{{Short description|Dam in Indian-administered Ladakh, Kashmir region}} | |||
{{Use dmy dates|date=March 2018}} | {{Use dmy dates|date=March 2018}} | ||
{{Use Indian English|date=March 2018}} | {{Use Indian English|date=March 2018}} | ||
| Line 57: | Line 58: | ||
}} | }} | ||
[[File:Alchi Project2.jpg|thumb|left|Alchi Hydroelectric Power Plant]] | [[File:Alchi Project2.jpg|thumb|left|Alchi Hydroelectric Power Plant]] | ||
The '''Nimoo Bazgo Power Project''' is a [[run-of-the-river]] power project on the [[Indus River]] situated at Alchi village, {{convert|75|km}} from [[Leh]] in the [[India]]n Union Territory of [[Ladakh]]. The project was conceived on 1 July 2001 and approved on 8 June 2005, and construction began on 23rd Sept, 2006. The project | The '''Nimoo Bazgo Power Project''' is a [[run-of-the-river]] power project on the [[Indus River]] situated at Alchi village, {{convert|75|km}} from [[Leh]] in the [[India]]n Union Territory of [[Ladakh]].<ref name="y902">{{cite web | title=Nimoo Bazgo Hydroelectric Project, Leh – emPowering Ladakh | website=Smart City | date=2014-04-26 | url=https://smartcity.eletsonline.com/nimoo-bazgo-hydroelectric-project-leh-empowering-ladakh/ | access-date=2024-09-14}}</ref> The project was conceived on 1 July 2001 and approved on 8 June 2005, and construction began on 23rd Sept, 2006. The project involved construction of a {{convert|57|m||adj=pre|-high|abbr=on}} concrete dam with five spillway blocks of {{convert|13|m|abbr=on}} each having ogee profile. The dam is 247.9m in length.<ref name="y902"/> It was officially completed and open in August 2014.<ref name="HydroReview">{{cite web | title=India prime minister dedicates 44-MW Chutak, 45-MW Nimoo Bazgo hydro projects | website=Hydro Review | date=2014-08-14 | url=https://www.hydroreview.com/world-regions/asiaoceania/india-prime-minister-dedicates-44-mw-chutak-45-mw-nimoo-bazgo-hydro-projects/#gref | access-date=2024-09-14}}</ref> | ||
The Nimoo Bazgo power | The Nimoo Bazgo power plant was stated to utilise a rated net head of {{convert|34|m|abbr=on}} to generate {{convert|239.30|GWh|abbr=off}}{{clarify|date=August 2014}} in a 90% dependable year. The project has three surface power units of {{convert|15|MW|abbr=on}} each with a total installed capacity of {{convert|45|MW||abbr=}}.<ref name="HydroReview"/> Every unit has a {{convert|3.3|m|abbr=on}} diameter, each {{convert|63|m|ft|abbr=on|adj=mid|-long}} penstocks. Each operating unit is stated to have been designed for a discharge of {{convert|48.7|m3/s|abbr=on}} and also have transformer yard and switch yard. The project was connected to the northern grid through a 220 kV transmission line from Leh to [[Srinagar]]. The dam diverts water from the Indus river by a {{convert|372|m|abbr=on}} long diversion channel and involves a flooding of only {{convert|3.42|km2|abbr=on}}. Thus the power density is {{convert|{{#expr:45/3.42 round 2}}|MW/km2|W/m2 MW/sqmi}}. The project was developed by National Hydroelectric Power Corporation (NHPC) Ltd.<ref name="HydroReview"/> Bharat Heavy Electricals Ltd. (BHEL) has executed the Electro-Mechanical works. | ||
All the three units of the project have been successfully commissioned. The project was inaugurated on 12 August 2014 by the Prime Minister of India [[Narendra Modi]], in a ceremony attended by senior officials including Chief Minister of Jammu & Kashmir [[Omar Abdullah]], National Security Adviser [[Ajit Kumar Doval]] and others.<ref>{{cite web|url=http://www.aninews.in/videogallery2/26687-pm-narendra-modi-inaugurates-45-mw-nimoo-bazgo-hydroelectric-power-project-in-leh.html|title=PM Narendra Modi inaugurates 45 MW Nimoo-Bazgo hydroelectric power project in Leh|publisher=aninews|accessdate=2015-02-27}}</ref> | ==History== | ||
