ref name="qohsrps">{{cite web|title=Deliverable No. 12 – Review of Impacts of HSR on the Transportation System within the Corridor |url=http://www.mto.gov.on.ca/english/pubs/high-speed-rail/impacts/QOHSR%20Del%2012%20Nov9E%20Final.pdf |work=Updated Feasibility Study of a High Speed Rail Service in the Québec City – Windsor Corridor |publisher=Ministère des Transports du Québec, Ontario Ministry of Transportation, and Transport Canada |access-date=17 November 2012 |date=November 2010 |url-status=dead |archive-url=https://web.archive.org/web/20121030014908/http://www.mto.gov.on.ca/english/pubs/high-speed-rail/impacts/QOHSR%20Del%2012%20Nov9E%20Final.pdf |archive-date=30 October 2012 }}</ref>


In the United States, railroad tracks are largely used for freight with [[At-grade intersection|at-grade crossings]]. Passenger trains in many corridors run on shared tracks with [[Freight rail transport|freight trains]]. Most trains are limited to top speeds of {{convert|79|mph|abbr=on}} unless they are equipped with an automatic [[Cab signalling|cab signal]], [[automatic train stop]], [[automatic train control]] or [[positive train control]] system approved by the [[Federal Railroad Administration]] (FRA).<ref>{{cite web|title=Code of Federal Regulations – Title 49 – Transportation|url=http://www.gpo.gov/fdsys/pkg/CFR-2011-title49-vol4/xml/CFR-2011-title49-vol4-sec236-0.xml|access-date=20 October 2012|archive-date=11 November 2014|archive-url=https://web.archive.org/web/20141111065846/http://www.gpo.gov/fdsys/pkg/CFR-2011-title49-vol4/xml/CFR-2011-title49-vol4-sec236-0.xml|url-status=live}}</ref> In developing higher-speed rail services, one of those safety systems must be used.
In the United States, railroad tracks are largely used for freight with [[Level crossing|at-grade crossings]]. Passenger trains in many corridors run on shared tracks with [[Freight rail transport|freight trains]]. Most trains are limited to top speeds of {{convert|79|mph|abbr=on}} unless they are equipped with an automatic [[Cab signalling|cab signal]], [[automatic train stop]], [[automatic train control]] or [[positive train control]] system approved by the [[Federal Railroad Administration]] (FRA).<ref>{{cite web|title=Code of Federal Regulations – Title 49 – Transportation|url=http://www.gpo.gov/fdsys/pkg/CFR-2011-title49-vol4/xml/CFR-2011-title49-vol4-sec236-0.xml|access-date=20 October 2012|archive-date=11 November 2014|archive-url=https://web.archive.org/web/20141111065846/http://www.gpo.gov/fdsys/pkg/CFR-2011-title49-vol4/xml/CFR-2011-title49-vol4-sec236-0.xml|url-status=live}}</ref> In developing higher-speed rail services, one of those safety systems must be used.


Additionally, the FRA establishes [[Rail speed limits in the United States#Track classes|classification of track quality]] which regulates the speed limits of trains with Class 5, Class 6, Class 7 and Class 8 for top speeds of {{cvt|90|mph|round=5}},<ref>{{cite web|title=Chapter 5 Track Safety Standards Classes 1 through 5|url=http://www.fra.dot.gov/downloads/safety/tss_compliance_manual_chapter_5_final_040107.pdf|work=Track Safety Standards Compliance Manual|publisher=Federal Railroad Administration|access-date=4 November 2012|archive-url=https://web.archive.org/web/20080528020612/http://www.fra.dot.gov/downloads/safety/tss_compliance_manual_chapter_5_final_040107.pdf|archive-date=28 May 2008}}</ref> {{cvt|110|mph|round=5}}, {{cvt|125|mph|round=5}} and {{cvt|160|mph|round=5}}, respectively.<ref>{{cite web|title=Chapter 6 Track Safety Standards Classes 6 through 9, p. 6.13|url=http://www.fra.dot.gov/downloads/safety/track_compliance_manual/TCM%206.PDF|work=Track Compliance Manual|publisher=Federal Railroad Administration|access-date=4 November 2012|archive-url=https://web.archive.org/web/20030923081943/http://www.fra.dot.gov/downloads/safety/track_compliance_manual/TCM%206.PDF|archive-date=23 September 2003}}</ref> The FRA also regulates passenger train design and safety standards to ensure trains that operate at speeds of {{cvt|80|mph|round=5}} up to {{cvt|125|mph|round=5}} comply with its ''Tier I'' standard and trains that operate at speeds up to {{cvt|150|mph|round=5}} comply with its ''Tier II'' standard.<ref>{{cite book|title=High Speed Passenger Rail Safety Strategy|year=2009|publisher=Federal Railroad Administration|page=23|url=http://www.fra.dot.gov/downloads/safety/HSRSafetyStrategy110609.pdf|access-date=7 November 2012|archive-url=https://web.archive.org/web/20110911035857/http://www.fra.dot.gov/downloads/safety/HSRSafetyStrategy110609.pdf|archive-date=11 September 2011}}</ref>
Additionally, the FRA establishes [[Rail speed limits in the United States#Track classes|classification of track quality]] which regulates the speed limits of trains with Class 5, Class 6, Class 7 and Class 8 for top speeds of {{cvt|90|mph|round=5}},<ref>{{cite web|title=Chapter 5 Track Safety Standards Classes 1 through 5|url=http://www.fra.dot.gov/downloads/safety/tss_compliance_manual_chapter_5_final_040107.pdf|work=Track Safety Standards Compliance Manual|publisher=Federal Railroad Administration|access-date=4 November 2012|archive-url=https://web.archive.org/web/20080528020612/http://www.fra.dot.gov/downloads/safety/tss_compliance_manual_chapter_5_final_040107.pdf|archive-date=28 May 2008}}</ref> {{cvt|110|mph|round=5}}, {{cvt|125|mph|round=5}} and {{cvt|160|mph|round=5}}, respectively.<ref>{{cite web|title=Chapter 6 Track Safety Standards Classes 6 through 9, p. 6.13|url=http://www.fra.dot.gov/downloads/safety/track_compliance_manual/TCM%206.PDF|work=Track Compliance Manual|publisher=Federal Railroad Administration|access-date=4 November 2012|archive-url=https://web.archive.org/web/20030923081943/http://www.fra.dot.gov/downloads/safety/track_compliance_manual/TCM%206.PDF|archive-date=23 September 2003}}</ref> The FRA also regulates passenger train design and safety standards to ensure trains that operate at speeds of {{cvt|80|mph|round=5}} up to {{cvt|125|mph|round=5}} comply with its ''Tier I'' standard and trains that operate at speeds up to {{cvt|150|mph|round=5}} comply with its ''Tier II'' standard.<ref>{{cite book|title=High Speed Passenger Rail Safety Strategy|year=2009|publisher=Federal Railroad Administration|page=23|url=http://www.fra.dot.gov/downloads/safety/HSRSafetyStrategy110609.pdf|access-date=7 November 2012|archive-url=https://web.archive.org/web/20110911035857/http://www.fra.dot.gov/downloads/safety/HSRSafetyStrategy110609.pdf|archive-date=11 September 2011}}</ref>
Line 90: Line 86:
In countries where there had been rail improvement projects in the later part of the 20th century and into the 2000s, there are inter-city rail services with comparable speed ranges of higher-speed rail, but they are not specifically called "higher-speed rail". Below are some examples of such services that are still in operation.
In countries where there had been rail improvement projects in the later part of the 20th century and into the 2000s, there are inter-city rail services with comparable speed ranges of higher-speed rail, but they are not specifically called "higher-speed rail". Below are some examples of such services that are still in operation.


* '''Europe:''' The [[InterCity]] services in many European countries have top speeds of mostly up to {{cvt|160|km/h|mph|round=5}}, but they can go up to {{cvt|200|km/h|mph|round=5}}. Intercity trains that cross international borders are usually designated as [[Eurocity]] and reach similar speeds where tracks allow it. High speed trains also may use upgraded and [[Railway electrification system|electrified]] lines that are not purpose-built during part of their journey at up to {{cvt|220|km/h|mph|round=5}}.
* '''Canada:''' The [[Quebec City–Windsor Corridor (Via Rail)|Quebec City–Windsor Corridor]] that runs between [[Gare du Palais|Quebec City]] and [[Windsor station (Ontario)|Windsor]] allows [[Via Rail]] trains to run at speeds of {{cvt|100|km/h|mph|round=5}}, about {{cvt|130|km/h|mph|round=5}} today.
* '''Europe:''' The [[InterCity]] services in many European countries have top speeds of mostly up to {{cvt|160|km/h|mph|round=5}}, but they can go up to {{cvt|200|km/h|mph|round=5}}. Intercity trains that cross international borders are usually designated as [[EuroCity]] and reach similar speeds where tracks allow it. High speed trains also may use upgraded and [[Railway electrification system|electrified]] lines that are not purpose-built during part of their journey at up to {{cvt|220|km/h|mph|round=5}}.
* '''Japan:''' The [[Mini-shinkansen]] lines in Japan are the conventional lines that have been converted from [[narrow gauge]] to [[standard gauge]] to allow [[Shinkansen]] trains to pass through with top speeds of {{cvt|130|km/h|mph|round=5}}.<ref>{{cite web|last1=Hoover|first1=Ryan|title=Mini-Shinkansen: How East Japan Railway Co. extended high-speed rail without huge infrastructure expenditures|url=http://oldsite.bayrailalliance.org/rail_technology/Mini_Shinkansen_jul06.pdf|publisher=BayRail Alliance|access-date=28 September 2014|date=20 July 2006|archive-date=11 November 2014|archive-url=https://web.archive.org/web/20141111070231/http://oldsite.bayrailalliance.org/rail_technology/Mini_Shinkansen_jul06.pdf|url-status=live}}</ref> However, the [[International Union of Railways]] recognizes the Mini-shinkansen lines as high-speed rail.<ref name=uic>{{cite web |title=High Speed Lines in the World |url=http://www.uic.org/IMG/pdf/20140901_high_speed_lines_in_the_world.pdf |archive-url=https://www.webcitation.org/6U8lfU2Gh?url=http://www.uic.org/IMG/pdf/20140901_high_speed_lines_in_the_world.pdf |url-status=dead |archive-date=17 November 2014 |publisher=International Union of Railways |access-date=27 September 2014 |date=1 September 2014 }}</ref> Two Mini-shinkansen lines have been constructed: the [[Yamagata Shinkansen]] and [[Akita Shinkansen]].<ref name="semmens1997">{{cite book |last=Semmens |first=Peter |title=High Speed in Japan: Shinkansen – The World's Busiest High-speed Railway |publisher=Platform 5 Publishing |year=1997 |isbn=1-872524-88-5 |location=Sheffield, UK}}</ref> Both of these lines branch off from the high-speed [[Tōhoku Shinkansen|Tohoku Shinkansen]] line with top speeds of 320&nbsp;km/h (200&nbsp;mph).
* '''Japan:''' The [[Mini-shinkansen]] lines in Japan are the conventional lines that have been converted from [[narrow gauge]] to [[standard gauge]] to allow [[Shinkansen]] trains to pass through with top speeds of {{cvt|130|km/h|mph|round=5}}.<ref>{{cite web|last1=Hoover|first1=Ryan|title=Mini-Shinkansen: How East Japan Railway Co. extended high-speed rail without huge infrastructure expenditures|url=http://oldsite.bayrailalliance.org/rail_technology/Mini_Shinkansen_jul06.pdf|publisher=BayRail Alliance|access-date=28 September 2014|date=20 July 2006|archive-date=11 November 2014|archive-url=https://web.archive.org/web/20141111070231/http://oldsite.bayrailalliance.org/rail_technology/Mini_Shinkansen_jul06.pdf|url-status=live}}</ref> However, the [[International Union of Railways]] recognizes the Mini-shinkansen lines as high-speed rail.<ref name=uic>{{cite web |title=High Speed Lines in the World |url=http://www.uic.org/IMG/pdf/20140901_high_speed_lines_in_the_world.pdf |archive-url=https://www.webcitation.org/6U8lfU2Gh?url=http://www.uic.org/IMG/pdf/20140901_high_speed_lines_in_the_world.pdf |url-status=dead |archive-date=17 November 2014 |publisher=International Union of Railways |access-date=27 September 2014 |date=1 September 2014 }}</ref> Two Mini-shinkansen lines have been constructed: the [[Yamagata Shinkansen]] and [[Akita Shinkansen]].<ref name="semmens1997">{{cite book |last=Semmens |first=Peter |title=High Speed in Japan: Shinkansen – The World's Busiest High-speed Railway |publisher=Platform 5 Publishing |year=1997 |isbn=1-872524-88-5 |location=Sheffield, UK}}</ref> Both of these lines branch off from the high-speed [[Tōhoku Shinkansen|Tohoku Shinkansen]] line with top speeds of 320&nbsp;km/h (200&nbsp;mph).
* '''Spain:''' Many inter-city rail services operated by [[Renfe Operadora]], the [[state-owned]] company, are not classified as high-speed rail. Those services are ''[[Alaris]]'', ''[[Altaria (rail service)|Altaria]]'', ''[[Arco (Renfe)|Arco]]'' and ''[[Talgo]]'' (from Talgo III to Talgo VII) with top speeds of {{cvt|160|and|200|km/h|mph|round=5}}<ref>{{cite web|title=AVE-Long Distance Products|url=http://www.renfe.com/EN/viajeros/larga_distancia/productos/index.html|publisher=Renfe|access-date=13 November 2013|archive-date=19 October 2017|archive-url=https://web.archive.org/web/20171019125238/http://www.renfe.com/EN/viajeros/larga_distancia/productos/index.html|url-status=live}}</ref>
* '''Spain:''' Many inter-city rail services operated by [[Renfe Operadora]], the [[state-owned]] company, are not classified as high-speed rail. Those services are ''[[Alaris]]'', ''[[Altaria (Renfe Operadora service)|Altaria]]'', ''[[Arco (Renfe Operadora service)|Arco]]'' and ''[[Talgo]]'' (from Talgo III to Talgo VII) with top speeds of {{cvt|160|and|200|km/h|mph|round=5}}<ref>{{cite web|title=AVE-Long Distance Products|url=http://www.renfe.com/EN/viajeros/larga_distancia/productos/index.html|publisher=Renfe|access-date=13 November 2013|archive-date=19 October 2017|archive-url=https://web.archive.org/web/20171019125238/http://www.renfe.com/EN/viajeros/larga_distancia/productos/index.html|url-status=live}}</ref>
* In '''[[Norway]]''', there is sometimes talked about ''høy hastighet'', which may be compared to higher-speed rail as used here – and ''høyhastighet'', high-speed rail. Most of the rail network is old, with sharp curves, and speeds at only {{cvt|70|–|130|km/h|mph|round=5}}. The lines around [[Oslo]] are upgraded or renewed, or are planned to be so. Some of the sections, like [[Follobanen]] (Oslo–Ski, 22&nbsp;km), are built or planned for {{cvt|250|km/h|mph|round=5}} – though others to ''høy hastighet'', i.e. {{cvt|160|km/h|round=5}} or {{cvt|200|km/h|round=5}}.<ref>{{cite news |last=Holtung |first=Siri |date=18 May 2011 |work=[[Byavisa Sandefjord]] |language=Norwegian Bokmål |title=Høyhastighet eller høy hastighet? Vestfoldbanen 2026 |trans-title=High-speed or high speed? The Vestfold track 2026 |url=http://byavisa.sandefjord.no/nor/Naering/Aktuelt/Hoeyhastighet-eller-hoey-hastighet-Vestfoldbanen-i-2026 |archive-url=https://web.archive.org/web/20160506022410/http://byavisa.sandefjord.no/nor/Naering/Aktuelt/Hoeyhastighet-eller-hoey-hastighet-Vestfoldbanen-i-2026 |archive-date=6 May 2016 |url-status=dead}}</ref> By the same token, the Norwegian [[Stadler FLIRT|FLIRT]] trains and the [[El 18]] locomotives have a top speed of 200&nbsp;km/h. [[Gardermobanen]] is called a high-speed line,<ref>http://www.jernbaneverket.no/Jernbanen/Banene/Gardermobanen/ {{Webarchive|url=https://web.archive.org/web/20160427110710/http://www.jernbaneverket.no/Jernbanen/Banene/Gardermobanen/ |date=27 April 2016 }}; in Norwegian</ref> and the [[GMB Class 71]] and [[NSB Class 73]] are often called high-speed trains<ref>http://www.nmj.no/1000366.html {{Webarchive|url=https://web.archive.org/web/20160406213616/http://www.nmj.no/1000366.html |date=6 April 2016 }}; in Norwegian</ref> – with {{cvt|210|km/h|round=5}} top speed. However, the limits are blurry. Sometimes, e.g. the FLIRTs are called high-speed trains.<ref>e.g. http://www.sb.no/nyheter/nyheter/for-hoy-togtut/s/2-2.428-1.7540611 {{Webarchive|url=https://web.archive.org/web/20160619071727/http://www.sb.no/nyheter/nyheter/for-hoy-togtut/s/2-2.428-1.7540611 |date=19 June 2016 }}; in Norwegian</ref>
* In '''Norway''', there is sometimes talked about ''høy hastighet'', which may be compared to higher-speed rail as used here – and ''høyhastighet'', high-speed rail. Most of the rail network is old, with sharp curves, and speeds at only {{cvt|70|–|130|km/h|mph|round=5}}. The lines around [[Oslo]] are upgraded or renewed, or are planned to be so. Some of the sections, like [[Follobanen]] (Oslo–Ski, 22&nbsp;km), are built or planned for {{cvt|250|km/h|mph|round=5}} – though others to ''høy hastighet'', i.e. {{cvt|160|km/h|round=5}} or {{cvt|200|km/h|round=5}}.<ref>{{cite news |last=Holtung |first=Siri |date=18 May 2011 |work=[[Byavisa Sandefjord]] |language=Norwegian Bokmål |title=Høyhastighet eller høy hastighet? Vestfoldbanen 2026 |trans-title=High-speed or high speed? The Vestfold track 2026 |url=http://byavisa.sandefjord.no/nor/Naering/Aktuelt/Hoeyhastighet-eller-hoey-hastighet-Vestfoldbanen-i-2026 |archive-url=https://web.archive.org/web/20160506022410/http://byavisa.sandefjord.no/nor/Naering/Aktuelt/Hoeyhastighet-eller-hoey-hastighet-Vestfoldbanen-i-2026 |archive-date=6 May 2016 |url-status=dead}}</ref> By the same token, the Norwegian [[Stadler FLIRT|FLIRT]] trains and the [[El 18]] locomotives have a top speed of 200&nbsp;km/h. [[Gardermobanen]] is called a high-speed line,<ref>http://www.jernbaneverket.no/Jernbanen/Banene/Gardermobanen/ {{Webarchive|url=https://web.archive.org/web/20160427110710/http://www.jernbaneverket.no/Jernbanen/Banene/Gardermobanen/ |date=27 April 2016 }}; in Norwegian</ref> and the [[GMB Class 71]] and [[NSB Class 73]] are often called high-speed trains<ref>http://www.nmj.no/1000366.html {{Webarchive|url=https://web.archive.org/web/20160406213616/http://www.nmj.no/1000366.html |date=6 April 2016 }}; in Norwegian</ref> – with {{cvt|210|km/h|round=5}} top speed. However, the limits are blurry. Sometimes, e.g. the FLIRTs are called high-speed trains.<ref>e.g. http://www.sb.no/nyheter/nyheter/for-hoy-togtut/s/2-2.428-1.7540611 {{Webarchive|url=https://web.archive.org/web/20160619071727/http://www.sb.no/nyheter/nyheter/for-hoy-togtut/s/2-2.428-1.7540611 |date=19 June 2016 }}; in Norwegian</ref>
* '''Sweden:''' [[SJ AB|SJ]] (Swedish Railways) operates inter-city rail services using [[SJ 2000|X 2000]] and [[Bombardier Regina|SJ3000(X55)]] trains in major routes across the country with top speeds of {{cvt|205|km/h|round=5}}. The operator brands them as ''snabbtåg'' ("fast trains") although "high-speed trains" is sometimes used in English language ads;<ref>{{cite web|title=Getting around Sweden by Train|url=http://www.visitsweden.com/sweden/travel-guide/getting-around-in-sweden/by-train/|publisher=VisitSweden|access-date=13 November 2013|archive-date=13 November 2013|archive-url=https://web.archive.org/web/20131113213824/http://www.visitsweden.com/sweden/travel-guide/getting-around-in-sweden/by-train/|url-status=live}}</ref><ref>{{Cite web |url=https://www.sj.se/en/about/about-sj/our-trains.html |title=Our trains |publisher=[[SJ AB]] |access-date=1 November 2017 |archive-date=7 November 2017 |archive-url=https://web.archive.org/web/20171107025602/https://www.sj.se/en/about/about-sj/our-trains.html |url-status=live }}</ref> however, the International Union of Railways only recognizes the {{cvt|320|km/h|round=5}} line from [[Stockholm]] to [[Malmö]] and [[Göteborg]] as the only high-speed rail lines in Sweden which is still in the planning stage, and are called "höghastighetsbanor" (''high-speed railways'').<ref name=uic/>
* '''Sweden:''' [[SJ AB|SJ]] (Swedish Railways) operates inter-city rail services using [[SJ 2000|X 2000]] and [[Bombardier Regina|SJ 3000 (X55)]] trains in major routes across the country with top speeds of {{cvt|205|km/h|round=5}}. The operator brands them as ''snabbtåg'' ("fast trains") although "high-speed trains" is sometimes used in English language ads;<ref>{{cite web|title=Getting around Sweden by Train|url=http://www.visitsweden.com/sweden/travel-guide/getting-around-in-sweden/by-train/|publisher=VisitSweden|access-date=13 November 2013|archive-date=13 November 2013|archive-url=https://web.archive.org/web/20131113213824/http://www.visitsweden.com/sweden/travel-guide/getting-around-in-sweden/by-train/|url-status=live}}</ref><ref>{{Cite web |url=https://www.sj.se/en/about/about-sj/our-trains.html |title=Our trains |publisher=[[SJ AB]] |access-date=1 November 2017 |archive-date=7 November 2017 |archive-url=https://web.archive.org/web/20171107025602/https://www.sj.se/en/about/about-sj/our-trains.html |url-status=live }}</ref> however, the International Union of Railways only recognizes the {{cvt|320|km/h|round=5}} line from [[Stockholm]] to [[Malmö]] and [[Gothenburg]] as the only high-speed rail lines in Sweden which is still in the planning stage, and are called "höghastighetsbanor" (''high-speed railways'').<ref name=uic/>
* In '''[[Germany]]''' regional trains along the Munich-Nuremberg high speed line which was built for {{cvt|300|km/h|round=5}} run at {{cvt|200|km/h|round=5}} without being specially designated. Those trains use locomotives that are used for Intercity trains elsewhere and the higher speed (in comparison to other regional trains) was chosen mainly to increase capacity.
* In '''Germany''' regional trains along the Munich-Nuremberg high speed line which was built for {{cvt|300|km/h|round=5}} run at {{cvt|200|km/h|round=5}} without being specially designated. Those trains use locomotives that are used for Intercity trains elsewhere and the higher speed (in comparison to other regional trains) was chosen mainly to increase capacity.
*'''The United Kingdom''' has service which run at 125&nbsp;mph or 200&nbsp;km/h, such as the [[East Coast Main Line|ECML]], [[West Coast Main Line|WCML]], [[Great Western Main Line|GWML]] and [[Midland Main Line|MML]]
*'''The United Kingdom''' has service which run at {{cvt|200|km/h|round=5}}, such as the [[East Coast Main Line]], [[West Coast Main Line]], [[Great Western Main Line]] and [[Midland Main Line]]. But there are signaling [[East Coast Main Line#Future|upgrades currently happening on the East Coast Main Line]] and rolling stock to increase speeds to {{cvt|225|km/h|round=5}}.
* '''South Korea''': [[Ministry of Land, Infrastructure and Transport (South Korea)|MOLIT]] designates railway lines as three categories: high-speed railway lines (''{{lang|ko|고속철도노선}}''), semi-high-speed railway lines (''{{lang|ko|준고속철도노선}}''), or conventional railway lines (''{{lang|ko|일반철도노선}}''). High-speed railway lines are limited to dedicated lines with maximum speed over {{cvt|300|km/h|round=5}}, while semi-high-speed rail can be mixed-use lines with maximum speed ranged in {{cvt|200|km/h|round=5}}–{{cvt|300|km/h|round=5}}. For conventional railway lines, due to the limitation of signal systems and designed maximum speed of trains, most lines are limited by maximum speed under {{cvt|150|km/h|round=5}}. However, [[Gyeongchun line]] has been upgraded as a higher-speed railway line, with dedicated [[ITX-Cheongchun]] EMU trains designed as maximum speed of {{cvt|180|km/h|round=5}}.
* '''South Korea''': [[Ministry of Land, Infrastructure and Transport|MOLIT]] designates railway lines as three categories: high-speed railway lines (''{{lang|ko|고속철도노선}}''), semi-high-speed railway lines (''{{lang|ko|준고속철도노선}}''), or conventional railway lines (''{{lang|ko|일반철도노선}}''). High-speed railway lines are limited to dedicated lines with maximum speed over {{cvt|300|km/h|round=5}}, while semi-high-speed rail can be mixed-use lines with maximum speed ranged in {{cvt|200|km/h|round=5}}–{{cvt|300|km/h|round=5}}. For conventional railway lines, due to the limitation of signal systems and designed maximum speed of trains, most lines are limited by maximum speed under {{cvt|150|km/h|round=5}}. However, [[Gyeongchun line]] has been upgraded as a higher-speed railway line, with dedicated [[ITX-Cheongchun]] EMU trains designed as maximum speed of {{cvt|180|km/h|round=5}}.


===Commuter rail services===
===Commuter rail services===
Some [[commuter rail]] services that cover shorter distances may achieve similar speeds but they are not typically called as higher-speed rail.<ref name=drpt/> Some examples are:
Some [[commuter rail]] services that cover shorter distances may achieve similar speeds but they are not typically called as higher-speed rail.<ref name=drpt/> Some examples are:
* Numerous regional ICRs in China such as [[Dongguan–Huizhou intercity railway]] and [[Changsha–Zhuzhou–Xiangtan intercity railway]] operate up to {{cvt|200|kph|round=5}}.
* Numerous regional ICRs in China such as [[Dongguan–Huizhou intercity railway]] and [[Changsha–Zhuzhou–Xiangtan intercity railway]] operate up to {{cvt|200|kph|round=5}}.
* [[Coaster (commuter rail)|Coaster]] links [[Oceanside, California]] and [[San Diego]] on ''[[Pacific Surfliner]]'' trackage with top speeds of {{Convert|90|mph|abbr=on}}<ref>{{cite web|title=Rail Safety Tips|url=http://www.gonctd.com/rail-safety-tips|publisher=North County Transit District|access-date=3 November 2016|archive-url=https://web.archive.org/web/20151223191933/http://www.gonctd.com/rail-safety-tips|archive-date=23 December 2015|url-status=dead}}</ref>
* [[Coaster (rail service)|Coaster]] links [[Oceanside, California]] and [[San Diego]] on ''[[Pacific Surfliner]]'' trackage with top speeds of {{Convert|90|mph|abbr=on}}<ref>{{cite web|title=Rail Safety Tips|url=http://www.gonctd.com/rail-safety-tips|publisher=North County Transit District|access-date=3 November 2016|archive-url=https://web.archive.org/web/20151223191933/http://www.gonctd.com/rail-safety-tips|archive-date=23 December 2015|url-status=dead}}</ref>
* [[MARC Train|MARC]] [[Penn Line]] covers {{Convert|77|mi|km}} on [[Northeast Corridor]] trackage and has been upgraded to {{cvt|125|mph|round=5}}<ref>{{cite news|last1=Starcic|first1=Janna|title=Maryland's MARC Railroad Upgrades Fleet, Service to Bolster Ridership|url=http://www.metro-magazine.com/rail/article/713751/maryland-s-marc-railroad-upgrades-fleet-service-to-bolster-ridership|access-date=26 October 2016|publisher=Metro Magazine|date=17 June 2016|archive-date=26 October 2016|archive-url=https://web.archive.org/web/20161026231331/http://www.metro-magazine.com/rail/article/713751/maryland-s-marc-railroad-upgrades-fleet-service-to-bolster-ridership|url-status=live}}</ref>
* [[MARC Train|MARC]] [[Penn Line]] covers {{Convert|77|mi|km}} on [[Northeast Corridor]] trackage and has been upgraded to {{cvt|125|mph|round=5}}<ref>{{cite news|last1=Starcic|first1=Janna|title=Maryland's MARC Railroad Upgrades Fleet, Service to Bolster Ridership|url=http://www.metro-magazine.com/rail/article/713751/maryland-s-marc-railroad-upgrades-fleet-service-to-bolster-ridership|access-date=26 October 2016|publisher=Metro Magazine|date=17 June 2016|archive-date=26 October 2016|archive-url=https://web.archive.org/web/20161026231331/http://www.metro-magazine.com/rail/article/713751/maryland-s-marc-railroad-upgrades-fleet-service-to-bolster-ridership|url-status=live}}</ref>
* [[Metrolink (California)|Metrolink]] [[Orange County Line]] and [[Inland Empire–Orange County Line]], also on ''Pacific Surfliner'' trackage, operate at top speeds of {{cvt|90|mph|round=5}} on segments south of Santa Ana<ref name=schematics>{{CA rail schematics}}</ref> and in [[Camp Pendleton]].<ref>{{cite book|title=2016 RTP/SCS Passenger Rail Appendix|date=December 2015|publisher=Southern California Association of Governments|url=http://scagrtpscs.net/Documents/2016/draft/d2016RTPSCS_PassengerRail.pdf|access-date=4 November 2016|archive-date=18 January 2017|archive-url=https://web.archive.org/web/20170118041409/http://scagrtpscs.net/Documents/2016/draft/d2016RTPSCS_PassengerRail.pdf|url-status=live}}</ref>
* [[Metrolink (California)|Metrolink]] [[Orange County Line]] and [[Inland Empire–Orange County Line]], also on ''Pacific Surfliner'' trackage, operate at top speeds of {{cvt|90|mph|round=5}} on segments south of Santa Ana<ref name=schematics>{{CA rail schematics}}</ref> and in [[Camp Pendleton]].<ref>{{cite book|title=2016 RTP/SCS Passenger Rail Appendix|date=December 2015|publisher=Southern California Association of Governments|url=http://scagrtpscs.net/Documents/2016/draft/d2016RTPSCS_PassengerRail.pdf|access-date=4 November 2016|archive-date=18 January 2017|archive-url=https://web.archive.org/web/20170118041409/http://scagrtpscs.net/Documents/2016/draft/d2016RTPSCS_PassengerRail.pdf|url-status=live}}</ref>
* [[Caltrain]] [[Electrification of Caltrain|electrification project]] is underway between [[San Francisco 4th and King Street Station|San Francisco]] to [[Tamien Station]] as part of upgrades for blended service with [[California High-Speed Rail|CHSR]]. The Caltrain trains will be capable of reaching speeds of up to {{cvt|110|mph|round=5}}.<ref>{{cite book|title=Caltrain Modernization Program|date=14 January 2014|publisher=Transbay Joint Powers Authority Citizen Advisory Group|url=http://transbaycenter.org/uploads/2014/01/TJPA-CAC-1.14.14.pdf|access-date=16 December 2016|archive-date=20 December 2016|archive-url=https://web.archive.org/web/20161220211157/http://transbaycenter.org/uploads/2014/01/TJPA-CAC-1.14.14.pdf|url-status=live}}</ref>
* [[Caltrain]] [[Caltrain Modernization Program|electrification project]] is underway between [[San Francisco 4th and King Street station|San Francisco]] to [[Tamien station]] as part of upgrades for blended service with [[California High-Speed Rail|CHSR]]. The Caltrain trains will be capable of reaching speeds of up to {{cvt|110|mph|round=5}}.<ref>{{cite book|title=Caltrain Modernization Program|date=14 January 2014|publisher=Transbay Joint Powers Authority Citizen Advisory Group|url=http://transbaycenter.org/uploads/2014/01/TJPA-CAC-1.14.14.pdf|access-date=16 December 2016|archive-date=20 December 2016|archive-url=https://web.archive.org/web/20161220211157/http://transbaycenter.org/uploads/2014/01/TJPA-CAC-1.14.14.pdf|url-status=live}}</ref>


==Rail improvement strategies==
==Rail improvement strategies==
[[File:Amt 9634-CDU-closeup.jpg|thumb|right|125px|Cab display unit of [[ACSES]], an approved [[Positive Train Control|PTC]] system]]
[[File:Amt 9634-CDU-closeup.jpg|thumb|right|125px|Cab display unit of [[ACSES]], an approved [[Positive Train Control|PTC]] system]]
There are many types of train that can support higher-speed rail operation. Usually, the rail infrastructure needs to be upgraded prior to such operation. However, the requirements to the infrastructure (signalling systems, curve radii, etc.) greatly increase with higher speeds, so an upgrade to a higher-speed standard is often simpler and less expensive than building new high-speed lines. But an upgrade to existing track currently in use, with busy traffic in some segments, introduces challenges associated with the construction work that could potentially disrupt the train services. The followings are some strategies used by regional transportation planners and rail track owners for their rail improvement projects in order to start the higher-speed rail services.
There are many types of trains that can support higher-speed rail operation. Usually, the rail infrastructure needs to be upgraded prior to such operation. However, the requirements to the infrastructure (signalling systems, curve radii, etc.) greatly increase with higher speeds, so an upgrade to a higher-speed standard is often simpler and less expensive than building new high-speed lines. But an upgrade to existing track currently in use, with busy traffic in some segments, introduces challenges associated with the construction work that could potentially disrupt the train services. The followings are some strategies used by regional transportation planners and rail track owners for their rail improvement projects in order to start the higher-speed rail services.


