robot: Update article (please report if you notice any mistake or error in this edit) |
m Removed empty portal template using script |
||
| Line 238: | Line 238: | ||
{{div col end}} | {{div col end}} | ||
{{Clear}} | {{Clear}} | ||
==References== | ==References== | ||
Revision as of 15:16, 14 August 2023
| Chennai Metro station | ||
![]() | ||
| Location | Chennai – Trichy Hwy, Anna Salai, Triplicane, Chennai, Tamil Nadu 600002 India | |
| Coordinates | 13°03′52″N 80°15′57″E / 13.0645067°N 80.2658909°E | |
| Owned by | Chennai Metro | |
| Operated by | Chennai Metro Rail Limited (CMRL) | |
| Line(s) | ||
| Platforms | Island platform Platform-1 → Chennai International Airport Platform-2 → Wimco Nagar | |
| Tracks | 2 | |
| Construction | ||
| Structure type | Underground, Double Track | |
| Parking | No | |
| Disabled access | Yes | |
| History | ||
| Opened | 10 February 2019 | |
| Electrified | Single phase 25 kV, 50 Hz AC through overhead catenary | |
| Services | ||
|
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Chennai Metro' not found. | ||
| Location | ||
LIC metro station is a Metro railway station on the Blue Line of the Chennai Metro. The station is among the underground stations along corridor I of the Chennai Metro, Wimco Nagar–Chennai International Airport stretch. The station serves the neighbourhoods of Egmore and Royapettah.
History
This section is empty. You can help by adding to it. (February 2019) |
Etymology
The station is named so because of the presence of the LIC Building, the city's first skyscraper, in the vicinity.
Construction
The station
The station was opened for public on 10 February 2019. However, some portions of the construction work remains incomplete on the date of inauguration.[1]
| LIC metro station | |
|---|---|
எல். ஐ. சி. மெட்ரோ | |
| General information | |
| Status | Complete |
| Type | Metro station |
| Location | Anna Salai |
| Town or city | Chennai |
| Country | India |
| Elevation | 10.0m |
| Completed | 2019 |
| Opened | 10 February 2019 |
| Inaugurated | 10 February 2019 |
| Design and construction | |
| Main contractor | L&T-SUCG JV |
| Website | |
| http://chennaimetrorail.org/ | |
Station layout
| G | Street level | Exit/Entrance |
| M | Mezzanine | Fare control, station agent, Ticket/token, shops |
| P | Southbound | Platform 1 → Towards → Chennai International Airport next station is Thousand Lights |
| Island platform, doors will open on the right | ||
| Northbound | Platform 2 ← Towards ← Wimco Nagar next station is Government Estate | |
| style="color:;background:#Template:Rail color;text-align:center;padding:5px"| LIC track layout | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and one Island platform
| ||||||||||||||||||||||||||||||||||||||||||
Facilities
List of available ATM at LIC metro station are
Connections
Bus
Rail
Entry/Exit
| align="center" colspan="5" style="background:#Template:Rail color;"| LIC metro station Entry/exits | |||
|---|---|---|---|
| Gate No-A1 | Gate No-A2 | Gate No-A3 | Gate No-A4 |
See also
References
- ↑ Sekar, Sunitha (21 January 2019). "Work on LIC, Thousand Lights Metro stations still on". The Hindu. Retrieved 10 February 2019.
External links
- chennaimetrorail
.org - UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.
- Google. "LIC metro station" (Map). Google Maps. Google.
{{cite map}}:|author=has generic name (help)