The project was conceived on 1 July 2001 and approved on 8 June 2005, and construction began on 23rd Sept, 2006.{{Citation needed|date=September 2024}} | |||
The project required the removal and cutting of tens of thousands of tonnes of rock, diversion of the river flow, construction of the dam, powerhouse and reservoir.<ref name="y902"/> The project required development of the mountain road network, as well as delivery of construction vehicles by aircraft to Leh.<ref name="y902"/> The project was complicated by the difficult terrain and sub-zero mountain temperatures at some 3,500m above sea level.<ref name="y902"/> | |||
All the three units of the project have been successfully commissioned. The project was inaugurated on 12 August 2014 by the Prime Minister of India [[Narendra Modi]], in a ceremony attended by senior officials including Chief Minister of Jammu & Kashmir [[Omar Abdullah]], National Security Adviser [[Ajit Kumar Doval]] and others.<ref>{{cite web|url=http://www.aninews.in/videogallery2/26687-pm-narendra-modi-inaugurates-45-mw-nimoo-bazgo-hydroelectric-power-project-in-leh.html|title=PM Narendra Modi inaugurates 45 MW Nimoo-Bazgo hydroelectric power project in Leh|publisher=aninews|accessdate=2015-02-27|archive-date=23 September 2015|archive-url=https://web.archive.org/web/20150923172856/http://www.aninews.in/videogallery2/26687-pm-narendra-modi-inaugurates-45-mw-nimoo-bazgo-hydroelectric-power-project-in-leh.html|url-status=dead}}</ref><ref name="HydroReview"/> | |||
The project, along with the [[Chutak Hydroelectric Plant]], was certified as compliant with the [[Indus Waters Treaty]] by the Indian Central Water Commission, with the project information passed over to Pakistan.<ref name="ET">{{cite web | title=Government clears 8 hydropower projects on Indus in Ladakh | website=The Economic Times | date=2021-01-07 | url=https://economictimes.indiatimes.com/industry/energy/power/government-clears-8-hydropower-projects-on-indus-in-ladakh/articleshow/80154524.cms | access-date=2024-09-14}}</ref> | |||
==Notes== | ==Notes== | ||
{{externalimage|topic=Nimoo Bazgo power project| | {{externalimage|topic=Nimoo Bazgo power project|float=right|width=200px | ||
|image1=[http://www.nhpcindia.com/WriteReadData/Projects/English/Images/55_1.gif Nimoo Bazgo Excavation] | |image1=[http://www.nhpcindia.com/WriteReadData/Projects/English/Images/55_1.gif Nimoo Bazgo Excavation] | ||
|image2=[http://www.nhpcindia.com/WriteReadData/Projects/English/Images/55_3.jpg Nimoo Bazgo Layout Plan] | |image2=[http://www.nhpcindia.com/WriteReadData/Projects/English/Images/55_3.jpg Nimoo Bazgo Layout Plan] | ||
| Line 70: | Line 78: | ||
{{reflist}} | {{reflist}} | ||
{{stack|}} | {{stack|{{Portal|India|Water|Renewable energy}}}} | ||
{{Power Plants of Jammu and Kashmir}} | {{Power Plants of Jammu and Kashmir}} | ||
{{Indus River dams}} | {{Indus River dams}} | ||
| Line 80: | Line 88: | ||
[[Category:Dams on the Indus River]] | [[Category:Dams on the Indus River]] | ||
[[Category:Power stations in Ladakh]] | [[Category:Power stations in Ladakh]] | ||
[[Category:2012 establishments in Jammu and Kashmir]] | [[Category:2012 establishments in Jammu and Kashmir]] | ||
Latest revision as of 21:56, 22 January 2026
| Alchi Dam | |
|---|---|
![]() Alchi Dam | |
Location of Alchi Dam in Ladakh | |
| Coordinates | 34°12′55″N 77°11′06″E / 34.21528°N 77.18500°E |
| Status | C |
| Construction began | September 2006 |
| Owner(s) | NHPC Limited |
| Dam and spillways | |
| Type of dam | Concrete-face rock-fill |
| Impounds | Indus River |
| Height | 57 m (187 ft) |
| Spillways | 5 |