===Signal upgrades===
===Signal upgrades===
In [[Victoria (Australia)|Victoria]], Australia, the increased top speeds from {{cvt|130|to|160|km/h|round=5}} in the [[Regional Fast Rail project]] required a change to the signalling system to account for increased braking distance. Prior to the project, the system comprised a mixture of equipment from pre-[[World War I|WWI]] mechanical signalling to the remote control systems of the 1980s. In some cases, operators needed to telephone the local operators to manually control the signal boxes. With the new speeds, the signalling needed to be computerized. The project employed the [[Solid State Interlocking]] with the newly laid [[fiber-optic]] communication between the components to use three computer systems to control the signals. When the output of one computer differs from the other two, the system will fail that computer and continue the signal operations as long as the outputs from the other two computers are consistent. The project deployed the [[Train Protection & Warning System]] which allows the system to automatically applies the brakes at a sufficient distance to stop the train if the driver does not control the speeds adequately. The project also incorporated Train Control and Monitoring System to allow real-time monitoring of the position of trains.<ref name=rfr>{{cite web|last=Marchant |first=Kevin |title=The Regional Fast Rail Project – A Technical Focus |url=http://acaa.net.au/pdf/2007_tp_pp/regionaltp.pdf |publisher=Australian Construction Achievement Award |access-date=19 January 2014 |url-status=dead |archive-url=https://web.archive.org/web/20130420163127/http://acaa.net.au/pdf/2007_tp_pp/regionaltp.pdf |archive-date=20 April 2013 }}</ref>
In [[Victoria (state)|Victoria]], Australia, the increased top speeds from {{cvt|130|to|160|km/h|round=5}} in the [[Regional Fast Rail project]] required a change to the signalling system to account for increased braking distance. Prior to the project, the system comprised a mixture of equipment from pre-World War I mechanical signalling to the remote control systems of the 1980s. In some cases, operators needed to telephone the local operators to manually control the signal boxes. With the new speeds, the signalling needed to be computerized. The project employed the [[Solid State Interlocking]] with the newly laid [[fiber-optic]] communication between the components to use three computer systems to control the signals. When the output of one computer differs from the other two, the system will fail that computer and continue the signal operations as long as the outputs from the other two computers are consistent. The project deployed the [[Train Protection & Warning System]] which allows the system to automatically applies the brakes at a sufficient distance to stop the train if the driver does not control the speeds adequately. The project also incorporated Train Control and Monitoring System to allow real-time monitoring of the position of trains.<ref name=rfr>{{cite web|last=Marchant |first=Kevin |title=The Regional Fast Rail Project – A Technical Focus |url=http://acaa.net.au/pdf/2007_tp_pp/regionaltp.pdf |publisher=Australian Construction Achievement Award |access-date=19 January 2014 |url-status=dead |archive-url=https://web.archive.org/web/20130420163127/http://acaa.net.au/pdf/2007_tp_pp/regionaltp.pdf |archive-date=20 April 2013 }}</ref>


In the United States, the first step to increase top speeds from {{convert|79|mph|abbr=on}} is to install a new signal system that incorporates FRA-approved positive train control (PTC) system that is compatible with higher-speed rail operation.<ref>{{cite web|title=Pacific Surfliner Corridor Los Angeles to San Diego – Service Development Plan|url=http://149.136.20.80/rail/dor/assets/File/CA-Pac-Surf_Final_SDP.pdf|publisher=California Department of Transportation|access-date=21 October 2012|archive-date=1 February 2014|archive-url=https://web.archive.org/web/20140201215458/http://149.136.20.80/rail/dor/assets/File/CA-Pac-Surf_Final_SDP.pdf|url-status=live}}</ref> They are both [[transponder]]-based and [[Global Positioning System|GPS]]-based PTC systems currently in use in the United States. By a mandate, a significant portion of the railroads in the United States will be covered by PTC by the end of 2015.<ref>{{cite web|title=Positive Train Control Overview|url=http://www.fra.dot.gov/rrs/pages/fp_1265.shtml|publisher=Federal Railroad Administration|access-date=21 October 2012|date=7 June 2012|archive-url=https://web.archive.org/web/20120904132328/http://www.fra.dot.gov/rrs/pages/fp_1265.shtml|archive-date=4 September 2012}}</ref>
In the United States, the first step to increase top speeds from {{convert|79|mph|abbr=on}} is to install a new signal system that incorporates FRA-approved positive train control (PTC) system that is compatible with higher-speed rail operation.<ref>{{cite web|title=Pacific Surfliner Corridor Los Angeles to San Diego – Service Development Plan|url=http://149.136.20.80/rail/dor/assets/File/CA-Pac-Surf_Final_SDP.pdf|publisher=California Department of Transportation|access-date=21 October 2012|archive-date=1 February 2014|archive-url=https://web.archive.org/web/20140201215458/http://149.136.20.80/rail/dor/assets/File/CA-Pac-Surf_Final_SDP.pdf|url-status=live}}</ref> They are both [[transponder]]-based and [[Global Positioning System|GPS]]-based PTC systems currently in use in the United States. By a mandate, a significant portion of the railroads in the United States will be covered by PTC by the end of 2015.<ref>{{cite web|title=Positive Train Control Overview|url=http://www.fra.dot.gov/rrs/pages/fp_1265.shtml|publisher=Federal Railroad Administration|access-date=21 October 2012|date=7 June 2012|archive-url=https://web.archive.org/web/20120904132328/http://www.fra.dot.gov/rrs/pages/fp_1265.shtml|archive-date=4 September 2012}}</ref>
Line 147: Line 144:
===Electrification===
===Electrification===
[[File:Amtrak Keystone Corridor Rosemont Curve.jpg|thumb|The "Main Line" portion of the Keystone Corridor is fully electrified.]]
[[File:Amtrak Keystone Corridor Rosemont Curve.jpg|thumb|The "Main Line" portion of the Keystone Corridor is fully electrified.]]
Another consideration is [[Railway electrification system|electrification]]. Electrifying a railway line entails a major upgrade to the rail infrastructure and equipment. On the infrastructure side, it requires [[Overhead line|catenary line]]s to be built above the tracks. New transmission lines are needed to carry power from the power plants. [[electrical substation|Substations]] are required for each of the {{Convert|40|mi|adj=on}} lengths to reduce severe voltage losses. There is also a need to consider the required amount of power supply and new power plants may be required. For locomotives, new electric locomotives are needed or existing [[diesel-electric locomotive]]s can be retrofitted into all-electric locomotives, but it is a complicated task.<ref>{{cite journal|last1=Freeman|first1=Richard|last2=Cooper|first2=Hal|title=Why Electrified Rail Is Superior|journal=21st Century|issue=Summer 2005|page=28}}</ref> These factors cause electrification to have high initial investment costs. The advantages of all-electric locomotives are that they provide quieter, cleaner and more reliable operations than the diesel-electric counterpart. The fuel consumption, locomotive maintenance costs and track wear of all all-electric locomotives are also lower.<ref>{{cite news|title=Current Developments in UK Rail: An Electrifying Future|url=http://www.railway-technology.com/features/feature104304/|access-date=28 September 2014|publisher=Railway-technology.com|date=9 December 2010|archive-date=19 October 2014|archive-url=https://web.archive.org/web/20141019115049/http://www.railway-technology.com/features/feature104304|url-status=live}}</ref> Furthermore, electric traction makes the operator more independent of oil price fluctuations and imports, as electricity can be generated from domestic resources or renewable energy. This was a major consideration in the electrification of the [[Deutsche Reichsbahn (East Germany)#Electrification|German Democratic Republic network]], as lignite (and therefore electricity) was cheap and plentiful domestically whereas oil had to be imported at world market prices.{{citation needed|date=March 2017}}
Another consideration is [[Railway electrification|electrification]]. Electrifying a railway line entails a major upgrade to the rail infrastructure and equipment. On the infrastructure side, it requires [[Overhead line|catenary line]]s to be built above the tracks. New transmission lines are needed to carry power from the power plants. [[electrical substation|Substations]] are required for each of the {{Convert|40|mi|adj=on}} lengths to reduce severe voltage losses. There is also a need to consider the required amount of power supply and new power plants may be required. For locomotives, new electric locomotives are needed or existing [[diesel-electric locomotive]]s can be retrofitted into all-electric locomotives, but it is a complicated task.<ref>{{cite journal|last1=Freeman|first1=Richard|last2=Cooper|first2=Hal|title=Why Electrified Rail Is Superior|journal=21st Century|issue=Summer 2005|page=28}}</ref> These factors cause electrification to have high initial investment costs. The advantages of all-electric locomotives are that they provide quieter, cleaner and more reliable operations than the diesel-electric counterpart. The fuel consumption, locomotive maintenance costs and track wear of all all-electric locomotives are also lower.<ref>{{cite news|title=Current Developments in UK Rail: An Electrifying Future|url=http://www.railway-technology.com/features/feature104304/|access-date=28 September 2014|publisher=Railway-technology.com|date=9 December 2010|archive-date=19 October 2014|archive-url=https://web.archive.org/web/20141019115049/http://www.railway-technology.com/features/feature104304|url-status=live}}</ref> Furthermore, electric traction makes the operator more independent of oil price fluctuations and imports, as electricity can be generated from domestic resources or renewable energy. This was a major consideration in the electrification of the [[Deutsche Reichsbahn (East Germany)#Electrification|German Democratic Republic network]], as [[lignite]] (and therefore electricity) was cheap and plentiful domestically whereas oil had to be imported at world market prices.{{citation needed|date=March 2017}}


An alternative to catenary lines is to use a [[third rail]] system which has a semi-continuous rigid conductor placed alongside or between the rails of a railway track. However the operating speeds of this type of systems cannot be greater than {{cvt|100|mph|round=5}} due to its limitation of the power supply gaps at turnouts and grade crossings. Therefore, the third rail system is not generally used for higher-speed rail.<ref>{{cite news|last1=Yadav|first1=Anil|title=Traction choices: overhead ac vs third rail dc|url=http://www.railjournal.com/index.php/rolling-stock/traction-choices-overhead-ac-vs-third-rail-dc.html|access-date=17 November 2014|work=International Railway Journal|date=4 February 2013|archive-date=6 September 2014|archive-url=https://web.archive.org/web/20140906202540/http://www.railjournal.com/index.php/rolling-stock/traction-choices-overhead-ac-vs-third-rail-dc.html|url-status=live}}</ref>
An alternative to catenary lines is to use a [[third rail]] system which has a semi-continuous rigid conductor placed alongside or between the rails of a railway track. However the operating speeds of this type of systems cannot be greater than {{cvt|100|mph|round=5}} due to its limitation of the power supply gaps at turnouts and grade crossings. Therefore, the third rail system is not generally used for higher-speed rail.<ref>{{cite news|last1=Yadav|first1=Anil|title=Traction choices: overhead ac vs third rail dc|url=http://www.railjournal.com/index.php/rolling-stock/traction-choices-overhead-ac-vs-third-rail-dc.html|access-date=17 November 2014|work=International Railway Journal|date=4 February 2013|archive-date=6 September 2014|archive-url=https://web.archive.org/web/20140906202540/http://www.railjournal.com/index.php/rolling-stock/traction-choices-overhead-ac-vs-third-rail-dc.html|url-status=live}}</ref>


One example in the United States that does involve electrification is the Keystone Improvement Project to provide higher-speed rail service along the [[Harrisburg, Pennsylvania|Harrisburg]]-[[Pittsburgh]] segment of the [[Keystone Corridor]] in [[Pennsylvania]]. The plan includes additional track, a new signal system and electrification. If completed as planned, this would allow [[Amtrak]] to utilize electric power continuously on service from [[Philadelphia]] to Pittsburgh. The first segment ("Main Line") has already been using [[electric locomotives]] with a top speed of {{cvt|110|mph|round=5}}.<ref>{{cite news|last=Cotey|first=Angela|title=Keystone Corridor|url=http://www.hsrupdates.com/corridor_profiles/details/Keystone-Corridor--84|access-date=20 October 2012|newspaper=Progressive Railroading|archive-date=12 July 2012|archive-url=https://web.archive.org/web/20120712080707/http://www.hsrupdates.com/corridor_profiles/details/Keystone-Corridor--84|url-status=live}}</ref>
One example in the United States that does involve electrification is the Keystone Improvement Project to provide higher-speed rail service along the [[Harrisburg, Pennsylvania|Harrisburg]][[Pittsburgh]] segment of the [[Keystone Corridor]] in [[Pennsylvania]]. The plan includes additional track, a new signal system and electrification. If completed as planned, this would allow [[Amtrak]] to utilize electric power continuously on service from [[Philadelphia]] to Pittsburgh. The first segment ("Main Line") has already been using [[electric locomotives]] with a top speed of {{cvt|110|mph|round=5}}.<ref>{{cite news|last=Cotey|first=Angela|title=Keystone Corridor|url=http://www.hsrupdates.com/corridor_profiles/details/Keystone-Corridor--84|access-date=20 October 2012|newspaper=Progressive Railroading|archive-date=12 July 2012|archive-url=https://web.archive.org/web/20120712080707/http://www.hsrupdates.com/corridor_profiles/details/Keystone-Corridor--84|url-status=live}}</ref>


==In operation==
==In operation==


===Australia===
=== United States ===
[[File:Countrylink XPT at Sydney Central station.jpg|thumb|[[NSW TrainLink]] [[New South Wales XPT|XPT]] at [[Sydney]]'s [[Central railway station, Sydney|Central station]]]]
This is the list of the current higher-speed intercity and long-distance trains. For the list of trains with a top speed {{cvt|110|mph|0}} and above, see [[High-speed rail in the United States]].
{| class="wikitable" style="font-size:95%;"
! Service name
! Route
!Operator!! Current Top speed !! Average speed!! Route length (miles) !! Equipment !! Note
|-
| ''[[Texas Eagle]]''
| [[Chicago Union Station|Chicago]]–[[Los Angeles Union Station|Los Angeles]]
|Amtrak|| {{cvt|100|mph|0}} || {{cvt|55|mph|0}} || 2,728 || Diesel-electric locomotive-hauled coaches ||<ref>{{citation |title=Texas Eagle |url=http://www.texaseagle.com/}}</ref>
|-
| ''[[Southwest Chief]]''
| [[Chicago Union Station|Chicago]]–[[Los Angeles Union Station|Los Angeles]]
|Amtrak|| {{cvt|90|mph|0}} || {{cvt|55|mph|0}} || 2,256 || Diesel-electric locomotive-hauled coaches ||<ref>{{cite news |last=Wolfe |first=Thomas |date=27 July 2005 |title=Passengers on Amtrak's Southwest Chief Experience a Community Away From Home |url=http://www.redorbit.com/news/technology/187759/passengers_on_amtraks_southwest_chief_experience_a_community_away_from/ |url-status=live |archive-url=https://web.archive.org/web/20150924130442/http://www.redorbit.com/news/technology/187759/passengers_on_amtraks_southwest_chief_experience_a_community_away_from/ |archive-date=24 September 2015 |access-date=21 October 2012 |newspaper=Red Orbit}}</ref>
|-
| ''[[Pacific Surfliner]]''
| [[Los Angeles Union Station|Los Angeles]]–[[Santa Fe Depot (San Diego)|San Diego]]
|Amtrak|| {{cvt|90|mph|0}} || {{cvt|55|mph|0}} || 130 || Diesel-electric locomotive-hauled coaches ||There is a study in place to increase maximum speed to {{cvt|110|mph|0}} when funding is available.<ref>{{cite web |title=Regional Transportation Plan 2012–2035 |url=http://rtpscs.scag.ca.gov/Documents/2012/final/SR/2012fRTP_PassengerRail.pdf |url-status=live |archive-url=https://web.archive.org/web/20150111070616/http://rtpscs.scag.ca.gov/Documents/2012/final/SR/2012fRTP_PassengerRail.pdf |archive-date=11 January 2015 |access-date=11 January 2015 |publisher=Southern California Association of Governments |page=9}}</ref>
|}
 
=== Australia ===
[[File:Countrylink XPT at Sydney Central station.jpg|thumb|[[NSW TrainLink]] [[New South Wales XPT|XPT]] at [[Central railway station, Sydney|Central station]]]]
[[File:QRTILTRAIN2.jpg|thumb|A [[Diesel Tilt Train]] at [[Bowen Hills railway station|Bowen Hills]]]]
[[File:QRTILTRAIN2.jpg|thumb|A [[Diesel Tilt Train]] at [[Bowen Hills railway station|Bowen Hills]]]]
{{See also|High-speed rail in Australia}}
{{See also|High-speed rail in Australia}}
In 1999, the concept of [[Regional Fast Rail project]] was initiated by the [[Government of Victoria (Australia)|State Government]] of [[Victoria (Australia)|Victoria]] with a goal to provide express higher-speed rail services between 4 main regional centres of Victoria ([[Geelong]], [[Ballarat]], [[Bendigo]] and the [[Latrobe Valley]]) and [[Melbourne]]. The initiative included a key component to upgrade rail infrastructure to have top speeds up to {{cvt|160|km/h|round=5}}. The development phase of initiative was between 2000 and 2002. Finally, the services on four lines began between 2005 and 2006 with top speeds of 160&nbsp;km/h using [[V/Line VLocity|VLocity]] trains.<ref>{{cite web|title=Results of special audits and other investigations, August 2006 |url=http://www.audit.vic.gov.au/reports_mp_psa/psa1602.html |publisher=Auditor General Victoria |access-date=13 November 2013 |url-status=dead |archive-url=https://web.archive.org/web/20060918152911/http://www.audit.vic.gov.au/reports_mp_psa/psa1602.html |archive-date=18 September 2006 }}</ref> Additionally, the services provided by [[Queensland Rail's Tilt Train]], the [[Transwa Prospector]] and [[New South Wales XPT|NSW TrainLink's XPT]] are considered higher-speed rail and all of those trains have a top service speed of 160&nbsp;km/h (99–100&nbsp;mph).<ref>{{Cite news|url=http://www.australiarailpass.com/tilt-train/|title=Travelling on the Tilt Train linking Brisbane and Rockhampton in Queensland|work=Explore Australia by rail with an Australian rail pass|access-date=10 July 2017|language=en-GB|archive-date=19 August 2017|archive-url=https://web.archive.org/web/20170819144137/http://www.australiarailpass.com/tilt-train/|url-status=live}}</ref><ref>{{Cite news|url=http://www.pta.wa.gov.au/news/media-statements/kalgoorlie-celebrates-launch-of-new-prospector|title=Kalgoorlie celebrates launch of new Prospector|work=Public Transport Authority of Western Australia|access-date=10 July 2017|language=en-AU|archive-date=19 August 2017|archive-url=https://web.archive.org/web/20170819145631/http://www.pta.wa.gov.au/news/media-statements/kalgoorlie-celebrates-launch-of-new-prospector|url-status=live}}</ref><ref>{{Cite web|url=http://www.theaustralian.com.au/national-affairs/policy/very-fast-train-xpt-showcases-all-the-best-the-80s-has-to-offer/news-story/1d1038d577ccaa00e3db1fecfe4825b1|title=Subscribe {{!}} theaustralian|website=theaustralian.com.au|access-date=10 July 2017|archive-date=6 November 2021|archive-url=https://web.archive.org/web/20211106101804/https://insight.adsrvr.org/track/up?adv=vrges6n&ref=https%3A%2F%2Fwww.theaustralian.com.au%2Fsubscribe%2Fnews%2F1%2F%3FsourceCode%3DTAWEB_WRE170_a%26dest%3Dhttps%253A%252F%252Fwww.theaustralian.com.au%252Fnational-affairs%252Fpolicy%252Fvery-fast-train-xpt-showcases-all-the-best-the-80s-has-to-offer%252Fnews-story%252F1d1038d577ccaa00e3db1fecfe4825b1%26memtype%3Danonymous%26mode%3Dpremium&upid=rjdl4pv&upv=1.1.0|url-status=live}}</ref>
In 1999, the concept of [[Regional Fast Rail project]] was initiated by the government of Victoria with a goal to provide express higher-speed rail services between four main regional centres of Victoria ([[Geelong]], [[Ballarat]], [[Bendigo]] and the [[Latrobe Valley]]) and [[Melbourne]]. The initiative included a key component to upgrade rail infrastructure to have top speeds up to {{cvt|160|km/h|round=5}}. The development phase of initiative was between 2000 and 2002. Finally, the services on four lines began between 2005 and 2006 with top speeds of 160&nbsp;km/h using [[V/Line VLocity|VLocity]] trains.<ref>{{cite web|title=Results of special audits and other investigations, August 2006 |url=http://www.audit.vic.gov.au/reports_mp_psa/psa1602.html |publisher=Auditor General Victoria |access-date=13 November 2013 |url-status=dead |archive-url=https://web.archive.org/web/20060918152911/http://www.audit.vic.gov.au/reports_mp_psa/psa1602.html |archive-date=18 September 2006 }}</ref> Additionally, [[Queensland Rail]]'s [[Tilt Train]], the [[The Prospector (train)|Prospector]] and [[New South Wales XPT|NSW TrainLink's XPT]] all have a top service speed of 160&nbsp;km/h (99–100&nbsp;mph).<ref>{{Cite news|url=http://www.australiarailpass.com/tilt-train/|title=Travelling on the Tilt Train linking Brisbane and Rockhampton in Queensland|work=Explore Australia by rail with an Australian rail pass|access-date=10 July 2017|language=en-GB|archive-date=19 August 2017|archive-url=https://web.archive.org/web/20170819144137/http://www.australiarailpass.com/tilt-train/|url-status=live}}</ref><ref>{{Cite news|url=http://www.pta.wa.gov.au/news/media-statements/kalgoorlie-celebrates-launch-of-new-prospector|title=Kalgoorlie celebrates launch of new Prospector|work=[[Public Transport Authority (Western Australia)]]|access-date=10 July 2017|language=en-AU|archive-date=19 August 2017|archive-url=https://web.archive.org/web/20170819145631/http://www.pta.wa.gov.au/news/media-statements/kalgoorlie-celebrates-launch-of-new-prospector|url-status=live}}</ref><ref>{{Cite web|url=http://www.theaustralian.com.au/national-affairs/policy/very-fast-train-xpt-showcases-all-the-best-the-80s-has-to-offer/news-story/1d1038d577ccaa00e3db1fecfe4825b1|title=???|website=[[The Australian]]|access-date=10 July 2017|archive-date=6 November 2021|archive-url=https://web.archive.org/web/20211106101804/https://insight.adsrvr.org/track/up?adv=vrges6n&ref=https%3A%2F%2Fwww.theaustralian.com.au%2Fsubscribe%2Fnews%2F1%2F%3FsourceCode%3DTAWEB_WRE170_a%26dest%3Dhttps%253A%252F%252Fwww.theaustralian.com.au%252Fnational-affairs%252Fpolicy%252Fvery-fast-train-xpt-showcases-all-the-best-the-80s-has-to-offer%252Fnews-story%252F1d1038d577ccaa00e3db1fecfe4825b1%26memtype%3Danonymous%26mode%3Dpremium&upid=rjdl4pv&upv=1.1.0|url-status=live}}</ref>


The New South Wales XPT (short for Express Passenger Train) is the main long-distance passenger train operated by NSW TrainLink on regional railway services in [[New South Wales]], Australia from [[Central railway station, Sydney|Sydney]] to [[Dubbo railway station|Dubbo]], [[Grafton railway station, New South Wales|Grafton]], and [[Casino railway station|Casino]] as well as interstate destinations, [[Roma Street railway station|Brisbane]] and [[Southern Cross railway station|Melbourne]]. The XPT is based on the [[British Rail]] designed [[InterCity 125|High Speed Train]] and entered service in April 1982. It came to fruition in January 1978 when the [[Public Transport Commission]] invited tenders for 25 high-speed [[railcar]]s similar to the [[WAGR WCA/WCE class|Prospector railcars]] delivered by [[Commonwealth Engineering|Comeng]] to the [[Western Australian Government Railways]] in 1971. Comeng's proposal for a train based on the InterCity 125 was announced as the successful bidder in October 1976.
The New South Wales XPT (short for Express Passenger Train) is the main long-distance passenger train operated by NSW TrainLink on regional railway services in [[New South Wales]], Australia from [[Central railway station, Sydney|Sydney]] to [[Dubbo railway station|Dubbo]], [[Grafton railway station, New South Wales|Grafton]], and [[Casino railway station|Casino]] as well as interstate destinations, [[Roma Street railway station|Brisbane]] and [[Southern Cross railway station|Melbourne]]. The XPT is based on the [[British Rail]] designed [[InterCity 125|High Speed Train]] and entered service in April 1982. It came to fruition in January 1978 when the [[Public Transport Commission]] invited tenders for 25 high-speed [[railcar]]s similar to the [[WAGR WCA/WCE class|Prospector railcars]] delivered by [[Commonwealth Engineering|Comeng]] to the [[Western Australian Government Railways]] in 1971. Comeng's proposal for a train based on the InterCity 125 was announced as the successful bidder in October 1976.


The Tilt Train is the name for two similar [[tilting train]] services, one [[Electric Tilt Train|electric]] and the other [[Diesel Tilt Train|diesel]], operated by [[Queensland Rail]] on the [[North Coast railway line, Queensland|North Coast line]] from [[Roma Street railway station|Brisbane]] to [[Rockhampton railway station|Rockhampton]] and [[Cairns railway station|Cairns]]. In May 1999 the [[Electric Tilt Train]] set an Australian train speed record of {{cvt|210|km/h|round=5}} north of [[Bundaberg]], a record that still stands.<ref>{{cite book|url=http://www.corporate.qr.com.au/Images/QR_Annual_Report_tcm15-2468.pdf|title=Annual Report June 1999|author=QR Limited|publisher=QR Limited|year=1999|location=Brisbane|page=53|author-link=Queensland Rail|access-date=20 August 2016|archive-url=https://web.archive.org/web/20090930024735/http://www.corporate.qr.com.au/Images/QR_Annual_Report_tcm15-2468.pdf|archive-date=30 September 2009|url-status=dead}}</ref><ref>"QR Tilt Train Sets Australian Rail Speed Record" ''Railway Digest'' June 1999 page 15</ref>
The Tilt Train is the name for two similar [[tilting train]] services, one [[Electric Tilt Train|electric]] and the other [[Diesel Tilt Train|diesel]], operated by [[Queensland Rail]] on the [[North Coast railway line, Queensland|North Coast line]] from [[Roma Street railway station|Brisbane]] to [[Rockhampton railway station|Rockhampton]] and [[Cairns railway station|Cairns]]. In May 1999 the [[Electric Tilt Train]] set an Australian train speed record of {{cvt|210|km/h|round=5}} north of [[Bundaberg]], a record that still stands.<ref>{{cite book|url=http://www.corporate.qr.com.au/Images/QR_Annual_Report_tcm15-2468.pdf|title=Annual Report June 1999|publisher=[[Queensland Rail]]|year=1999|location=Brisbane|page=53|author-link=Queensland Rail|access-date=20 August 2016|archive-url=https://web.archive.org/web/20090930024735/http://www.corporate.qr.com.au/Images/QR_Annual_Report_tcm15-2468.pdf|archive-date=30 September 2009|url-status=dead}}</ref><ref>QR Tilt Train Sets Australian Rail Speed Record ''[[Railway Digest]]'' June 1999 page 15</ref>


The [[Transwa WDA/WDB/WDC class]] are a class of railcars built by [[UGL Rail|United Goninan]], [[Broadmeadow, New South Wales|Broadmeadow]] for [[Transwa]] in 2004–05 to replace the [[WAGR WCA/WCE class]] railcars on the ''[[Transwa AvonLink|AvonLink]]'' and ''[[Transwa Prospector|Prospector]]'' services in [[Australia]]. They are capable of high-speed operation.
The [[Transwa WDA/WDB/WDC class]] are a class of railcars built by [[UGL Rail|United Goninan]], [[Broadmeadow]] for [[Transwa]] in 2004–05 to replace the [[WAGR WCA/WCE class]] railcars on the ''[[AvonLink]]'' and ''[[The Prospector (train)|Prospector]]'' services in [[Australia]]. They are capable of high-speed operation.


===China===
===China===
[[File:High_and_Higher_speed_rail_in_China.svg|thumb|400x400px|alt=Railway Lines in China that run CRH services|Geographically accurate map of CRH services.<br>Magenta and Red: High-speed rail<br>Yellow: Higher-speed rail<br>Black text in image: Cities that host CR divisions headquarters]]
[[File:High_and_Higher_speed_rail_in_China.svg|thumb|400x400px|alt=Railway Lines in China that run CRH services|Geographically accurate map of CRH services.<br>Magenta and Red: High-speed rail<br>Yellow: Higher-speed rail<br>Black text in image: Cities that host CR divisions headquarters]]
[[File:CRH6F-A-0496@FGP (20201009113705).jpg|left|thumb|A S511 train in the [[Beijing Suburban Railway]].]]
[[File:CRH6F-A-0496@FGP (20201009113705).jpg|left|thumb|A S511 train in the [[Beijing Suburban Railway]].]]
[[File:China Railways train K9787 on Nanjiang Railway line.jpg|left|thumb|Train K9787 in the [[Southern Xinjiang railway|'''Nanjiang railway''']].]]
[[File:China Railways train K9787 on Nanjiang Railway line.jpg|left|thumb|Train K9787 in the [[Southern Xinjiang railway]].]]
In China, higher-speed railways are railways that are not officially categorized as high-speed rail but allow [[China Railway High-speed|CRH EMUs]] run on it with speeds up to 200&nbsp;km/h.<ref>{{Cite web|url=http://www.gov.cn/zwgk/2013-09/06/content_2482594.htm|title=铁路安全管理条例|website=gov.cn|access-date=15 May 2018|archive-date=14 October 2014|archive-url=https://web.archive.org/web/20141014043645/http://www.gov.cn/zwgk/2013-09/06/content_2482594.htm|url-status=live}}</ref> Typically these lines are classified as Grade I conventional railways and are used by both passenger and freight services.
In China, higher-speed railways are railways that are not officially categorized as high-speed rail but allow [[China Railway High-speed|CRH EMUs]] run on it with speeds up to 200&nbsp;km/h.<ref>{{Cite web|url=http://www.gov.cn/zwgk/2013-09/06/content_2482594.htm|title=铁路安全管理条例|website=gov.cn|access-date=15 May 2018|archive-date=14 October 2014|archive-url=https://web.archive.org/web/20141014043645/http://www.gov.cn/zwgk/2013-09/06/content_2482594.htm|url-status=live}}</ref> Typically these lines are classified as Grade I conventional railways and are used by both passenger and freight services.


Line 178: Line 195:
Identifiers starting with G indicates at least part of the train's route operates at a maximum 300&nbsp;km/h or above (this is a characteristic of the line rather than the precise maximum speed of this exact train) and not running at deliberately reduced speed on any section. Other sections of the route may have lower speeds as low as 160&nbsp;km/h.
Identifiers starting with G indicates at least part of the train's route operates at a maximum 300&nbsp;km/h or above (this is a characteristic of the line rather than the precise maximum speed of this exact train) and not running at deliberately reduced speed on any section. Other sections of the route may have lower speeds as low as 160&nbsp;km/h.


Identifiers starting with C indicates short-distance travel using CRH trains, the maximum speed is irrelevant (ranging from 160&nbsp;km/h Ürümqi-Korla service to 350&nbsp;km/h Beijing-Tianjin (via intercity) service).
Identifiers starting with C indicates short-distance travel using CRH trains, the maximum speed is irrelevant (ranging from 160&nbsp;km/h Ürümqi-Korla service to 350&nbsp;km/h Beijing–Tianjin (via intercity) service).


Identifiers starting with D indicates CRH services with maximum speed 265&nbsp;km/h or less, including overnight sleepers on 310&nbsp;km/h Beijing-Guangzhou line (running them 310&nbsp;km/h overnight not only causes noises but also disturbs sleeping patterns of passengers. This is an example of deliberately reduced speeds).
Identifiers starting with D indicates CRH services with maximum speed 265&nbsp;km/h or less, including overnight sleepers on 310&nbsp;km/h Beijing–Guangzhou line (running them 310&nbsp;km/h overnight not only causes noises but also disturbs sleeping patterns of passengers. This is an example of deliberately reduced speeds).


Identifiers starting with S indicates metropolitan services using CRH rolling stock and have a different fare system to the national one. Their maximum speed is 160&nbsp;km/h.
Identifiers starting with S indicates metropolitan services using CRH rolling stock and have a different fare system to the national one. Their maximum speed is 160&nbsp;km/h.
Line 205: Line 222:
|
|
|-
|-
| [[Northern Xinjiang railway|Lanzhou-Xinjiang (West)]]*<br>
| [[Northern Xinjiang railway|Lanzhou–Xinjiang (West)]]*<br>
(including [[Second Ürümqi–Jinghe Railway|Second track]])
(including [[Second Ürümqi–Jinghe Railway|Second track]])
| 兰新线西段(北疆线)
| 兰新线西段(北疆线)
Line 213: Line 230:
| Bole station where Boltala Prefecture branch splits is no longer a passenger stop.<ref>{{Cite web |url=http://www.china-railway.com.cn/xwzx/zhxw/201909/t20190924_96313.html |title=中国国家铁路集团有限公司<!-- Bot generated title --> |access-date=29 November 2019 |archive-date=1 August 2020 |archive-url=https://web.archive.org/web/20200801162329/http://www.china-railway.com.cn/xwzx/zhxw/201909/t20190924_96313.html |url-status=live }}</ref>
| Bole station where Boltala Prefecture branch splits is no longer a passenger stop.<ref>{{Cite web |url=http://www.china-railway.com.cn/xwzx/zhxw/201909/t20190924_96313.html |title=中国国家铁路集团有限公司<!-- Bot generated title --> |access-date=29 November 2019 |archive-date=1 August 2020 |archive-url=https://web.archive.org/web/20200801162329/http://www.china-railway.com.cn/xwzx/zhxw/201909/t20190924_96313.html |url-status=live }}</ref>
|-
|-
| [[Jinghe–Yining–Khorgos railway|Jinghe-Khorgos]]
| [[Jinghe–Yining–Khorgos railway|Jinghe–Khorgos]]
| 精伊霍铁路
| 精伊霍铁路
| {{rws|Jinghe South}}
| {{rws|Jinghe South}}
Line 220: Line 237:
|
|
|-
|-
| [[Bole–Shuanghe–Boltala railway|Boltala Prefecture Branch]]
| [[Bole–Shuanghe–Boltala railway|Boltala Prefecture branch]]
| 博州支线
| 博州支线
| {{rws|Bole}}
| {{rws|Bole}}
Line 227: Line 244:
|  
|  
|-
|-
| [[Dunhuang railway|Liuyuan-Golmud]]*
| [[Dunhuang railway|Liuyuan–Golmud]]*
| 柳格线柳敦段
| 柳格线柳敦段
| {{rws|Yumen}}
| {{rws|Yumen}}
Line 234: Line 251:
| No CRH train from/to Dunhuang stops at Yumen.
| No CRH train from/to Dunhuang stops at Yumen.
|-
|-
| [[Changchun–Baicheng Railway|Changchun-Baicheng]]<br>[[Baicheng–Arxan Railway|Baicheng-Arxan]]*
| [[Changchun–Baicheng Railway|Changchun–Baicheng]]<br>[[Baicheng–Arxan Railway|Baicheng–Arxan]]*
| 长白·白阿线(长乌段)
| 长白·白阿线(长乌段)
| {{rws|Changchun}}
| {{rws|Changchun}}
Line 241: Line 258:
|
|
|-
|-
| [[Hohhot–Ordos Railway|Hohhot-Ordos]]
| [[Hohhot–Ordos Railway|Hohhot–Ordos]]
| 呼鄂线
| 呼鄂线
| {{rws|Hohhot East}}
| {{rws|Hohhot East}}
Line 248: Line 265:
|
|
|-
|-
| [[Huairou–Miyun line|Beijing Suburban:<br>Huairou-Miyun]]
| [[Huairou–Miyun line|Beijing Suburban:<br>Huairou–Miyun]]
| 北京市郊怀密线
| 北京市郊怀密线
| {{rws|Qinghe||Qinghe}}
| {{rws|Qinghe||Qinghe}}
Line 262: Line 279:
|
|
|-
|-
| [[Tianjin–Jizhou railway|Tianjin-Jizhou]]
| [[Tianjin–Jizhou railway|Tianjin–Jizhou]]
| 津蓟铁路
| 津蓟铁路
| {{rws|Tianjin}}
| {{rws|Tianjin}}
Line 269: Line 286:
|
|
|-
|-
| [[Beijing–Qinhuangdao railway|Beijing-Qinhuangdao]]
| [[Beijing–Qinhuangdao railway|Beijing–Qinhuangdao]]
| 京秦线(京哈线)
| 京秦线(京哈线)
| {{rws|Beijing}}
| {{rws|Beijing}}
| {{rws|Qinhuangdao}}
| {{rws|Qinhuangdao}}
| D Z T K Y
| D Z T K Y
| Both [[Beijing-Shanhaiguan railway|conventional]] and [[Tianjin–Qinhuangdao high-speed railway|high-speed]] services has some detouring to Tianjin instead.
| Both [[Beijing–Shanhaiguan railway|conventional]] and [[Tianjin–Qinhuangdao high-speed railway|high-speed]] services has some detouring to Tianjin instead.
|-
|-
| Xiong'an Area
| Xiong'an Area
Line 290: Line 307:
| Part of [[Datong–Xi'an passenger railway|Datong-Xi'an high-speed line]].
| Part of [[Datong–Xi'an passenger railway|Datong-Xi'an high-speed line]].
|-
|-
| [[Beijing–Shanghai railway|Beijing-Shanghai Overnight Sleepers]]
| [[Beijing–Shanghai railway|Beijing–Shanghai Overnight Sleepers]]
| 京沪动卧
| 京沪动卧
| {{rws|Beijing}}
| {{rws|Beijing}}
Line 297: Line 314:
| 2/1/3 pair(s) of trains between Beijing and Shanghai/Nanjing/Hangzhou daily.<br>Trains to Hangzhou have section between Kunshan and Hangzhou runs via [[Shanghai–Kunming railway]] and does not stop at Shanghai.
| 2/1/3 pair(s) of trains between Beijing and Shanghai/Nanjing/Hangzhou daily.<br>Trains to Hangzhou have section between Kunshan and Hangzhou runs via [[Shanghai–Kunming railway]] and does not stop at Shanghai.
|-
|-
| [[Longkou–Yantai railway|Longkou-Yantai]]
| [[Longkou–Yantai railway|Longkou–Yantai]]
| 龙烟线
| 龙烟线
| {{rws|Longkoushi}}
| {{rws|Longkoushi}}
Line 304: Line 321:
|
|
|-
|-
| [[Nanjing–Qidong railway|Nanjing-Qidong]]*
| [[Nanjing–Qidong railway|Nanjing–Qidong]]*
| 宁启线南启段
| 宁启线南启段
| {{rws|Nantong}}
| {{rws|Nantong}}
Line 325: Line 342:
| Locally administered
| Locally administered
|-
|-
| [[Dazhou–Chengdu railway|Dazhou-Chengdu]]*
| [[Dazhou–Chengdu railway|Dazhou–Chengdu]]*
| 达成线成遂段
| 达成线成遂段
| {{rws|Dazhou}}
| {{rws|Dazhou}}
Line 332: Line 349:
| Section between Suining and Chengdu is 200&nbsp;km/h
| Section between Suining and Chengdu is 200&nbsp;km/h
|-
|-
| [[Xiangyang–Chongqing railway|Xiangyang-Chongqing]]*
| [[Xiangyang–Chongqing railway|Xiangyang–Chongqing]]*
| 襄渝线达渝段
| 襄渝线达渝段
| {{rws|Dazhou}}
| {{rws|Dazhou}}
Line 339: Line 356:
|
|
|-
|-
| [[Nanchong–Gaoxing railway|Nanchong-Gaoxing]]
| [[Nanchong–Gaoxing railway|Nanchong–Gaoxing]]
| 南高线
| 南高线
| {{rws|Nanchong}}
| {{rws|Nanchong}}
Line 346: Line 363:
| Gaoxing station connects to Dazhou-Chongqing but is not a passenger stop
| Gaoxing station connects to Dazhou-Chongqing but is not a passenger stop
|-
|-
| [[Shimen–Changsha railway|Shimen County-Changsha]]
| [[Shimen–Changsha railway|Shimen County–Changsha]]
| 石长线
| 石长线
| {{rws|Shimenxian North}}
| {{rws|Shimenxian North}}
Line 353: Line 370:
|
|
|-
|-
| [[Kunming–Yuxi–Hekou railway|Kunming-Hekou]]*
| [[Kunming–Yuxi–Hekou railway|Kunming–Hekou]]*
| 昆玉河铁路(标准轨)
| 昆玉河铁路(标准轨)
| [[Yuxi railway station (Yunnan)|Yuxi]]
| [[Yuxi railway station (Yunnan)|Yuxi]]
Line 360: Line 377:
| CRH service between Yuxi and Kunming South run on [[Kunming–Yuxi intercity railway]] (200&nbsp;km/h)
| CRH service between Yuxi and Kunming South run on [[Kunming–Yuxi intercity railway]] (200&nbsp;km/h)
|-
|-
| [[Shanghai–Kunming railway|Shanghai-Kunming]]*
| [[Shanghai–Kunming railway|Shanghai–Kunming]]*
| 沪昆线宣昆段
| 沪昆线宣昆段
| {{rws|Xuanwei}}
| {{rws|Xuanwei}}
Line 367: Line 384:
|
|
|-
|-
| [[Litang–Zhanjiang railway|Litang-Zhanjiang]]*
| [[Litang–Zhanjiang railway|Litang–Zhanjiang]]*
| 黎湛线贵玉段
| 黎湛线贵玉段
| {{rws|Guigang}}
| {{rws|Guigang}}
Line 374: Line 391:
|
|
|-
|-
| [[Shejiang–Shantou railway|Shejiang-Shantou]]*
| [[Shejiang–Shantou railway|Shejiang–Shantou]]*
| 畲汕线潮汕至汕头
| 畲汕线潮汕至汕头
| {{rws|Chaoshan}}
| {{rws|Chaoshan}}
Line 393: Line 410:
! Note
! Note
|-
|-
| [[Jinshan railway|Shanghai Area: Jinshan]]
| [[Jinshan Railway|Shanghai Area: Jinshan]]
| 金山线
| 金山线
| {{rws|Shanghai South}}
| {{rws|Shanghai South}}
| {{rws|Jinshanwei}}
| {{rws|Jinshanwei}}
| S<ref>{{cite web|url=http://sh.sina.com.cn/news/m/2021-01-19/detail-ikftssan8253719.shtml|title=20日起金山铁路动车组车次全面更新 列车时刻保持不变|date=2021-01-19}}</ref>
| S<ref>{{cite web|url=http://sh.sina.com.cn/news/m/2021-01-19/detail-ikftssan8253719.shtml|title=20日起金山铁路动车组车次全面更新 列车时刻保持不变|date=19 January 2021}}</ref>
|  
|  
|-
|-
Line 421: Line 438:
| Different from [[Baotou–Xi'an high-speed railway]] (under construction).
| Different from [[Baotou–Xi'an high-speed railway]] (under construction).
|-
|-
| [[Yichang–Wanzhou railway|Nanjing-Chengdu]]*
| [[Yichang–Wanzhou railway|Nanjing–Chengdu]]*
| 宁蓉线宜凉段<br>(宜万铁路)
| 宁蓉线宜凉段<br>(宜万铁路)
| {{rws|Yichang East}}
| {{rws|Yichang East}}
Line 428: Line 445:
| Passenger service branches at {{rws|Lichuan}}.
| Passenger service branches at {{rws|Lichuan}}.
|-
|-
| [[Chongqing–Lanzhou railway|Lanzhou-Chongqing]]
| [[Chongqing–Lanzhou railway|Lanzhou–Chongqing]]
| 兰渝铁路
| 兰渝铁路
| {{rws|Lanzhou}}
| {{rws|Lanzhou}}
Line 435: Line 452:
|
|
|-
|-
| [[Changsha–Zhuzhou–Xiangtan intercity railway|Changsha-Zhuzhou/Xiangtan]]
| [[Changsha–Zhuzhou–Xiangtan intercity railway|Changsha–Zhuzhou/Xiangtan]]
| 长株潭城际铁路
| 长株潭城际铁路
| {{rws|Changsha West}}
| {{rws|Changsha West}}
Line 442: Line 459:
|
|
|-
|-
| [[Guiyang–Kaiyang intercity railway|Guiyang-Kaiyang]]
| [[Guiyang–Kaiyang intercity railway|Guiyang–Kaiyang]]
| 贵开城际铁路
| 贵开城际铁路
| {{rws|Guiyang North}}
| {{rws|Guiyang North}}
Line 455: Line 472:
|
|
|-
|-
| [[Guangzhou–Shenzhen railway|Guangzhou-Shenzhen (quadtuple track)]]
| [[Guangzhou–Shenzhen railway|Guangzhou-Shenzhen (quadruple track)]]
| 广深线(城际线)
| 广深线(城际线)
| {{rws|Foshan West}}
| {{rws|Foshan West}}
| {{rws|Shenzhen}}
| {{rws|Shenzhen}}
| C D
| C D
| Through operation to {{rws|Huaiji}} (Guiyang-Guangzhou high-speed line), it operates at 180&nbsp;km/h.
| Through operation to {{rws|Huaiji}} (Guiyang–Guangzhou high-speed line), it operates at 180&nbsp;km/h.
|}
|}


