Bangur Nagar metro station: Difference between revisions

Created by LavadaTitheradge
Last edited December 20, 2025
Finished writing a new addition.
 
No edit summary
 
Line 1: Line 1:
{{Short description|A Mumbai Metro station on Line 2}}
{{Short description|Mumbai Metro's Yellow Line 2A terminal metro station}}
{{notability|Geography}}
{{Use dmy dates|date=March 2023}}
 
{{Use Indian English|date=March 2023}}
{{Use dmy dates}}
{{Use Indian English}}
{{Infobox station
{{Infobox station
| name = Bangur Nagar
| name               = Bangur Nagar
| type = [[Mumbai Metro]] station
| native_name        = {{white|{{nobold|बांगूर नगर}}}}
| style = Mumbai Metro
| style             = Mumbai Metro
| image =  
| style2            = Yellow
| image_caption =  
| image             = Bangur Nagar metro station.jpg
| address = Bangur Nagar, Goregaon West, Mumbai, Maharashtra 400090
| image_upright      = 1.3
| coordinates = {{coord|19.16256|N|72.83487|E}}
| image_caption     = Bangur Nagar metro station as seen from New Link Rd
| line = {{color box|#{{rail color|Mumbai Metro|2}}; font-size:100%|[[Line 2 (Mumbai Metro)|<span style="color:black;">'''Yellow Line 2'''</span>]]|}}
| address           = Mitha Nagar, Goregaon West, Mumbai, Maharashtra 400090
| other =  
| coordinates       = {{coord|19.1624723|N|72.8348708|E|format=dms|region:IN|display=inline, title}}
| structure = [[Elevated]]
| line               = {{rcb|Mumbai Metro|Line 2A|croute}}
| platform = [[Side platform]]<br/>Platform-1 → [[Dahisar East metro station|Dahisar East]]<br />Platform-2 → [[D N Nagar metro station|Andheri West]]
| other             =  
| operator = Mumbai Metro One Pvt Ltd (MMOPL)
| structure         = [[Elevated]]
| depth =  
| platform           = 2 [[side platforms]]
| tracks = 2
| owned              = [[File:MMRDA logo cropped.svg|22px]] [[Mumbai Metropolitan Region Development Authority]]
| parking = No
| operator           = {{rint|mumbai|m}} Maha Mumbai Metro Operation Corporation Ltd.
| bicycle =  
| depth             =  
| opened = {{start date and age|df=yes|2023|January|19}}
| tracks             =  
| closed =  
| parking           = No
| rebuilt =
| bicycle           =  
| electrified = 25 kV 50 Hz AC through [[overhead catenary]]
| opened             = {{start date and age|df=yes|2023|January|19}}
| ADA =  
| accessible        =  
| code =
<!-- Other information -->
| owned = [[Mumbai Metropolitan Region Development Authority]] (MMRDA)
| code              = '''<span style="background-color:#{{rcr|Mumbai Metro|2A}}">213</span>'''
| zone =
| former             =  
| smartcardname =
| passengers         =  
| smartcardstatus =
| pass_year         = 2023
| former =  
| pass_rank         =  
| passengers =  
| pass_percent       =  
| pass_year =  
| pass_system       =  
| pass_rank =  
| mpassengers       =  
| pass_percent =  
| services           = {{Adjstn|system=Mumbai Metro|line=2A|right=Lower Malad|left=Goregaon (West)}}
| pass_system =  
| route_map          = {{MM Line 2}}
| mpassengers =  
| map_state          = collapsed
| services = {{Adjacent stations|system=Mumbai Metro|line=2A||left=Lower Malad |to-left=Dahisar East|right=Goregaon West |to-right=Andheri West}}
| mapframe          = yes
| map_type = Mumbai
| mapframe-marker    = rail
| map_dot_label =  
| mapframe-marker-color = #{{rail color|Mumbai Metro|Line 2}}
| map_size = 300
| mapframe-zoom      = 14
| route_map = {{MM Line 2}}
| map_state = collapsed
}}
}}
'''Bangur Nagar''', formerly '''Pahadi Goregaon''', is a metro station on the [[Line 2 (Mumbai Metro)|Yellow Line 2A]] of [[Mumbai Metro]]. This station is located in an elevated position on New Link Road in North Mumbai. This metro station was inaugurated on 19 January 2023.<ref>{{Cite web |title=Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here |url=https://www.dnaindia.com/mumbai/report-mumbai-metro-line-2a-line-7-launches-check-routes-station-details-here-3018021 |access-date=2023-04-18 |website=DNA India |language=en}}</ref><ref>{{Cite web |title=Mumbai Metro: These 2 lines to get operational today. Check route, other details |url=https://www.livemint.com/news/india/mumbai-metro-rail-lines-2a-7-to-get-operational-today-check-route-other-details-11674107578757.html |access-date=2023-04-18 |website=mint |language=en}}</ref><ref>{{Cite web |title=Mumbai Metro's 2A & 7 Lines to Cover Andheri to Dahisar in Just 75 Minutes {{!}} Know Fare, Routes as Ops Begin Today |url=https://www.news18.com/news/india/mumbai-metros-2a-7-lines-to-cover-andheri-to-dahisar-in-just-75-minutes-know-fare-routes-as-ops-begin-today-6877861.html |access-date=2023-04-18 |website=News18 |language=en}}</ref>
'''Bangur Nagar''' is the elevated metro station serving Bangur Nagra neighbourhood of [[Goregaon]] on the North-South corridor of the [[Line 2 (Mumbai Metro)|Yellow Line 2A]] of the [[Mumbai Metro]] in [[Mumbai]], India. This station is owned by the [[Mumbai Metropolitan Region Development Authority]] (MMRDA), and was inaugurated on 19 January 2023.<ref>{{Cite web |title=Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here |url=https://www.dnaindia.com/mumbai/report-mumbai-metro-line-2a-line-7-launches-check-routes-station-details-here-3018021 |access-date=2023-04-18 |website=DNA India |language=en |archive-date=18 April 2023 |archive-url=https://web.archive.org/web/20230418015654/https://www.dnaindia.com/mumbai/report-mumbai-metro-line-2a-line-7-launches-check-routes-station-details-here-3018021 |url-status=live }}</ref><ref>{{Cite web |date=2023-01-19 |title=Mumbai Metro: These 2 lines to get operational today. Check route, other details |url=https://www.livemint.com/news/india/mumbai-metro-rail-lines-2a-7-to-get-operational-today-check-route-other-details-11674107578757.html |access-date=2023-04-18 |website=mint |language=en |archive-date=18 April 2023 |archive-url=https://web.archive.org/web/20230418021157/https://www.livemint.com/news/india/mumbai-metro-rail-lines-2a-7-to-get-operational-today-check-route-other-details-11674107578757.html |url-status=live }}</ref>