| Spillway type | Blocks |
| Spillway capacity | 13 m (43 ft) |
| Nimoo Bazgo Hydroelectric Plant | |
| Operator(s) | NHPC Limited |
| Commission date | Unit#3: Dec 2012, Unit#2: Jan 2013, Unit#1: June 2013 |
| Hydraulic head | 372 m (1,220 ft) |
| Turbines | 3 x 15 MW Francis-type |
| Installed capacity | 45 MW |

The Nimoo Bazgo Power Project is a run-of-the-river power project on the Indus River situated at Alchi village, 75 kilometres (47 mi) from Leh in the Indian Union Territory of Ladakh.[1] The project was conceived on 1 July 2001 and approved on 8 June 2005, and construction began on 23rd Sept, 2006. The project involved construction of a 57-high m (187 ft) concrete dam with five spillway blocks of 13 m (43 ft) each having ogee profile. The dam is 247.9m in length.[1] It was officially completed and open in August 2014.[2]
The Nimoo Bazgo power plant was stated to utilise a rated net head of 34 m (112 ft) to generate 239.30 gigawatt-hours (861.5 terajoules)[clarification needed] in a 90% dependable year. The project has three surface power units of 15 MW (20,000 hp) each with a total installed capacity of 45 megawatts (60,000 hp).[2] Every unit has a 3.3 m (11 ft) diameter, each 63 m-long (207 ft) penstocks. Each operating unit is stated to have been designed for a discharge of 48.7 m3/s (1,720 cu ft/s) and also have transformer yard and switch yard. The project was connected to the northern grid through a 220 kV transmission line from Leh to Srinagar. The dam diverts water from the Indus river by a 372 m (1,220 ft) long diversion channel and involves a flooding of only 3.42 km2 (1.32 sq mi). Thus the power density is 13.16 megawatts per square kilometre (13.16 W/m2; 34.1 MW/sq mi). The project was developed by National Hydroelectric Power Corporation (NHPC) Ltd.[2] Bharat Heavy Electricals Ltd. (BHEL) has executed the Electro-Mechanical works.
History[edit | edit source]
The project was conceived on 1 July 2001 and approved on 8 June 2005, and construction began on 23rd Sept, 2006.[citation needed]
The project required the removal and cutting of tens of thousands of tonnes of rock, diversion of the river flow, construction of the dam, powerhouse and reservoir.[1] The project required development of the mountain road network, as well as delivery of construction vehicles by aircraft to Leh.[1] The project was complicated by the difficult terrain and sub-zero mountain temperatures at some 3,500m above sea level.[1]
All the three units of the project have been successfully commissioned. The project was inaugurated on 12 August 2014 by the Prime Minister of India Narendra Modi, in a ceremony attended by senior officials including Chief Minister of Jammu & Kashmir Omar Abdullah, National Security Adviser Ajit Kumar Doval and others.[3][2]
The project, along with the Chutak Hydroelectric Plant, was certified as compliant with the Indus Waters Treaty by the Indian Central Water Commission, with the project information passed over to Pakistan.[4]
Notes[edit | edit source]
- ↑ 1.0 1.1 1.2 1.3 1.4 "Nimoo Bazgo Hydroelectric Project, Leh – emPowering Ladakh". Smart City. 26 April 2014. Retrieved 14 September 2024.
- ↑ 2.0 2.1 2.2 2.3 "India prime minister dedicates 44-MW Chutak, 45-MW Nimoo Bazgo hydro projects". Hydro Review. 14 August 2014. Retrieved 14 September 2024.
- ↑ "PM Narendra Modi inaugurates 45 MW Nimoo-Bazgo hydroelectric power project in Leh". aninews. Archived from the original on 23 September 2015. Retrieved 27 February 2015.
- ↑ "Government clears 8 hydropower projects on Indus in Ladakh". The Economic Times. 7 January 2021. Retrieved 14 September 2024.
Template:Power Plants of Jammu and Kashmir Template:Indus River dams