Line 474: Line 491:
! Note
! Note
|-
|-
| [[Beijing–Baotou railway|Jining-Baotou quadtuple track]]*
| [[Beijing–Baotou railway|Jining–Baotou quadruple track]]*
| 集包第二双线
| 集包第二双线
| {{rws|Jining South}}
| {{rws|Jining South}}
Line 481: Line 498:
| The section between Hohhot East and Baotou is high-speed rail.<br>The section between Jining South and Hohhot differs from [[Zhangjiakou–Hohhot high-speed railway]] (all of this line's D class service is transfterred to it).
| The section between Hohhot East and Baotou is high-speed rail.<br>The section between Jining South and Hohhot differs from [[Zhangjiakou–Hohhot high-speed railway]] (all of this line's D class service is transfterred to it).
|-
|-
| [[Taiyuan–Zhongwei–Yinchuan railway|Taiyuan-Zhongwei/Yinchuan Corridor]]
| [[Taiyuan–Zhongwei–Yinchuan railway|Taiyuan–Zhongwei/Yinchuan Corridor]]
| 太中银通道
| 太中银通道
| {{rws|Taiyuan}}
| {{rws|Taiyuan}}
Line 506: Line 523:
| {{rws|Guangzhou South}}/{{rws|Zhuhai}}
| {{rws|Guangzhou South}}/{{rws|Zhuhai}}
| D
| D
| Section between Shanghai and Hangzhou uses [[Shanghai–Kunming high-speed railway|Shanghai-Kunming high-speed line]]. Section between Shenzhen North and Zhuhai uses [[Guangzhou–Shenzhen–Hong Kong Express Rail Link|Guangzhou-Shenzhen-Hong Kong high-speed line]] and [[Guangzhou–Zhuhai intercity railway|Guangzhou-Zhuhai intercity line]].
| Section between Shanghai and Hangzhou uses [[Shanghai–Kunming high-speed railway|Shanghai–Kunming high-speed line]]. Section between Shenzhen North and Zhuhai uses [[Guangzhou–Shenzhen–Hong Kong Express Rail Link|Guangzhou-Shenzhen-Hong Kong high-speed line]] and [[Guangzhou–Zhuhai intercity railway|Guangzhou-Zhuhai intercity line]].
|-
|-
| [[Beijing–Guangzhou high-speed railway|Beijing-Guangzhou sleepers]]
| [[Beijing–Guangzhou high-speed railway|Beijing–Guangzhou sleepers]]
| 京广动卧
| 京广动卧
| {{rws|Beijing}}
| {{rws|Beijing}}
| {{rws|Guangzhou South}} and others (see note)
| {{rws|Guangzhou South}} and others (see note)
| D
| D
| Overnight service to {{rws|Shenzhen North}}, {{rws|Zhuhai}}, {{rws|Zhanjiang West}} and {{rws|Kunming}} using [[Beijing–Guangzhou high-speed railway|Beijing-Guangzhou-Shenzhen]], Guangzhou-Zhuhai, [[Shenzhen–Zhanjiang high-speed railway|Xinhui-Maoming-Zhanjiang]] and Shanghai-Kunming high-speed lines.
| Overnight service to {{rws|Shenzhen North}}, {{rws|Zhuhai}}, {{rws|Zhanjiang West}} and {{rws|Kunming}} using [[Beijing–Guangzhou high-speed railway|Beijing–Guangzhou–Shenzhen]], Guangzhou-Zhuhai, [[Shenzhen–Zhanjiang high-speed railway|Xinhui–Maoming–Zhanjiang]] and Shanghai–Kunming high-speed lines.
|}
|}


Line 520: Line 537:


===India===
===India===
[[File:Gatimaan express.jpg|thumb|[[Gatiman Express]] at [[New Delhi railway station]]]]
[[File:Rajendra B.Aklekar.jpg|thumb|[[Tejas Express]] in [[Mumbai]]]]
[[File:Howrah New Jalpaiguri Vande Bharat Express.jpg|thumb|[[Vande Bharat Express]] during its inaugural run from [[Howrah]] to [[New Jalpaiguri]]]]
[[File:Howrah New Jalpaiguri Vande Bharat Express.jpg|thumb|[[Vande Bharat Express]] during its inaugural run from [[Howrah]] to [[New Jalpaiguri]]]]
[[File:Gatimaan express.jpg|thumb|[[Gatimaan Express]] at [[New Delhi Railway Station]]]]
[[File:Namo Bharat Train closeup.jpg|thumb|[[RapidX]] train in [[Delhi-Meerut RRTS]]]]
[[File:Rajendra B.Aklekar.jpg|thumb|[[Tejas Express]] in [[Mumbai]]]]
The '''[[Gatiman Express]]''' was India's first semi-high speed train.<ref>{{Cite news|agency=PTI|date=12 October 2014|title=Delhi-Agra semi-high speed train to be named Gatimaan Express|language=en-IN|work=The Hindu|url=https://www.thehindu.com/news/cities/Delhi/delhiagra-semihigh-speed-train-to-be-named-gatimaan-express/article6493500.ece|access-date=18 July 2021|issn=0971-751X|archive-date=9 November 2020|archive-url=https://web.archive.org/web/20201109083623/https://www.thehindu.com/news/cities/Delhi/delhiagra-semihigh-speed-train-to-be-named-gatimaan-express/article6493500.ece|url-status=live}}</ref> In October 2014, the [[Indian Railways|railways]] applied for safety certificate from [[Commission of Railway Safety]] to start the service. In June 2015, the train was officially announced. The train was launched on 5 April 2016 and completed its maiden journey between Nizamuddin and Agra Cantt within 100 minutes. But due to low occupancy, Indian Railways first extended this train from Agra to [[Gwalior]] on 19 February 2018 and then to [[Jhansi]] on 1 April 2018.{{Citation needed|date=November 2021}}
[[File:02423 Dibrugarh Rajdhani Express approaching Katihar.jpg|thumb|[[WAP 7]] hauling a [[Rajdhani Express]]]]
 
The '''[[Gatimaan Express]]''' was India's first semi-high speed train.<ref>{{Cite news|others=PTI|date=2014-10-12|title=Delhi-Agra semi-high speed train to be named Gatimaan Express|language=en-IN|work=The Hindu|url=https://www.thehindu.com/news/cities/Delhi/delhiagra-semihigh-speed-train-to-be-named-gatimaan-express/article6493500.ece|access-date=2021-07-18|issn=0971-751X|archive-date=9 November 2020|archive-url=https://web.archive.org/web/20201109083623/https://www.thehindu.com/news/cities/Delhi/delhiagra-semihigh-speed-train-to-be-named-gatimaan-express/article6493500.ece|url-status=live}}</ref> In October 2014, the [[Indian Railways|railways]] applied for safety certificate from [[Commission of Railway Safety]] to start the service. In June 2015, the train was officially announced. The train was launched on 5 April 2016 and completed its maiden journey between Nizamuddin and Agra Cantt within 100 minutes. But due to low occupancy, Indian Railways first extended this train from Agra to [[Gwalior]] on 19 February 2018 and then to [[Jhansi]] on 1 April 2018.{{Citation needed|date=November 2021}}
The '''[[Tejas Express]]''' was Introduced by [[Indian Railways]] in 2017. It features modern onboard facilities with doors which are operated automatically. Tejas means "sharp", "lustre" and "brilliance" in many Indian languages. The inaugural run of Tejas Express was on 24 May 2017 from [[Chhatrapati Shivaji Terminus|Mumbai Chhatrapati Shivaji Terminus]] to [[Karmali railway station|Karmali]], [[Goa]]. It covered 552&nbsp;km in 8 hours and 30 minutes.<ref>{{Cite web|last=Nair|first=Binoo|date=30 September 2016|title=Mumbai-Goa route gets Railways' premium train Tejas|url=https://www.dnaindia.com/india/report-mumbai-goa-route-gets-railways-premium-train-tejas-2260090|access-date=18 July 2021|website=DNA India|language=en|archive-date=18 July 2021|archive-url=https://web.archive.org/web/20210718235004/https://www.dnaindia.com/india/report-mumbai-goa-route-gets-railways-premium-train-tejas-2260090|url-status=live}}</ref> On 1 March 2019, second Tejas Express of the country was flagged off between [[Chennai Egmore railway station|Chennai Egmore]] and [[Madurai Junction]] by Prime Minister [[Narendra Modi]]. It covered 497&nbsp;km in 6 hours and 30 minutes.<ref>{{Cite web|date=1 March 2019|title=Madurai–Chennai Tejas Express flagged off! After Vande Bharat, it's the swankiest Indian Railways train|url=https://www.financialexpress.com/infrastructure/railways/new-trains-2019-tejas-express-chennai-egmore-madurai-train-no-22672-22671-schedule/1502482/|access-date=18 July 2021|website=The Financial Express|language=en-US|archive-date=18 July 2021|archive-url=https://web.archive.org/web/20210718235005/https://www.financialexpress.com/infrastructure/railways/new-trains-2019-tejas-express-chennai-egmore-madurai-train-no-22672-22671-schedule/1502482/|url-status=live}}</ref> [[Lucknow–New Delhi Tejas Express]], which was inaugurated on 4 October 2019, is India's first train operated by private operators, [[IRCTC]], a subsidiary of [[Indian Railways]].<ref>{{Cite web|last=Ray|first=Anulekha|date=4 October 2019|title=India's first private train Lucknow-Delhi Tejas Express flagged off today|url=https://www.livemint.com/news/india/india-s-first-private-train-lucknow-delhi-tejas-express-starts-today-key-things-11570164891093.html|access-date=18 July 2021|website=mint|language=en|archive-date=18 July 2021|archive-url=https://web.archive.org/web/20210718235003/https://www.livemint.com/news/india/india-s-first-private-train-lucknow-delhi-tejas-express-starts-today-key-things-11570164891093.html|url-status=live}}</ref> The Ahmedabad–Mumbai Tejas express, also operated by IRCTC was inaugurated on 17 January 2020.<ref>{{Cite web|website=RailPost |title=Ahmedabad–Mumbai Tejas Express To Be Flagged Off Toda|date=17 January 2020 |url=https://www.railpost.in/ahmedabad-mumbai-tejas-express-to-be-flagged-off-today/|access-date=18 July 2021|language=en-US|archive-date=18 July 2021|archive-url=https://web.archive.org/web/20210718235006/https://www.railpost.in/ahmedabad-mumbai-tejas-express-to-be-flagged-off-today/|url-status=live}}</ref> From 1 September 2021, the train [[LHB coach|LHB]] Rajdhani Rakes are replaced with LHB [[Tejas Express|Tejas]] Sleeper Rakes. This increased the speed of the train to 130&nbsp;km/h. The train can travel at a top speed of 160&nbsp;km/h making it a Semi-High Speed Train.
 
In 2021, [[Indian Railways]] started to upgrade [[Rajdhani Express|Rajdhani]] Coaches to [[Tejas Express|Tejas]] coaches. This replaced its traditional [[LHB coach|LHB]] Rajdhani coaches On 15 February 2021, the [[Agartala–Anand Vihar Terminal Rajdhani Express|Agartala Rajdhani Express]] was upgraded with Tejas livery Sleeper Coaches. On 19 July 2021, the [[Mumbai Rajdhani Express]] was upgraded to Tejas class smart coaches. [[LHB coach|LHB]] Rajdhani coaches.<ref>{{cite news |last1=Tyagi |first1=Harshita |title=Western Railway runs Mumbai–New Delhi Rajdhani Express with new Tejas-like smart sleeper coaches |url=https://www.timesnownews.com/business-economy/industry/article/western-railway-runs-mumbai-new-delhi-rajdhani-express-with-new-tejas-like-smart-sleeper-coaches/787342 |url-status=live |archive-url=https://web.archive.org/web/20210719154222/https://www.timesnownews.com/business-economy/industry/article/western-railway-runs-mumbai-new-delhi-rajdhani-express-with-new-tejas-like-smart-sleeper-coaches/787342 |archive-date=19 July 2021 |access-date=19 July 2021 |work=Times Now}}</ref><ref>{{cite news |title=The Incredibles |url=https://mumbaimirror.indiatimes.com/mumbai/other/the-incredibles/articleshow/84307471.cms |url-status=live |archive-url=https://web.archive.org/web/20210719154223/https://mumbaimirror.indiatimes.com/mumbai/other/the-incredibles/articleshow/84307471.cms |archive-date=19 July 2021 |access-date=19 July 2021 |work=Mumbai Mirror}}</ref> On 1 September 2021 the [[Rajendra Nagar Patna Rajdhani Express]] was upgraded to Tejas rakes. This increased the speed of the train to 130&nbsp;km/h. The train can travel at a top speed of 160&nbsp;km/h.<ref>{{Cite web |last=Livemint |date=1 September 2021 |title=Railways starts Patna-New Delhi Rajdhani Express with Tejas rake from today |url=https://www.livemint.com/news/india/indian-railways-starts-patna-new-delhi-rajdhani-express-with-tejas-rake-from-today-11630500931343.html |url-status=live |archive-url=https://web.archive.org/web/20210903060758/https://www.livemint.com/news/india/indian-railways-starts-patna-new-delhi-rajdhani-express-with-tejas-rake-from-today-11630500931343.html |archive-date=3 September 2021 |access-date=3 September 2021 |website=mint |language=en}}</ref>
 
In 2019, '''[[Vande Bharat Express]]''', also known as '''Train 18''',<ref name="VBE">{{cite web|url=https://www.ndtv.com/india-news/train-18-indias-fastest-named-vande-bharat-express-piyush-goyal-1983965|title=India's fastest to be called Vande Bharat Express|work=Indian Express|access-date=28 January 2019|archive-date=28 January 2019|archive-url=https://web.archive.org/web/20190128060002/https://www.ndtv.com/india-news/train-18-indias-fastest-named-vande-bharat-express-piyush-goyal-1983965|url-status=live}}</ref> was inaugurated. This is an Indian higher-speed rail [[inter-city rail|intercity]] [[electric multiple unit]].<ref name="express24">{{citation|title=Train 18, India's first engine-less train, set to hit tracks on October 29|date=24 October 2018|url=https://indianexpress.com/article/india/train-18-indias-first-engine-less-train-set-to-hit-tracks-on-october-29-5415892/|work=[[The Indian Express]]|access-date=9 December 2020|archive-date=6 November 2018|archive-url=https://web.archive.org/web/20181106233913/https://indianexpress.com/article/india/train-18-indias-first-engine-less-train-set-to-hit-tracks-on-october-29-5415892/|url-status=live}}</ref> It was designed and built by [[Integral Coach Factory]] (ICF) at [[Perambur]], [[Chennai]] under the Indian government's [[Make in India]] initiative over a span of 18 months. The [[unit cost]] of the first [[rake (train)|rake]] was given as {{INRConvert|1|b}}, though the unit cost is expected to go down with subsequent production.<ref name="prabhakar">{{cite news |last1=Prabhakar |first1=Siddarth |title=First Made-in-India engineless train gets on track for trial run – Times of India |url=https://timesofindia.indiatimes.com/city/chennai/first-made-in-india-train-set-ready-for-trial-run/articleshow/66324376.cms |access-date=4 November 2018 |work=[[The Times of India]] |date=23 October 2018 |archive-date=5 November 2018 |archive-url=https://web.archive.org/web/20181105101450/https://timesofindia.indiatimes.com/city/chennai/first-made-in-india-train-set-ready-for-trial-run/articleshow/66324376.cms |url-status=live }}</ref> At the original price, it is estimated to be 40% cheaper than a similar train imported from Europe.<ref name="arora">{{cite news |last1=Arora |first1=Rajat |title=Made-in-India 160 km per hour train to run from June |url=https://economictimes.indiatimes.com/industry/transportation/railways/made-in-india-160-km-per-hour-train-to-run-from-june/articleshow/63323107.cms |access-date=5 November 2018 |work=[[The Economic Times]] |date=16 March 2018 |location=[[New Delhi]], India |archive-date=27 June 2018 |archive-url=https://web.archive.org/web/20180627202039/https://economictimes.indiatimes.com/industry/transportation/railways/made-in-india-160-km-per-hour-train-to-run-from-june/articleshow/63323107.cms |url-status=live }}</ref> The train was launched on 15 February 2019, from [[New Delhi|Delhi]] to [[Varanasi]].<ref>{{cite news | url=https://www.businesstoday.in/current/economy-politics/train-18-pm-modi-to-flag-off-vande-bharat-express-on-february-15-from-new-delhi/story/317978.html | title=Train 18: PM Modi to flag off Vande Bharat Express on February 15 from New Delhi | date=7 February 2019 | newspaper=Business Today | author=PTI | access-date=15 February 2019 | archive-date=7 February 2019 | archive-url=https://web.archive.org/web/20190207131914/https://www.businesstoday.in/current/economy-politics/train-18-pm-modi-to-flag-off-vande-bharat-express-on-february-15-from-new-delhi/story/317978.html | url-status=live }}</ref> The service was named 'Vande Bharat Express' on 27 January 2019.<ref>{{Cite web|url=http://www.pib.nic.in/PressReleseDetail.aspx?PRID=1561592|title=Minister of Railways & Coal Shri Piyush Goyal Announces 'Vande Bharat Express'|website=Press Information Bureau, India|access-date=27 January 2019|archive-date=27 January 2019|archive-url=https://web.archive.org/web/20190127212747/http://www.pib.nic.in/PressReleseDetail.aspx?PRID=1561592|url-status=live}}</ref> On 5 October 2019, a second [[Vande Bharat Express]] was opened from [[New Delhi|Delhi]] to [[Katra, Jammu and Kashmir|Katra]]<ref>{{cite news |title=Vande Bharat trains: Soon, 44 more semi-high speed trains on Indian Railways network; check details |url=https://www.financialexpress.com/infrastructure/railways/vande-bharat-trains-soon-44-more-semi-high-speed-trains-on-indian-railways-network-check-details/2017412/#:~:text=ministry%20had%20stated.-,At%20present%2C%20Indian%20Railways%20operates%20two%20world%2Dclass%20Vande%20Bharat,between%20New%20Delhi%20and%20Katra. |access-date=23 August 2020 |work=The Financial Express |date=8 July 2020 |archive-date=19 August 2020 |archive-url=https://web.archive.org/web/20200819135854/https://www.financialexpress.com/infrastructure/railways/vande-bharat-trains-soon-44-more-semi-high-speed-trains-on-indian-railways-network-check-details/2017412/#:~:text=ministry%20had%20stated.-,At%20present%2C%20Indian%20Railways%20operates%20two%20world%2Dclass%20Vande%20Bharat,between%20New%20Delhi%20and%20Katra. |url-status=live }}</ref> On 30 September 2022, Prime Minister [[Narendra Modi]] inaugurated a 3rd Vande Bharat Express rake connecting [[Mumbai]] and [[Ahmedabad]] passing through [[Surat]]. This rake was an upgraded second generation version.<ref name=":6">{{Cite web |last=Livemint |date=30 September 2022 |title=New Vande Bharat Express flagged off by PM. Know routes, timings, other details |url=https://www.livemint.com/news/india/new-vande-bharat-express-launched-by-pm-narendra-modi-know-routes-timings-other-details-11664515160424.html |access-date=1 October 2022 |website=mint |language=en}}</ref> an other second generation rake was inaugurated from Delhi to [[Una, Himachal Pradesh|Una]] passing through [[Chandigarh]].<ref name=":7">{{cite web |title=PM Modi to flag off Vande Bharat Express in Himachal Pradesh's Una today |date=12 October 2022 |url=https://indianexpress.com/article/cities/chandigarh/pm-modi-to-flag-off-vande-bharat-express-himachal-pradesh-una-tomorrow-8204532/ |access-date=13 October 2022 |publisher=Indian Express}}</ref>
 
The [[Delhi–Meerut Regional Rapid Transit System|Delhi Meerut Regional Rapid Transit System]] (RRTS), also known as [[RapidX (trainset)|RapidX]], is a semi high-speed rail project inaugurated in 2023. Trains, called [[Namo Bharat|Namo Bharat trains]], can reach speeds of up to 180 kilometers per hour.
 
'''Inaugural run and entry into service'''


The '''[[Tejas Express]]''' was Introduced by [[Indian Railways]] in 2017. It features modern onboard facilities with doors which are operated automatically. Tejas means "sharp", "lustre" and "brilliance" in many Indian languages. The inaugural run of Tejas Express was on 24 May 2017 from [[Chhatrapati Shivaji Maharaj Terminus|Mumbai Chhatrapati Shivaji Maharaj Terminus]] to [[Karmali railway station|Karmali]], [[Goa]]. It covered 552&nbsp;km in 8 hours and 30 minutes.<ref>{{Cite web|last=Nair|first=Binoo|date=2016-09-30|title=Mumbai-Goa route gets Railways' premium train Tejas|url=https://www.dnaindia.com/india/report-mumbai-goa-route-gets-railways-premium-train-tejas-2260090|access-date=2021-07-18|website=DNA India|language=en|archive-date=18 July 2021|archive-url=https://web.archive.org/web/20210718235004/https://www.dnaindia.com/india/report-mumbai-goa-route-gets-railways-premium-train-tejas-2260090|url-status=live}}</ref> On 1 March 2019, second Tejas Express of the country was flagged off between [[Chennai Egmore railway station|Chennai Egmore]] and [[Madurai Junction]] by Prime Minister [[Narendra Modi]]. It covered 497&nbsp;km in 6 hours and 30 minutes.<ref>{{Cite web|date=2019-03-01|title=Madurai-Chennai Tejas Express flagged off! After Vande Bharat, it's the swankiest Indian Railways train|url=https://www.financialexpress.com/infrastructure/railways/new-trains-2019-tejas-express-chennai-egmore-madurai-train-no-22672-22671-schedule/1502482/|access-date=2021-07-18|website=The Financial Express|language=en-US|archive-date=18 July 2021|archive-url=https://web.archive.org/web/20210718235005/https://www.financialexpress.com/infrastructure/railways/new-trains-2019-tejas-express-chennai-egmore-madurai-train-no-22672-22671-schedule/1502482/|url-status=live}}</ref> [[Lucknow – New Delhi Tejas Express]], which was inaugurated on 4 October 2019, is India's first train operated by private operators, [[IRCTC]], a subsidiary of [[Indian Railways]].<ref>{{Cite web|last=Ray|first=Anulekha|date=2019-10-04|title=India's first private train Lucknow-Delhi Tejas Express flagged off today|url=https://www.livemint.com/news/india/india-s-first-private-train-lucknow-delhi-tejas-express-starts-today-key-things-11570164891093.html|access-date=2021-07-18|website=mint|language=en|archive-date=18 July 2021|archive-url=https://web.archive.org/web/20210718235003/https://www.livemint.com/news/india/india-s-first-private-train-lucknow-delhi-tejas-express-starts-today-key-things-11570164891093.html|url-status=live}}</ref> The Ahmedabad – Mumbai Tejas express, also operated by IRCTC was inaugurated on the 17 January 2020.<ref>{{Cite web|last=Desk|first=RailPost News|title=Ahmedabad-Mumbai Tejas Express To Be Flagged Off Today – RailPost.in|date=17 January 2020 |url=https://www.railpost.in/ahmedabad-mumbai-tejas-express-to-be-flagged-off-today/|access-date=2021-07-18|language=en-US|archive-date=18 July 2021|archive-url=https://web.archive.org/web/20210718235006/https://www.railpost.in/ahmedabad-mumbai-tejas-express-to-be-flagged-off-today/|url-status=live}}</ref> From 1 September 2021, the train [[LHB coach|LHB]] Rajdhani Rakes are replaced with LHB [[Tejas Express|Tejas]] Sleeper Rakes. This increased the speed of the train to 130&nbsp;km/h. The train can travel at a top speed of 160&nbsp;km/h making it a Semi-High Speed Train.
The train flagged off for an inaugural run by Prime Minister of India Narendra Modi, on 15 February 2019,<ref>{{cite web |date=7 February 2019 |title=Train 18: PM Modi to flag off Vande Bharat Express on February 15 from New Delhi |url=https://www.businesstoday.in/current/economy-politics/train-18-pm-modi-to-flag-off-vande-bharat-express-on-february-15-from-new-delhi/story/317978.html |url-status=live |archive-url=https://web.archive.org/web/20190207131914/https://www.businesstoday.in/current/economy-politics/train-18-pm-modi-to-flag-off-vande-bharat-express-on-february-15-from-new-delhi/story/317978.html |archive-date=7 February 2019 |access-date=17 February 2019 |work=Business Today}}</ref> with its commercial run started from 17 February 2019 onwards.
It will be running on the Delhi-Varanasi route,<ref name="ndtv">{{cite news |date=29 October 2018 |title=Pics: Train 18 To Begin Trial Run Today. Here Are 10 Things To Know |url=https://www.ndtv.com/business/train-18-indias-fastest-train-route-launch-date-today-features-engineless-rotating-seats-in-pictures-1939151 |url-status=live |archive-url=https://web.archive.org/web/20181105062047/https://www.ndtv.com/business/train-18-indias-fastest-train-route-launch-date-today-features-engineless-rotating-seats-in-pictures-1939151 |archive-date=5 November 2018 |access-date=4 November 2018 |work=[[NDTV Profit]] |publisher=NDTV}}</ref> via [[Kanpur]] and [[Allahabad|Prayagraj]], connecting the holy city of [[Varanasi]] to the Capital city, reducing travel time along the route by 15 percent.<ref name="express24" /> The train's regenerative brakes are also expected to allow a 30% savings in electricity costs as compared to its predecessor.<ref>{{Cite news |date=14 November 2018 |title=T 18: Train with a brain is Railways 'engineering marvel' |url=http://www.uniindia.com/news/india/t-18-train-with-a-brain-is-railways-engineering-marvel/1404772.html |url-status=live |archive-url=https://web.archive.org/web/20210504213000/http://www.uniindia.com/news/india/t-18-train-with-a-brain-is-railways-engineering-marvel/1404772.html |archive-date=4 May 2021 |access-date=9 December 2020 |work=[[United News of India]]}}</ref> At an operating speed of {{convert|160|km/h}}, it will outpace the [[Shatabdi Express]] by {{convert|30|km/h}}.<ref name="ndtv" /> Although the trainset has been tested for speeds up to 180 km/h, it is capable of running at speed of 200 km/h. Every other car on the train is motorised.<ref name="unitedtrial">{{cite news |date=29 October 2018 |title=Self-propelled Train 18 debuts for trial run |url=http://www.uniindia.com/news/india/self-propelled-train-18-debuts-for-trial-run/1391824.html |url-status=live |archive-url=https://web.archive.org/web/20181105012318/http://www.uniindia.com/news/india/self-propelled-train-18-debuts-for-trial-run/1391824.html |archive-date=5 November 2018 |access-date=4 November 2018 |work=[[United News of India]]}}</ref> The 8-hour journey from New Delhi to Varanasi station has the Chair Car CC Class fare of ₹1,755.00 and covers the total distance of about 762 kilometers.<ref>{{Cite web |title=INDIAN RAILWAY CATERING & TOURISM CORPORATION LTD. |url=https://www.irctc.co.in/nget/train-list |url-status=dead |archive-url=https://web.archive.org/web/20200618044258/https://www.irctc.co.in/nget/train-list |archive-date=18 June 2020 |access-date=9 December 2020}}</ref>


In 2019, '''[[Vande Bharat Express]]''', also known as '''Train 18''',<ref name="VBE">{{cite web|url=https://www.ndtv.com/india-news/train-18-indias-fastest-named-vande-bharat-express-piyush-goyal-1983965|title=India's fastest to be called Vande Bharat Express|work=Indian Express|access-date=28 January 2019|archive-date=28 January 2019|archive-url=https://web.archive.org/web/20190128060002/https://www.ndtv.com/india-news/train-18-indias-fastest-named-vande-bharat-express-piyush-goyal-1983965|url-status=live}}</ref> was inaugurated. This is an Indian higher-speed rail [[inter-city rail|intercity]] [[electric multiple unit]].<ref name="express24">{{citation|title=Train 18, India's first engine-less train, set to hit tracks on October 29|date=24 October 2018|url=https://indianexpress.com/article/india/train-18-indias-first-engine-less-train-set-to-hit-tracks-on-october-29-5415892/|work=[[The Indian Express]]|access-date=9 December 2020|archive-date=6 November 2018|archive-url=https://web.archive.org/web/20181106233913/https://indianexpress.com/article/india/train-18-indias-first-engine-less-train-set-to-hit-tracks-on-october-29-5415892/|url-status=live}}</ref> It was designed and built by [[Integral Coach Factory]] (ICF) at [[Perambur]], [[Chennai]] under the Indian government's [[Make in India]] initiative over a span of 18 months. The [[unit cost]] of the first [[rake (train)|rake]] was given as {{INRConvert|1|b}}, though the unit cost is expected to go down with subsequent production.<ref name="prabhakar">{{cite news |last1=Prabhakar |first1=Siddarth |title=First Made-in-India engineless train gets on track for trial run – Times of India |url=https://timesofindia.indiatimes.com/city/chennai/first-made-in-india-train-set-ready-for-trial-run/articleshow/66324376.cms |access-date=4 November 2018 |work=[[The Times of India]] |date=23 October 2018 |archive-date=5 November 2018 |archive-url=https://web.archive.org/web/20181105101450/https://timesofindia.indiatimes.com/city/chennai/first-made-in-india-train-set-ready-for-trial-run/articleshow/66324376.cms |url-status=live }}</ref> At the original price, it is estimated to be 40% cheaper than a similar train imported from Europe.<ref name="arora">{{cite news |last1=Arora |first1=Rajat |title=Made-in-India 160 km per hour train to run from June |url=https://economictimes.indiatimes.com/industry/transportation/railways/made-in-india-160-km-per-hour-train-to-run-from-june/articleshow/63323107.cms |access-date=5 November 2018 |work=[[The Economic Times]] |date=16 March 2018 |location=[[New Delhi]], India |archive-date=27 June 2018 |archive-url=https://web.archive.org/web/20180627202039/https://economictimes.indiatimes.com/industry/transportation/railways/made-in-india-160-km-per-hour-train-to-run-from-june/articleshow/63323107.cms |url-status=live }}</ref> The train was launched on 15 February 2019, from [[New Delhi|Delhi]] to [[Varanasi]].<ref>{{cite news | url=https://www.businesstoday.in/current/economy-politics/train-18-pm-modi-to-flag-off-vande-bharat-express-on-february-15-from-new-delhi/story/317978.html | title=Train 18: PM Modi to flag off Vande Bharat Express on February 15 from New Delhi | date=7 February 2019 | newspaper=Business Today | author=PTI | access-date=15 February 2019 | archive-date=7 February 2019 | archive-url=https://web.archive.org/web/20190207131914/https://www.businesstoday.in/current/economy-politics/train-18-pm-modi-to-flag-off-vande-bharat-express-on-february-15-from-new-delhi/story/317978.html | url-status=live }}</ref> The service was named 'Vande Bharat Express' on 27 January 2019.<ref>{{Cite web|url=http://www.pib.nic.in/PressReleseDetail.aspx?PRID=1561592|title=Minister of Railways & Coal Shri Piyush Goyal Announces 'Vande Bharat Express'|website=Press Information Bureau, India|access-date=27 January 2019|archive-date=27 January 2019|archive-url=https://web.archive.org/web/20190127212747/http://www.pib.nic.in/PressReleseDetail.aspx?PRID=1561592|url-status=live}}</ref> On 5 October 2019, a second [[Vande Bharat Express]] was opened from [[New Delhi|Delhi]] to [[Katra, Jammu and Kashmir|Katra]]<ref>{{cite news |title=Vande Bharat trains: Soon, 44 more semi-high speed trains on Indian Railways network; check details |url=https://www.financialexpress.com/infrastructure/railways/vande-bharat-trains-soon-44-more-semi-high-speed-trains-on-indian-railways-network-check-details/2017412/#:~:text=ministry%20had%20stated.-,At%20present%2C%20Indian%20Railways%20operates%20two%20world%2Dclass%20Vande%20Bharat,between%20New%20Delhi%20and%20Katra. |access-date=23 August 2020 |work=The Financial Express |date=8 July 2020 |archive-date=19 August 2020 |archive-url=https://web.archive.org/web/20200819135854/https://www.financialexpress.com/infrastructure/railways/vande-bharat-trains-soon-44-more-semi-high-speed-trains-on-indian-railways-network-check-details/2017412/#:~:text=ministry%20had%20stated.-,At%20present%2C%20Indian%20Railways%20operates%20two%20world%2Dclass%20Vande%20Bharat,between%20New%20Delhi%20and%20Katra. |url-status=live }}</ref> On 30 September 2022, Prime Minister [[Narendra Modi]] inaugurated a 3rd Vande Bharat Express rake connecting [[Mumbai]] and [[Ahmedabad]] passing through [[Surat]]. This rake was an upgraded second generation version.<ref name=":6">{{Cite web |last=Livemint |date=2022-09-30 |title=New Vande Bharat Express flagged off by PM. Know routes, timings, other details |url=https://www.livemint.com/news/india/new-vande-bharat-express-launched-by-pm-narendra-modi-know-routes-timings-other-details-11664515160424.html |access-date=2022-10-01 |website=mint |language=en}}</ref> an other second generation rake was inaugurated from Delhi to [[Una, Himachal Pradesh|Una]] passing through [[Chandigarh]].<ref name=":7">{{cite web |title=PM Modi to flag off Vande Bharat Express in Himachal Pradesh's Una today |date=12 October 2022 |url=https://indianexpress.com/article/cities/chandigarh/pm-modi-to-flag-off-vande-bharat-express-himachal-pradesh-una-tomorrow-8204532/ |access-date=13 October 2022 |publisher=Indian Express}}</ref>
=== Japan ===
The ''[[Skyliner]]'' limited express train service between [[Tokyo]] and [[Narita International Airport|Narita Airport]] in the fastest non-Shinkansen rail service in the country, with a speed of {{Convert|160|km/h|mph|round=|abbr=on}}.<ref name="SLinfo">{{cite web |url= https://www.keisei.co.jp/keisei/tetudou/skyliner/us/skyliner/index.php |title=Skyliner Overview|publisher=Keisei Electric Railway Co., Ltd.|location= Japan|language=en|access-date=12 November 2019}}</ref>


In 2021, [[Indian Railways]] started to upgrade [[Rajdhani Express|Rajdhani]] Coaches to [[Tejas Express|Tejas]] coaches. This replaced its traditional [[LHB coach|LHB]] Rajdhani coaches On 15 February 2021,The [[Agartala–Anand Vihar Terminal Rajdhani Express|Agartala Rajdhani Express]] was upgraded with [[Tejas Express|Tejas]] livery Sleeper Coaches. On 19 July 2021, the [[Mumbai Rajdhani Express]] was upgraded to [[Tejas Express|Tejas]] class smart coaches. [[LHB coach|LHB]] Rajdhani coaches.<ref>{{cite news|last1=Tyagi|first1=Harshita|title=Western Railway runs Mumbai–New Delhi Rajdhani Express with new Tejas-like smart sleeper coaches|work=Times Now|url=https://www.timesnownews.com/business-economy/industry/article/western-railway-runs-mumbai-new-delhi-rajdhani-express-with-new-tejas-like-smart-sleeper-coaches/787342|access-date=19 July 2021|archive-date=19 July 2021|archive-url=https://web.archive.org/web/20210719154222/https://www.timesnownews.com/business-economy/industry/article/western-railway-runs-mumbai-new-delhi-rajdhani-express-with-new-tejas-like-smart-sleeper-coaches/787342|url-status=live}}</ref><ref>{{cite news|title=The Incredibles|work=Mumbai Mirror|url=https://mumbaimirror.indiatimes.com/mumbai/other/the-incredibles/articleshow/84307471.cms|access-date=19 July 2021|archive-date=19 July 2021|archive-url=https://web.archive.org/web/20210719154223/https://mumbaimirror.indiatimes.com/mumbai/other/the-incredibles/articleshow/84307471.cms|url-status=live}}</ref> On 1 September 2021 the [[Rajendra Nagar Patna Rajdhani Express]] was upgraded to Tejas rakes. This increased the speed of the train to 130&nbsp;km/h. The train can travel at a top speed of 160&nbsp;km/h.<ref>{{Cite web|last=Livemint|date=2021-09-01|title=Railways starts Patna-New Delhi Rajdhani Express with Tejas rake from today|url=https://www.livemint.com/news/india/indian-railways-starts-patna-new-delhi-rajdhani-express-with-tejas-rake-from-today-11630500931343.html|access-date=2021-09-03|website=mint|language=en|archive-date=3 September 2021|archive-url=https://web.archive.org/web/20210903060758/https://www.livemint.com/news/india/indian-railways-starts-patna-new-delhi-rajdhani-express-with-tejas-rake-from-today-11630500931343.html|url-status=live}}</ref>
Before 2015, the ''[[Hakutaka#March 1997 – March 2015|Hakutaka]]'' limited express train service on the [[Hokuhoku Line]] in [[Niigata Prefecture]] also matched the speed of {{Convert|160|km/h|mph|round=|abbr=on}}. However, after the opening of [[Hokuriku Shinkansen]] on 14 March 2015, the maximum speed limit of the line was reduced to {{Convert|130|km/h|mph|round=5|abbr=on}}.<ref>Itō, Kumi. ''Transformation underwent at Hokuetsu Express'', ''Railway Fan'', Issue 670, Kōyūsha, February 2017, p. 68-73.</ref>