== History ==
== History ==
Trial runs on section of 2A from [[Dhanukarwadi metro station|Dhanukarwadi]] to Dahisar East has started from 31 May 2021. Dahisar East commercial operations began on 3 April 2022 with First phase of [[Line 2 (Mumbai Metro)|line 2A]].
The station was originally named Pahadi Goregaon. The MMRDA renamed the station as Bangur Nagar on 10 April 2023 due to public demand.<ref>{{Cite web |title=Mumbai: Three Metro stations renamed on public demand |url=https://www.freepressjournal.in/mumbai/mumbai-three-metro-stations-renamed-on-public-demand |access-date=2023-07-09 |website=Free Press Journal |language=en}}</ref>


== Station Layout ==
== Station layout ==
{| cellspacing="0" cellpadding="3" border="0"
{| border=0 cellspacing=0 cellpadding=3
| style="border-bottom:solid 1px gray;border-top:solid 1px gray;" width="50" valign="top" |'''G'''
|style="border-bottom:solid 1px gray;vertical-align:top;border-top:solid 1px gray;" rowspan=4;|'''2nd Floor'''
| style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width="100" valign="top" |Street Level
|style="border-top:solid 1px gray;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" colspan=2|{{small|[[Side platform]] {{access icon}}}}
| style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width="500" valign="top" |Exit/Entrance
|-
| valign="top" |'''L1'''
| valign="top" |Mezzanine
| valign="top" |Fare control, station agent, Metro Card vending machines, crossover
|-
| rowspan="4" style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width="50" valign="top" |'''L2'''
| colspan="2" style="border-top:solid 1px gray;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" |<small>[[Side platform]]<nowiki> | Doors will open on the left </nowiki>{{access icon}}</small>
|-
|-
| style="border-bottom:solid 1px gray;" width="100" |<span style="color:#{{rail color|Mumbai Metro|2}}">'''Platform 2'''<br />'''Southbound'''</span>
|style="border-bottom:solid 1px gray;" width=50 height=45|'''<span style=background-color:#{{rail color|Mumbai Metro|yellow}}>Platform 1</span>'''
| style="border-bottom:solid 1px gray;" width="500" |Towards [[Andheri West metro station|Andheri West]] <small>next station is [[Goregaon West metro station|Goregaon West]]</small>
|style="border-bottom:solid 1px gray;" width=390| {{0|→}} towards {{ltl|Mumbai Metro|line 2A|Right}} {{small|([[Lower Malad metro station|Lower Malad]])}} →
|-
|-
|<span style="color:#{{rail color|Mumbai Metro|2}}">'''Platform 1'''<br />'''Northbound'''</span>
| height=45|<span style=background-color:#{{rail color|Mumbai Metro|yellow}}>'''Platform 2'''</span>
|Towards [[Dahisar East metro station|Dahisar East]] <small>next station is [[Lower Malad metro station|Lower Malad]]</small>
| ← towards {{ltl|Mumbai Metro|line 2A|Left}} {{small|([[Goregaon (West) metro station|Goregaon (West)]])}}
|-
|-
| colspan="2" style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;" align="center" |<small>[[Side platform]]<nowiki> | Doors will open on the left </nowiki>{{access icon}}</small>
|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;text-align:center;" colspan=2|{{small|[[Side platform]] {{access icon}}}}
|-
|-
| rowspan="2" style="border-bottom:solid 1px gray;" width="50" valign="top" |'''L2'''
|style="vertical-align:top"|'''1st Floor'''