==== Inaugural run and entry into service ====
=== South Korea ===
The train flagged off for an inaugural run by Prime Minister of India Narendra Modi, on 15 February 2019,<ref>{{cite web|url=https://www.businesstoday.in/current/economy-politics/train-18-pm-modi-to-flag-off-vande-bharat-express-on-february-15-from-new-delhi/story/317978.html|title=Train 18: PM Modi to flag off Vande Bharat Express on February 15 from New Delhi|work=Business Today|date=7 February 2019|access-date=17 February 2019|archive-date=7 February 2019|archive-url=https://web.archive.org/web/20190207131914/https://www.businesstoday.in/current/economy-politics/train-18-pm-modi-to-flag-off-vande-bharat-express-on-february-15-from-new-delhi/story/317978.html|url-status=live}}</ref> with its commercial run started from 17 February 2019 onwards.
[[Great Train eXpress]] (GTX), a [[commuter rail]] network in the [[Seoul Metropolitan Area]], has a speed of {{Convert|180|km/h|mph|round=|abbr=on}}. Only one line, GTX-A, is currently operating. Two more lines, GTX-B and GTX-C, are scheduled to open in 2030.<ref>{{cite web |last= |first= |date=2024-01-31 |title=[Graphic News] GTX lines expansion |url=https://m.koreaherald.com/view.php?ud=20240130000858 |access-date=2024-03-31 |website=The Korea Herald}}</ref> Three other lines, named GTX-D, GTX-E and GTX-F, are currently being planned.<ref>{{Cite web |date=2024-01-25 |title=드디어 베일 벗은 '2기 GTX'…D·E·F 노선 '이곳' 지난다 |url=https://www.hankyung.com/article/202401259242i |access-date=2024-03-31 |website=한국경제}}</ref>
It will be running on the Delhi-Varanasi route,<ref name="ndtv" /> via [[Kanpur]] and [[Allahabad|Prayagraj]], connecting the holy city of [[Varanasi]] to the Capital city, reducing travel time along the route by 15 percent.<ref name="express24" /> The train's regenerative brakes are also expected to allow a 30% savings in electricity costs as compared to its predecessor.<ref>{{Cite news|url=http://www.uniindia.com/news/india/t-18-train-with-a-brain-is-railways-engineering-marvel/1404772.html|title=T 18: Train with a brain is Railways 'engineering marvel'|date=14 November 2018|work=[[United News of India]]|access-date=9 December 2020|archive-date=4 May 2021|archive-url=https://web.archive.org/web/20210504213000/http://www.uniindia.com/news/india/t-18-train-with-a-brain-is-railways-engineering-marvel/1404772.html|url-status=live}}</ref> At an operating speed of {{convert|160|km/h}}, it will outpace the [[Shatabdi Express]] by {{convert|30|km/h}}.<ref name="ndtv">{{cite news|title=Pics: Train 18 To Begin Trial Run Today. Here Are 10 Things To Know|url=https://www.ndtv.com/business/train-18-indias-fastest-train-route-launch-date-today-features-engineless-rotating-seats-in-pictures-1939151|access-date=4 November 2018|work=[[NDTV Profit]]|publisher=NDTV|date=29 October 2018|archive-date=5 November 2018|archive-url=https://web.archive.org/web/20181105062047/https://www.ndtv.com/business/train-18-indias-fastest-train-route-launch-date-today-features-engineless-rotating-seats-in-pictures-1939151|url-status=live}}</ref> Although the trainset has been tested for speeds up to 180 km/h, it is capable of running at speed of 200 km/h. Every other car on the train is motorised.<ref name="unitedtrial">{{cite news|url=http://www.uniindia.com/news/india/self-propelled-train-18-debuts-for-trial-run/1391824.html|title=Self-propelled Train 18 debuts for trial run|date=29 October 2018|work=[[United News of India]]|access-date=4 November 2018|archive-date=5 November 2018|archive-url=https://web.archive.org/web/20181105012318/http://www.uniindia.com/news/india/self-propelled-train-18-debuts-for-trial-run/1391824.html|url-status=live}}</ref> The 8-hour journey from New Delhi to Varanasi station has the Chair Car CC Class fare of ₹1,755.00 and covers the total distance of about 762 kilometers.<ref>{{Cite web|url=https://www.irctc.co.in/nget/train-list|title=INDIAN RAILWAY CATERING & TOURISM CORPORATION LTD.|access-date=9 December 2020|archive-date=18 June 2020|archive-url=https://web.archive.org/web/20200618044258/https://www.irctc.co.in/nget/train-list|url-status=dead}}</ref>
{| class="wikitable sortable" style="font-size:95%;"
!Rail Sections
!Service Name
!Propulsion Technology
!Length
!Date Inaugurated
!Maximum Permitted Speed
!Average Speed
|-
|[[Kanpur–Delhi section|Delhi - Kanpur]] and [[Mughalsarai–Kanpur section|Kanpur - Varanasi - Mughalsarai]]
|[[New Delhi - Varanasi Vande Bharat Express]]
|[[Electric multiple unit]]
|{{convert|762|km|sortable=on|abbr=on}}
|15 February 2019
|{{convert|130|km/h|sortable=on|abbr=on}}
|{{convert|95|km/h|sortable=on|abbr=on}}
|-
|[[Kanpur–Delhi section|Delhi - Agra - Kanpur]] and [[Agra–Bhopal section|Agra - Jhansi - Bhopal]]
|[[Rani Kamalapati (Habibganj)–Hazrat Nizamuddin Vande Bharat Express|Hazrat Nizamuddin - Rani Kamalapati Vande Bharat Express]]
|[[Electric multiple unit]]
|{{Convert|702|km|sortable=on|abbr=on}}
|1 April 2023
|{{Convert|160|km/h|sortable=on|abbr=on}}
|{{Convert|94|km/h|sortable=on|abbr=on}}
|-
|[[Kanpur–Delhi section|Delhi - Agra - Kanpur]] and [[Agra–Bhopal section|Agra - Jhansi - Bhopal]]
|[[Gatimaan Express|Hazrat Nizamuddin - Jhansi Gatimaan Express]]
|[[Indian locomotive class WAP-7|Electric locomotive (WAP-7)]]
|{{convert|403|km|sortable=on|abbr=on}}
|5 April 2016 (extended to [[Jhansi]] on 1 April 2018)
|{{convert|160|km/h|sortable=on|abbr=on}}
|{{convert|91|km/h|sortable=on|abbr=on}}
|-
|[[New Delhi–Mumbai main line|New Delhi - Mumbai]]
|[[Mumbai Rajdhani Express|New Delhi - Mumbai Central Tejas Rajdhani Express]]
|[[Indian locomotive class WAP-7|Electric locomotive (WAP-7)]]
|{{convert|1386|km|sortable=on|abbr=on}}
|19 July 2021
|{{convert|160|km/h|sortable=on|abbr=on}}
|{{convert|89|km/h|sortable=on|abbr=on}}
|}


===Laos===
===Laos===
{{Main article|Boten–Vientiane railway}}
{{Main article|Boten–Vientiane railway}}
Passenger trains on the 2021 opened Boten–Vientiane railway travel at speeds of up to 160&nbsp;km/h,<ref>{{Cite web|title=China-Laos Railway starts operation|url=http://www.news.cn/english/2021-12/03/c_1310350441.htm|access-date=2021-12-06|website=www.news.cn}}</ref><ref>{{Cite web|date=2021-11-28|title=Laos hopes for economic boost from Chinese-built railway|url=https://www.france24.com/en/live-news/20211128-laos-hopes-for-economic-boost-from-chinese-built-railway|access-date=2021-12-06|website=France 24|language=en}}</ref> however the railway has been described as 'high-speed' as well.<ref>{{Cite news|date=2021-12-03|title=China and Laos open $6 billion high-speed rail link|language=en|work=Reuters|url=https://www.reuters.com/markets/deals/china-laos-open-6-billion-high-speed-rail-link-2021-12-03/|access-date=2021-12-06}}</ref> Some sections of the railway were planned to allow speeds of up to 200&nbsp;km/h, however this was downgraded to 160&nbsp;km/h in the final design.<ref>{{Cite web|date=2020-08-04|title=China-Laos railway – a guide to the Boten-Vientiane railway in Laos|url=https://futuresoutheastasia.com/vientiane-boten-railway/|access-date=2021-12-06|website=Future Southeast Asia|language=en-US}}</ref><ref>{{Cite news|title=High speed rail coming to Laos|work=Bangkok Post|url=https://www.bangkokpost.com/learning/advanced/345036/high-speed-rail-coming-to-laos|access-date=2021-12-06}}</ref>


===United States===
Passenger trains on the 2021 opened Boten–Vientiane railway travel at speeds of up to 160&nbsp;km/h,<ref>{{Cite web|title=China-Laos Railway starts operation|url=http://www.news.cn/english/2021-12/03/c_1310350441.htm|access-date=6 December 2021|website=www.news.cn}}</ref><ref>{{Cite web|date=28 November 2021|title=Laos hopes for economic boost from Chinese-built railway|url=https://www.france24.com/en/live-news/20211128-laos-hopes-for-economic-boost-from-chinese-built-railway|access-date=6 December 2021|website=France 24|language=en}}</ref> however the railway has been described as 'high-speed' as well.<ref>{{Cite news|date=3 December 2021|title=China and Laos open $6 billion high-speed rail link|language=en|work=Reuters|url=https://www.reuters.com/markets/deals/china-laos-open-6-billion-high-speed-rail-link-2021-12-03/|access-date=6 December 2021}}</ref> Some sections of the railway were planned to allow speeds of up to 200&nbsp;km/h, however this was downgraded to 160&nbsp;km/h in the final design.<ref>{{Cite web|date=4 August 2020|title=China-Laos railway – a guide to the Boten-Vientiane railway in Laos|url=https://futuresoutheastasia.com/vientiane-boten-railway/|access-date=6 December 2021|website=Future Southeast Asia|language=en-US}}</ref><ref>{{Cite news|title=High speed rail coming to Laos|work=Bangkok Post|url=https://www.bangkokpost.com/learning/advanced/345036/high-speed-rail-coming-to-laos|access-date=6 December 2021}}</ref>
[[File:Amtrak 627 with a Northeast Regional in Madison, Connecticut, April 2015.jpg|thumb|[[Amtrak]] [[Northeast Regional]] in [[Connecticut]].]]
[[File:Keystone Service train passing through Devon station, July 2007.jpg|thumb|[[Amtrak]] [[Keystone Service]] passing [[Devon station]] in [[Pennsylvania]].]]
This is the list of the current higher-speed rail services from the [[East Coast of the United States|East Coast]] to the [[West Coast of the United States|West Coast]]:
{| class="wikitable sortable" style="font-size:95%;"
|+
! Corridor / Segment !! Service name !! Length (miles) !! Equipment !! Power !! Current Top speed (mph) !! Avg speed (mph)<ref>{{Cite web|url=https://www.amtrak.com/content/dam/projects/dotcom/english/public/documents/timetables/Amtrak-System-Timetable-060118.pdf|title=Amtrak System Timetable: Updated June 2018|date=1 June 2018|access-date=27 September 2018|archive-date=22 September 2018|archive-url=https://web.archive.org/web/20180922164720/https://www.amtrak.com/content/dam/projects/dotcom/english/public/documents/timetables/Amtrak-System-Timetable-060118.pdf|url-status=live}}</ref>!! Note
|-
| [[Washington Union Station|Washington, DC]]–[[South Station|Boston, MA]] || ''[[Northeast Regional]]'' || 457 || locomotive-hauled [[Coach (rail)|coaches]] || [[Electric locomotive|Electric]] || {{cvt|125|mph|0}} || {{cvt|57|mph|0}} ||<ref>{{cite news|last1=Vantuono|first1=William C.|title=ACS-64 technical support agreement under way|url=http://www.railwayage.com/index.php/mechanical/locomotives/acs-64-technical-support-agreement-under-way.html?channel=35|access-date=15 October 2014|work=Railway Age|date=29 September 2014|archive-date=18 October 2014|archive-url=https://web.archive.org/web/20141018083158/http://www.railwayage.com/index.php/mechanical/locomotives/acs-64-technical-support-agreement-under-way.html?channel=35|url-status=live}}</ref> Trains run on [[Northeast Corridor]] trackage shared by high-speed ''[[Acela Express]]'' trains. This service also qualifies as high-speed rail in certain portions of its route when traveling at its maximum speed, {{cvt|125|mph|km/h|0}}.
|-
|[[30th Street Station|Philadelphia]]–[[Harrisburg Transportation Center|Harrisburg, PA]], [[Pennsylvania|PA]]||''[[Keystone Service]]''|| 104 || locomotive-hauled coaches || Electric || {{cvt|110|mph|0}} || {{cvt|59|mph|0}} ||
|-
| [[Pennsylvania Station (New York)|New York City]]–[[Albany–Rensselaer station|Albany, NY]] || ''[[Empire Service (train)|Empire Service]]'', ''[[Lake Shore Limited]]'', ''[[Maple Leaf (train)|Maple Leaf]]'', ''[[Adirondack (train)|Adirondack]]'', ''[[Ethan Allen Express]]'' || 141 || locomotive-hauled coaches  || [[Diesel locomotive#Diesel–electric|Diesel-electric]] || {{cvt|110|mph|0}} || {{cvt|56|mph|0}} ||<ref name="crs"/>
|-
|[[Union Station (New Haven)|New Haven, CT]]–[[Springfield Union Station (Massachusetts)|Springfield, MA]] ||[[Hartford Line]], ''[[Vermonter (train)|Vermonter]]'', ''[[Northeast Regional]]'' || 62 || locomotive-hauled coaches || Diesel-electric || {{cvt|110|mph|0}} || {{cvt|47|mph|0}} || Amtrak services running on the [[New Haven–Springfield Line]] started operating at {{cvt|110|mph|0}} on 16 June 2018.<ref>{{Cite press release |url=https://www.ct.gov/dot/cwp/view.asp?A=1373&Q=603150 |title=AMTRAK RUNS TEST TRAINS OF UP TO 110 MPH IN PREPARATION FOR THE LAUNCH OF THE HARTFORD LINE ON JUNE 16 |date=6 June 2018 |access-date=27 September 2018 |publisher=Connecticut Department of Transportation |archive-date=28 September 2018 |archive-url=https://web.archive.org/web/20180928044107/https://www.ct.gov/dot/cwp/view.asp?A=1373&Q=603150 |url-status=live }}</ref>
|-
| [[Chicago Union Station|Chicago, IL]]–[[Detroit]]/[[Pontiac Transportation Center|Pontiac]], MI || ''[[Wolverine (train)|Wolverine]]'' || 304 || locomotive-hauled coaches || Diesel-electric || {{cvt|110|mph|0}} || {{cvt|57|mph|0}} ||As of 2014, a {{Convert|97|mi|adj=on}} portion allows speeds up to {{cvt|110|mph|0}}. Another portion of {{Convert|135|mi}} is under construction to increase to those speeds.<ref name="crs"/><ref name="framichigan">{{cite web|last1=Davis|first1=Wynne|last2=Hoeffner|first2=Tim|title=2014 FRA Rail Program Delivery: MICHIGAN T.O. 5 Midwest|url=http://www.fra.dot.gov/Elib/Document/4105|website=Federal Rail Administration|date=4 August 2014|access-date=17 January 2015|archive-date=7 October 2015|archive-url=https://web.archive.org/web/20151007144123/https://www.fra.dot.gov/Elib/Document/4105|url-status=live}}</ref>
|-
| [[Chicago Union Station|Chicago, IL]]–[[Port Huron station|Port Huron, MI]] || ''[[Blue Water (train)|Blue Water]]'' || 319 || locomotive-hauled coaches  || Diesel-electric || {{cvt|110|mph|0}} || {{cvt|49|mph|0}} ||As of 2014, a {{Convert|97|mi|adj=on}} portion allows speeds up to {{cvt|110|mph|0}}.<ref name="framichigan"/><ref>{{cite news|title=AMTRAK 110 MPH MICHIGAN SERVICE GIVEN GREEN LIGHT|url=http://www.michigan.gov/documents/mdot/MDOT-12-010FRA_gives110mph_376056_7.pdf|access-date=23 October 2012|newspaper=Amtrak MDOT Press Release|date=7 February 2012|archive-date=22 December 2012|archive-url=https://web.archive.org/web/20121222220100/https://www.michigan.gov/documents/mdot/MDOT-12-010FRA_gives110mph_376056_7.pdf|url-status=live}}</ref>
|-
| [[Chicago Union Station|Chicago, IL]]–[[Gateway Transportation Center|St. Louis, MO]] || ''[[Lincoln Service]]'',''[[Texas Eagle]]'' || 284 || locomotive-hauled coaches  || Diesel-electric || {{cvt|110|mph|0}} || {{cvt|53|mph|0}} ||<ref>{{Cite web |last=Magliari |first=Marc |date=2023-05-03 |title=110 mph Schedules Coming for Amtrak Chicago-St. Louis Corridor |url=https://media.amtrak.com/2023/05/110-mph-schedules-coming-for-amtrak-chicago-st-louis-corridor/ |access-date=2023-05-03 |website=Amtrak Media |language=en-US}}</ref>
|-
| [[Chicago Union Station|Chicago, IL]]–[[Union Station (Los Angeles)|Los Angeles, CA]] || ''[[Texas Eagle]]'' || 2,728 || locomotive-hauled coaches || Diesel-electric || {{cvt|100|mph|0}} || {{cvt|55|mph|0}} ||<ref>{{citation |url=http://www.texaseagle.com/ |title=Texas Eagle |url-status=live}}</ref>
|-
| [[Chicago Union Station|Chicago, IL]]–[[Union Station (Los Angeles)|Los Angeles, CA]] || ''[[Southwest Chief]]'' || 2,256 || locomotive-hauled coaches || Diesel-electric || {{cvt|90|mph|0}} || {{cvt|55|mph|0}} ||<ref>{{cite news|last=Wolfe|first=Thomas|title=Passengers on Amtrak's Southwest Chief Experience a Community Away From Home|url=http://www.redorbit.com/news/technology/187759/passengers_on_amtraks_southwest_chief_experience_a_community_away_from/|access-date=21 October 2012|newspaper=Red Orbit|date=27 July 2005|archive-date=24 September 2015|archive-url=https://web.archive.org/web/20150924130442/http://www.redorbit.com/news/technology/187759/passengers_on_amtraks_southwest_chief_experience_a_community_away_from/|url-status=live}}</ref>
|-
| [[Los Angeles Union Station|Los Angeles, CA]]–[[Santa Fe Depot (San Diego)|San Diego, CA]] || ''[[Pacific Surfliner]]'', ''[[Metrolink (Southern California)|Metrolink]] ([[Orange County Line|Orange County]] and [[Inland Empire–Orange County Line|Inland Empire–Orange County]] lines)'', ''[[Coaster (commuter rail)|Coaster]]'' || 130 || locomotive-hauled coaches || Diesel-electric || {{cvt|90|mph|0}} || {{cvt|55|mph|0}} ||<ref name="crs"/> There is a study in place to increase maximum speed to {{cvt|110|mph|0}} when funding is available.<ref>{{cite web|title=Regional Transportation Plan 2012–2035|url=http://rtpscs.scag.ca.gov/Documents/2012/final/SR/2012fRTP_PassengerRail.pdf|publisher=Southern California Association of Governments|access-date=11 January 2015|page=9|archive-date=11 January 2015|archive-url=https://web.archive.org/web/20150111070616/http://rtpscs.scag.ca.gov/Documents/2012/final/SR/2012fRTP_PassengerRail.pdf|url-status=live}}</ref>
|}


==Earlier attempts==
==Earlier attempts==
Line 616: Line 575:


===Ireland===
===Ireland===
In 2010, there was a report commissioned by the [[Chartered Institute of Logistics and Transport]] as a mid-term review of [[Transport 21]], an Irish infrastructure plan announced in 2005. The report recommended, among other things, a development of national rail to provide higher-speed rail services.<ref>{{cite web|title=T21 Midterm Review|url=http://www.cilt.ie/images/stories/T21_Midterm_Review.pdf|publisher=Chartered Institute of Logistics and Transport (Ireland)|access-date=29 July 2013|date=November 2010|archive-url=https://web.archive.org/web/20150210213521/http://cilt.ie/images/stories/T21_Midterm_Review.pdf|archive-date=10 February 2015|url-status=dead}}</ref> However, there have been no progress toward the recommendation.
In 2010, a report was commissioned by the [[Chartered Institute of Logistics and Transport]] as a mid-term review of [[Transport 21]], an Irish infrastructure plan announced in 2005. The report recommended, among other things, the development of national rail to provide higher-speed rail services.<ref>{{cite web |title=T21 Midterm Review |url= http://www.cilt.ie/images/stories/T21_Midterm_Review.pdf |publisher=Chartered Institute of Logistics and Transport (Ireland) |access-date=29 July 2013 |date=November 2010 |archive-url= https://web.archive.org/web/20150210213521/http://cilt.ie/images/stories/T21_Midterm_Review.pdf|archive-date=10 February 2015|url-status=dead}}</ref> However, there has been no progress towards implementing the recommendation.


===United States===
===United States===
There have been long-range visions to establish high/higher-speed rail networks in different regions of the United States but without adequate funding. During the [[American Recovery and Reinvestment Act of 2009]], there was a surge of interest to apply for grants from the [[Federal government of the United States|federal government]] to start those projects. However, many proposals have been put on hold or cancelled after failing to secure funding or support from the public or key local politicians.<ref name="Ohio-Wisconsin">{{cite news|last=Lambert|first=Lisa|title=U.S. yanks high-speed rail funds for Wisconsin and Ohio|url=https://www.reuters.com/article/us-usa-infrastructure-highspeedrail-idUSTRE6B860B20101209|access-date=3 November 2012|newspaper=Reuters|date=9 December 2010|archive-date=14 January 2016|archive-url=https://web.archive.org/web/20160114090643/http://www.reuters.com/article/us-usa-infrastructure-highspeedrail-idUSTRE6B860B20101209|url-status=live}}</ref><ref>{{cite news|title=Rejected by Florida, U.S. reallocates $2 billion for high-speed rail|url=http://www.cnn.com/2011/POLITICS/05/09/lahood.rail/index.html|access-date=3 November 2012|newspaper=CNN|date=10 May 2011|archive-date=17 September 2012|archive-url=https://web.archive.org/web/20120917234112/http://www.cnn.com/2011/POLITICS/05/09/lahood.rail/index.html|url-status=live}}</ref>
There have been long-range visions to establish high/higher-speed rail networks in different regions of the United States but without adequate funding. During the [[American Recovery and Reinvestment Act of 2009]], there was a surge of interest to apply for grants from the [[Federal government of the United States|federal government]] to start those projects. However, many proposals have been put on hold or cancelled after failing to secure funding or support from the public or key local politicians.<ref name="Ohio-Wisconsin">{{cite news|last=Lambert|first=Lisa|title=U.S. yanks high-speed rail funds for Wisconsin and Ohio|url=https://www.reuters.com/article/us-usa-infrastructure-highspeedrail-idUSTRE6B860B20101209|access-date=3 November 2012|newspaper=Reuters|date=9 December 2010|archive-date=14 January 2016|archive-url=https://web.archive.org/web/20160114090643/http://www.reuters.com/article/us-usa-infrastructure-highspeedrail-idUSTRE6B860B20101209|url-status=live}}</ref><ref>{{cite news|title=Rejected by Florida, U.S. reallocates $2 billion for high-speed rail|url=http://www.cnn.com/2011/POLITICS/05/09/lahood.rail/index.html|access-date=3 November 2012|newspaper=[[CNN]] |date=10 May 2011|archive-date=17 September 2012|archive-url=https://web.archive.org/web/20120917234112/http://www.cnn.com/2011/POLITICS/05/09/lahood.rail/index.html|url-status=live}}</ref>


====Amtrak Cascades====
====Amtrak Cascades====
{{Main|Amtrak Cascades}}
{{Main|Amtrak Cascades}}
Amtrak Cascades, a {{Convert|467|mi||adj=on}} intercity rail service, stretches from [[Eugene, Oregon|Eugene]], Oregon, through the [[Washington (state)|State of Washington]] to [[Vancouver]], British Columbia, in Canada. As of 2010, the long-term goal of this corridor was to have the top speeds of the segment of Eugene, Oregon, to [[Blaine, Washington|Blaine]], Washington, with top speeds in the {{cvt|90|to|120|mph|round=5}} range, and eventually {{cvt|150|mph|round=5}} on a dedicated track.<ref>{{cite news|title=Washington to get $590 million for high-speed rail improvements |url=http://seattletimes.com/html/localnews/2010910788_highspeedrail28m.html |access-date=22 October 2012 |newspaper=The Seattle Times |date=27 January 2010 |url-status=dead |archive-url=https://web.archive.org/web/20121017222206/http://seattletimes.com/html/localnews/2010910788_highspeedrail28m.html |archive-date=17 October 2012 }}</ref> However, as of 2012, the [[Washington State Department of Transportation]] plans for its {{Convert|300|mi||adj=on}} stretch to have top speeds of only {{convert|79|mph|abbr=on}},<ref>{{cite web|title=High-Speed Rail Program|url=http://www.wsdot.wa.gov/Rail/highspeedrail.htm|publisher=WSDOT|access-date=22 October 2012|archive-url=https://web.archive.org/web/20121014084917/http://www.wsdot.wa.gov/rail/highspeedrail.htm|archive-date=14 October 2012|url-status=dead}}</ref> and the plan in Oregon is to limit the speeds to {{cvt|79|mph|0}} as well, with safety and other freight service concerns voiced by the track owner, [[Union Pacific Railroad]].<ref>{{cite web|title=Corridor Forum Meeting #1 – Summary|url=http://www.oregonpassengerrail.org/files/meetings/corridor_forum/09252012/final_cf_summary_09252012.pdf|work=Oregon Passenger Rail – Eugene Portland|publisher=Oregon Passenger Rail|access-date=3 November 2012|archive-date=29 May 2014|archive-url=https://web.archive.org/web/20140529205137/http://www.oregonpassengerrail.org/files/meetings/corridor_forum/09252012/final_cf_summary_09252012.pdf|url-status=live}}</ref> This essentially halts the plan to provide a higher-speed rail service on this corridor in the near future.
Amtrak Cascades, a {{Convert|467|mi||adj=on}} intercity rail service, stretches from [[Eugene, Oregon|Eugene]], Oregon, through the [[Washington (state)|State of Washington]] to [[Vancouver]], British Columbia, in Canada. As of 2010, the long-term goal of this corridor was to have the top speeds of the segment of Eugene, Oregon, to [[Blaine, Washington|Blaine]], Washington, with top speeds in the {{cvt|90|to|120|mph|round=5}} range, and eventually {{cvt|150|mph|round=5}} on a dedicated track.<ref>{{cite news|title=Washington to get $590 million for high-speed rail improvements |url=http://seattletimes.com/html/localnews/2010910788_highspeedrail28m.html |access-date=22 October 2012 |newspaper=The Seattle Times |date=27 January 2010 |url-status=dead |archive-url=https://web.archive.org/web/20121017222206/http://seattletimes.com/html/localnews/2010910788_highspeedrail28m.html |archive-date=17 October 2012 }}</ref> However, as of 2012, the [[Washington State Department of Transportation]] plans for its {{Convert|300|mi||adj=on}} stretch to have top speeds of only {{convert|79|mph|abbr=on}},<ref>{{cite web|title=High-Speed Rail Program|url=http://www.wsdot.wa.gov/Rail/highspeedrail.htm|publisher=WSDOT|access-date=22 October 2012|archive-url=https://web.archive.org/web/20121014084917/http://www.wsdot.wa.gov/rail/highspeedrail.htm|archive-date=14 October 2012|url-status=dead}}</ref> and the plan in Oregon is to limit the speeds to {{cvt|79|mph|0}} as well, with safety and other freight service concerns voiced by the track owner, [[Union Pacific Railroad]].<ref>{{cite web|title=Corridor Forum Meeting #1 – Summary|url=http://www.oregonpassengerrail.org/files/meetings/corridor_forum/09252012/final_cf_summary_09252012.pdf|work=Oregon Passenger Rail – Eugene Portland|publisher=Oregon Passenger Rail|access-date=3 November 2012|archive-date=29 May 2014|archive-url=https://web.archive.org/web/20140529205137/http://www.oregonpassengerrail.org/files/meetings/corridor_forum/09252012/final_cf_summary_09252012.pdf|url-status=live}}</ref> This essentially halts the plan to provide a higher-speed rail service on this corridor in the near future.


Line 629: Line 589:
The ''[[Northern Lights Express]]'' project, in the planning stages and proposed to begin construction in 2017, would upgrade the BNSF trackage between [[Minneapolis]] and [[Duluth, Minnesota|Duluth]] to support service up to {{cvt|90|mph|round=5}}.<ref>{{cite news|last1=Levy|first1=Paul|title=Plans for $1B rail line from Minneapolis to Duluth chugging along|url=http://www.startribune.com/local/west/265144831.html|access-date=17 November 2014|work=Star Tribune West Metro|date=29 June 2014|archive-date=29 November 2014|archive-url=https://web.archive.org/web/20141129044618/http://www.startribune.com/local/west/265144831.html|url-status=live}}</ref>
The ''[[Northern Lights Express]]'' project, in the planning stages and proposed to begin construction in 2017, would upgrade the BNSF trackage between [[Minneapolis]] and [[Duluth, Minnesota|Duluth]] to support service up to {{cvt|90|mph|round=5}}.<ref>{{cite news|last1=Levy|first1=Paul|title=Plans for $1B rail line from Minneapolis to Duluth chugging along|url=http://www.startribune.com/local/west/265144831.html|access-date=17 November 2014|work=Star Tribune West Metro|date=29 June 2014|archive-date=29 November 2014|archive-url=https://web.archive.org/web/20141129044618/http://www.startribune.com/local/west/265144831.html|url-status=live}}</ref>


Other higher-speed rail proposals are periodically considered, but would need to pass through neighboring states, which have thus far not agreed to cooperate. Minnesota transportation planners proposed a higher-speed rail service called the ''River Route'', with top speeds of {{cvt|110|mph|round=5}}, between Minneapolis–Saint Paul, Minnesota, and Chicago, Illinois, via Milwaukee, Wisconsin, which follows the ''[[Empire Builder]]'' route.<ref>{{cite web|title=River Route: Twin Cities to Chicago|url=http://www.mnhighspeedrail.com/html/mn-rail-route.php|publisher=Minnesota High-Speed Rail|access-date=3 November 2012|archive-date=5 May 2012|archive-url=https://web.archive.org/web/20120505020919/http://www.mnhighspeedrail.com/html/mn-rail-route.php|url-status=live}}</ref> There is no current progress with ''the River Route'' project due to the cancellation of the funding in Wisconsin.
Other higher-speed rail proposals are periodically considered, but would need to pass through neighboring states, which have thus far not agreed to cooperate. Minnesota transportation planners proposed a higher-speed rail service called the ''River Route'', with top speeds of {{cvt|110|mph|round=5}}, between Minneapolis–Saint Paul, Minnesota, and Chicago, via Milwaukee, Wisconsin, which follows the ''[[Empire Builder]]'' route.<ref>{{cite web|title=River Route: Twin Cities to Chicago|url=http://www.mnhighspeedrail.com/html/mn-rail-route.php|publisher=Minnesota High-Speed Rail|access-date=3 November 2012|archive-date=5 May 2012|archive-url=https://web.archive.org/web/20120505020919/http://www.mnhighspeedrail.com/html/mn-rail-route.php|url-status=live}}</ref> The service would eventually open in 2024 as the ''[[Borealis (train)|Borealis]]'', though with a top speed of only {{cvt|79|mph|round=}}.


Another alternative that has been discussed is to have a new route that heads south to Iowa to join the rail link from Iowa to Chicago.<ref>{{cite news|title=Dayton has hopes for high-speed rail in Minn.|url=http://minnesota.publicradio.org/display/web/2011/02/25/dayton-high-speed-rail/|access-date=4 November 2012|newspaper=Minnesota Public Radio|date=25 February 2011|archive-date=6 November 2021|archive-url=https://web.archive.org/web/20211106101723/https://www.mprnews.org/story/2011/02/25/dayton-high-speed-rail|url-status=live}}</ref> There was a report in 2011 that Iowa would halt its involvement in high/higher-speed rail projects.<ref name="Branstad">{{cite news|title=Branstad kills Iowa involvement in high-speed rail|url=http://www.dailyiowan.com/2011/08/22/Metro/24459.html|access-date=4 November 2012|newspaper=The Daily Iowan|date=22 August 2011|archive-date=8 September 2012|archive-url=https://web.archive.org/web/20120908185436/http://www.dailyiowan.com/2011/08/22/Metro/24459.html|url-status=live}}</ref> However, the [[Iowa Department of Transportation]] and [[Illinois Department of Transportation]] continue to pursue the study of rail link between Chicago and [[Omaha, Nebraska|Omaha]], Nebraska, through Iowa with top speeds of {{cvt|110|mph|round=5}}.<ref name="IowaEIS">{{cite web|title=Tier 1 Service Level EIS: Chapter 2 – Alternatives|url=http://www.iowadot.gov/chicagotoomaha/pdfs/draftEIS/Chapter%202%20Alternatives.pdf|work=Chicago to Council Bluffs-Omaha Regional Passenger Rail System Planning Study|publisher=Iowa Department of Transportation|access-date=4 November 2012|archive-date=3 September 2013|archive-url=https://web.archive.org/web/20130903163718/http://www.iowadot.gov/chicagotoomaha/pdfs/draftEIS/Chapter%202%20Alternatives.pdf|url-status=live}}</ref><ref name="IowaPatch">{{cite news|title=Omaha to Chicago (and possibly through Iowa City) Railway Route Study to Kick off this Month|url=http://iowacity.patch.com/articles/omaha-to-chicago-and-possibly-through-iowa-city-railway-study-to-take-place#pdf-9053359|access-date=4 November 2012|newspaper=Iowa City Patch|date=6 February 2012|archive-url=https://web.archive.org/web/20140529232642/http://iowacity.patch.com/groups/politics-and-elections/p/omaha-to-chicago-and-possibly-through-iowa-city-railw81492e66d1|archive-date=29 May 2014}}</ref> Therefore, the status of the proposal to link Minneapolis–Saint Paul with Chicago via Iowa is unknown.
Another alternative that has been discussed is to have a new route that heads south to Iowa to join the rail link from Iowa to Chicago.<ref>{{cite news|title=Dayton has hopes for high-speed rail in Minn.|url=http://minnesota.publicradio.org/display/web/2011/02/25/dayton-high-speed-rail/|access-date=4 November 2012|newspaper=Minnesota Public Radio|date=25 February 2011|archive-date=6 November 2021|archive-url=https://web.archive.org/web/20211106101723/https://www.mprnews.org/story/2011/02/25/dayton-high-speed-rail|url-status=live}}</ref> There was a report in 2011 that Iowa would halt its involvement in high/higher-speed rail projects.<ref name="Branstad">{{cite news|title=Branstad kills Iowa involvement in high-speed rail|url=http://www.dailyiowan.com/2011/08/22/Metro/24459.html|access-date=4 November 2012|newspaper=The Daily Iowan|date=22 August 2011|archive-date=8 September 2012|archive-url=https://web.archive.org/web/20120908185436/http://www.dailyiowan.com/2011/08/22/Metro/24459.html|url-status=live}}</ref> However, the [[Iowa Department of Transportation]] and [[Illinois Department of Transportation]] continue to pursue the study of rail link between Chicago and [[Omaha, Nebraska]], through Iowa with top speeds of {{cvt|110|mph|round=5}}.<ref name="IowaEIS">{{cite web|title=Tier 1 Service Level EIS: Chapter 2 – Alternatives|url=http://www.iowadot.gov/chicagotoomaha/pdfs/draftEIS/Chapter%202%20Alternatives.pdf|work=Chicago to Council Bluffs-Omaha Regional Passenger Rail System Planning Study|publisher=Iowa Department of Transportation|access-date=4 November 2012|archive-date=3 September 2013|archive-url=https://web.archive.org/web/20130903163718/http://www.iowadot.gov/chicagotoomaha/pdfs/draftEIS/Chapter%202%20Alternatives.pdf|url-status=live}}</ref><ref name="IowaPatch">{{cite news|title=Omaha to Chicago (and possibly through Iowa City) Railway Route Study to Kick off this Month|url=http://iowacity.patch.com/articles/omaha-to-chicago-and-possibly-through-iowa-city-railway-study-to-take-place#pdf-9053359|access-date=4 November 2012|newspaper=Iowa City Patch|date=6 February 2012|archive-url=https://web.archive.org/web/20140529232642/http://iowacity.patch.com/groups/politics-and-elections/p/omaha-to-chicago-and-possibly-through-iowa-city-railw81492e66d1|archive-date=29 May 2014}}</ref> Therefore, the status of the proposal to link Minneapolis–Saint Paul with Chicago via Iowa is unknown.


====New York====
====New York====
{{main|Turboliner#RTL-III}}
{{main|Turboliner#RTL-III}}
[[File:Turboliner 152.jpg|thumb|right|An un-rebuilt RTL Turboliner in New York in 1983.]]
[[File:Turboliner 152.jpg|thumb|right|An un-rebuilt RTL Turboliner in New York in 1983.]]
In 1998, [[New York (state)|New York]] State initiated a $185 million program in partnership with [[Amtrak]] to increase the speeds of the ''[[Empire Service (train)|Empire Service]]'' to {{cvt|125|mph|round=5}} by reconstructing all seven [[Gas turbine locomotive|gas-turbine]] [[Turboliner]] trainsets, originally built in 1976–1977, to the new [[Turboliner#RTL-III|RTL-III]] specification. The reconstructed trains, coupled with track improvements, would cut the travel time between New York City and [[Albany, New York|Albany]] by 20 minutes. However, the project ran into many problems including issues with the trains and the unsuccessful implementation of required track improvements.<ref>{{cite news|last=Kaplan|first=Thomas|title=For Sale: 4 Weedy, Rusty Relics of a Doomed Rail Project|url=https://www.nytimes.com/2012/06/01/nyregion/cuomo-administration-looks-to-sell-4-trains-from-failed-rail-project.html?_r=0|access-date=8 November 2012|newspaper=The New York Times|date=31 May 2012|archive-date=10 February 2018|archive-url=https://web.archive.org/web/20180210062203/http://www.nytimes.com/2012/06/01/nyregion/cuomo-administration-looks-to-sell-4-trains-from-failed-rail-project.html?_r=0|url-status=live}}</ref> New York ended the rehabilitation program in 2005 after spending $70.3 million.<ref name="tu20050528">{{cite news|title=Express rail plan hits end of line |url=http://www.ble-t.org/pr/news/pf_headline.asp?id=13679 |newspaper=[[Times Union (Albany)|Times Union]] |date=28 May 2005 |first=Cathy |last=Woodruff |archive-url=https://web.archive.org/web/20140819084101/http://www.ble-t.org/pr/news/pf_headline.asp?id=13679 |archive-date=19 August 2014 |url-status=dead }}</ref> Fallout over the program led to litigation between New York and Amtrak; Amtrak would eventually pay New York $20 million and commit to funding $10 million in track improvements.<ref name="tu20071213">{{cite news|title=Track cleared for upgrades; State suit settled; Amtrak to pay $20M, make improvements |url=http://alb.merlinone.net/mweb/wmsql.wm.request?oneimage&imageid=6433663 |newspaper=[[Times Union (Albany)|Times Union]] |date=13 December 2007 |first=Cathy |last=Woodruff |archive-url=https://web.archive.org/web/20141111072558/http://alb.merlinone.net/mweb/wmsql.wm.request?oneimage&imageid=6433663 |archive-date=11 November 2014 |url-status=dead }}</ref> New York auctioned off its surplus Turboliners in 2012 for $420,000.<ref name="tu20121213">{{cite web|last=Karlin|first=Rick|title=State's rusting trains sell for $420,000|date=13 December 2012|url=http://www.timesunion.com/local/article/State-s-rusting-trains-sell-for-420-000-4116188.php|access-date=13 December 2012|archive-date=22 March 2016|archive-url=https://web.archive.org/web/20160322232019/http://www.timesunion.com/local/article/State-s-rusting-trains-sell-for-420-000-4116188.php|url-status=live}}</ref>
In 1998, [[New York (state)|New York]] State initiated a $185 million program in partnership with [[Amtrak]] to increase the speeds of the ''[[Empire Service]]'' to {{cvt|125|mph|round=5}} by reconstructing all seven [[Gas turbine locomotive|gas-turbine]] [[Turboliner]] trainsets, originally built in 1976–1977, to the new [[Turboliner#RTL-III|RTL-III]] specification. The reconstructed trains, coupled with track improvements, would cut the travel time between New York City and [[Albany, New York|Albany]] by 20 minutes. However, the project ran into many problems including issues with the trains and the unsuccessful implementation of required track improvements.<ref>{{cite news|last=Kaplan|first=Thomas|title=For Sale: 4 Weedy, Rusty Relics of a Doomed Rail Project|url=https://www.nytimes.com/2012/06/01/nyregion/cuomo-administration-looks-to-sell-4-trains-from-failed-rail-project.html?_r=0|access-date=8 November 2012|newspaper=The New York Times|date=31 May 2012|archive-date=10 February 2018|archive-url=https://web.archive.org/web/20180210062203/http://www.nytimes.com/2012/06/01/nyregion/cuomo-administration-looks-to-sell-4-trains-from-failed-rail-project.html?_r=0|url-status=live}}</ref> New York ended the rehabilitation program in 2005 after spending $70.3 million.<ref name="tu20050528">{{cite news|title=Express rail plan hits end of line |url=http://www.ble-t.org/pr/news/pf_headline.asp?id=13679 |newspaper=[[Times Union (Albany)|Times Union]] |date=28 May 2005 |first=Cathy |last=Woodruff |archive-url=https://web.archive.org/web/20140819084101/http://www.ble-t.org/pr/news/pf_headline.asp?id=13679 |archive-date=19 August 2014 |url-status=dead }}</ref> Fallout over the program led to litigation between New York and Amtrak; Amtrak would eventually pay New York $20 million and commit to funding $10 million in track improvements.<ref name="tu20071213">{{cite news|title=Track cleared for upgrades; State suit settled; Amtrak to pay $20M, make improvements |url=http://alb.merlinone.net/mweb/wmsql.wm.request?oneimage&imageid=6433663 |newspaper=[[Times Union (Albany)|Times Union]] |date=13 December 2007 |first=Cathy |last=Woodruff |archive-url=https://web.archive.org/web/20141111072558/http://alb.merlinone.net/mweb/wmsql.wm.request?oneimage&imageid=6433663 |archive-date=11 November 2014 |url-status=dead }}</ref> New York auctioned off its surplus Turboliners in 2012 for $420,000.<ref name="tu20121213">{{cite web|last=Karlin|first=Rick|title=State's rusting trains sell for $420,000|work=Times Union |date=13 December 2012|url=http://www.timesunion.com/local/article/State-s-rusting-trains-sell-for-420-000-4116188.php|access-date=13 December 2012|archive-date=22 March 2016|archive-url=https://web.archive.org/web/20160322232019/http://www.timesunion.com/local/article/State-s-rusting-trains-sell-for-420-000-4116188.php|url-status=live}}</ref>


====Ohio====
====Ohio====
{{Main|Ohio Hub}}
{{Main|Ohio Hub}}
The Ohio Hub, a rail improvement project proposed by the [[Ohio Department of Transportation]], is aimed at revitalizing passenger rail service in the Ohio region. The proposal was to increase the top speeds to {{cvt|110|mph|round=5}} in the network connecting [[Cleveland]], [[Columbus, Ohio|Columbus]], and [[Cincinnati]], commonly referred as the 3-C corridor.<ref>{{cite web|title=The Ohio & Lake Erie Regional Rail Ohio Hub Study: Technical Memorandum & Business Plan|url=http://www2.dot.state.oh.us/ohiorail/Ohio%20Hub/Website/ordc/Ohio_Hub_Final_Docs/Final_Document_Rev_12_06_07/Executive_Summary_Full_Report.pdf|work=The Ohio Hub|publisher=Ohio Department of Transportation|access-date=3 November 2012|archive-url=https://web.archive.org/web/20120418024153/http://www2.dot.state.oh.us/ohiorail/Ohio%20Hub/Website/ordc/Ohio_Hub_Final_Docs/Final_Document_Rev_12_06_07/Executive_Summary_Full_Report.pdf|archive-date=18 April 2012|date=July 2007}}</ref> The project is currently in an unknown state after the U.S. government rescinded the federal funding from Ohio and redirected it to other states.<ref name="Ohio-Wisconsin"/>
The Ohio Hub, a rail improvement project proposed by the [[Ohio Department of Transportation]], is aimed at revitalizing passenger rail service in the Ohio region. The proposal was to increase the top speeds to {{cvt|110|mph|round=5}} in the network connecting [[Cleveland]], [[Columbus, Ohio|Columbus]], and [[Cincinnati]], commonly referred as the 3-C corridor.<ref>{{cite web|title=The Ohio & Lake Erie Regional Rail Ohio Hub Study: Technical Memorandum & Business Plan|url=http://www2.dot.state.oh.us/ohiorail/Ohio%20Hub/Website/ordc/Ohio_Hub_Final_Docs/Final_Document_Rev_12_06_07/Executive_Summary_Full_Report.pdf|work=The Ohio Hub|publisher=Ohio Department of Transportation|access-date=3 November 2012|archive-url=https://web.archive.org/web/20120418024153/http://www2.dot.state.oh.us/ohiorail/Ohio%20Hub/Website/ordc/Ohio_Hub_Final_Docs/Final_Document_Rev_12_06_07/Executive_Summary_Full_Report.pdf|archive-date=18 April 2012|date=July 2007}}</ref> The project is currently in an unknown state after the U.S. government rescinded the federal funding from Ohio and redirected it to other states.<ref name="Ohio-Wisconsin"/>


====Wisconsin====
====Wisconsin====
In October 2009, the [[Wisconsin Department of Transportation]] adopted the ''Connections 2030'' plan which is the long-range plan for state transportation needs. The plan includes ''Wisconsin Rail Plan 2030'', the twenty-year plan to improve the state railroad system by 2030. In the rail plan, there is a multi-phase project to upgrade the rail service from Chicago, Illinois, to [[Milwaukee]] and [[Madison, Wisconsin|Madison]], Wisconsin, with top speeds of {{cvt|110|mph|round=5}}. The latter phases of the project will expand the same service to [[Minneapolis–Saint Paul]] in Minnesota and another route to [[Green Bay, Wisconsin|Green Bay]], Wisconsin.<ref>{{cite web|title=Chapter 6: Intercity Passenger Rail |url=http://www.dot.wisconsin.gov/projects/state/docs/railplan-chapter6.pdf |work=Wisconsin Rail Plan 2030 |publisher=Wisconsin Department of Transportation |access-date=3 November 2012 |url-status=dead |archive-url=https://web.archive.org/web/20130817004243/http://dot.wisconsin.gov/projects/state/docs/railplan-chapter6.pdf |archive-date=17 August 2013 }}</ref> There was a reaction against the project in 2010, and the $810 million grant the state originally received for the project from the federal government was rescinded.<ref name="Ohio-Wisconsin"/> As of 2012, the rail plan is postponed indefinitely.<ref>{{cite web|title=Wisconsin Rail Plan 2030 – Draft plan |url=http://www.dot.wisconsin.gov/projects/state/railplan-chapters.htm |work=Wisconsin Rail Plan 2030 |publisher=Wisconsin Department of Transportation |access-date=3 November 2012 |url-status=dead |archive-url=https://web.archive.org/web/20121025134111/http://www.dot.wisconsin.gov/projects/state/railplan-chapters.htm |archive-date=25 October 2012 }}</ref>
In October 2009, the [[Wisconsin Department of Transportation]] adopted the ''Connections 2030'' plan which is the long-range plan for state transportation needs. The plan includes ''Wisconsin Rail Plan 2030'', the twenty-year plan to improve the state railroad system by 2030. In the rail plan, there is a multi-phase project to upgrade the rail service from Chicago, to [[Milwaukee]] and [[Madison, Wisconsin]], with top speeds of {{cvt|110|mph|round=5}}. The latter phases of the project will expand the same service to [[Minneapolis–Saint Paul]] in Minnesota and another route to [[Green Bay, Wisconsin|Green Bay]], Wisconsin.<ref>{{cite web|title=Chapter 6: Intercity Passenger Rail |url=http://www.dot.wisconsin.gov/projects/state/docs/railplan-chapter6.pdf |work=Wisconsin Rail Plan 2030 |publisher=Wisconsin Department of Transportation |access-date=3 November 2012 |url-status=dead |archive-url=https://web.archive.org/web/20130817004243/http://dot.wisconsin.gov/projects/state/docs/railplan-chapter6.pdf |archive-date=17 August 2013 }}</ref> There was a reaction against the project in 2010, and the $810 million grant the state originally received for the project from the federal government was rescinded.<ref name="Ohio-Wisconsin"/> As of 2012, the rail plan is postponed indefinitely.<ref>{{cite web|title=Wisconsin Rail Plan 2030 – Draft plan |url=http://www.dot.wisconsin.gov/projects/state/railplan-chapters.htm |work=Wisconsin Rail Plan 2030 |publisher=Wisconsin Department of Transportation |access-date=3 November 2012 |url-status=dead |archive-url=https://web.archive.org/web/20121025134111/http://www.dot.wisconsin.gov/projects/state/railplan-chapters.htm |archive-date=25 October 2012 }}</ref>


==Current efforts==
==Current efforts==
Line 653: Line 615:
Bangladesh Government has taken initiatives to develop high-speed rail (HSR) in between its two major cities – Dhaka, the National Capital City and Chattogram (former Chittagong), the second largest and the principal Port City of the country. Bangladesh Railway (BR), the Government-owned and-managed transportation agency of the country, signed a contract of BDT 102 crore on 31 May 2018 with a Consortium of China Railway Design Corporation (CRDC), a Chinese Company and Mazumder Enterprise (ME), a Bangladeshi Pvt. Ltd. Company for feasibility study and detailed design for construction of proposed Dhaka-Chattogram via Cumilla/Laksam HSR line.
Bangladesh Government has taken initiatives to develop high-speed rail (HSR) in between its two major cities – Dhaka, the National Capital City and Chattogram (former Chittagong), the second largest and the principal Port City of the country. Bangladesh Railway (BR), the Government-owned and-managed transportation agency of the country, signed a contract of BDT 102 crore on 31 May 2018 with a Consortium of China Railway Design Corporation (CRDC), a Chinese Company and Mazumder Enterprise (ME), a Bangladeshi Pvt. Ltd. Company for feasibility study and detailed design for construction of proposed Dhaka-Chattogram via Cumilla/Laksam HSR line.


With 320.79&nbsp;km length, Dhaka-Chattogram is the main business corridor and life line of BR, and at present, the railway route is a circuitous way through Tongi-Bhairab Bazar-Brahmanbaria-Cumilla-Chattogram. The proposed shorter route, which would be Dhaka-Cumilla/Laksham-Chattogram, will cut short the length by about 91&nbsp;km, making the total length around 230&nbsp;km. The expected speed of the proposed HSR would be above 250&nbsp;km/h (yet to determine) and it would take less than one hour to reach Chattogram from Dhaka, which currently takes more than five hours. Under the 18-month contract, the Consortium's responsibilities will include identifying alternative alignments, assessing the viability of the project, preparing detailed engineering design, and cost estimation.
With 320.79&nbsp;km length, Dhaka-Chattogram is the main business corridor and life line of BR, and at present, the railway route is a circuitous way through Tongi-Bhairab Bazar-Brahmanbaria-Cumilla-Chattogram. The proposed shorter route, which would be Dhaka-Cumilla/Laksham-Chattogram, will cut short the length by about 91&nbsp;km, making the total length around 230&nbsp;km. The expected speed of the proposed HSR would be above 300&nbsp;km/h (yet to determine) and it would take less than one hour to reach Chattogram from Dhaka, which currently takes more than five hours. Under the 18-month contract, the Consortium's responsibilities will include identifying alternative alignments, assessing the viability of the project, preparing detailed engineering design, and cost estimation.
<ref>{{Cite web |url=http://srmilan.tripod.com/ |title=Welcome to Milan's World<!-- Bot generated title --> |access-date=18 August 2018 |archive-date=19 August 2018 |archive-url=https://web.archive.org/web/20180819081211/http://srmilan.tripod.com/ |url-status=live }}</ref>
<ref>{{Cite web |url=http://srmilan.tripod.com/ |title=Welcome to Milan's World<!-- Bot generated title --> |access-date=18 August 2018 |archive-date=19 August 2018 |archive-url=https://web.archive.org/web/20180819081211/http://srmilan.tripod.com/ |url-status=live }}</ref>


===Canada===
===Canada===
For a rail route to connect [[Windsor, Ontario]] to [[Detroit|Detroit, Michigan]] in the United States, a higher-speed rail plan was proposed as an alternative after a study on the Windsor to [[Quebec City]] route in Canada was to consider only high-speed rail with top speeds of {{cvt|200|km/h|mph|round=5}} or more. Politicians in Windsor area proposed in 2012 that having higher-speed rail connection between Windsor and Detroit must be part of the consideration.<ref name="qohsrps"/><ref>{{cite web|title=Masse Rolls Out Need for Speed Campaign|url=http://www.brianmasse.ca/post/masse-rolls-out-need-for-speed-campaign|publisher=Office of Brian Masse|access-date=17 November 2012|archive-url=https://archive.today/20130115064002/http://www.brianmasse.ca/post/masse-rolls-out-need-for-speed-campaign|archive-date=15 January 2013|url-status=dead}}</ref><ref>{{cite news|title=Windsor politicians disagree with rail study|url=http://www.cbc.ca/news/canada/windsor/story/2011/10/18/wdr-high-speed-rail.html|access-date=17 November 2012|newspaper=CBCNews|date=18 October 2012|archive-date=24 October 2011|archive-url=https://web.archive.org/web/20111024130630/http://www.cbc.ca/news/canada/windsor/story/2011/10/18/wdr-high-speed-rail.html|url-status=live}}</ref>
For a rail route to connect [[Windsor, Ontario]] to [[Detroit|Detroit, Michigan]] in the United States, a higher-speed rail plan was proposed as an alternative after a study on the Windsor to [[Quebec City]] route in Canada was to consider only high-speed rail with top speeds of {{cvt|200|km/h|mph|round=5}} or more. Politicians in Windsor area proposed in 2012 that having higher-speed rail connection between Windsor and Detroit must be part of the consideration.<ref name="qohsrps"/><ref>{{cite web|title=Masse Rolls Out Need for Speed Campaign|url=http://www.brianmasse.ca/post/masse-rolls-out-need-for-speed-campaign|publisher=Office of Brian Masse|access-date=17 November 2012|archive-url=https://archive.today/20130115064002/http://www.brianmasse.ca/post/masse-rolls-out-need-for-speed-campaign|archive-date=15 January 2013|url-status=dead}}</ref><ref>{{cite news|title=Windsor politicians disagree with rail study|url=https://www.cbc.ca/news/canada/windsor/watch-windsor-politicians-disagree-with-rail-study-1.1056861|access-date=17 November 2012|newspaper=CBCNews|date=18 October 2012|archive-date=24 October 2011|archive-url=https://web.archive.org/web/20111024130630/http://www.cbc.ca/news/canada/windsor/story/2011/10/18/wdr-high-speed-rail.html|url-status=live}}</ref>


Another feasibility study is ongoing as part of the Northern New England Intercity Rail Initiative to connect between [[Boston]] and [[Montreal]] trains at top speeds of {{cvt|90|mph|round=5}}.<ref name=NNEIRI/>
Another feasibility study is ongoing as part of the Northern New England Intercity Rail Initiative to connect between [[Boston]] and [[Montreal]] trains at top speeds of {{cvt|90|mph|round=5}}.<ref name=NNEIRI/>


===Greece===
===Greece===
A project to modernize railway network in Greece is ongoing. A new {{Convert|106|km|abbr=on|adj=on}} alignment between [[Tithorea]] and [[Domokos]] is designed to avoid the mountainous part. The new line will have speeds of {{cvt|160|and|200|km/h|round=5}}.<ref name=greece/>
A project to modernize railway network in Greece is ongoing. A new {{Convert|106|km|abbr=on|adj=on}} alignment between [[Tithorea]] and [[Domokos]] is designed to avoid the mountainous part. The new line will have speeds of {{cvt|160|and|200|km/h|round=5}}.<ref name=Greece/>


===India===
===India===
In October 2013, the [[Minister of Railways (India)|Minister of Railways]] announced at the two-day international technical conference on ''High Speed Rail Travel; Low Cost Solution'' that the focus of India's rail improvement is to implement a lower cost solution to meet the immediate needs by providing higher-speed rail services as an incremental step before the dedicated track high-speed rail can be achieved. India's higher-speed rail will be in the range of {{cvt|160|and|200|km/h|round=5}}.<ref name="india"/> On 3 July 2014, a trail run with the new top speeds of {{cvt|160|km/h|round=5}} was successfully completed on a journey of {{cvt|200|km|round=5}} between [[Delhi]] and [[Agra]]. The new service, operational since 5 April 2016, cut the travel time from 126 minutes (compared to standard trains) with a top speed of {{convert|160|km/h|abbr=on}} to 99 minutes.<ref>{{cite news|last1=Singh|first1=Mahendra|title=Delhi to Agra in 99 minutes; train hits 160 kmph on trial run|url=http://timesofindia.indiatimes.com/india/Delhi-to-Agra-in-99-minutes-train-hits-160-kmph-on-trial-run/articleshow/37732774.cms|access-date=4 July 2014|work=The Times of India|date=4 July 2014|archive-date=4 July 2014|archive-url=https://web.archive.org/web/20140704035708/http://timesofindia.indiatimes.com/india/Delhi-to-Agra-in-99-minutes-train-hits-160-kmph-on-trial-run/articleshow/37732774.cms|url-status=live}}</ref>
In October 2013, the [[Minister of Railways (India)|Minister of Railways]] announced at the two-day international technical conference on ''High Speed Rail Travel; Low Cost Solution'' that the focus of India's rail improvement was to implement a lower-cost solution to meet immediate needs by providing higher-speed rail services as an incremental step before dedicated-track high-speed rail can be achieved. India's higher-speed rail would be in the range of {{cvt|160|and|200|km/h|round=5}}.<ref name="India" /> On 3 July 2014, a trial run with new top speeds of {{cvt|160|km/h|round=5}} was successfully completed on a journey of {{cvt|200|km|round=5}} between [[Delhi]] and [[Agra]]. The new service, operational since 5 April 2016, cut the travel time from 126 minutes (compared to standard trains) with a top speed of {{convert|160|km/h|abbr=on}} to 99 minutes.<ref>{{cite news |last1=Singh |first1=Mahendra |title=Delhi to Agra in 99 minutes; train hits 160 kmph on trial run |url= http://timesofindia.indiatimes.com/india/Delhi-to-Agra-in-99-minutes-train-hits-160-kmph-on-trial-run/articleshow/37732774.cms|access-date=4 July 2014 |work=The Times of India |date=4 July 2014 |archive-date=4 July 2014 |archive-url= https://web.archive.org/web/20140704035708/http://timesofindia.indiatimes.com/india/Delhi-to-Agra-in-99-minutes-train-hits-160-kmph-on-trial-run/articleshow/37732774.cms |url-status=live}}</ref>


In 2019 the government approved 3 rapid regional railways including [[Delhi–Meerut Regional Rapid Transit System]] with speeds up to 160&nbsp;km/h.<ref>{{Cite web|url=https://www.ndtv.com/delhi-news/over-rs-30-000-crore-cleared-for-delhi-meerut-high-speed-rail-corridor-1996284|title=Over Rs 30,000 Crore Cleared For Delhi-Meerut High-Speed Rail Corridor|website=NDTV.com|access-date=12 November 2019|archive-date=27 August 2019|archive-url=https://web.archive.org/web/20190827050043/https://www.ndtv.com/delhi-news/over-rs-30-000-crore-cleared-for-delhi-meerut-high-speed-rail-corridor-1996284|url-status=live}}</ref>
In 2019, the government approved 3 rapid regional railways including the [[Delhi–Meerut Regional Rapid Transit System]] with speeds up to 160&nbsp;km/h.<ref>{{Cite news |url= https://www.ndtv.com/delhi-news/over-rs-30-000-crore-cleared-for-delhi-meerut-high-speed-rail-corridor-1996284 |title=Over Rs 30,000 Crore Cleared For Delhi-Meerut High-Speed Rail Corridor |website=NDTV.com |access-date=12 November 2019 |archive-date=27 August 2019 |archive-url= https://web.archive.org/web/20190827050043/https://www.ndtv.com/delhi-news/over-rs-30-000-crore-cleared-for-delhi-meerut-high-speed-rail-corridor-1996284 |url-status=live}}</ref>


in June 2020 the government of [[Kerala]] approved the [[Thiruvananthapuram–Kasargode Semi High Speed Rail Corridor|Thiruvananthapuram–Kasargode Semi High Speed Rail Corridor or Silver line]], a Semi-High speed rail line connecting the state.<ref>{{Cite news|last=Radhakrishnan|first=S. Anil|date=2020-06-09|title=K-Rail revises alignment of section|language=en-IN|work=The Hindu|url=https://www.thehindu.com/news/national/kerala/k-rail-revises-alignment-of-vadakara-thalassery-section/article31787611.ece|access-date=2021-07-19|issn=0971-751X|archive-date=19 July 2021|archive-url=https://web.archive.org/web/20210719024535/https://www.thehindu.com/news/national/kerala/k-rail-revises-alignment-of-vadakara-thalassery-section/article31787611.ece|url-status=live}}</ref>
In June 2020, the government of [[Kerala]] approved the [[Thiruvananthapuram–Kasargode Semi High Speed Rail Corridor|Thiruvananthapuram–Kasargode Semi High Speed Rail Corridor or Silver line]], a Semi-High speed rail line connecting the state.<ref>{{Cite news |last=Radhakrishnan |first=S. Anil |date=9 June 2020 |title=K-Rail revises alignment of section |work=The Hindu |url= https://www.thehindu.com/news/national/kerala/k-rail-revises-alignment-of-vadakara-thalassery-section/article31787611.ece |access-date=19 July 2021 |archive-date=19 July 2021|archive-url= https://web.archive.org/web/20210719024535/https://www.thehindu.com/news/national/kerala/k-rail-revises-alignment-of-vadakara-thalassery-section/article31787611.ece |url-status=live}}</ref>


in July 2021, The Government announced plans of making 10 new [[Vande Bharat Express|Vande Bharat Express Lines]] connecting Over 40 cities. This is planned to be done by 2022.<ref>{{Cite web|date=2021-07-18|title=Indian Railways gears up to roll out 10 trains to link 40 cities in Vande Bharat boost: Report|url=https://www.hindustantimes.com/india-news/indian-railways-gears-up-to-roll-out-10-trains-to-link-40-cities-in-vande-bharat-boost-report-101626582550550.html|access-date=2021-07-19|website=Hindustan Times|language=en|archive-date=18 July 2021|archive-url=https://web.archive.org/web/20210718155752/https://www.hindustantimes.com/india-news/indian-railways-gears-up-to-roll-out-10-trains-to-link-40-cities-in-vande-bharat-boost-report-101626582550550.html|url-status=live}}</ref>
In July 2021, the Government announced plans to create 10 new [[Vande Bharat Express|Vande Bharat Express lines]] connecting over 40 cities. This is planned to be done by 2022.<ref>{{Cite news |date=18 July 2021 |title=Indian Railways gears up to roll out 10 trains to link 40 cities in Vande Bharat boost: Report |url= https://www.hindustantimes.com/india-news/indian-railways-gears-up-to-roll-out-10-trains-to-link-40-cities-in-vande-bharat-boost-report-101626582550550.html |access-date=19 July 2021 |website=Hindustan Times |archive-date=18 July 2021 |archive-url= https://web.archive.org/web/20210718155752/https://www.hindustantimes.com/india-news/indian-railways-gears-up-to-roll-out-10-trains-to-link-40-cities-in-vande-bharat-boost-report-101626582550550.html |url-status=live}}</ref>


===Malaysia===
===Malaysia===
[[File:ETS EP arriving KLO.jpg|thumb|right|A [[KTM Class 93]] (Platinum service) arriving in [[Kuala Lumpur railway station|Kuala Lumpur]]]]{{Unreferenced section|date=February 2022}}
[[File:ETS EP arriving KLO.jpg|thumb|right|A [[KTM Class 93]] (Platinum service) arriving in [[Kuala Lumpur railway station|Kuala Lumpur]]]]
{{Unreferenced section|date=February 2022}}
The [[KTM ETS]] is an [[inter-city rail]] service operated by [[Keretapi Tanah Melayu]] Berhad utilizing electric multiple units. The KTM ETS is the second electric train service to be operated by the Malaysian railway company, after the [[KTM Komuter]] service.
The [[KTM ETS]] is an [[inter-city rail]] service operated by [[Keretapi Tanah Melayu]] Berhad utilizing electric multiple units. The KTM ETS is the second electric train service to be operated by the Malaysian railway company, after the [[KTM Komuter]] service.


Commencing in August 2010, the ETS is the fastest [[metre gauge]] train service in [[Malaysia]] and operates along the electrified and double-tracked stretch of the [[KTM West Coast Line|West Coast Line]] between {{rws|Gemas}} and {{rws|Padang Besar}} on the [[Malaysia-Thailand Border|Malaysia-Thai border]] by the Malaysian national railway operator, [[Keretapi Tanah Melayu]].
Commencing in August 2010, the ETS is the fastest [[metre gauge]] train service in [[Malaysia]] and operates along the electrified and double-tracked stretch of the [[KTM West Coast Line|West Coast Line]] between {{rws|Gemas}} and {{rws|Padang Besar}} on the [[Malaysia–Thailand border]] by the Malaysian national railway operator, [[Keretapi Tanah Melayu]].


The rail service is operated by KTM Intercity Division. It was previously operated by ETS Sendirian Berhad, a fully owned subsidiary of [[Keretapi Tanah Melayu]] Berhad. The operation speed for this train is 140&nbsp;km/h with the maximum possible speeds for the trains at 160&nbsp;km/h.
The rail service is operated by KTM Intercity Division. It was previously operated by ETS Sendirian Berhad, a fully owned subsidiary of [[Keretapi Tanah Melayu]] Berhad. The operation speed for this train is 140&nbsp;km/h with the maximum possible speeds for the trains at 160&nbsp;km/h.


=== New Zealand ===
=== New Zealand ===
Advocacy group Greater Auckland proposed the Regional Rapid Rail initiative in 2017, including tilt trains with a maximum speed of 160&nbsp;km/h.<ref>{{cite web|url=https://www.nzherald.co.nz/rotorua-daily-post/news/article.cfm?c_id=1503438&objectid=11905926|title=High-speed Auckland to Rotorua rail link proposed|website=NZ Herald|date=18 August 2017|access-date=5 August 2017|archive-date=17 August 2017|archive-url=https://web.archive.org/web/20170817193406/http://www.nzherald.co.nz/rotorua-daily-post/news/article.cfm?c_id=1503438&objectid=11905926|url-status=live}}</ref> This network would link [[Auckland]] with [[Hamilton, New Zealand|Hamilton]], [[Tauranga]] and [[Rotorua]]. In December 2018, the [[Government of New Zealand]] committed funding to reintroducing a five-year trial rail service between [[Papakura]] in southern Auckland to Hamilton, starting in 2020.<ref>{{Cite news |url=https://www.pressreader.com/new-zealand/hamilton-news/20190531 |title=Tron Express launch date pushed back |date=31 May 2019 |newspaper=Hamilton News |page=4 |access-date=3 June 2019 |archive-date=3 June 2019 |archive-url=https://web.archive.org/web/20190603011804/https://www.pressreader.com/new-zealand/hamilton-news/20190531 |url-status=live }}</ref>
Advocacy group Greater Auckland proposed the Regional Rapid Rail initiative in 2017, including tilt trains with a maximum speed of 160&nbsp;km/h.<ref>{{cite web|url=https://www.nzherald.co.nz/rotorua-daily-post/news/article.cfm?c_id=1503438&objectid=11905926|title=High-speed Auckland to Rotorua rail link proposed|website=[[The New Zealand Herald]] |date=18 August 2017|access-date=5 August 2017|archive-date=17 August 2017|archive-url=https://web.archive.org/web/20170817193406/http://www.nzherald.co.nz/rotorua-daily-post/news/article.cfm?c_id=1503438&objectid=11905926|url-status=live}}</ref> This network would link [[Auckland]] with [[Hamilton, New Zealand|Hamilton]], [[Tauranga]] and [[Rotorua]]. In December 2018, the government of New Zealand committed funding to reintroducing a five-year trial rail service between [[Papakura]] in southern Auckland to Hamilton, starting in 2020.<ref>{{Cite news |url=https://www.pressreader.com/new-zealand/hamilton-news/20190531 |title=Tron Express launch date pushed back |date=31 May 2019 |newspaper=Hamilton News |page=4 |access-date=3 June 2019 |archive-date=3 June 2019 |archive-url=https://web.archive.org/web/20190603011804/https://www.pressreader.com/new-zealand/hamilton-news/20190531 |url-status=live }}</ref>