| style="border-bottom:solid 1px gray;" width="100" |
|style="vertical-align:top"|Mezzanine
| style="border-bottom:solid 1px gray;" width="500" |
|style="vertical-align:top"|Fare control, station agent, Metro QR ticket vending machines, crossover
|-
|-
|style="border-bottom:solid 1px gray;border-top:solid 1px gray; vertical-align:top" width=50 |'''Ground'''
|style="border-top:solid 1px gray;border-bottom:solid 1px gray; vertical-align:top" width=100 |Street level
|style="border-top:solid 1px gray;border-bottom:solid 1px gray; vertical-align:top" width=420 |Exit/Entrance
|}
|}


=== Power and Signaling System ===
=== Power and signaling system ===
Like all other stations and railways of [[Mumbai Metro|Mumbai metro]], Bangur Nagar station also uses 25,000 volt AC power system by [[Overhead line|overhead catenary]] to operate the trains.
Like all other stations and railways of the [[Mumbai Metro]], Andheri West station also uses 25,000 volt AC power system by [[Overhead line|overhead catenary]] to operate the trains.


== References ==
== References ==
{{reflist|30em}}
{{reflist|30em}}


{{Mumbai Metro navbox}}
{{Mumbai Metro navbox|line 2=yes}}


[[Category:Railway stations in India opened in 2023]]
[[Category:Railway stations in India opened in 2023]]
[[Category:Mumbai Metro stations]]
[[Category:Mumbai Metro stations]]
[[Category:2023 establishments in Maharashtra]]

Latest revision as of 20:44, 20 December 2025


Bangur Nagar

बांगूर नगर
Bangur Nagar metro station as seen from New Link Rd
LocationMitha Nagar, Goregaon West, Mumbai, Maharashtra 400090
Coordinates19°09′45″N 72°50′06″E / 19.1624723°N 72.8348708°E / 19.1624723; 72.8348708
Owned by Mumbai Metropolitan Region Development Authority
Operated byFile:Mumbai Metro Line 1 logo.png Maha Mumbai Metro Operation Corporation Ltd.
Line(s)Template:Rcb
Platforms2 side platforms
Construction
Structure typeElevated
ParkingNo
Other information
Station code213
History
Opened19 January 2023; 3 years ago (2023-01-19)
Services
Template:Adjstn
Location
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).

Bangur Nagar is the elevated metro station serving Bangur Nagra neighbourhood of Goregaon on the North-South corridor of the Yellow Line 2A of the Mumbai Metro in Mumbai, India. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 19 January 2023.[1][2]

History[edit | edit source]

Station layout[edit | edit source]

2nd Floor Side platform Disabled access
Platform 1 towards Template:Ltl (Lower Malad)
Platform 2 ← towards Template:Ltl (Goregaon (West))
Side platform Disabled access
1st Floor Mezzanine Fare control, station agent, Metro QR ticket vending machines, crossover
Ground Street level Exit/Entrance

Power and signaling system[edit | edit source]

Like all other stations and railways of the Mumbai Metro, Andheri West station also uses 25,000 volt AC power system by overhead catenary to operate the trains.

References[edit | edit source]

  1. "Mumbai Metro: Line 2A, Line 7 launched, check routes, station details here". DNA India. Archived from the original on 18 April 2023. Retrieved 18 April 2023.
  2. "Mumbai Metro: These 2 lines to get operational today. Check route, other details". mint. 19 January 2023. Archived from the original on 18 April 2023. Retrieved 18 April 2023.