===Panama===
===Panama===
Line 694: Line 657:
===United States===
===United States===
This is a partial list of ongoing higher-speed rail projects from the [[East Coast of the United States|East Coast]] to the [[West Coast of the United States|West Coast]].
This is a partial list of ongoing higher-speed rail projects from the [[East Coast of the United States|East Coast]] to the [[West Coast of the United States|West Coast]].
{| class="wikitable sortable" style="font-size:95%;"
{| class="wikitable sortable" style="font-size:95%;"
|+
|+
! Corridor / Segment !! Length !! Top speed !! Avg speed !! Current status !! Note
! Corridor / Segment !! Length !! Top speed !! Avg speed !! Current status !! Note
|-
|-
| [[Boston]], MA – [[Springfield, Massachusetts|Springfield]], MA – [[Montreal|Montreal, QC]], Canada || {{cvt|408|mi|0}} || {{cvt|90|mph|round=5}} || {{cvt|55|mph|0}} || Feasibility study || A study of higher-speed rail options with top speeds of {{cvt|90|mph|round=5}} in 3 sections along the route.<ref name=NNEIRI>{{cite report|title=Preliminary Service Options Performance Report|url=http://www.massdot.state.ma.us/Portals/39/Docs/ServiceLeveland_April%2022_2014_small.pdf|website=Northern New England Intercity Rail Initiative|publisher=massDOT|pages=11|access-date=21 January 2015|date=April 2014|archive-date=21 January 2015|archive-url=https://web.archive.org/web/20150121084907/http://www.massdot.state.ma.us/Portals/39/Docs/ServiceLeveland_April%2022_2014_small.pdf|url-status=live}}</ref><ref>{{cite web|title=Public Meetings White River, VT & Springfield, MA January 22 and 23, 2014|url=http://www.massdot.state.ma.us/Portals/39/Docs/2014-01-24NNEIRIPresentationforWebsite.pdf|website=Northern New England Intercity Rail Initiative|publisher=massDOT|access-date=21 January 2015|archive-date=21 January 2015|archive-url=https://web.archive.org/web/20150121084047/http://www.massdot.state.ma.us/Portals/39/Docs/2014-01-24NNEIRIPresentationforWebsite.pdf|url-status=live}}</ref><ref>{{cite web|title=Stakeholder Meeting Pioneer Valley Planning Commission May 7, 2014|url=http://www.massdot.state.ma.us/Portals/39/Docs/2014_May%207_StakeholdePresentation_Final.pdf|website=Northern New England Intercity Rail Initiative|publisher=massDOT|access-date=21 January 2015|archive-date=21 January 2015|archive-url=https://web.archive.org/web/20150121084343/http://www.massdot.state.ma.us/Portals/39/Docs/2014_May%207_StakeholdePresentation_Final.pdf|url-status=live}}</ref>
| [[Boston]] – [[Springfield, Massachusetts]] – [[Montreal]], Canada || {{cvt|408|mi|0}} || {{cvt|90|mph|round=5}} || {{cvt|55|mph|0}} || Feasibility study || A study of higher-speed rail options with top speeds of {{cvt|90|mph|round=5}} in 3 sections along the route.<ref name=NNEIRI>{{cite report|title=Preliminary Service Options Performance Report|url=http://www.massdot.state.ma.us/Portals/39/Docs/ServiceLeveland_April%2022_2014_small.pdf|website=Northern New England Intercity Rail Initiative|publisher=massDOT|pages=11|access-date=21 January 2015|date=April 2014|archive-date=21 January 2015|archive-url=https://web.archive.org/web/20150121084907/http://www.massdot.state.ma.us/Portals/39/Docs/ServiceLeveland_April%2022_2014_small.pdf|url-status=live}}</ref><ref>{{cite web|title=Public Meetings White River, VT & Springfield, MA January 22 and 23, 2014|url=http://www.massdot.state.ma.us/Portals/39/Docs/2014-01-24NNEIRIPresentationforWebsite.pdf|website=Northern New England Intercity Rail Initiative|publisher=massDOT|access-date=21 January 2015|archive-date=21 January 2015|archive-url=https://web.archive.org/web/20150121084047/http://www.massdot.state.ma.us/Portals/39/Docs/2014-01-24NNEIRIPresentationforWebsite.pdf|url-status=live}}</ref><ref>{{cite web|title=Stakeholder Meeting Pioneer Valley Planning Commission May 7, 2014|url=http://www.massdot.state.ma.us/Portals/39/Docs/2014_May%207_StakeholdePresentation_Final.pdf|website=Northern New England Intercity Rail Initiative|publisher=massDOT|access-date=21 January 2015|archive-date=21 January 2015|archive-url=https://web.archive.org/web/20150121084343/http://www.massdot.state.ma.us/Portals/39/Docs/2014_May%207_StakeholdePresentation_Final.pdf|url-status=live}}</ref>
|-
|-
| New York City – [[Niagara Falls, New York|Niagara Falls]], NY || {{cvt|463|mi|0}} || {{cvt|125|mph|round=5}} || {{cvt|85|mph|0}} || [[Environmental impact statement#Tiering|Tier 1 EIS]] || Fully electrified track, and straightened Hudson River route. See{{NoteTag|name=note1|The study includes higher-speed rail alternatives with top speeds of {{cvt|90|mph|round=5|abbr=values}} (options A and B) and {{cvt|110|mph|round=5}}. It also has high-speed rail options with top speeds of {{cvt|125|mph|round=5|abbr=values}}, {{cvt|160|mph|round=5|abbr=values}} and {{cvt|220|mph|round=5}}. As of March 2012, the Tier 1 EIS has eliminated the high-speed rail options, except for the 125 mph option. The numbers on the table represent the 125 mph alternative. The other alternatives are for non-electrified track with average speeds of {{cvt|57|mph|0}} (for 90A option), {{cvt|61|mph|0|abbr=values}} (for 90B option), and {{cvt|63|mph|0|abbr=values}} (for 110 option).<ref>{{cite web|title=Online Briefing Winter 2011 2012 |url=https://www.dot.ny.gov/content/delivery/Main-Projects/S93751-Home/S93751--Repository/ECHSR_Online_Briefing_March_2012.pdf |work=High Speed Rail Empire Corridor Project |publisher=New York Department of Transportation |access-date=8 November 2012 |url-status=dead |archive-url=https://web.archive.org/web/20160304074513/https://www.dot.ny.gov/content/delivery/Main-Projects/S93751-Home/S93751--Repository/ECHSR_Online_Briefing_March_2012.pdf |archive-date=4 March 2016 }}</ref>}}
| New York City – [[Niagara Falls, New York]] || {{cvt|463|mi|0}} || {{cvt|125|mph|round=5}} || {{cvt|85|mph|0}} || [[Environmental impact statement#Tiering|Tier 1 EIS]] || Fully electrified track, and straightened Hudson River route. See{{NoteTag|name=note1|The study includes higher-speed rail alternatives with top speeds of {{cvt|90|mph|round=5|abbr=values}} (options A and B) and {{cvt|110|mph|round=5}}. It also has high-speed rail options with top speeds of {{cvt|125|mph|round=5|abbr=values}}, {{cvt|160|mph|round=5|abbr=values}} and {{cvt|220|mph|round=5}}. As of March 2012, the Tier 1 EIS has eliminated the high-speed rail options, except for the 125 mph option. The numbers on the table represent the 125 mph alternative. The other alternatives are for non-electrified track with average speeds of {{cvt|57|mph|0}} (for 90A option), {{cvt|61|mph|0|abbr=values}} (for 90B option), and {{cvt|63|mph|0|abbr=values}} (for 110 option).<ref>{{cite web|title=Online Briefing Winter 2011 - 2012 |url=https://www.dot.ny.gov/content/delivery/Main-Projects/S93751-Home/S93751--Repository/ECHSR_Online_Briefing_March_2012.pdf |work=High Speed Rail Empire Corridor Project |publisher=New York Department of Transportation |access-date=8 November 2012 |url-status=dead |archive-url=https://web.archive.org/web/20160304074513/https://www.dot.ny.gov/content/delivery/Main-Projects/S93751-Home/S93751--Repository/ECHSR_Online_Briefing_March_2012.pdf |archive-date=4 March 2016 }}</ref>}}
|-
|-
| Washington, DC – [[Richmond, Virginia|Richmond]], VA || {{cvt|115|mi|0}} || {{cvt|90|mph|round=5}} || || [[Environmental impact statement#Tiering|Tier 2 EIS]] || <ref name="va-nc">{{cite web|title=Virginia-North Carolina Interstate High-Speed Rail Compact: Lengthening and Strengthening the Northeast Corridor (NEC) – April 20, 2012 |url=http://www.letsgetmoving.org/images/uploads/pages/VA-NC-HSR-Compact-one-page-summary.pdf |publisher=Regional Transport Alliance |access-date=22 October 2012 |url-status=dead |archive-url=https://web.archive.org/web/20141020223728/http://www.letsgetmoving.org/images/uploads/pages/VA-NC-HSR-Compact-one-page-summary.pdf |archive-date=20 October 2014 }}</ref><ref>{{cite news|title=Public to Weigh in on D.C. to Richmond Higher Speed Passenger Rail|url=http://www.nbc29.com/story/26718018/public-to-weigh-in-on-dc-to-richmond-higher-speed-passenger-rail|access-date=15 October 2014|work=U.S. Department of Transportation Federal Railroad Administration Press Release|date=6 October 2014|archive-date=18 October 2014|archive-url=https://web.archive.org/web/20141018150703/http://www.nbc29.com/story/26718018/public-to-weigh-in-on-dc-to-richmond-higher-speed-passenger-rail|url-status=live}}</ref><ref name="frasoutheast">{{Cite report |author=Randy Brown |author2=Jason Orthner |date=4 August 2014 |title=2014 FRA Rail Program Delivery: Southeast Region |url=http://www.fra.dot.gov/Elib/Document/4104 |publisher=Federal Railroad Administration |access-date=16 January 2015 |archive-date=4 March 2016 |archive-url=https://web.archive.org/web/20160304092147/http://www.fra.dot.gov/Elib/Document/4104 |url-status=live }}</ref>
| Washington, DC – [[Richmond, Virginia]] || {{cvt|115|mi|0}} || {{cvt|90|mph|round=5}} || || [[Environmental impact statement#Tiering|Tier 2 EIS]] || <ref name="va-nc">{{cite web|title=Virginia-North Carolina Interstate High-Speed Rail Compact: Lengthening and Strengthening the Northeast Corridor (NEC) – April 20, 2012 |url=http://www.letsgetmoving.org/images/uploads/pages/VA-NC-HSR-Compact-one-page-summary.pdf |publisher=Regional Transport Alliance |access-date=22 October 2012 |url-status=dead |archive-url=https://web.archive.org/web/20141020223728/http://www.letsgetmoving.org/images/uploads/pages/VA-NC-HSR-Compact-one-page-summary.pdf |archive-date=20 October 2014 }}</ref><ref>{{cite news|title=Public to Weigh in on D.C. to Richmond Higher Speed Passenger Rail|url=http://www.nbc29.com/story/26718018/public-to-weigh-in-on-dc-to-richmond-higher-speed-passenger-rail|access-date=15 October 2014|work=U.S. Department of Transportation Federal Railroad Administration Press Release|date=6 October 2014|archive-date=18 October 2014|archive-url=https://web.archive.org/web/20141018150703/http://www.nbc29.com/story/26718018/public-to-weigh-in-on-dc-to-richmond-higher-speed-passenger-rail|url-status=live}}</ref><ref name="frasoutheast">{{Cite report |author=Randy Brown |author2=Jason Orthner |date=4 August 2014 |title=2014 FRA Rail Program Delivery: Southeast Region |url=http://www.fra.dot.gov/Elib/Document/4104 |publisher=Federal Railroad Administration |access-date=16 January 2015 |archive-date=4 March 2016 |archive-url=https://web.archive.org/web/20160304092147/http://www.fra.dot.gov/Elib/Document/4104 |url-status=dead }}</ref>
|-
|-
| Richmond – [[Newport News, Virginia|Newport News]], VA || || {{cvt|90|mph|round=5}} || || Tier 1 EIS || <ref name="frasoutheast"/>
| Richmond – [[Newport News, Virginia]] || || {{cvt|90|mph|round=5}} || || Tier 1 EIS || <ref name="frasoutheast"/>
|-
|-
| Richmond – [[Norfolk, Virginia|Norfolk]], VA || || {{cvt|110|mph|round=5}} || || Tier 1 EIS || <ref name="frasoutheast"/>
| Richmond – [[Norfolk, Virginia]] || || {{cvt|110|mph|round=5}} || || Tier 1 EIS || <ref name="frasoutheast"/>
|-
|-
| Richmond, VA – [[Raleigh, North Carolina|Raleigh]], NC || {{cvt|160|mi|0}} || {{cvt|110|mph|round=5}} || {{cvt|87|mph|0}} || Tier 2 EIS || Top speeds from Richmond, VA, to south of [[Petersburg, Virginia|Petersburg]], VA, will be {{cvt|90|mph|round=5}} and changed to {{cvt|110|mph|round=5}} after that.<ref>{{Cite report|title=Recommendation Report: Southeast High Speed Rail Richmond, VA to Raleigh, NC, Tier II Environmental Impact Statement |url=http://www.sehsr.org/pdf/Report.pdf |publisher=DRPT and NCDOT |page=10 |access-date=19 May 2014 |url-status=dead |archive-url=https://web.archive.org/web/20131018150716/http://sehsr.org/pdf/Report.pdf |archive-date=18 October 2013 }}</ref>
| Richmond, VA – [[Raleigh, North Carolina]] || {{cvt|160|mi|0}} || {{cvt|110|mph|round=5}} || {{cvt|87|mph|0}} || Tier 2 EIS || Top speeds from Richmond, VA, to south of [[Petersburg, Virginia]], will be {{cvt|90|mph|round=5}} and changed to {{cvt|110|mph|round=5}} after that.<ref>{{Cite report|title=Recommendation Report: Southeast High Speed Rail Richmond, VA to Raleigh, NC, Tier II Environmental Impact Statement |url=http://www.sehsr.org/pdf/Report.pdf |publisher=DRPT and NCDOT |page=10 |access-date=19 May 2014 |url-status=dead |archive-url=https://web.archive.org/web/20131018150716/http://sehsr.org/pdf/Report.pdf |archive-date=18 October 2013 }}</ref>
|-
|-
| Raleigh – [[Charlotte, North Carolina|Charlotte]], NC || {{cvt|180|mi|0}} || {{cvt|90|mph|round=5}} || || Construction || <ref name="frasoutheast"/>
| Raleigh – [[Charlotte, North Carolina]] || {{cvt|180|mi|0}} || {{cvt|90|mph|round=5}} || || Construction || <ref name="frasoutheast"/>
|-
|-
| Charlotte, NC – [[Atlanta]], GA || {{cvt|245|mi|0}} || {{cvt|110|mph|round=5}} || || Tier 1 EIS || A {{cvt|110|mph|round=5}} option is considered along with {{cvt|150|mph|round=5|adj=on}} high-speed rail.<ref name="frasoutheast"/>
| Charlotte, NC – [[Atlanta]] || {{cvt|245|mi|0}} || {{cvt|110|mph|round=5}} || || Tier 1 EIS || A {{cvt|110|mph|round=5}} option is considered along with {{cvt|150|mph|round=5|adj=on}} high-speed rail.<ref name="frasoutheast"/>
|-
|-
| Atlanta, GA – [[Macon, Georgia|Macon]], GA – [[Jacksonville, Florida|Jacksonville]], FL || {{cvt|408| / |368|mi|0}} || {{cvt|90–100| / |130|mph|round=5}} || {{cvt|77| / |94|mph|0}} || Tier 1 EIS || See{{NoteTag|name=note2|The study includes two main alternatives for higher-speed rail. The first alternative is called Shared Use with top speeds of {{cvt|90–110|mph|round=5}}. The second alternative is called Hybrid High Performance with top speeds of {{cvt|130|mph|round=5}} (however it would be classified as high-speed rail). There are also high-speed rail alternatives in the same study with top speeds of {{cvt|180–220|mph||disp=preunit|+|round=5}}. The numbers on the table represent the first two alternatives.<ref>{{cite web|title=Executive Summary: Atlanta Birmingham Corridor|url=http://www.dot.ga.gov/travelingingeorgia/rail/Documents/HighSpeedRail/Executive%20Summaries.pdf|work=Tier 1 EIS|publisher=Georgia Department of Transportation|access-date=8 November 2012|archive-url=https://web.archive.org/web/20141118050336/http://www.dot.ga.gov/travelingingeorgia/rail/Documents/HighSpeedRail/Executive%20Summaries.pdf|archive-date=18 November 2014}}</ref> Federal Railroad Administration signed the Final EIS and Record of Decision in September 2017 to formally complete the Tier 1 EIS process for Atlanta to Chattanooga route.<ref>{{cite book|title=Tier 1 Combined Final Environmental Impact Statement and Record of Decision (Tier 1 FEIS/ROD)|date=12 September 2017|publisher=Federal Railroad Administration|url=https://www.fra.dot.gov/Elib/Document/17445|access-date=17 October 2017}}{{Dead link|date=July 2022 |bot=InternetArchiveBot |fix-attempted=yes }}</ref>}}
| Atlanta – [[Macon, Georgia]] – [[Jacksonville, Florida]] || {{cvt|408| / |368|mi|0}} || {{cvt|90–100| / |130|mph|round=5}} || {{cvt|77| / |94|mph|0}} || Tier 1 EIS || See{{NoteTag|name=note2|The study includes two main alternatives for higher-speed rail. The first alternative is called Shared Use with top speeds of {{cvt|90–110|mph|round=5}}. The second alternative is called Hybrid High Performance with top speeds of {{cvt|130|mph|round=5}} (however it would be classified as high-speed rail). There are also high-speed rail alternatives in the same study with top speeds of {{cvt|180–220|mph||disp=preunit|+|round=5}}. The numbers on the table represent the first two alternatives.<ref>{{cite web|title=Executive Summary: Atlanta Birmingham Corridor|url=http://www.dot.ga.gov/travelingingeorgia/rail/Documents/HighSpeedRail/Executive%20Summaries.pdf|work=Tier 1 EIS|publisher=Georgia Department of Transportation|access-date=8 November 2012|archive-url=https://web.archive.org/web/20141118050336/http://www.dot.ga.gov/travelingingeorgia/rail/Documents/HighSpeedRail/Executive%20Summaries.pdf|archive-date=18 November 2014}}</ref> Federal Railroad Administration signed the Final EIS and Record of Decision in September 2017 to formally complete the Tier 1 EIS process for Atlanta to Chattanooga route.<ref>{{cite book|title=Tier 1 Combined Final Environmental Impact Statement and Record of Decision (Tier 1 FEIS/ROD)|date=12 September 2017|publisher=Federal Railroad Administration|url=https://www.fra.dot.gov/Elib/Document/17445|access-date=17 October 2017}}{{dead link|date=July 2025|bot=medic}}{{cbignore|bot=medic}}</ref>}}
|-
|-
| Atlanta, GA – [[Chattanooga, Tennessee|Chattanooga]] / [[Nashville, Tennessee|Nashville]], TN – [[Louisville, Kentucky|Louisville]], KY || {{cvt|489| / |428|mi|0}} || {{cvt|90–100| / |130|mph|round=5}} || {{cvt|72| / |85|mph|0}} || Tier 1 EIS completed || See{{NoteTag|name=note2}}
| Atlanta – [[Chattanooga, Tennessee]] / [[Nashville, Tennessee]] – [[Louisville, Kentucky]] || {{cvt|489| / |428|mi|0}} || {{cvt|90–100| / |130|mph|round=5}} || {{cvt|72| / |85|mph|0}} || Tier 1 EIS completed || See{{NoteTag|name=note2}}
|-
|-
| Atlanta, GA – [[Birmingham, Alabama|Birmingham]], AL || {{cvt|176| / |150|mi|0}} || {{cvt|90–100| / |130|mph|round=5}} || {{cvt|64| / |90|mph|0}} || Tier 1 EIS || See{{NoteTag|name=note2}}
| Atlanta – [[Birmingham, Alabama]] || {{cvt|176| / |150|mi|0}} || {{cvt|90–100| / |130|mph|round=5}} || {{cvt|64| / |90|mph|0}} || Tier 1 EIS || See{{NoteTag|name=note2}}
|-
|-
| Atlanta, GA – [[Columbus, Georgia|Columbus]], GA || {{cvt|116|mi|0}} || {{cvt|79–110|mph|round=5}} || {{cvt|60|mph|0}} || Feasibility Study || Higher-speed rail was one of the 3 alternatives in the feasibility study completed in 2014. Funding is not yet available to begin Tier 1 EIS phase.<ref>{{cite book|title=Columbus to Atlanta High Speed Rail Feasibility Study – Final Report|date=February 2014|publisher=Columbus Consolidated Government|url=http://www.columbusga.org/planning/HS-Rail/CHSR_Report_Final.pdf|access-date=17 December 2016|archive-date=3 July 2014|archive-url=https://web.archive.org/web/20140703092748/http://columbusga.org/planning/hs-rail/CHSR_Report_Final.pdf|url-status=live}}</ref>
| Atlanta – [[Columbus, Georgia]] || {{cvt|116|mi|0}} || {{cvt|79–110|mph|round=5}} || {{cvt|60|mph|0}} || Feasibility Study || Higher-speed rail was one of the 3 alternatives in the feasibility study completed in 2014. Funding is not yet available to begin Tier 1 EIS phase.<ref>{{cite book|title=Columbus to Atlanta High Speed Rail Feasibility Study – Final Report|date=February 2014|publisher=Columbus Consolidated Government|url=http://www.columbusga.org/planning/HS-Rail/CHSR_Report_Final.pdf|access-date=17 December 2016|archive-date=3 July 2014|archive-url=https://web.archive.org/web/20140703092748/http://columbusga.org/planning/hs-rail/CHSR_Report_Final.pdf|url-status=live}}</ref>
|-
|-
| [[Miami]] – [[Orlando, Florida|Orlando]], FL || {{cvt|230|mi|0}} || {{cvt|125|mph|round=5}} || {{cvt|80|mph|0}} || Testing<ref>{{cite news |title=Brightline to Begin Testing at 110 MPH through Martin and St. Lucie Counties |url=https://www.bocaratontribune.com/bocaratonnews/2022/10/brightline-to-begin-testing-at-110-mph-through-martin-and-st-lucie-counties/ |access-date=28 October 2022 |agency=Boca Raton Tribune |date=5 October 2022}}</ref> || [[Brightline]] is a [[Florida]]-based company building a higher-speed rail line that opened service between [[MiamiCentral|Miami]] and [[West Palm Beach station (Brightline)|West Palm Beach]] in 2018, with speeds up to {{cvt|79|mph|round=5}}. Service will eventually be extended to [[Orlando International Airport Intermodal Terminal|Orlando]] in 2023, with speeds up to {{cvt|125|mph|round=5}}, where it will be classified as a high-speed rail service. It is the first inter-city rail not handled by Amtrak in the contiguous U.S. since 1983 when the [[Denver and Rio Grande Western Railroad]] discontinued its [[Rio Grande Zephyr]].<ref>{{cite news|title=Mica Sets High-Speed Approval for Miami-Orlando Private Rail Service|url=http://mica.house.gov/index.cfm?sectionid=25&itemid=1199|archive-url=https://archive.today/20121213071908/http://mica.house.gov/index.cfm?sectionid=25&itemid=1199|url-status=dead|archive-date=13 December 2012|access-date=22 October 2012|newspaper=U.S. Rep. John L. Mica Press Release|date=18 June 2012}}</ref><ref>{{cite news|last1=Turnbell|first1=Michael|title=Demolition begins for All Aboard Florida's new station|url=http://www.sun-sentinel.com/local/broward/fl-all-aboard-lauderdale-demo-20141029-story.html|access-date=11 January 2015|work=Sun Sentinel|archive-date=31 December 2014|archive-url=https://web.archive.org/web/20141231201617/http://www.sun-sentinel.com/local/broward/fl-all-aboard-lauderdale-demo-20141029-story.html|url-status=live}}</ref>
| [[Columbus, Ohio]] – [[Fort Wayne, Indiana]] – Chicago|| {{cvt|300|mi|0}} || {{cvt|110|mph|round=5}} || || Feasibility Study || Initial operating speeds up to {{cvt|110|mph|round=5}}.<ref>{{cite news|last=Barrow|first=Keith|title=Columbus – Chicago passenger rail study published|url=http://www.railjournal.com/index.php/north-america/columbus-%E2%80%93-chicago-passenger-rail-study-published.html|access-date=20 July 2013|newspaper=International Railway Journal|date=18 July 2013|archive-date=7 December 2013|archive-url=https://web.archive.org/web/20131207050244/http://www.railjournal.com/index.php/north-america/columbus-%E2%80%93-chicago-passenger-rail-study-published.html|url-status=live}}</ref> Study funded by local governments and organizations, not by state governments.<ref>{{cite news|last=LeDuc |first=Doug |title=Support for passenger rail study gains steam |url=http://www.fwdailynews.com/news/latest/support-for-passenger-rail-study-gains-steam/article_0dd859a0-4533-5e60-a737-577a91d3e04a.html |archive-url=https://archive.today/20130720024612/http://www.fwdailynews.com/news/latest/support-for-passenger-rail-study-gains-steam/article_0dd859a0-4533-5e60-a737-577a91d3e04a.html |url-status=dead |archive-date=20 July 2013 |access-date=20 July 2013 |newspaper=FW Daily News |date=9 March 2012 }}</ref>
|-
|-
| [[Columbus, Ohio|Columbus]], OH – [[Fort Wayne, Indiana|Fort Wayne]], Indiana – Chicago, IL|| {{cvt|300|mi|0}} || {{cvt|110|mph|round=5}} || || Feasibility Study || Initial operating speeds up to {{cvt|110|mph|round=5}}.<ref>{{cite news|last=Barrow|first=Keith|title=Columbus – Chicago passenger rail study published|url=http://www.railjournal.com/index.php/north-america/columbus-%E2%80%93-chicago-passenger-rail-study-published.html|access-date=20 July 2013|newspaper=International Railway Journal|date=18 July 2013|archive-date=7 December 2013|archive-url=https://web.archive.org/web/20131207050244/http://www.railjournal.com/index.php/north-america/columbus-%E2%80%93-chicago-passenger-rail-study-published.html|url-status=live}}</ref> Study funded by local governments and organizations, not by state governments.<ref>{{cite news|last=LeDuc |first=Doug |title=Support for passenger rail study gains steam |url=http://www.fwdailynews.com/news/latest/support-for-passenger-rail-study-gains-steam/article_0dd859a0-4533-5e60-a737-577a91d3e04a.html |archive-url=https://archive.today/20130720024612/http://www.fwdailynews.com/news/latest/support-for-passenger-rail-study-gains-steam/article_0dd859a0-4533-5e60-a737-577a91d3e04a.html |url-status=dead |archive-date=20 July 2013 |access-date=20 July 2013 |newspaper=FW Daily News |date=9 March 2012 }}</ref>
| [[Ann Arbor, Michigan]] – [[Traverse City, Michigan]]|| {{cvt|250|mi|0}} || {{cvt|90–110|mph|round=5}} || || Feasibility Study || Three alternatives with 2 higher-speed rail alternatives at top speeds of {{cvt|90|mph|round=5}} and {{cvt|110|mph|round=5}}<ref>{{cite news|last1=Dawsey|first1=Chastity Pratt|title=Plans on track for passenger train from Ann Arbor to Traverse City, group says|url=https://www.bridgemi.com/quality-life/plans-track-passenger-train-ann-arbor-traverse-city-group-says|access-date=21 April 2018|work=Bridge|date=17 April 2018|archive-date=21 April 2018|archive-url=https://web.archive.org/web/20180421163139/https://www.bridgemi.com/quality-life/plans-track-passenger-train-ann-arbor-traverse-city-group-says|url-status=live}}</ref>
|-
|-
| [[Ann Arbor, Michigan|Ann Arbor]], MI – [[Traverse City, Michigan|Traverse City]], MI|| {{cvt|250|mi|0}} || {{cvt|90–110|mph|round=5}} || || Feasibility Study || Three alternatives with 2 higher-speed rail alternatives at top speeds of {{cvt|90|mph|round=5}} and {{cvt|110|mph|round=5}}<ref>{{cite news|last1=Dawsey|first1=Chastity Pratt|title=Plans on track for passenger train from Ann Arbor to Traverse City, group says|url=https://www.bridgemi.com/quality-life/plans-track-passenger-train-ann-arbor-traverse-city-group-says|access-date=21 April 2018|work=Bridge|date=17 April 2018|archive-date=21 April 2018|archive-url=https://web.archive.org/web/20180421163139/https://www.bridgemi.com/quality-life/plans-track-passenger-train-ann-arbor-traverse-city-group-says|url-status=live}}</ref>
| [[Kalamazoo, Michigan]] – [[Albion, Michigan]] || {{cvt|45|mi|0}} || {{cvt|110|mph|round=5}} || || Operation starts 25 May 2021 || <ref>{{cite news |title=Amtrak Midwest trains get green light to increase max speed on Michigan route |url=https://www.progressiverailroading.com/amtrak/news/Amtrak-Midwest-trains-get-green-light-to-increase-max-speed-on-Michigan-route--63505 |access-date=19 May 2021 |agency=Progressive Railroading |date=18 May 2021 |archive-date=18 May 2021 |archive-url=https://web.archive.org/web/20210518155416/https://www.progressiverailroading.com/amtrak/news/Amtrak-Midwest-trains-get-green-light-to-increase-max-speed-on-Michigan-route--63505 |url-status=live }}</ref>
|-
|-
| [[Kalamazoo, Michigan|Kalamazoo]], MI – [[Albion, Michigan|Albion]], MI || {{cvt|45|mi|0}} || {{cvt|110|mph|round=5}} || || Operation starts May 25, 2021 || <ref>{{cite news |title=Amtrak Midwest trains get green light to increase max speed on Michigan route |url=https://www.progressiverailroading.com/amtrak/news/Amtrak-Midwest-trains-get-green-light-to-increase-max-speed-on-Michigan-route--63505 |access-date=19 May 2021 |agency=Progressive Railroading |date=18 May 2021 |archive-date=18 May 2021 |archive-url=https://web.archive.org/web/20210518155416/https://www.progressiverailroading.com/amtrak/news/Amtrak-Midwest-trains-get-green-light-to-increase-max-speed-on-Michigan-route--63505 |url-status=live }}</ref>
| Chicago – [[Milwaukee]] || {{cvt|86|mi|0}} || {{cvt|90|mph|round=5}} || {{cvt|59|mph|0}} || Environmental Assessment || The top speeds of {{cvt|90|mph|round=5}} is one of the alternatives under consideration.<ref>{{cite web|title=Chicago-Milwaukee Environmental Assessment & Service Development Plan: Agency Stakeholder Meeting |url=http://www.dot.wisconsin.gov/projects/rail/docs/chi-mil-12-2-14.pdf |website=Wisconsin Department of Transportation |access-date=19 January 2015 |date=2 December 2014 |url-status=dead |archive-url=https://web.archive.org/web/20150119044455/http://www.dot.wisconsin.gov/projects/rail/docs/chi-mil-12-2-14.pdf |archive-date=19 January 2015 }}</ref>
|-
|-
| Chicago, IL – [[Milwaukee]], WI || {{cvt|86|mi|0}} || {{cvt|90|mph|round=5}} || {{cvt|59|mph|0}} || Environmental Assessment || The top speeds of {{cvt|90|mph|round=5}} is one of the alternatives under consideration.<ref>{{cite web|title=Chicago-Milwaukee Environmental Assessment & Service Development Plan: Agency Stakeholder Meeting |url=http://www.dot.wisconsin.gov/projects/rail/docs/chi-mil-12-2-14.pdf |website=Wisconsin Department of Transportation |access-date=19 January 2015 |date=2 December 2014 |url-status=dead |archive-url=https://web.archive.org/web/20150119044455/http://www.dot.wisconsin.gov/projects/rail/docs/chi-mil-12-2-14.pdf |archive-date=19 January 2015 }}</ref>
| Chicago – [[Omaha, Nebraska]] (via [[Iowa]]) || {{cvt|474–516|mi|0}} || {{cvt|110|mph|round=5}} || || Tier 1 EIS ||<ref name="IowaEIS"/><ref name="IowaPatch"/>
|-
|-
| Chicago, IL – [[Omaha, Nebraska|Omaha]], NE (via [[Iowa]]) || {{cvt|474–516|mi|0}} || {{cvt|110|mph|round=5}} || || Tier 1 EIS ||<ref name="IowaEIS"/><ref name="IowaPatch"/>
| [[Minneapolis]] [[Duluth, Minnesota]] || {{cvt|152|mi|0}} || {{cvt|90|mph|round=5}} || || Environmental Assessment completed || Known as [[Northern Lights Express]], received [[Finding Of No Significant Impact]] on Tier 2 Environmental Assessment in February 2018, and cleared to seek federal funding for design and construction.<ref>{{cite book|title=Northern Lights Express Passenger Rail Project from Minneapolis to Duluth, Minnesota Finding of No Significant Impact and Section 4(f) Determination|date=20 February 2018|publisher=Federal Railroad Administration|url=https://www.fra.dot.gov/Elib/Document/17846|access-date=13 March 2018}}{{dead link|date=July 2025|bot=medic}}{{cbignore|bot=medic}}</ref>
|-
|-
| [[Minneapolis]] – [[Duluth, Minnesota|Duluth]], MN || {{cvt|152|mi|0}} || {{cvt|90|mph|round=5}} || || Environmental Assessment completed || Known as [[Northern Lights Express]], received [[Finding Of No Significant Impact]] on Tier 2 Environmental Assessment in February 2018, and cleared to seek federal funding for design and construction.<ref>{{cite book|title=Northern Lights Express Passenger Rail Project from Minneapolis to Duluth, Minnesota Finding of No Significant Impact and Section 4(f) Determination|date=20 February 2018|publisher=Federal Railroad Administration|url=https://www.fra.dot.gov/Elib/Document/17846|access-date=13 March 2018}}{{Dead link|date=May 2023 |bot=InternetArchiveBot |fix-attempted=yes }}</ref>
| St. Louis – [[Kansas City, Missouri]] || {{cvt|283|mi|0}}<ref>{{cite web|title=March 2011 Narrative Application Form – Individual PE/NEPA, Part I: MO-KC to STL Corridor-Pleasant Hill to Jefferson City (90 mph) PE/NEPA|url=http://www.modot.org/othertransportation/rail/documents/12PHtoJC.pdf|publisher=Missouri Department of Transportation|access-date=13 February 2013|archive-date=9 November 2012|archive-url=https://web.archive.org/web/20121109091022/http://modot.org/othertransportation/rail/documents/12PHtoJC.pdf|url-status=live}}</ref> || {{cvt|90|mph|round=5}} || || Construction || New sidings between [[Jefferson City, Missouri|Jefferson City]] and [[Lee's Summit, Missouri|Lee's Summit]] for {{cvt|90|mph|round=5}} service<ref>{{cite web|title=Show Me Improved Rail Service|url=http://www.modot.org/othertransportation/rail/documents/Application%20Summary%20for%20FRA%20HSIPR%20FY%202011%20Projects.pdf|publisher=Missouri Department of Transportation|access-date=13 February 2013|date=April 2011|archive-date=9 November 2012|archive-url=https://web.archive.org/web/20121109091218/http://modot.org/othertransportation/rail/documents/Application%20Summary%20for%20FRA%20HSIPR%20FY%202011%20Projects.pdf|url-status=live}}</ref>
|-
|-
| St. Louis, MO – [[Kansas City, Missouri|Kansas City]], MO || {{cvt|283|mi|0}}<ref>{{cite web|title=March 2011 Narrative Application Form – Individual PE/NEPA, Part I: MO-KC to STL Corridor-Pleasant Hill to Jefferson City (90 mph) PE/NEPA|url=http://www.modot.org/othertransportation/rail/documents/12PHtoJC.pdf|publisher=Missouri Department of Transportation|access-date=13 February 2013|archive-date=9 November 2012|archive-url=https://web.archive.org/web/20121109091022/http://modot.org/othertransportation/rail/documents/12PHtoJC.pdf|url-status=live}}</ref> || {{cvt|90|mph|round=5}} || || Construction || New sidings between [[Jefferson City, Missouri|Jefferson City]] and [[Lee's Summit, Missouri|Lee's Summit]] for {{cvt|90|mph|round=5}} service<ref>{{cite web|title=Show Me Improved Rail Service|url=http://www.modot.org/othertransportation/rail/documents/Application%20Summary%20for%20FRA%20HSIPR%20FY%202011%20Projects.pdf|publisher=Missouri Department of Transportation|access-date=13 February 2013|date=April 2011|archive-date=9 November 2012|archive-url=https://web.archive.org/web/20121109091218/http://modot.org/othertransportation/rail/documents/Application%20Summary%20for%20FRA%20HSIPR%20FY%202011%20Projects.pdf|url-status=live}}</ref>
| [[Oklahoma City]] – [[San Antonio]]|| {{cvt|850|mi|0}} || {{cvt|110|mph|round=5}} || || Feasibility Study || See{{NoteTag|name=note3|The study includes higher-speed rail up to {{cvt|110|mph|round=5}} and high-speed rail of {{cvt|150|mph||disp=preunit|+|round=5}} options.<ref name=nctcog>{{cite web|title=Coordination with TxDOT on Two Federally-Funded High Speed Rail Corridor Studies (July 22, 2011) |url=http://www.nctcog.org/trans/committees/sttc/Item_6.sttc072211.pdf |publisher=North Central Texas Council of Governments |access-date=24 October 2012 |url-status=dead |archive-url=https://web.archive.org/web/20130331130101/http://www.nctcog.org/trans/committees/sttc/Item_6.sttc072211.pdf |archive-date=31 March 2013 }}</ref>}}
|-
|-
| [[Oklahoma City]], OK – [[San Antonio]], TX || {{cvt|850|mi|0}} || {{cvt|110|mph|round=5}} || || Feasibility Study || See{{NoteTag|name=note3|The study includes higher-speed rail up to {{cvt|110|mph|round=5}} and high-speed rail of {{cvt|150|mph||disp=preunit|+|round=5}} options.<ref name=nctcog>{{cite web|title=Coordination with TxDOT on Two Federally-Funded High Speed Rail Corridor Studies (July 22, 2011) |url=http://www.nctcog.org/trans/committees/sttc/Item_6.sttc072211.pdf |publisher=North Central Texas Council of Governments |access-date=24 October 2012 |url-status=dead |archive-url=https://web.archive.org/web/20130331130101/http://www.nctcog.org/trans/committees/sttc/Item_6.sttc072211.pdf |archive-date=31 March 2013 }}</ref>}}
| [[Dallas–Fort Worth metroplex|Dallas/Fort Worth]] – [[Houston]]|| {{cvt|239|mi|0}} || {{cvt|110|mph|round=5}} || || Feasibility Study || See{{NoteTag|name=note3}}
|-
|-
| [[Dallas–Fort Worth metroplex|Dallas/Fort Worth]] – [[Houston]], TX || {{cvt|239|mi|0}} || {{cvt|110|mph|round=5}} || || Feasibility Study || See{{NoteTag|name=note3}}
| [[Phoenix, Arizona|Phoenix]] – [[Tucson, Arizona]]|| {{cvt|120|mi|0}} || {{cvt|125|mph|round=5}} || {{cvt|66|mph|0}} || Tier 1 EIS completed|| Three alternatives finalized by Arizona Department of Transportation.<ref>{{cite web|title=Final Alternatives 2013|url=http://www.azdot.gov/docs/default-source/planning/final-alternatives-2013.pdf?sfvrsn=0|publisher=Arizona Department of Transportation|access-date=19 May 2014|archive-date=19 May 2014|archive-url=https://web.archive.org/web/20140519192216/http://www.azdot.gov/docs/default-source/planning/final-alternatives-2013.pdf?sfvrsn=0|url-status=live}}</ref> The Yellow Corridor Alternative was selected as the preferred alternative at the completion of Tier 1 EIS.<ref>{{cite book|title=Arizona Passenger Rail Corridor Study – Tucson to Phoenix: Record of Decision|date=1 December 2016|publisher=Arizona Department of Transportation|access-date=17 October 2017|url=https://www.fra.dot.gov/Elib/Document/16858|archive-date=15 May 2017|archive-url=https://web.archive.org/web/20170515014439/https://www.fra.dot.gov/Elib/Document/16858|url-status=dead}}</ref>
|-
| [[Phoenix, Arizona|Phoenix]] – [[Tucson]], AZ || {{cvt|120|mi|0}} || {{cvt|125|mph|round=5}} || {{cvt|66|mph|0}} || Tier 1 EIS completed|| Three alternatives finalized by Arizona Department of Transportation.<ref>{{cite web|title=Final Alternatives 2013|url=http://www.azdot.gov/docs/default-source/planning/final-alternatives-2013.pdf?sfvrsn=0|publisher=Arizona Department of Transportation|access-date=19 May 2014|archive-date=19 May 2014|archive-url=https://web.archive.org/web/20140519192216/http://www.azdot.gov/docs/default-source/planning/final-alternatives-2013.pdf?sfvrsn=0|url-status=live}}</ref> The Yellow Corridor Alternative was selected as the preferred alternative at the completion of Tier 1 EIS.<ref>{{cite book|title=Arizona Passenger Rail Corridor Study – Tucson to Phoenix: Record of Decision|date=1 December 2016|publisher=Arizona Department of Transportation|access-date=17 October 2017|url=https://www.fra.dot.gov/Elib/Document/16858|archive-date=15 May 2017|archive-url=https://web.archive.org/web/20170515014439/https://www.fra.dot.gov/Elib/Document/16858|url-status=live}}</ref>
|-
|-
| colspan="6" | '''Notes'''<br>{{NoteFoot}}
| colspan="6" | '''Notes'''<br>{{NoteFoot}}
Line 754: Line 716:
In Michigan, a feasibility study sponsored by an environmental group is in progress for a new rail line between [[Detroit]] and [[Grand Rapids]]. The proposal is to have trains running at speeds between {{convert|79|and|110|mph|abbr=on}}. The state transportation department is interested in the study but is not ready to move beyond this study.<ref>{{cite news|last1=Fleming|first1=Leonard N.|title=Grand Rapids, Detroit train idea taking shape|url=http://www.detroitnews.com/story/news/local/michigan/2015/07/20/detroit-gr-train-proposal/30448267/|access-date=10 August 2015|work=The Detroit News|date=21 July 2015|archive-date=16 August 2015|archive-url=https://web.archive.org/web/20150816104004/http://www.detroitnews.com/story/news/local/michigan/2015/07/20/detroit-gr-train-proposal/30448267/|url-status=live}}</ref>
In Michigan, a feasibility study sponsored by an environmental group is in progress for a new rail line between [[Detroit]] and [[Grand Rapids]]. The proposal is to have trains running at speeds between {{convert|79|and|110|mph|abbr=on}}. The state transportation department is interested in the study but is not ready to move beyond this study.<ref>{{cite news|last1=Fleming|first1=Leonard N.|title=Grand Rapids, Detroit train idea taking shape|url=http://www.detroitnews.com/story/news/local/michigan/2015/07/20/detroit-gr-train-proposal/30448267/|access-date=10 August 2015|work=The Detroit News|date=21 July 2015|archive-date=16 August 2015|archive-url=https://web.archive.org/web/20150816104004/http://www.detroitnews.com/story/news/local/michigan/2015/07/20/detroit-gr-train-proposal/30448267/|url-status=live}}</ref>


In Texas, the East Texas Corridor Council proposed a higher-speed rail route between [[Longview, Texas|Longview]] and [[Dallas]]. The trains will operate at speeds of {{Convert|80|mph|abbr=on}} and {{cvt|110|mph|round=5}}.<ref>{{cite news|last=Jones|first=Peggy|title=A bullet train in East Texas? Company plans to build Dallas-Houston route|url=http://www.news-journal.com/news/local/a-bullet-train-in-east-texas-company-plans-to-build/article_3d2e4393-680a-5c4b-a091-280abd7ad51d.html|access-date=24 October 2012|newspaper=News Journal, Longview, Texas}}</ref>
In Texas, the East Texas Corridor Council proposed a higher-speed rail route between [[Longview, Texas|Longview]] and [[Dallas]]. The trains will operate at speeds of {{Convert|80|mph|abbr=on}} and {{cvt|110|mph|round=5}}.<ref>{{cite news|last=Jones|first=Peggy|title=A bullet train in East Texas? Company plans to build Dallas-Houston route|url=http://www.news-journal.com/news/local/a-bullet-train-in-east-texas-company-plans-to-build/article_3d2e4393-680a-5c4b-a091-280abd7ad51d.html|archive-url=https://archive.today/20130129194543/http://www.news-journal.com/news/local/a-bullet-train-in-east-texas-company-plans-to-build/article_3d2e4393-680a-5c4b-a091-280abd7ad51d.html|url-status=dead|archive-date=29 January 2013|access-date=24 October 2012|newspaper=News Journal, Longview, Texas}}</ref>


===Vietnam===
===Vietnam===
Line 762: Line 724:
{{Portal|Transport|Rail}}
{{Portal|Transport|Rail}}
* [[High-speed rail]]
* [[High-speed rail]]
==Notes==
{{Notelist}}


==References==
==References==

Latest revision as of 04:28, 5 March 2026


Higher-speed rail (HrSR)[lower-alpha 1] is used to describe inter-city passenger rail services that have top speeds higher than conventional rail but not fast enough to be called high-speed rail services.[4][5] The term is also used by planners to identify the incremental rail improvements to increase train speeds and reduce travel time as alternatives to larger efforts to create or expand the high-speed rail networks.[6]

Though the definition of higher-speed rail varies from country to country, most countries use the term to refer to rail services operating at speeds of up to 200 km/h (125 mph).[7]

The concept is usually viewed as stemming from efforts to upgrade a legacy railway line to high speed railway standards (speeds in excess of 250 km/h or 155 mph), but usually falling short on the intended speeds. The faster speeds are achieved through various means including new rolling stock such as tilting trains, upgrades to tracks including shallower curves, electrification, in-cab signalling, and less frequent halts/stops.[8]

Definitions by country[edit | edit source]

As with the definitions of high-speed rail, the definition varies by country. The term has been used by government agencies,[9] government officials,[10] transportation planners,[11] academia,[12] the rail industry,[13] and the media,[14] but sometimes with overlaps in the speed definitions. Some countries with an established definition of higher-speed rail include:

  • In Canada, according to the Surface Transportation Policy, Department of Transport, the speed range for higher-speed rail is between 160 and 240 km/h (100 and 150 mph).[5]
  • In India, according to the Ministry of Railways, the speed range for India's higher-speed rail will be between 160 and 200 km/h (100 and 125 mph).[7]
  • In the United Kingdom, the term higher-speed rail is used for upgraded tracks with train speeds up to 125 mph (200 km/h)[15]
  • In the United States, the term "higher-speed rail", as opposed to "high-speed rail", is used by regional planners in many U.S. states to describe inter-city passenger rail services with top speeds of between 90 mph (145 km/h)[16] and 110 mph (175 km/h).[17][18][19] This is the equivalent of the definition of "Emerging High-Speed Rail" as defined by the Federal Railroad Administration.[20] The Congressional Research Service defines rail services on dedicated tracks with speeds over 150 mph (240 km/h) as "Very High Speed Rail".[21]Template:ParagraphState-level departments of transportation and council of governments may use different definitions. Below is the list of known definitions of higher-speed rail which use some of the 5 speed levels, 80 mph (130 km/h), 90 mph (145 km/h), 110 mph (175 km/h), 125 mph (200 km/h) and 150 mph (240 km/h):
Agency / Council Top speeds (mph) Ref
California Department of Transportation Up to 125 [22]
Minnesota Department of Transportation Greater than 90 but less than 125 [23]
North Central Texas Council of Governments 80–150 [11]
Oklahoma Department of Transportation 110–125 [24]
Texas Department of Transportation 110–125 [24]
Virginia Department of Rail and Public Transportation Up to 110 [19]

Speed limits[edit | edit source]

In Canada, the assumption about grade crossing is that operating higher-speed rail services between 160 and 200 km/h (99 and 124 mph) would require "improved levels of protection in acceptable areas".[25]

In the United States, railroad tracks are largely used for freight with at-grade crossings. Passenger trains in many corridors run on shared tracks with freight trains. Most trains are limited to top speeds of 79 mph (127 km/h) unless they are equipped with an automatic cab signal, automatic train stop, automatic train control or positive train control system approved by the Federal Railroad Administration (FRA).[26] In developing higher-speed rail services, one of those safety systems must be used.

Additionally, the FRA establishes classification of track quality which regulates the speed limits of trains with Class 5, Class 6, Class 7 and Class 8 for top speeds of 90 mph (145 km/h),[27] 110 mph (175 km/h), 125 mph (200 km/h) and 160 mph (255 km/h), respectively.[28] The FRA also regulates passenger train design and safety standards to ensure trains that operate at speeds of 80 mph (130 km/h) up to 125 mph (200 km/h) comply with its Tier I standard and trains that operate at speeds up to 150 mph (240 km/h) comply with its Tier II standard.[29]

Another limitation is the safety of grade crossings (also known as level crossings, flat level crossings, non-grade-separated crossings) which limits how fast trains can go. FRA regulations set speed limits for tracks with grade crossings as follows:[30] Level crossings are generally the most dangerous part of the railway network with a large number of fatal incidents occurring at a grade crossing.

  • For 110 mph (175 km/h) or less: Grade crossings are permitted. States and railroads cooperate to determine the needed warning devices, including passive crossbucks, flashing lights, two quadrant gates (close only 'entering' lanes of road), long gate arms, median barriers, and various combinations. Lights and/or gates are activated by circuits wired to the track (track circuits).
  • For 110 to 125 mph (175 to 200 km/h): The FRA permits crossings only if an "impenetrable barrier" blocks highway traffic when a train approaches.
  • Above 125 mph (200 km/h): No crossings will be permitted.

In Europe, the limit is often 160 km/h (100 mph) over grade crossings.[31] In Sweden there is a special rule permitting 200 km/h (125 mph) if there are barriers and automatic detection of road vehicles standing on the track.[32] In Russia 250 km/h (155 mph) is permitted over grade crossings.[33] The United Kingdom has railway lines of 200 km/h (125 mph) which still use grade crossings.

With the above limitations, many regional transportation planners focus on rail improvements to have the top speeds up to 110 mph (175 km/h) when proposing a new higher-speed rail service.[21]

Similar categories[edit | edit source]

In countries where there had been rail improvement projects in the later part of the 20th century and into the 2000s, there are inter-city rail services with comparable speed ranges of higher-speed rail, but they are not specifically called "higher-speed rail". Below are some examples of such services that are still in operation.

  • Canada: The Quebec City–Windsor Corridor that runs between Quebec City and Windsor allows Via Rail trains to run at speeds of 100 km/h (60 mph), about 130 km/h (80 mph) today.
  • Europe: The InterCity services in many European countries have top speeds of mostly up to 160 km/h (100 mph), but they can go up to 200 km/h (125 mph). Intercity trains that cross international borders are usually designated as EuroCity and reach similar speeds where tracks allow it. High speed trains also may use upgraded and electrified lines that are not purpose-built during part of their journey at up to 220 km/h (135 mph).
  • Japan: The Mini-shinkansen lines in Japan are the conventional lines that have been converted from narrow gauge to standard gauge to allow Shinkansen trains to pass through with top speeds of 130 km/h (80 mph).[34] However, the International Union of Railways recognizes the Mini-shinkansen lines as high-speed rail.[35] Two Mini-shinkansen lines have been constructed: the Yamagata Shinkansen and Akita Shinkansen.[36] Both of these lines branch off from the high-speed Tohoku Shinkansen line with top speeds of 320 km/h (200 mph).
  • Spain: Many inter-city rail services operated by Renfe Operadora, the state-owned company, are not classified as high-speed rail. Those services are Alaris, Altaria, Arco and Talgo (from Talgo III to Talgo VII) with top speeds of 160 and 200 km/h (100 and 125 mph)[37]
  • In Norway, there is sometimes talked about høy hastighet, which may be compared to higher-speed rail as used here – and høyhastighet, high-speed rail. Most of the rail network is old, with sharp curves, and speeds at only 70–130 km/h (45–80 mph). The lines around Oslo are upgraded or renewed, or are planned to be so. Some of the sections, like Follobanen (Oslo–Ski, 22 km), are built or planned for 250 km/h (155 mph) – though others to høy hastighet, i.e. 160 km/h (100 mph) or 200 km/h (125 mph).[38] By the same token, the Norwegian FLIRT trains and the El 18 locomotives have a top speed of 200 km/h. Gardermobanen is called a high-speed line,[39] and the GMB Class 71 and NSB Class 73 are often called high-speed trains[40] – with 210 km/h (130 mph) top speed. However, the limits are blurry. Sometimes, e.g. the FLIRTs are called high-speed trains.[41]
  • Sweden: SJ (Swedish Railways) operates inter-city rail services using X 2000 and SJ 3000 (X55) trains in major routes across the country with top speeds of 205 km/h (125 mph). The operator brands them as snabbtåg ("fast trains") although "high-speed trains" is sometimes used in English language ads;[42][43] however, the International Union of Railways only recognizes the 320 km/h (200 mph) line from Stockholm to Malmö and Gothenburg as the only high-speed rail lines in Sweden which is still in the planning stage, and are called "höghastighetsbanor" (high-speed railways).[35]
  • In Germany regional trains along the Munich-Nuremberg high speed line which was built for 300 km/h (185 mph) run at 200 km/h (125 mph) without being specially designated. Those trains use locomotives that are used for Intercity trains elsewhere and the higher speed (in comparison to other regional trains) was chosen mainly to increase capacity.
  • The United Kingdom has service which run at 200 km/h (125 mph), such as the East Coast Main Line, West Coast Main Line, Great Western Main Line and Midland Main Line. But there are signaling upgrades currently happening on the East Coast Main Line and rolling stock to increase speeds to 225 km/h (140 mph).
  • South Korea: MOLIT designates railway lines as three categories: high-speed railway lines (고속철도노선), semi-high-speed railway lines (준고속철도노선), or conventional railway lines (일반철도노선). High-speed railway lines are limited to dedicated lines with maximum speed over 300 km/h (185 mph), while semi-high-speed rail can be mixed-use lines with maximum speed ranged in 200 km/h (125 mph)–300 km/h (185 mph). For conventional railway lines, due to the limitation of signal systems and designed maximum speed of trains, most lines are limited by maximum speed under 150 km/h (95 mph). However, Gyeongchun line has been upgraded as a higher-speed railway line, with dedicated ITX-Cheongchun EMU trains designed as maximum speed of 180 km/h (110 mph).

Commuter rail services[edit | edit source]

Some commuter rail services that cover shorter distances may achieve similar speeds but they are not typically called as higher-speed rail.[19] Some examples are:

Rail improvement strategies[edit | edit source]

Cab display unit of ACSES, an approved PTC system

There are many types of trains that can support higher-speed rail operation. Usually, the rail infrastructure needs to be upgraded prior to such operation. However, the requirements to the infrastructure (signalling systems, curve radii, etc.) greatly increase with higher speeds, so an upgrade to a higher-speed standard is often simpler and less expensive than building new high-speed lines. But an upgrade to existing track currently in use, with busy traffic in some segments, introduces challenges associated with the construction work that could potentially disrupt the train services. The followings are some strategies used by regional transportation planners and rail track owners for their rail improvement projects in order to start the higher-speed rail services.

Signal upgrades[edit | edit source]

In Victoria, Australia, the increased top speeds from 130 to 160 km/h (80 to 100 mph) in the Regional Fast Rail project required a change to the signalling system to account for increased braking distance. Prior to the project, the system comprised a mixture of equipment from pre-World War I mechanical signalling to the remote control systems of the 1980s. In some cases, operators needed to telephone the local operators to manually control the signal boxes. With the new speeds, the signalling needed to be computerized. The project employed the Solid State Interlocking with the newly laid fiber-optic communication between the components to use three computer systems to control the signals. When the output of one computer differs from the other two, the system will fail that computer and continue the signal operations as long as the outputs from the other two computers are consistent. The project deployed the Train Protection & Warning System which allows the system to automatically applies the brakes at a sufficient distance to stop the train if the driver does not control the speeds adequately. The project also incorporated Train Control and Monitoring System to allow real-time monitoring of the position of trains.[49]

In the United States, the first step to increase top speeds from 79 mph (127 km/h) is to install a new signal system that incorporates FRA-approved positive train control (PTC) system that is compatible with higher-speed rail operation.[50] They are both transponder-based and GPS-based PTC systems currently in use in the United States. By a mandate, a significant portion of the railroads in the United States will be covered by PTC by the end of 2015.[51]

Concrete ties on a BNSF line

Track improvements[edit | edit source]

To support trains that run regularly at higher speeds, the rails need to be reliable. Most freight tracks have wooden ties which cause rails to become slightly misaligned over time due to wood rot, splitting and spike-pull (where the spike is gradually loosened from the tie).[52] The concrete ties used to replace them are intended to make the track more stable, particularly with changes in temperature.[53] Rail joints are also an issue, since most conventional rail lines use bolts and fishplates to join two sections of the rail together. This causes the joint to become slightly misaligned over time due to loosening bolts. To make for a smoother ride at higher speeds, the lengths of rail may be welded together to form continuous welded rail (CWR). However, the continuous welded rails are vulnerable to stress due to changes in temperature.[54]

In Australia, the track condition before the Regional Fast Rail project could only support trains up to speeds of 130 km/h (80 mph). The tracks are with mixture of wooden and concrete ties. The rail weight varies but with majority being 47 kg/m (95 lb/yd). The track upgrade in the project included changing to use concrete ties and to use new standard of rail weight at 60 kg/m (121 lb/yd) in order to support the new top speeds of 160 km/h (100 mph).[55]

There may be restriction in maximum operating speeds due to track geometry of existing line, especially on curves. Straightening the route, where possible, will reduce the travel time by increasing the allowable speeds and by reducing the length of track. When straight routes are not possible, reducing the number of curves and lowering the degree of curvature would result in higher achievable speeds on those curves. An example is the elimination of three consecutive reverse curves in favor of one larger curve. Raising superelevation may be considered for sharp curves which significantly limit speed. The higher speeds on those modified curves, together with the higher superelevation, will require track modification to have transition spirals to and from those curves to be longer.[56]

Old turnouts may need replacement to allow trains to run through the turnouts at higher speeds. In the United States, some old turnouts have speed limit of 20 mph (30 km/h). Even with newer turnouts (rated #20), the diverging speed limit is still at 45 mph (70 km/h) which would significantly slow down the higher-speed train passing through those sections. High-speed turnouts (rated #32.7) are capable of handling maximum diverging speeds of 80 mph (130 km/h).[57][58][59]

In order to minimize the downtime to upgrade tracks, a track renewal train (TRT) can automate much of the process, replacing rails, ties, and ballast at the rate of 2 miles per day. In the United States, a TRT is used by Union Pacific Railroad on the track shared with future higher-speed rail service in Illinois area.[60][61]

For electrified track, the old catenary may need to be replaced. The fixed-tension catenary which is acceptable for low speeds may not be suitable for regular higher-speed rail services, where a constant tension is automatically maintained when temperature changes cause the length of the wire to expand or contract.[62]

Crossing improvements[edit | edit source]

With trains running at higher speeds throughout the route, safety at all at-grade crossings needs to be considered.

In Australia, the levels of upgrade of the crossing in the rail improvements project were based on the risk analysis. The improvements included flashing light protection, automatic full barriers protection, and pedestrian gates crossings. The project also introduced the use of rubber panels at the crossings.[49]

In the United States, the FRA limits train speeds to 110 mph (175 km/h) without an "impenetrable barrier" at each crossing. Even with that top speed, the grade crossings must have adequate means to prevent collisions. Another option is grade separation, but it could be cost-prohibitive and the planners may opt for at-grade crossing improvements instead.[30]

The safety improvements at crossings can be done using combination of techniques. This includes passive devices such as upgraded signage and pavement markings. Another low-cost passive device is median separators which are installed along the center line of roadways, extending approximately 70 to 100 feet from the crossing, to discourage drivers from running around the crossing gates. More active devices include the four-quadrant gate, which blocks both sides of each traffic lane. Longer gate arms can cover 3/4 of the roadway. Video cameras can also be installed to catch the violators. A signal monitoring system can also be installed to alert the crews when the crossing equipment has malfunctioned.[63]

In Norway, grade crossing speed are not permitted to exceed 160 km/h (100 mph).[64]

Rerouting and passing sidings[edit | edit source]

Norfolk Southern Railway freight enters the NEC from the Port Road Branch in Perryville, Maryland

In areas where there is frequent interference between freight and passenger trains due to congestion which causes the passenger trains to slow down, more extensive improvements may be needed. Certain segments of the line in congested areas may need to be rerouted. New track may need to be laid to avoid many curves which slow down the trains. In stretches of heavy freight train traffic, adding passing sidings along the segment should be considered. Sometimes certain stations may need to be bypassed.[65]

Electrification[edit | edit source]

The "Main Line" portion of the Keystone Corridor is fully electrified.

Another consideration is electrification. Electrifying a railway line entails a major upgrade to the rail infrastructure and equipment. On the infrastructure side, it requires catenary lines to be built above the tracks. New transmission lines are needed to carry power from the power plants. Substations are required for each of the 40-mile (64 km) lengths to reduce severe voltage losses. There is also a need to consider the required amount of power supply and new power plants may be required. For locomotives, new electric locomotives are needed or existing diesel-electric locomotives can be retrofitted into all-electric locomotives, but it is a complicated task.[66] These factors cause electrification to have high initial investment costs. The advantages of all-electric locomotives are that they provide quieter, cleaner and more reliable operations than the diesel-electric counterpart. The fuel consumption, locomotive maintenance costs and track wear of all all-electric locomotives are also lower.[67] Furthermore, electric traction makes the operator more independent of oil price fluctuations and imports, as electricity can be generated from domestic resources or renewable energy. This was a major consideration in the electrification of the German Democratic Republic network, as lignite (and therefore electricity) was cheap and plentiful domestically whereas oil had to be imported at world market prices.[citation needed]

An alternative to catenary lines is to use a third rail system which has a semi-continuous rigid conductor placed alongside or between the rails of a railway track. However the operating speeds of this type of systems cannot be greater than 100 mph (160 km/h) due to its limitation of the power supply gaps at turnouts and grade crossings. Therefore, the third rail system is not generally used for higher-speed rail.[68]

One example in the United States that does involve electrification is the Keystone Improvement Project to provide higher-speed rail service along the HarrisburgPittsburgh segment of the Keystone Corridor in Pennsylvania. The plan includes additional track, a new signal system and electrification. If completed as planned, this would allow Amtrak to utilize electric power continuously on service from Philadelphia to Pittsburgh. The first segment ("Main Line") has already been using electric locomotives with a top speed of 110 mph (175 km/h).[69]

In operation[edit | edit source]

United States[edit | edit source]

This is the list of the current higher-speed intercity and long-distance trains. For the list of trains with a top speed 110 mph (177 km/h) and above, see High-speed rail in the United States.

Service name Route Operator Current Top speed Average speed Route length (miles) Equipment Note
Texas Eagle ChicagoLos Angeles Amtrak 100 mph (161 km/h) 55 mph (89 km/h) 2,728 Diesel-electric locomotive-hauled coaches [70]
Southwest Chief ChicagoLos Angeles Amtrak 90 mph (145 km/h) 55 mph (89 km/h) 2,256 Diesel-electric locomotive-hauled coaches [71]
Pacific Surfliner Los AngelesSan Diego Amtrak 90 mph (145 km/h) 55 mph (89 km/h) 130 Diesel-electric locomotive-hauled coaches There is a study in place to increase maximum speed to 110 mph (177 km/h) when funding is available.[72]

Australia[edit | edit source]

NSW TrainLink XPT at Central station
A Diesel Tilt Train at Bowen Hills

In 1999, the concept of Regional Fast Rail project was initiated by the government of Victoria with a goal to provide express higher-speed rail services between four main regional centres of Victoria (Geelong, Ballarat, Bendigo and the Latrobe Valley) and Melbourne. The initiative included a key component to upgrade rail infrastructure to have top speeds up to 160 km/h (100 mph). The development phase of initiative was between 2000 and 2002. Finally, the services on four lines began between 2005 and 2006 with top speeds of 160 km/h using VLocity trains.[73] Additionally, Queensland Rail's Tilt Train, the Prospector and NSW TrainLink's XPT all have a top service speed of 160 km/h (99–100 mph).[74][75][76]

The New South Wales XPT (short for Express Passenger Train) is the main long-distance passenger train operated by NSW TrainLink on regional railway services in New South Wales, Australia from Sydney to Dubbo, Grafton, and Casino as well as interstate destinations, Brisbane and Melbourne. The XPT is based on the British Rail designed High Speed Train and entered service in April 1982. It came to fruition in January 1978 when the Public Transport Commission invited tenders for 25 high-speed railcars similar to the Prospector railcars delivered by Comeng to the Western Australian Government Railways in 1971. Comeng's proposal for a train based on the InterCity 125 was announced as the successful bidder in October 1976.

The Tilt Train is the name for two similar tilting train services, one electric and the other diesel, operated by Queensland Rail on the North Coast line from Brisbane to Rockhampton and Cairns. In May 1999 the Electric Tilt Train set an Australian train speed record of 210 km/h (130 mph) north of Bundaberg, a record that still stands.[77][78]

The Transwa WDA/WDB/WDC class are a class of railcars built by United Goninan, Broadmeadow for Transwa in 2004–05 to replace the WAGR WCA/WCE class railcars on the AvonLink and Prospector services in Australia. They are capable of high-speed operation.

China[edit | edit source]

Railway Lines in China that run CRH services
Geographically accurate map of CRH services.
Magenta and Red: High-speed rail
Yellow: Higher-speed rail
Black text in image: Cities that host CR divisions headquarters
A S511 train in the Beijing Suburban Railway.
Train K9787 in the Southern Xinjiang railway.

In China, higher-speed railways are railways that are not officially categorized as high-speed rail but allow CRH EMUs run on it with speeds up to 200 km/h.[79] Typically these lines are classified as Grade I conventional railways and are used by both passenger and freight services.

Note that the majority of high-speed lines are also called "passenger-only"(Chinese: 客运专线) lines. Inside mainland China this word invokes a sense of higher-speed rail but the wording usage is inconsistent.

Train identifiers[edit | edit source]

Identifiers starting with G indicates at least part of the train's route operates at a maximum 300 km/h or above (this is a characteristic of the line rather than the precise maximum speed of this exact train) and not running at deliberately reduced speed on any section. Other sections of the route may have lower speeds as low as 160 km/h.

Identifiers starting with C indicates short-distance travel using CRH trains, the maximum speed is irrelevant (ranging from 160 km/h Ürümqi-Korla service to 350 km/h Beijing–Tianjin (via intercity) service).

Identifiers starting with D indicates CRH services with maximum speed 265 km/h or less, including overnight sleepers on 310 km/h Beijing–Guangzhou line (running them 310 km/h overnight not only causes noises but also disturbs sleeping patterns of passengers. This is an example of deliberately reduced speeds).

Identifiers starting with S indicates metropolitan services using CRH rolling stock and have a different fare system to the national one. Their maximum speed is 160 km/h.

Note: The start and end station in the following lists accounts only CRH services. * denotes some section of this line doesn't have 160 km/h CRH services.

Conventional lines running CRH services[edit | edit source]

Template:Complete list

Line name Line name
(Chinese)
start station end station Train identifiers Note
Southern Xinjiang* 南疆线(吐库二线段) Turpan/Turpan North Korla C T K Y none
Lanzhou–Xinjiang (West)*

(including Second track)

兰新线西段(北疆线) Ürümqi Bole C T K Y Bole station where Boltala Prefecture branch splits is no longer a passenger stop.[80]
Jinghe–Khorgos 精伊霍铁路 Jinghe South Khorgos C T K Y
Boltala Prefecture branch 博州支线 Bole Boltala C T K Y
Liuyuan–Golmud* 柳格线柳敦段 Yumen Dunhuang D K Y none No CRH train from/to Dunhuang stops at Yumen.
Changchun–Baicheng
Baicheng–Arxan*
长白·白阿线(长乌段) Changchun Ulanhot C Z K
Hohhot–Ordos 呼鄂线 Hohhot East Ordos D Z K
Beijing Suburban:
Huairou–Miyun
北京市郊怀密线 Qinghe Gubeikou S
Beijing Suburban:
Sub-Center
北京市郊副中心线 Liangxiang Qiaozhuang East S
Tianjin–Jizhou 津蓟铁路 Tianjin Jizhou North S
Beijing–Qinhuangdao 京秦线(京哈线) Beijing Qinhuangdao D Z T K Y Both conventional and high-speed services has some detouring to Tianjin instead.
Xiong'an Area 雄安地区动车 Shijiazhuang Beijing South D Z T K Y Section between Xushui East and Bazhou West is high-speed Tianjin–Baoding intercity railway(mixed traffic).
G class trains running solely on aforementioned section is not counted.
Section between Shijiazhuang and Xushui East is Beijing–Guangzhou railway.
Section between Bazhou West and Beijing South is Beijing–Kowloon railway.
Northern Tongpu Quadruple Track* 北同蒲三四线 Huairen East Yuanping West D Z K Part of Datong-Xi'an high-speed line.
Beijing–Shanghai Overnight Sleepers 京沪动卧 Beijing Hangzhou D 2/1/3 pair(s) of trains between Beijing and Shanghai/Nanjing/Hangzhou daily.
Trains to Hangzhou have section between Kunshan and Hangzhou runs via Shanghai–Kunming railway and does not stop at Shanghai.
Longkou–Yantai 龙烟线 Longkoushi Yantai D
Nanjing–Qidong* 宁启线南启段 Nantong Qidong D Section between Nanjing and Nantong is 200 km/h
CR Shanghai Suburban (Shaoxing) 上海局市域(绍兴) Qianqing Shangyu S Locally administered
CR Shanghai Suburban (Ningbo) 上海局市域(宁波) Ningbo Yuyao S Locally administered
Dazhou–Chengdu* 达成线成遂段 Dazhou Suining D Z T K Section between Suining and Chengdu is 200 km/h
Xiangyang–Chongqing* 襄渝线达渝段 Dazhou Chongqing North D T K
Nanchong–Gaoxing 南高线 Nanchong Gaoxing D Gaoxing station connects to Dazhou-Chongqing but is not a passenger stop
Shimen County–Changsha 石长线 Shimenxian North Changsha D T K
Kunming–Hekou* 昆玉河铁路(标准轨) Yuxi Hekou North C K CRH service between Yuxi and Kunming South run on Kunming–Yuxi intercity railway (200 km/h)
Shanghai–Kunming* 沪昆线宣昆段 Xuanwei Kunming C Z T K none
Litang–Zhanjiang* 黎湛线贵玉段 Guigang Yulin D T K none
Shejiang–Shantou* 畲汕线潮汕至汕头 Chaoshan Shantou G D K

Newly built lines operating less than 200 km/h speed[edit | edit source]

Template:Complete list

Line name Line name
(Chinese)
start station end station Train identifiers Note
Shanghai Area: Jinshan 金山线 Shanghai South Jinshanwei S[81]
Zhongchuan Airport intercity 中川机场城际 Lanzhou West Zhongchuan Airport C D Lanzhou Area only except a single round trip to/from Tianshui South.
Beijing Subway Daxing Airport Express 北京地铁大兴机场线 Template:Stl Template:Stl Not exist Not part of China Railway System.
Baotou-Xi'an* 包西线西延段 Xi'an Yan'an D Z T K Different from Baotou–Xi'an high-speed railway (under construction).
Nanjing–Chengdu* 宁蓉线宜凉段
(宜万铁路)
Yichang East Liangwu G D Z K Passenger service branches at Lichuan.
Lanzhou–Chongqing 兰渝铁路 Lanzhou Chongqing North G D Z K
Changsha–Zhuzhou/Xiangtan 长株潭城际铁路 Changsha West Zhuzhou South/Xiangtan C
Guiyang–Kaiyang 贵开城际铁路 Guiyang North Kaiyang C
Guiyang Loop Line 贵阳市域铁路环线 Loop Line C
Guangzhou-Shenzhen (quadruple track) 广深线(城际线) Foshan West Shenzhen C D Through operation to Huaiji (Guiyang–Guangzhou high-speed line), it operates at 180 km/h.

Designated 200 km/h, operating 160 km/h lines with currently no C/D/G class services[edit | edit source]

Template:Complete list

Line name Line name
(Chinese)
start station end station Train identifiers Note
Jining–Baotou quadruple track* 集包第二双线 Jining South Hohhot East Z T K none The section between Hohhot East and Baotou is high-speed rail.
The section between Jining South and Hohhot differs from Zhangjiakou–Hohhot high-speed railway (all of this line's D class service is transfterred to it).
Taiyuan–Zhongwei/Yinchuan Corridor 太中银通道 Taiyuan Zhongwei/Yinchuan Z T K none

Slow speeds on lines normally running high-speed[edit | edit source]

This section lists the deliberately reduced scenarios mentioned in "train identifiers" section above. Template:Complete list

Line name Line name
(Chinese)
start station end station Train identifiers Note
Southeast coastal sleepers 沪广动卧 Shanghai Hongqiao/Shanghai Guangzhou South/Zhuhai D Section between Shanghai and Hangzhou uses Shanghai–Kunming high-speed line. Section between Shenzhen North and Zhuhai uses Guangzhou-Shenzhen-Hong Kong high-speed line and Guangzhou-Zhuhai intercity line.
Beijing–Guangzhou sleepers 京广动卧 Beijing Guangzhou South and others (see note) D Overnight service to Shenzhen North, Zhuhai, Zhanjiang West and Kunming using Beijing–Guangzhou–Shenzhen, Guangzhou-Zhuhai, Xinhui–Maoming–Zhanjiang and Shanghai–Kunming high-speed lines.

Greece[edit | edit source]

Since 1997, ongoing construction to upgrade and built higher-speed lines capable of speeds of up to 200 km/h (120 mph) is conducted. The P.A.Th.E. Plan (Patras-Athens-Thessaloniki-Evzonoi), as it is called aims at reduced journey times between Greece's main cities (Athens, Thessaloniki and Patra) as well as an improved rail connection between Greece and North Macedonia. Currently, only the modernized lines of DomokosThessaloniki, Athens AirportKiato, and ThessalonikiStrymonas are in operation at maximum speeds of 160 km/h (99 mph).[82]

India[edit | edit source]

Gatiman Express at New Delhi railway station
Tejas Express in Mumbai
Vande Bharat Express during its inaugural run from Howrah to New Jalpaiguri
RapidX train in Delhi-Meerut RRTS

The Gatiman Express was India's first semi-high speed train.[83] In October 2014, the railways applied for safety certificate from Commission of Railway Safety to start the service. In June 2015, the train was officially announced. The train was launched on 5 April 2016 and completed its maiden journey between Nizamuddin and Agra Cantt within 100 minutes. But due to low occupancy, Indian Railways first extended this train from Agra to Gwalior on 19 February 2018 and then to Jhansi on 1 April 2018.[citation needed]

The Tejas Express was Introduced by Indian Railways in 2017. It features modern onboard facilities with doors which are operated automatically. Tejas means "sharp", "lustre" and "brilliance" in many Indian languages. The inaugural run of Tejas Express was on 24 May 2017 from Mumbai Chhatrapati Shivaji Terminus to Karmali, Goa. It covered 552 km in 8 hours and 30 minutes.[84] On 1 March 2019, second Tejas Express of the country was flagged off between Chennai Egmore and Madurai Junction by Prime Minister Narendra Modi. It covered 497 km in 6 hours and 30 minutes.[85] Lucknow–New Delhi Tejas Express, which was inaugurated on 4 October 2019, is India's first train operated by private operators, IRCTC, a subsidiary of Indian Railways.[86] The Ahmedabad–Mumbai Tejas express, also operated by IRCTC was inaugurated on 17 January 2020.[87] From 1 September 2021, the train LHB Rajdhani Rakes are replaced with LHB Tejas Sleeper Rakes. This increased the speed of the train to 130 km/h. The train can travel at a top speed of 160 km/h making it a Semi-High Speed Train.

In 2021, Indian Railways started to upgrade Rajdhani Coaches to Tejas coaches. This replaced its traditional LHB Rajdhani coaches On 15 February 2021, the Agartala Rajdhani Express was upgraded with Tejas livery Sleeper Coaches. On 19 July 2021, the Mumbai Rajdhani Express was upgraded to Tejas class smart coaches. LHB Rajdhani coaches.[88][89] On 1 September 2021 the Rajendra Nagar Patna Rajdhani Express was upgraded to Tejas rakes. This increased the speed of the train to 130 km/h. The train can travel at a top speed of 160 km/h.[90]

In 2019, Vande Bharat Express, also known as Train 18,[91] was inaugurated. This is an Indian higher-speed rail intercity electric multiple unit.[92] It was designed and built by Integral Coach Factory (ICF) at Perambur, Chennai under the Indian government's Make in India initiative over a span of 18 months. The unit cost of the first rake was given as 1 billion (US$14 million), though the unit cost is expected to go down with subsequent production.[93] At the original price, it is estimated to be 40% cheaper than a similar train imported from Europe.[94] The train was launched on 15 February 2019, from Delhi to Varanasi.[95] The service was named 'Vande Bharat Express' on 27 January 2019.[96] On 5 October 2019, a second Vande Bharat Express was opened from Delhi to Katra[97] On 30 September 2022, Prime Minister Narendra Modi inaugurated a 3rd Vande Bharat Express rake connecting Mumbai and Ahmedabad passing through Surat. This rake was an upgraded second generation version.[98] an other second generation rake was inaugurated from Delhi to Una passing through Chandigarh.[99]

The Delhi Meerut Regional Rapid Transit System (RRTS), also known as RapidX, is a semi high-speed rail project inaugurated in 2023. Trains, called Namo Bharat trains, can reach speeds of up to 180 kilometers per hour.

Inaugural run and entry into service

The train flagged off for an inaugural run by Prime Minister of India Narendra Modi, on 15 February 2019,[100] with its commercial run started from 17 February 2019 onwards. It will be running on the Delhi-Varanasi route,[101] via Kanpur and Prayagraj, connecting the holy city of Varanasi to the Capital city, reducing travel time along the route by 15 percent.[92] The train's regenerative brakes are also expected to allow a 30% savings in electricity costs as compared to its predecessor.[102] At an operating speed of 160 kilometres per hour (99 mph), it will outpace the Shatabdi Express by 30 kilometres per hour (19 mph).[101] Although the trainset has been tested for speeds up to 180 km/h, it is capable of running at speed of 200 km/h. Every other car on the train is motorised.[103] The 8-hour journey from New Delhi to Varanasi station has the Chair Car CC Class fare of ₹1,755.00 and covers the total distance of about 762 kilometers.[104]

Japan[edit | edit source]

The Skyliner limited express train service between Tokyo and Narita Airport in the fastest non-Shinkansen rail service in the country, with a speed of 160 km/h (99 mph).[105]

Before 2015, the Hakutaka limited express train service on the Hokuhoku Line in Niigata Prefecture also matched the speed of 160 km/h (99 mph). However, after the opening of Hokuriku Shinkansen on 14 March 2015, the maximum speed limit of the line was reduced to 130 km/h (80 mph).[106]

South Korea[edit | edit source]

Great Train eXpress (GTX), a commuter rail network in the Seoul Metropolitan Area, has a speed of 180 km/h (110 mph). Only one line, GTX-A, is currently operating. Two more lines, GTX-B and GTX-C, are scheduled to open in 2030.[107] Three other lines, named GTX-D, GTX-E and GTX-F, are currently being planned.[108]

Laos[edit | edit source]

Passenger trains on the 2021 opened Boten–Vientiane railway travel at speeds of up to 160 km/h,[109][110] however the railway has been described as 'high-speed' as well.[111] Some sections of the railway were planned to allow speeds of up to 200 km/h, however this was downgraded to 160 km/h in the final design.[112][113]

Earlier attempts[edit | edit source]

Canada[edit | edit source]

There have been several different attempts at higher speed rail in the Quebec City–Windsor Corridor, and several high speed rail attempts as well.[5]

Ireland[edit | edit source]

In 2010, a report was commissioned by the Chartered Institute of Logistics and Transport as a mid-term review of Transport 21, an Irish infrastructure plan announced in 2005. The report recommended, among other things, the development of national rail to provide higher-speed rail services.[114] However, there has been no progress towards implementing the recommendation.

United States[edit | edit source]

There have been long-range visions to establish high/higher-speed rail networks in different regions of the United States but without adequate funding. During the American Recovery and Reinvestment Act of 2009, there was a surge of interest to apply for grants from the federal government to start those projects. However, many proposals have been put on hold or cancelled after failing to secure funding or support from the public or key local politicians.[115][116]

Amtrak Cascades[edit | edit source]

Amtrak Cascades, a 467-mile (752 km) intercity rail service, stretches from Eugene, Oregon, through the State of Washington to Vancouver, British Columbia, in Canada. As of 2010, the long-term goal of this corridor was to have the top speeds of the segment of Eugene, Oregon, to Blaine, Washington, with top speeds in the 90 to 120 mph (145 to 195 km/h) range, and eventually 150 mph (240 km/h) on a dedicated track.[117] However, as of 2012, the Washington State Department of Transportation plans for its 300-mile (480 km) stretch to have top speeds of only 79 mph (127 km/h),[118] and the plan in Oregon is to limit the speeds to 79 mph (127 km/h) as well, with safety and other freight service concerns voiced by the track owner, Union Pacific Railroad.[119] This essentially halts the plan to provide a higher-speed rail service on this corridor in the near future.

Minnesota[edit | edit source]

The Northern Lights Express project, in the planning stages and proposed to begin construction in 2017, would upgrade the BNSF trackage between Minneapolis and Duluth to support service up to 90 mph (145 km/h).[120]

Other higher-speed rail proposals are periodically considered, but would need to pass through neighboring states, which have thus far not agreed to cooperate. Minnesota transportation planners proposed a higher-speed rail service called the River Route, with top speeds of 110 mph (175 km/h), between Minneapolis–Saint Paul, Minnesota, and Chicago, via Milwaukee, Wisconsin, which follows the Empire Builder route.[121] The service would eventually open in 2024 as the Borealis, though with a top speed of only 79 mph (127 km/h).

Another alternative that has been discussed is to have a new route that heads south to Iowa to join the rail link from Iowa to Chicago.[122] There was a report in 2011 that Iowa would halt its involvement in high/higher-speed rail projects.[123] However, the Iowa Department of Transportation and Illinois Department of Transportation continue to pursue the study of rail link between Chicago and Omaha, Nebraska, through Iowa with top speeds of 110 mph (175 km/h).[124][125] Therefore, the status of the proposal to link Minneapolis–Saint Paul with Chicago via Iowa is unknown.

New York[edit | edit source]

An un-rebuilt RTL Turboliner in New York in 1983.

In 1998, New York State initiated a $185 million program in partnership with Amtrak to increase the speeds of the Empire Service to 125 mph (200 km/h) by reconstructing all seven gas-turbine Turboliner trainsets, originally built in 1976–1977, to the new RTL-III specification. The reconstructed trains, coupled with track improvements, would cut the travel time between New York City and Albany by 20 minutes. However, the project ran into many problems including issues with the trains and the unsuccessful implementation of required track improvements.[126] New York ended the rehabilitation program in 2005 after spending $70.3 million.[127] Fallout over the program led to litigation between New York and Amtrak; Amtrak would eventually pay New York $20 million and commit to funding $10 million in track improvements.[128] New York auctioned off its surplus Turboliners in 2012 for $420,000.[129]

Ohio[edit | edit source]

The Ohio Hub, a rail improvement project proposed by the Ohio Department of Transportation, is aimed at revitalizing passenger rail service in the Ohio region. The proposal was to increase the top speeds to 110 mph (175 km/h) in the network connecting Cleveland, Columbus, and Cincinnati, commonly referred as the 3-C corridor.[130] The project is currently in an unknown state after the U.S. government rescinded the federal funding from Ohio and redirected it to other states.[115]

Wisconsin[edit | edit source]

In October 2009, the Wisconsin Department of Transportation adopted the Connections 2030 plan which is the long-range plan for state transportation needs. The plan includes Wisconsin Rail Plan 2030, the twenty-year plan to improve the state railroad system by 2030. In the rail plan, there is a multi-phase project to upgrade the rail service from Chicago, to Milwaukee and Madison, Wisconsin, with top speeds of 110 mph (175 km/h). The latter phases of the project will expand the same service to Minneapolis–Saint Paul in Minnesota and another route to Green Bay, Wisconsin.[131] There was a reaction against the project in 2010, and the $810 million grant the state originally received for the project from the federal government was rescinded.[115] As of 2012, the rail plan is postponed indefinitely.[132]

Current efforts[edit | edit source]

Baltic states[edit | edit source]

The three Baltic states have been working with the European Union as part of the Trans-European Transport Networks (TEN-T) initiative on a study to build a higher-speed rail line in the Rail Baltica corridor to connect Warsaw, in Poland, and Tallinn, in Estonia.[133]

Bangladesh[edit | edit source]

Bangladesh Government has taken initiatives to develop high-speed rail (HSR) in between its two major cities – Dhaka, the National Capital City and Chattogram (former Chittagong), the second largest and the principal Port City of the country. Bangladesh Railway (BR), the Government-owned and-managed transportation agency of the country, signed a contract of BDT 102 crore on 31 May 2018 with a Consortium of China Railway Design Corporation (CRDC), a Chinese Company and Mazumder Enterprise (ME), a Bangladeshi Pvt. Ltd. Company for feasibility study and detailed design for construction of proposed Dhaka-Chattogram via Cumilla/Laksam HSR line.

With 320.79 km length, Dhaka-Chattogram is the main business corridor and life line of BR, and at present, the railway route is a circuitous way through Tongi-Bhairab Bazar-Brahmanbaria-Cumilla-Chattogram. The proposed shorter route, which would be Dhaka-Cumilla/Laksham-Chattogram, will cut short the length by about 91 km, making the total length around 230 km. The expected speed of the proposed HSR would be above 300 km/h (yet to determine) and it would take less than one hour to reach Chattogram from Dhaka, which currently takes more than five hours. Under the 18-month contract, the Consortium's responsibilities will include identifying alternative alignments, assessing the viability of the project, preparing detailed engineering design, and cost estimation. [134]

Canada[edit | edit source]

For a rail route to connect Windsor, Ontario to Detroit, Michigan in the United States, a higher-speed rail plan was proposed as an alternative after a study on the Windsor to Quebec City route in Canada was to consider only high-speed rail with top speeds of 200 km/h (125 mph) or more. Politicians in Windsor area proposed in 2012 that having higher-speed rail connection between Windsor and Detroit must be part of the consideration.[25][135][136]

Another feasibility study is ongoing as part of the Northern New England Intercity Rail Initiative to connect between Boston and Montreal trains at top speeds of 90 mph (145 km/h).[137]

Greece[edit | edit source]

A project to modernize railway network in Greece is ongoing. A new 106 km (66 mi) alignment between Tithorea and Domokos is designed to avoid the mountainous part. The new line will have speeds of 160 and 200 km/h (100 and 125 mph).[138]

India[edit | edit source]

In October 2013, the Minister of Railways announced at the two-day international technical conference on High Speed Rail Travel; Low Cost Solution that the focus of India's rail improvement was to implement a lower-cost solution to meet immediate needs by providing higher-speed rail services as an incremental step before dedicated-track high-speed rail can be achieved. India's higher-speed rail would be in the range of 160 and 200 km/h (100 and 125 mph).[7] On 3 July 2014, a trial run with new top speeds of 160 km/h (100 mph) was successfully completed on a journey of 200 km (125 mi) between Delhi and Agra. The new service, operational since 5 April 2016, cut the travel time from 126 minutes (compared to standard trains) with a top speed of 160 km/h (99 mph) to 99 minutes.[139]

In 2019, the government approved 3 rapid regional railways including the Delhi–Meerut Regional Rapid Transit System with speeds up to 160 km/h.[140]

In June 2020, the government of Kerala approved the Thiruvananthapuram–Kasargode Semi High Speed Rail Corridor or Silver line, a Semi-High speed rail line connecting the state.[141]

In July 2021, the Government announced plans to create 10 new Vande Bharat Express lines connecting over 40 cities. This is planned to be done by 2022.[142]

Malaysia[edit | edit source]

A KTM Class 93 (Platinum service) arriving in Kuala Lumpur

The KTM ETS is an inter-city rail service operated by Keretapi Tanah Melayu Berhad utilizing electric multiple units. The KTM ETS is the second electric train service to be operated by the Malaysian railway company, after the KTM Komuter service.

Commencing in August 2010, the ETS is the fastest metre gauge train service in Malaysia and operates along the electrified and double-tracked stretch of the West Coast Line between Gemas and Padang Besar on the Malaysia–Thailand border by the Malaysian national railway operator, Keretapi Tanah Melayu.

The rail service is operated by KTM Intercity Division. It was previously operated by ETS Sendirian Berhad, a fully owned subsidiary of Keretapi Tanah Melayu Berhad. The operation speed for this train is 140 km/h with the maximum possible speeds for the trains at 160 km/h.

New Zealand[edit | edit source]

Advocacy group Greater Auckland proposed the Regional Rapid Rail initiative in 2017, including tilt trains with a maximum speed of 160 km/h.[143] This network would link Auckland with Hamilton, Tauranga and Rotorua. In December 2018, the government of New Zealand committed funding to reintroducing a five-year trial rail service between Papakura in southern Auckland to Hamilton, starting in 2020.[144]

Panama[edit | edit source]

China claimed to invest capitals into 160 km/h rail corridor, total length would be 491 km.[145]

Philippines[edit | edit source]

The state-owned Philippine National Railways plans to rebuild its historic South Main Line from Manila to the Bicol Region in the southeastern tip of Luzon. The agency will build 639 km (397 mi) of track, with the main line itself leading to Matnog, Sorsogon and a spur line leading to Batangas City. It will be a standard-gauge railway served by Chinese-built diesel multiple units with a maximum speed of 160 km/h (100 mph) and an average speed of 107 km/h (66 mph) including stops.[146] The project will start construction in mid-2020 and is set to open partially by 2022.

In January 2022, PNR general manager Junn Magno defined the agency's future high-speed rail projects to be electrified railways with a maximum speed of at least 200 km/h (120 mph). The high power costs and resulting expensive ticket prices resulted in the operation of high-speed rail in the country to be marked as infeasible. The agency then resorted to semi-high speed express trains for its new standard-gauge lines.[147]

United States[edit | edit source]

This is a partial list of ongoing higher-speed rail projects from the East Coast to the West Coast.

Corridor / Segment Length Top speed Avg speed Current status Note
BostonSpringfield, MassachusettsMontreal, Canada 408 mi (657 km) 90 mph (145 km/h) 55 mph (89 km/h) Feasibility study A study of higher-speed rail options with top speeds of 90 mph (145 km/h) in 3 sections along the route.[137][148][149]
New York City – Niagara Falls, New York 463 mi (745 km) 125 mph (200 km/h) 85 mph (137 km/h) Tier 1 EIS Fully electrified track, and straightened Hudson River route. See[note 1]
Washington, DC – Richmond, Virginia 115 mi (185 km) 90 mph (145 km/h) Tier 2 EIS [151][152][153]
Richmond – Newport News, Virginia 90 mph (145 km/h) Tier 1 EIS [153]
Richmond – Norfolk, Virginia 110 mph (175 km/h) Tier 1 EIS [153]
Richmond, VA – Raleigh, North Carolina 160 mi (257 km) 110 mph (175 km/h) 87 mph (140 km/h) Tier 2 EIS Top speeds from Richmond, VA, to south of Petersburg, Virginia, will be 90 mph (145 km/h) and changed to 110 mph (175 km/h) after that.[154]
Raleigh – Charlotte, North Carolina 180 mi (290 km) 90 mph (145 km/h) Construction [153]
Charlotte, NC – Atlanta 245 mi (394 km) 110 mph (175 km/h) Tier 1 EIS A 110 mph (175 km/h) option is considered along with 150 mph (240 km/h) high-speed rail.[153]
Atlanta – Macon, GeorgiaJacksonville, Florida 408 / 368 mi (657 / 592 km) 90–100 / 130 mph (145–160 / 210 km/h) 77 / 94 mph (124 / 151 km/h) Tier 1 EIS See[note 2]
Atlanta – Chattanooga, Tennessee / Nashville, TennesseeLouisville, Kentucky 489 / 428 mi (787 / 689 km) 90–100 / 130 mph (145–160 / 210 km/h) 72 / 85 mph (116 / 137 km/h) Tier 1 EIS completed See[note 2]
Atlanta – Birmingham, Alabama 176 / 150 mi (283 / 241 km) 90–100 / 130 mph (145–160 / 210 km/h) 64 / 90 mph (103 / 145 km/h) Tier 1 EIS See[note 2]
Atlanta – Columbus, Georgia 116 mi (187 km) 79–110 mph (125–175 km/h) 60 mph (97 km/h) Feasibility Study Higher-speed rail was one of the 3 alternatives in the feasibility study completed in 2014. Funding is not yet available to begin Tier 1 EIS phase.[157]
Columbus, OhioFort Wayne, Indiana – Chicago 300 mi (483 km) 110 mph (175 km/h) Feasibility Study Initial operating speeds up to 110 mph (175 km/h).[158] Study funded by local governments and organizations, not by state governments.[159]
Ann Arbor, MichiganTraverse City, Michigan 250 mi (402 km) 90–110 mph (145–175 km/h) Feasibility Study Three alternatives with 2 higher-speed rail alternatives at top speeds of 90 mph (145 km/h) and 110 mph (175 km/h)[160]
Kalamazoo, MichiganAlbion, Michigan 45 mi (72 km) 110 mph (175 km/h) Operation starts 25 May 2021 [161]
Chicago – Milwaukee 86 mi (138 km) 90 mph (145 km/h) 59 mph (95 km/h) Environmental Assessment The top speeds of 90 mph (145 km/h) is one of the alternatives under consideration.[162]
Chicago – Omaha, Nebraska (via Iowa) 474–516 mi (763–830 km) 110 mph (175 km/h) Tier 1 EIS [124][125]
MinneapolisDuluth, Minnesota 152 mi (245 km) 90 mph (145 km/h) Environmental Assessment completed Known as Northern Lights Express, received Finding Of No Significant Impact on Tier 2 Environmental Assessment in February 2018, and cleared to seek federal funding for design and construction.[163]
St. Louis – Kansas City, Missouri 283 mi (455 km)[164] 90 mph (145 km/h) Construction New sidings between Jefferson City and Lee's Summit for 90 mph (145 km/h) service[165]
Oklahoma CitySan Antonio 850 mi (1,368 km) 110 mph (175 km/h) Feasibility Study See[note 3]
Dallas/Fort WorthHouston 239 mi (385 km) 110 mph (175 km/h) Feasibility Study See[note 3]
PhoenixTucson, Arizona 120 mi (193 km) 125 mph (200 km/h) 66 mph (106 km/h) Tier 1 EIS completed Three alternatives finalized by Arizona Department of Transportation.[167] The Yellow Corridor Alternative was selected as the preferred alternative at the completion of Tier 1 EIS.[168]
Notes
  1. The study includes higher-speed rail alternatives with top speeds of 90 (145) (options A and B) and 110 mph (175 km/h). It also has high-speed rail options with top speeds of 125 (200), 160 (255) and 220 mph (355 km/h). As of March 2012, the Tier 1 EIS has eliminated the high-speed rail options, except for the 125 mph option. The numbers on the table represent the 125 mph alternative. The other alternatives are for non-electrified track with average speeds of 57 mph (92 km/h) (for 90A option), 61 (98) (for 90B option), and 63 (101) (for 110 option).[150]
  2. 2.0 2.1 2.2 The study includes two main alternatives for higher-speed rail. The first alternative is called Shared Use with top speeds of 90–110 mph (145–175 km/h). The second alternative is called Hybrid High Performance with top speeds of 130 mph (210 km/h) (however it would be classified as high-speed rail). There are also high-speed rail alternatives in the same study with top speeds of 180–220+ mph (290–355+ km/h). The numbers on the table represent the first two alternatives.[155] Federal Railroad Administration signed the Final EIS and Record of Decision in September 2017 to formally complete the Tier 1 EIS process for Atlanta to Chattanooga route.[156]
  3. 3.0 3.1 The study includes higher-speed rail up to 110 mph (175 km/h) and high-speed rail of 150+ mph (240+ km/h) options.[166]

Proposed routes[edit | edit source]

In addition to ongoing projects, there are proposed routes that have not reached the feasibility study stage yet. In Pennsylvania, a rail advocacy group started fund raising efforts in 2014 to obtain $25,000 for a preliminary study and additional $100,000 for feasibility study of the route from Erie to Pittsburgh. The proposal is for 110 mph (175 km/h) express train services to directly link the two cities. An alternative is to have intermediate stops in Ohio cities including Ashtabula, Warren, and Youngstown before heading back to New Castle, Pennsylvania.[169]

In Ohio, a rail advocacy group works with local political leaders in Ohio, Indiana and Illinois to consider a higher-speed rail line from Cincinnati to Chicago. This is in response to another advocacy group in Indiana that gained funding for the Columbus, OhioFort Wayne – Chicago route that is already in feasibility study stage. The group persuaded the Hamilton County government in Ohio to advocate for the study.[170] The county commissioners unanimously voted in September 2014 to pursue a feasibility study. As a possible route that goes through the states of Kentucky and Indiana, the county expects that Ohio-Kentucky-Indiana Regional Council of Governments will help fund a feasibility study.[171]

In Michigan, a feasibility study sponsored by an environmental group is in progress for a new rail line between Detroit and Grand Rapids. The proposal is to have trains running at speeds between 79 and 110 mph (127 and 177 km/h). The state transportation department is interested in the study but is not ready to move beyond this study.[172]

In Texas, the East Texas Corridor Council proposed a higher-speed rail route between Longview and Dallas. The trains will operate at speeds of 80 mph (130 km/h) and 110 mph (175 km/h).[173]

Vietnam[edit | edit source]

In 2018, Vietnam planned to build a higher-speed rail line in the northern part of the country to link between Haiphong, Hanoi, and Lào Cai which is then connected to China. The 391-kilometre (243 mi) line will run parallel to the existing regular speed railway. The top speeds for the new services will be up to 160 km/h (100 mph).[174]

See also[edit | edit source]

Notes[edit | edit source]

  1. Also known as high-performance rail,[1] higher-performance rail,[2] semi-high-speed rail, or almost-high-speed rail.[3]

References[edit | edit source]

  1. "H.R.4361 – National High Performance Passenger Rail Transportation-Oriented Development Act of 2012[permanent dead link]" 112th Congress of the United States. Retrieved 10 September 2013.
  2. Clayton, Mark (21 August 2012). "Obama plan for high-speed rail, after hitting a bump, chugs forward again". Christian Science Monitor. Archived from the original on 9 October 2012. Retrieved 10 October 2012.
  3. [1] [dead link]
  4. Bowen, Douglas John (27 August 2012). "U.S. HSR accelerates". Railway Age. Archived from the original on 1 October 2012. Retrieved 10 October 2012.
  5. 5.0 5.1 5.2 "Ms. Helena Borges (Director General, Surface Transportation Policy, Department of Transport) at the Transport, Infrastructure and Communities Committee". Canada Parliament. 12 May 2009. Archived from the original on 21 September 2013. Retrieved 31 August 2013.
  6. Safety of High Speed Ground Transportation Systems (PDF) (Report). Federal Railroad Administration. December 1994. Archived (PDF) from the original on 3 March 2016. Retrieved 3 July 2014.
  7. 7.0 7.1 7.2 "Railway Minister Launches High Speed Rail Corporation of India Limited (HSRC)". Disha Diary. 29 October 2013. Archived from the original on 13 November 2013. Retrieved 13 November 2013.
  8. "India-China to collaborate on building semi-high speed rail". The Economic Times. 29 March 2014. Archived from the original on 27 July 2014. Retrieved 4 July 2014.
  9. Hahn, Johannes (11 November 2013). "From Passengers to Captains of Europe's Baltic Sea Strategy" (PDF). 4th Annual Forum on the EU Strategy for the Baltic Sea Region. European Commission. Archived (PDF) from the original on 13 November 2013. Retrieved 13 November 2013.
  10. "40th Parliament, 2nd Session Standing Committee on Transport, Infrastructure and Communities". Canada Parliament. 9 June 2009. Archived from the original on 21 September 2013. Retrieved 31 August 2013.
  11. 11.0 11.1 "Section 5 Rail Transportation" (PDF). Congestion Management Process (CMP). North Central Texas Council of Governments. p. V-14. Archived from the original (PDF) on 13 May 2012. Retrieved 31 August 2013.
  12. Thoren, Thomas (9 December 2012). "Team Studies Track Components for Shared-Use Rail Lines". University of Illinois. Archived from the original on 21 September 2013. Retrieved 31 August 2013.
  13. Thompson, Louis S. (October 1994). "High-Speed Rail (HSR) in the United States – Why Isn't There More?" (PDF). Japan Railway & Transport Review: 37. Archived (PDF) from the original on 21 September 2013. Retrieved 31 August 2013.
  14. Galuszka, Peter (13 June 2011). "The other reason Virginia didn't seek rail money (WP Opinions)". Washington Post. Archived from the original on 21 September 2013. Retrieved 31 August 2013.
  15. "Written evidence from Paul Atkins (HSR 07)". UK House of Commons – Transport Committee. Archived from the original on 11 January 2015. Retrieved 11 January 2015.
  16. Lind, William (11 May 2011). "Run a Train That's Fast Enough". Engineering News-Record. Archived from the original on 22 January 2013. Retrieved 10 October 2012.
  17. "Higher Speed Rail in North Carolina and Virginia: Lengthening and Strengthening the Northeast Corridor (NEC)" (PDF). Regional Transportation Alliance. Archived from the original (PDF) on 14 May 2012. Retrieved 10 October 2012.
  18. "FAQ". The Cascadia High Speed Rail. Archived from the original on 24 August 2013. Retrieved 10 October 2012.
  19. 19.0 19.1 19.2 "Tier I Draft Environmental Impact Statement: Open House and Public Hearing" (PDF). Virginia Department of Rail and Public Transportation. Archived (PDF) from the original on 24 October 2013. Retrieved 10 October 2012.
  20. "High-Speed Rail Strategic Plan" (PDF). Federal Railroad Administration. April 2009. p. 10. Archived from the original on 7 January 2013. Retrieved 16 April 2009.
  21. 21.0 21.1 "The Development of High Speed Rail in the United States: Issues and Recent Events" (PDF). Congressional Research Service. Archived (PDF) from the original on 8 May 2013. Retrieved 10 October 2012.
  22. "Next-Generation Rail Supply Chain Connectivity Forum, Sacramento, California". National Institute of Standards and Technology and Manufacturing Extension Partnership. 8 February 2012. p. 6. Archived from the original on 25 September 2012. Retrieved 22 January 2014.
  23. "State Aviation System Plan" (PDF). Minnesota Department of Transportation. July 2013. p. 200. Archived (PDF) from the original on 3 February 2014. Retrieved 22 January 2014.
  24. 24.0 24.1 "Types of passenger rail" (PDF). Texas-Oklahoma Passenger Rail Study Newsletter. 2 (1): 2. Winter 2014. Archived (PDF) from the original on 3 February 2014. Retrieved 22 January 2014.
  25. 25.0 25.1 "Deliverable No. 12 – Review of Impacts of HSR on the Transportation System within the Corridor" (PDF). Updated Feasibility Study of a High Speed Rail Service in the Québec City – Windsor Corridor. Ministère des Transports du Québec, Ontario Ministry of Transportation, and Transport Canada. November 2010. Archived from the original (PDF) on 30 October 2012. Retrieved 17 November 2012.
  26. "Code of Federal Regulations – Title 49 – Transportation". Archived from the original on 11 November 2014. Retrieved 20 October 2012.
  27. "Chapter 5 Track Safety Standards Classes 1 through 5" (PDF). Track Safety Standards Compliance Manual. Federal Railroad Administration. Archived from the original (PDF) on 28 May 2008. Retrieved 4 November 2012.
  28. "Chapter 6 Track Safety Standards Classes 6 through 9, p. 6.13" (PDF). Track Compliance Manual. Federal Railroad Administration. Archived from the original (PDF) on 23 September 2003. Retrieved 4 November 2012.
  29. High Speed Passenger Rail Safety Strategy (PDF). Federal Railroad Administration. 2009. p. 23. Archived from the original (PDF) on 11 September 2011. Retrieved 7 November 2012.
  30. 30.0 30.1 "High-Speed Grade Crossings". Federal Railroad Administration. Archived from the original on 4 September 2012. Retrieved 20 October 2012.
  31. "Ten Years of Work Needed Before New Trains Can Reach Top Speed". Estonian Public Broadcasting. 21 May 2013. Archived from the original on 29 November 2014. Retrieved 17 November 2014.
  32. Kartläggning av plankorsningar – B05-690/TR00 (Swedish) (PDF). Banverket. 30 June 2006. Archived from the original (PDF) on 21 May 2013. Retrieved 17 November 2014.
  33. "High-Speed Russian Train Stirs Anger". Bloomberg BusinessWeek. 12 July 2010. Archived from the original on 24 September 2015. Retrieved 17 November 2014.
  34. Hoover, Ryan (20 July 2006). "Mini-Shinkansen: How East Japan Railway Co. extended high-speed rail without huge infrastructure expenditures" (PDF). BayRail Alliance. Archived (PDF) from the original on 11 November 2014. Retrieved 28 September 2014.
  35. 35.0 35.1 "High Speed Lines in the World" (PDF). International Union of Railways. 1 September 2014. Archived from the original (PDF) on 17 November 2014. Retrieved 27 September 2014.
  36. Semmens, Peter (1997). High Speed in Japan: Shinkansen – The World's Busiest High-speed Railway. Sheffield, UK: Platform 5 Publishing. ISBN 1-872524-88-5.
  37. "AVE-Long Distance Products". Renfe. Archived from the original on 19 October 2017. Retrieved 13 November 2013.
  38. Holtung, Siri (18 May 2011). "Høyhastighet eller høy hastighet? Vestfoldbanen 2026" [High-speed or high speed? The Vestfold track 2026]. Byavisa Sandefjord (in Norwegian Bokmål). Archived from the original on 6 May 2016.{{cite news}}: CS1 maint: unrecognized language (link)
  39. http://www.jernbaneverket.no/Jernbanen/Banene/Gardermobanen/ Archived 27 April 2016 at the Wayback Machine; in Norwegian
  40. http://www.nmj.no/1000366.html Archived 6 April 2016 at the Wayback Machine; in Norwegian
  41. e.g. http://www.sb.no/nyheter/nyheter/for-hoy-togtut/s/2-2.428-1.7540611 Archived 19 June 2016 at the Wayback Machine; in Norwegian
  42. "Getting around Sweden by Train". VisitSweden. Archived from the original on 13 November 2013. Retrieved 13 November 2013.
  43. "Our trains". SJ AB. Archived from the original on 7 November 2017. Retrieved 1 November 2017.
  44. "Rail Safety Tips". North County Transit District. Archived from the original on 23 December 2015. Retrieved 3 November 2016.
  45. Starcic, Janna (17 June 2016). "Maryland's MARC Railroad Upgrades Fleet, Service to Bolster Ridership". Metro Magazine. Archived from the original on 26 October 2016. Retrieved 26 October 2016.
  46. Template:CA rail schematics
  47. 2016 RTP/SCS Passenger Rail Appendix (PDF). Southern California Association of Governments. December 2015. Archived (PDF) from the original on 18 January 2017. Retrieved 4 November 2016.
  48. Caltrain Modernization Program (PDF). Transbay Joint Powers Authority Citizen Advisory Group. 14 January 2014. Archived (PDF) from the original on 20 December 2016. Retrieved 16 December 2016.
  49. 49.0 49.1 Marchant, Kevin. "The Regional Fast Rail Project – A Technical Focus" (PDF). Australian Construction Achievement Award. Archived from the original (PDF) on 20 April 2013. Retrieved 19 January 2014.
  50. "Pacific Surfliner Corridor Los Angeles to San Diego – Service Development Plan" (PDF). California Department of Transportation. Archived (PDF) from the original on 1 February 2014. Retrieved 21 October 2012.
  51. "Positive Train Control Overview". Federal Railroad Administration. 7 June 2012. Archived from the original on 4 September 2012. Retrieved 21 October 2012.
  52. Sonoma-Marin Area Rail Transit Project SCH #2002112033 Concrete Rail Ties CEQA Addendum to 2006 FEIR (PDF). Sonoma-Marin Area Rail Transit District. January 2011. p. 6. Archived (PDF) from the original on 4 March 2016. Retrieved 17 November 2014.
  53. "At a Glance: Railway Sleeper Materials". Railway-technology.com. 6 August 2010. Archived from the original on 29 November 2014. Retrieved 17 November 2014.
  54. "Continuous welded rails strengthen network". Creamer's Media Engineering News. 27 June 2014. Retrieved 17 November 2014.{{cite news}}: CS1 maint: deprecated archival service (link)
  55. Deveney, Thomas J. (19 March 2004). "Regional Fast Rail – Project Overview". IRSE Technical Convention. Archived from the original on 29 November 2014. Retrieved 19 January 2014.
  56. Technical Monograph: Transportation Planning for the Richmond–Charlotte Railroad Corridor (FRA/RDV-04/02) (PDF) (Volume II ed.). Federal Railroad Administration. 2004. Archived from the original (PDF) on 6 September 2012.
  57. "AMTRAK REQUESTS LESS FEDERAL OPERATING SUPPORT" (PDF). Amtrak Press Release. 3 February 2012. Archived (PDF) from the original on 30 July 2013. Retrieved 21 October 2012.
  58. "Automatic Train Control and Advanced Civil Speed Enforcement System; Northeast Corridor Railroads" (PDF). Federal Railroad Administration. Archived from the original (PDF) on 27 May 2010. Retrieved 21 October 2012.
  59. "Track improvements: Raleigh – Greensboro". NCDOT. Archived from the original on 27 September 2013. Retrieved 21 October 2012.
  60. "TRT 909". IDOT High Speed Rail. Archived from the original on 13 November 2012. Retrieved 21 October 2012.
  61. "TRT-909 Track Renewal System". Harsco Rail. Archived from the original on 18 January 2013. Retrieved 21 October 2012.
  62. "Catenary Improvements Continue on Metro-North's New Haven Line". MTA. Archived from the original on 27 September 2012. Retrieved 22 October 2012.
  63. "Sealed Corridor Program". NCDOT. Archived from the original on 1 September 2012. Retrieved 22 October 2012.
  64. http://www.jernbaneverket.no/Sikkerhet/Planovergangar/Der-vei-krysser-jernbane/ Archived 4 March 2016 at the Wayback Machine; in Norwegian
  65. "WSDOT Summary of Track 1 Projects" (PDF). Archived (PDF) from the original on 17 October 2012. Retrieved 22 October 2012.
  66. Freeman, Richard; Cooper, Hal. "Why Electrified Rail Is Superior". 21st Century (Summer 2005): 28.
  67. "Current Developments in UK Rail: An Electrifying Future". Railway-technology.com. 9 December 2010. Archived from the original on 19 October 2014. Retrieved 28 September 2014.
  68. Yadav, Anil (4 February 2013). "Traction choices: overhead ac vs third rail dc". International Railway Journal. Archived from the original on 6 September 2014. Retrieved 17 November 2014.
  69. Cotey, Angela. "Keystone Corridor". Progressive Railroading. Archived from the original on 12 July 2012. Retrieved 20 October 2012.
  70. Texas Eagle
  71. Wolfe, Thomas (27 July 2005). "Passengers on Amtrak's Southwest Chief Experience a Community Away From Home". Red Orbit. Archived from the original on 24 September 2015. Retrieved 21 October 2012.
  72. "Regional Transportation Plan 2012–2035" (PDF). Southern California Association of Governments. p. 9. Archived (PDF) from the original on 11 January 2015. Retrieved 11 January 2015.
  73. "Results of special audits and other investigations, August 2006". Auditor General Victoria. Archived from the original on 18 September 2006. Retrieved 13 November 2013.
  74. "Travelling on the Tilt Train linking Brisbane and Rockhampton in Queensland". Explore Australia by rail with an Australian rail pass. Archived from the original on 19 August 2017. Retrieved 10 July 2017.
  75. "Kalgoorlie celebrates launch of new Prospector". Public Transport Authority (Western Australia). Archived from the original on 19 August 2017. Retrieved 10 July 2017.
  76. "???". The Australian. Archived from the original on 6 November 2021. Retrieved 10 July 2017.
  77. Annual Report June 1999 (PDF). Brisbane: Queensland Rail. 1999. p. 53. Archived from the original (PDF) on 30 September 2009. Retrieved 20 August 2016.
  78. QR Tilt Train Sets Australian Rail Speed Record Railway Digest June 1999 page 15
  79. "铁路安全管理条例". gov.cn. Archived from the original on 14 October 2014. Retrieved 15 May 2018.
  80. "中国国家铁路集团有限公司". Archived from the original on 1 August 2020. Retrieved 29 November 2019.
  81. "20日起金山铁路动车组车次全面更新 列车时刻保持不变". 19 January 2021.
  82. "Railway Infrastructure". OSE SA. Archived from the original on 16 July 2015. Retrieved 10 August 2015.
  83. "Delhi-Agra semi-high speed train to be named Gatimaan Express". The Hindu. PTI. 12 October 2014. ISSN 0971-751X. Archived from the original on 9 November 2020. Retrieved 18 July 2021.
  84. Nair, Binoo (30 September 2016). "Mumbai-Goa route gets Railways' premium train Tejas". DNA India. Archived from the original on 18 July 2021. Retrieved 18 July 2021.
  85. "Madurai–Chennai Tejas Express flagged off! After Vande Bharat, it's the swankiest Indian Railways train". The Financial Express. 1 March 2019. Archived from the original on 18 July 2021. Retrieved 18 July 2021.
  86. Ray, Anulekha (4 October 2019). "India's first private train Lucknow-Delhi Tejas Express flagged off today". mint. Archived from the original on 18 July 2021. Retrieved 18 July 2021.
  87. "Ahmedabad–Mumbai Tejas Express To Be Flagged Off Toda". RailPost. 17 January 2020. Archived from the original on 18 July 2021. Retrieved 18 July 2021.
  88. Tyagi, Harshita. "Western Railway runs Mumbai–New Delhi Rajdhani Express with new Tejas-like smart sleeper coaches". Times Now. Archived from the original on 19 July 2021. Retrieved 19 July 2021.
  89. "The Incredibles". Mumbai Mirror. Archived from the original on 19 July 2021. Retrieved 19 July 2021.
  90. Livemint (1 September 2021). "Railways starts Patna-New Delhi Rajdhani Express with Tejas rake from today". mint. Archived from the original on 3 September 2021. Retrieved 3 September 2021.
  91. "India's fastest to be called Vande Bharat Express". Indian Express. Archived from the original on 28 January 2019. Retrieved 28 January 2019.
  92. 92.0 92.1 "Train 18, India's first engine-less train, set to hit tracks on October 29", The Indian Express, 24 October 2018, archived from the original on 6 November 2018, retrieved 9 December 2020
  93. Prabhakar, Siddarth (23 October 2018). "First Made-in-India engineless train gets on track for trial run – Times of India". The Times of India. Archived from the original on 5 November 2018. Retrieved 4 November 2018.
  94. Arora, Rajat (16 March 2018). "Made-in-India 160 km per hour train to run from June". The Economic Times. New Delhi, India. Archived from the original on 27 June 2018. Retrieved 5 November 2018.
  95. PTI (7 February 2019). "Train 18: PM Modi to flag off Vande Bharat Express on February 15 from New Delhi". Business Today. Archived from the original on 7 February 2019. Retrieved 15 February 2019.
  96. "Minister of Railways & Coal Shri Piyush Goyal Announces 'Vande Bharat Express'". Press Information Bureau, India. Archived from the original on 27 January 2019. Retrieved 27 January 2019.
  97. "Vande Bharat trains: Soon, 44 more semi-high speed trains on Indian Railways network; check details". The Financial Express. 8 July 2020. Archived from the original on 19 August 2020. Retrieved 23 August 2020.
  98. Livemint (30 September 2022). "New Vande Bharat Express flagged off by PM. Know routes, timings, other details". mint. Retrieved 1 October 2022.
  99. "PM Modi to flag off Vande Bharat Express in Himachal Pradesh's Una today". Indian Express. 12 October 2022. Retrieved 13 October 2022.
  100. "Train 18: PM Modi to flag off Vande Bharat Express on February 15 from New Delhi". Business Today. 7 February 2019. Archived from the original on 7 February 2019. Retrieved 17 February 2019.
  101. 101.0 101.1 "Pics: Train 18 To Begin Trial Run Today. Here Are 10 Things To Know". NDTV Profit. NDTV. 29 October 2018. Archived from the original on 5 November 2018. Retrieved 4 November 2018.
  102. "T 18: Train with a brain is Railways 'engineering marvel'". United News of India. 14 November 2018. Archived from the original on 4 May 2021. Retrieved 9 December 2020.
  103. "Self-propelled Train 18 debuts for trial run". United News of India. 29 October 2018. Archived from the original on 5 November 2018. Retrieved 4 November 2018.
  104. "INDIAN RAILWAY CATERING & TOURISM CORPORATION LTD". Archived from the original on 18 June 2020. Retrieved 9 December 2020.
  105. "Skyliner Overview". Japan: Keisei Electric Railway Co., Ltd. Retrieved 12 November 2019.
  106. Itō, Kumi. Transformation underwent at Hokuetsu Express, Railway Fan, Issue 670, Kōyūsha, February 2017, p. 68-73.
  107. "[Graphic News] GTX lines expansion". The Korea Herald. 31 January 2024. Retrieved 31 March 2024.
  108. "드디어 베일 벗은 '2기 GTX'…D·E·F 노선 '이곳' 지난다". 한국경제. 25 January 2024. Retrieved 31 March 2024.
  109. "China-Laos Railway starts operation". www.news.cn. Retrieved 6 December 2021.
  110. "Laos hopes for economic boost from Chinese-built railway". France 24. 28 November 2021. Retrieved 6 December 2021.
  111. "China and Laos open $6 billion high-speed rail link". Reuters. 3 December 2021. Retrieved 6 December 2021.
  112. "China-Laos railway – a guide to the Boten-Vientiane railway in Laos". Future Southeast Asia. 4 August 2020. Retrieved 6 December 2021.
  113. "High speed rail coming to Laos". Bangkok Post. Retrieved 6 December 2021.
  114. "T21 Midterm Review" (PDF). Chartered Institute of Logistics and Transport (Ireland). November 2010. Archived from the original (PDF) on 10 February 2015. Retrieved 29 July 2013.
  115. 115.0 115.1 115.2 Lambert, Lisa (9 December 2010). "U.S. yanks high-speed rail funds for Wisconsin and Ohio". Reuters. Archived from the original on 14 January 2016. Retrieved 3 November 2012.
  116. "Rejected by Florida, U.S. reallocates $2 billion for high-speed rail". CNN. 10 May 2011. Archived from the original on 17 September 2012. Retrieved 3 November 2012.
  117. "Washington to get $590 million for high-speed rail improvements". The Seattle Times. 27 January 2010. Archived from the original on 17 October 2012. Retrieved 22 October 2012.
  118. "High-Speed Rail Program". WSDOT. Archived from the original on 14 October 2012. Retrieved 22 October 2012.
  119. "Corridor Forum Meeting #1 – Summary" (PDF). Oregon Passenger Rail – Eugene Portland. Oregon Passenger Rail. Archived (PDF) from the original on 29 May 2014. Retrieved 3 November 2012.
  120. Levy, Paul (29 June 2014). "Plans for $1B rail line from Minneapolis to Duluth chugging along". Star Tribune West Metro. Archived from the original on 29 November 2014. Retrieved 17 November 2014.
  121. "River Route: Twin Cities to Chicago". Minnesota High-Speed Rail. Archived from the original on 5 May 2012. Retrieved 3 November 2012.
  122. "Dayton has hopes for high-speed rail in Minn". Minnesota Public Radio. 25 February 2011. Archived from the original on 6 November 2021. Retrieved 4 November 2012.
  123. "Branstad kills Iowa involvement in high-speed rail". The Daily Iowan. 22 August 2011. Archived from the original on 8 September 2012. Retrieved 4 November 2012.
  124. 124.0 124.1 "Tier 1 Service Level EIS: Chapter 2 – Alternatives" (PDF). Chicago to Council Bluffs-Omaha Regional Passenger Rail System Planning Study. Iowa Department of Transportation. Archived (PDF) from the original on 3 September 2013. Retrieved 4 November 2012.
  125. 125.0 125.1 "Omaha to Chicago (and possibly through Iowa City) Railway Route Study to Kick off this Month". Iowa City Patch. 6 February 2012. Archived from the original on 29 May 2014. Retrieved 4 November 2012.
  126. Kaplan, Thomas (31 May 2012). "For Sale: 4 Weedy, Rusty Relics of a Doomed Rail Project". The New York Times. Archived from the original on 10 February 2018. Retrieved 8 November 2012.
  127. Woodruff, Cathy (28 May 2005). "Express rail plan hits end of line". Times Union. Archived from the original on 19 August 2014.
  128. Woodruff, Cathy (13 December 2007). "Track cleared for upgrades; State suit settled; Amtrak to pay $20M, make improvements". Times Union. Archived from the original on 11 November 2014.
  129. Karlin, Rick (13 December 2012). "State's rusting trains sell for $420,000". Times Union. Archived from the original on 22 March 2016. Retrieved 13 December 2012.
  130. "The Ohio & Lake Erie Regional Rail Ohio Hub Study: Technical Memorandum & Business Plan" (PDF). The Ohio Hub. Ohio Department of Transportation. July 2007. Archived from the original (PDF) on 18 April 2012. Retrieved 3 November 2012.
  131. "Chapter 6: Intercity Passenger Rail" (PDF). Wisconsin Rail Plan 2030. Wisconsin Department of Transportation. Archived from the original (PDF) on 17 August 2013. Retrieved 3 November 2012.
  132. "Wisconsin Rail Plan 2030 – Draft plan". Wisconsin Rail Plan 2030. Wisconsin Department of Transportation. Archived from the original on 25 October 2012. Retrieved 3 November 2012.
  133. "Rail Baltica Final Report Volume I" (PDF). AECOM Limited. May 2011. Archived from the original (PDF) on 13 November 2013. Retrieved 13 November 2013.
  134. "Welcome to Milan's World". Archived from the original on 19 August 2018. Retrieved 18 August 2018.
  135. "Masse Rolls Out Need for Speed Campaign". Office of Brian Masse. Retrieved 17 November 2012.{{cite web}}: CS1 maint: deprecated archival service (link)
  136. "Windsor politicians disagree with rail study". CBCNews. 18 October 2012. Archived from the original on 24 October 2011. Retrieved 17 November 2012.
  137. 137.0 137.1 Preliminary Service Options Performance Report (PDF). Northern New England Intercity Rail Initiative (Report). massDOT. April 2014. p. 11. Archived (PDF) from the original on 21 January 2015. Retrieved 21 January 2015.
  138. Cite error: Invalid <ref> tag; no text was provided for refs named Greece
  139. Singh, Mahendra (4 July 2014). "Delhi to Agra in 99 minutes; train hits 160 kmph on trial run". The Times of India. Archived from the original on 4 July 2014. Retrieved 4 July 2014.
  140. "Over Rs 30,000 Crore Cleared For Delhi-Meerut High-Speed Rail Corridor". NDTV.com. Archived from the original on 27 August 2019. Retrieved 12 November 2019.
  141. Radhakrishnan, S. Anil (9 June 2020). "K-Rail revises alignment of section". The Hindu. Archived from the original on 19 July 2021. Retrieved 19 July 2021.
  142. "Indian Railways gears up to roll out 10 trains to link 40 cities in Vande Bharat boost: Report". Hindustan Times. 18 July 2021. Archived from the original on 18 July 2021. Retrieved 19 July 2021.
  143. "High-speed Auckland to Rotorua rail link proposed". The New Zealand Herald. 18 August 2017. Archived from the original on 17 August 2017. Retrieved 5 August 2017.
  144. "Tron Express launch date pushed back". Hamilton News. 31 May 2019. p. 4. Archived from the original on 3 June 2019. Retrieved 3 June 2019.
  145. "China in Panama: High-speed rail, mega infrastructure news + more". 28 September 2018. Archived from the original on 1 August 2020. Retrieved 24 November 2019.
  146. "Towards Improving Connectivity Between the Bicol and Calabarzon Regions". nro5.neda.gov.ph. National Economic and Development Authority. Archived from the original on 14 November 2019. Retrieved 8 February 2020.
  147. PNR Bicol Express Train (Junn Magno's Interview on Dos Por Dos). DZRH, via Jessv PH on Youtube. 22 January 2022. Retrieved 22 January 2022.
  148. "Public Meetings White River, VT & Springfield, MA January 22 and 23, 2014" (PDF). Northern New England Intercity Rail Initiative. massDOT. Archived (PDF) from the original on 21 January 2015. Retrieved 21 January 2015.
  149. "Stakeholder Meeting Pioneer Valley Planning Commission May 7, 2014" (PDF). Northern New England Intercity Rail Initiative. massDOT. Archived (PDF) from the original on 21 January 2015. Retrieved 21 January 2015.
  150. "Online Briefing Winter 2011 - 2012" (PDF). High Speed Rail Empire Corridor Project. New York Department of Transportation. Archived from the original (PDF) on 4 March 2016. Retrieved 8 November 2012.
  151. "Virginia-North Carolina Interstate High-Speed Rail Compact: Lengthening and Strengthening the Northeast Corridor (NEC) – April 20, 2012" (PDF). Regional Transport Alliance. Archived from the original (PDF) on 20 October 2014. Retrieved 22 October 2012.
  152. "Public to Weigh in on D.C. to Richmond Higher Speed Passenger Rail". U.S. Department of Transportation Federal Railroad Administration Press Release. 6 October 2014. Archived from the original on 18 October 2014. Retrieved 15 October 2014.
  153. 153.0 153.1 153.2 153.3 153.4 Randy Brown; Jason Orthner (4 August 2014). 2014 FRA Rail Program Delivery: Southeast Region (Report). Federal Railroad Administration. Archived from the original on 4 March 2016. Retrieved 16 January 2015.
  154. Recommendation Report: Southeast High Speed Rail Richmond, VA to Raleigh, NC, Tier II Environmental Impact Statement (PDF) (Report). DRPT and NCDOT. p. 10. Archived from the original (PDF) on 18 October 2013. Retrieved 19 May 2014.
  155. "Executive Summary: Atlanta Birmingham Corridor" (PDF). Tier 1 EIS. Georgia Department of Transportation. Archived from the original (PDF) on 18 November 2014. Retrieved 8 November 2012.
  156. Tier 1 Combined Final Environmental Impact Statement and Record of Decision (Tier 1 FEIS/ROD). Federal Railroad Administration. 12 September 2017. Retrieved 17 October 2017.[dead link]
  157. Columbus to Atlanta High Speed Rail Feasibility Study – Final Report (PDF). Columbus Consolidated Government. February 2014. Archived (PDF) from the original on 3 July 2014. Retrieved 17 December 2016.
  158. Barrow, Keith (18 July 2013). "Columbus – Chicago passenger rail study published". International Railway Journal. Archived from the original on 7 December 2013. Retrieved 20 July 2013.
  159. LeDuc, Doug (9 March 2012). "Support for passenger rail study gains steam". FW Daily News. Retrieved 20 July 2013.{{cite news}}: CS1 maint: deprecated archival service (link)
  160. Dawsey, Chastity Pratt (17 April 2018). "Plans on track for passenger train from Ann Arbor to Traverse City, group says". Bridge. Archived from the original on 21 April 2018. Retrieved 21 April 2018.
  161. "Amtrak Midwest trains get green light to increase max speed on Michigan route". Progressive Railroading. 18 May 2021. Archived from the original on 18 May 2021. Retrieved 19 May 2021.
  162. "Chicago-Milwaukee Environmental Assessment & Service Development Plan: Agency Stakeholder Meeting" (PDF). Wisconsin Department of Transportation. 2 December 2014. Archived from the original (PDF) on 19 January 2015. Retrieved 19 January 2015.
  163. Northern Lights Express Passenger Rail Project from Minneapolis to Duluth, Minnesota Finding of No Significant Impact and Section 4(f) Determination. Federal Railroad Administration. 20 February 2018. Retrieved 13 March 2018.[dead link]
  164. "March 2011 Narrative Application Form – Individual PE/NEPA, Part I: MO-KC to STL Corridor-Pleasant Hill to Jefferson City (90 mph) PE/NEPA" (PDF). Missouri Department of Transportation. Archived (PDF) from the original on 9 November 2012. Retrieved 13 February 2013.
  165. "Show Me Improved Rail Service" (PDF). Missouri Department of Transportation. April 2011. Archived (PDF) from the original on 9 November 2012. Retrieved 13 February 2013.
  166. "Coordination with TxDOT on Two Federally-Funded High Speed Rail Corridor Studies (July 22, 2011)" (PDF). North Central Texas Council of Governments. Archived from the original (PDF) on 31 March 2013. Retrieved 24 October 2012.
  167. "Final Alternatives 2013" (PDF). Arizona Department of Transportation. Archived (PDF) from the original on 19 May 2014. Retrieved 19 May 2014.
  168. Arizona Passenger Rail Corridor Study – Tucson to Phoenix: Record of Decision. Arizona Department of Transportation. 1 December 2016. Archived from the original on 15 May 2017. Retrieved 17 October 2017.
  169. Barron, Sean (5 September 2014). "Eastgate advisory board talks about high-speed rail service". The Vindicator. Archived from the original on 15 September 2014. Retrieved 30 September 2014.
  170. Williams, Jason (23 September 2014). "High-speed rail to Chicago sought". Cincinnati.com. Archived from the original on 27 February 2021. Retrieved 30 September 2014.
  171. "Hamilton County Commissioners Back High-Speed Rail". WKRC TV. 25 September 2014. Archived from the original on 29 September 2014. Retrieved 30 September 2014.
  172. Fleming, Leonard N. (21 July 2015). "Grand Rapids, Detroit train idea taking shape". The Detroit News. Archived from the original on 16 August 2015. Retrieved 10 August 2015.
  173. Jones, Peggy. "A bullet train in East Texas? Company plans to build Dallas-Houston route". News Journal, Longview, Texas. Retrieved 24 October 2012.{{cite news}}: CS1 maint: deprecated archival service (link)
  174. "Vietnam plans to build faster railway to China border". VietnameNet Bridge. 9 April 2018. Archived from the original on 22 April 2018. Retrieved 21 April 2018.

Template:Public transport Template:Higher-speed rail