>Monkbot m Task 18 (cosmetic): eval 2 templates: hyphenate params (2×); |
robot: Update article (please report if you notice any mistake or error in this edit) |
||
| Line 1: | Line 1: | ||
{{Use dmy dates|date=November 2018}} | {{Use dmy dates|date=November 2018}} | ||
{{Use Indian English|date=November 2018}} | {{Use Indian English|date=November 2018}} | ||
{{Infobox station | {{Infobox station | ||
| name | | name = [[File:Chennai Metro logo.svg|50px]]<br />Egmore Metro | ||
| type | | type = [[:Category:Chennai Metro stations|Chennai Metro Station]] | ||
| style | | style = Chennai Metro | ||
| image | | image = Egmore metro station.jpg | ||
| image_size | | image_size = | ||
| image_caption = | | image_caption = | ||
| address | | address = Egmore, Chennai, Tamil Nadu 600008 | ||
| coordinates | | coordinates = {{coord|13.0791464|80.2610885|type:railwaystation_region:SG|format=dms}} | ||
| line | | line = {{color box|#{{rail color|Chennai Metro|Green}}}} [[Green Line (Chennai Metro)]] | ||
| other | | other = | ||
| structure | | structure = Underground, [[Double-track railway|Double Track]] | ||
| platform | | platform = [[Island platform]]<br /> | ||
Platform-1 → [[St. Thomas Mount railway station#Integrated Terminus for suburban.2C MRTS .26 METRO|St. Thomas Mount]]<br />Platform-2 → [[Chennai Central metro station]] | Platform-1 → [[St. Thomas Mount railway station#Integrated Terminus for suburban.2C MRTS .26 METRO metro station|St. Thomas Mount]]<br />Platform-2 → [[Chennai Central metro station|M.G.R Chennai Central]] | ||
| depth | | depth = | ||
| levels | | levels = 2 | ||
| tracks | | tracks = 2 | ||
| parking | | parking = {{Parking symbol}} Available | ||
| bicycle | | bicycle = | ||
| baggage_check = | | baggage_check = | ||
| opened | | opened = {{start date and age|df=yes|2018|May|25}} | ||
| closed | | closed = | ||
| rebuilt | | rebuilt = | ||
| electrified | | electrified = Single phase 25 kV, 50 Hz AC through [[overhead catenary]] | ||
| ADA | | ADA = Yes {{access icon}} | ||
| code | | code = | ||
| owned | | owned = [[Chennai Metro]] | ||
| operator | | operator = Chennai Metro Rail Limited (CMRL) | ||
| zone | | zone = | ||
| smartcardname = | | smartcardname = | ||
| smartcardstatus = | | smartcardstatus = | ||
| former | | former = | ||
| passengers | | passengers = | ||
| pass_year | | pass_year = | ||
| pass_percent | | pass_percent = | ||
| pass_system | | pass_system = | ||
| mpassengers | | mpassengers = | ||
| services | | services = {{adjacent stations|system=Chennai Metro|line=Green|left=Chennai Central|right=Nehru Park}} | ||
| map_type = India Chennai | |||
| map_type | | map_size = 300 | ||
| map_size | |||
| map_dot_label = Egmore metro station | | map_dot_label = Egmore metro station | ||
| route_map | | route_map = {{Chennai Metro Green Line Route}} | ||
| map_state | | map_state = collapsed | ||
}} | }} | ||
| Line 60: | Line 59: | ||
Egmore is underground Metro station situated on [[Green Line (Chennai Metro)]]. | Egmore is underground Metro station situated on [[Green Line (Chennai Metro)]]. | ||
{{Infobox building | {{Infobox building | ||
| name = Egmore metro station | | name = Egmore metro station | ||
| native_name = எழும்பூர் | | native_name = எழும்பூர் | ||
| Line 67: | Line 66: | ||
| logo_size = 100px | | logo_size = 100px | ||
| logo_alt = | | logo_alt = | ||
| logo_caption = Chennai Metro Logo | | logo_caption = Chennai Metro Logo | ||
| image = | | image = | ||
| image_size = | | image_size = | ||
| image_alt = | | image_alt = | ||
| image_caption = | | image_caption = | ||
| Line 75: | Line 74: | ||
| map_alt = | | map_alt = | ||
| map_caption = | | map_caption = | ||
| map_size = 280 | | map_size = 280 | ||
| map_dot_label = | | map_dot_label = | ||
| map_dot_mark = | | map_dot_mark = | ||
| Line 81: | Line 80: | ||
| former_names = | | former_names = | ||
| alternate_names = | | alternate_names = | ||
| etymology = | | etymology = | ||
| status = Complete | | status = Complete | ||
| cancelled = | | cancelled = | ||
| Line 94: | Line 93: | ||
| coordinates = | | coordinates = | ||
| altitude = | | altitude = | ||
| current_tenants = | | current_tenants = | ||
| namesake = | | namesake = | ||
| groundbreaking_date = | | groundbreaking_date = | ||
| start_date = | | start_date = | ||
| stop_date = | | stop_date = | ||
| est_completion = | | est_completion = | ||
| topped_out_date = | | topped_out_date = | ||
| completion_date = {{end date|2018}} | | completion_date = {{end date|2018}} | ||
| opened_date = | | opened_date = {{end date|2018|05|25|df=y}} | ||
| inauguration_date = {{end date|2018|05|25|df=y}} | | inauguration_date = {{end date|2018|05|25|df=y}} | ||
| relocated_date = | | relocated_date = | ||
| renovation_date = | | renovation_date = | ||
| closing_date = | | closing_date = | ||
| demolition_date = | | demolition_date = | ||
| cost = | | cost = | ||
| ren_cost = | | ren_cost = | ||
| Line 115: | Line 114: | ||
| affiliation = | | affiliation = | ||
| height = | | height = | ||
| architectural = | | architectural = | ||
| tip = | | tip = | ||
| antenna_spire = | | antenna_spire = | ||
| Line 124: | Line 123: | ||
| circumference = | | circumference = | ||
| weight = | | weight = | ||
| other_dimensions = | | other_dimensions = | ||
| structural_system = | | structural_system = | ||
| material | | material = | ||
| size | | size = | ||
| floor_count | | floor_count = | ||
| floor_area | | floor_area = | ||
| elevator_count | | elevator_count = | ||
| grounds_area | | grounds_area = | ||
| architect | | architect = | ||
| architecture_firm = | | architecture_firm = | ||
| developer | | developer = | ||
| engineer | | engineer = | ||
| structural_engineer = | | structural_engineer = | ||
| services_engineer = | | services_engineer = | ||
| civil_engineer | | civil_engineer = | ||
| other_designers = | | other_designers = | ||
| quantity_surveyor = | | quantity_surveyor = | ||
| main_contractor = L&T-SUCG JV | | main_contractor = L&T-SUCG JV | ||
| awards | | awards = | ||
| designations | | designations = | ||
| known_for | | known_for = | ||
| ren_architect | | ren_architect = | ||
| ren_firm | | ren_firm = | ||
| ren_engineer | | ren_engineer = | ||
| ren_str_engineer = | | ren_str_engineer = | ||
| ren_serv_engineer = | | ren_serv_engineer = | ||
| Line 153: | Line 152: | ||
| ren_oth_designers = | | ren_oth_designers = | ||
| ren_qty_surveyor = | | ren_qty_surveyor = | ||
| ren_contractor = | | ren_contractor = | ||
| ren_awards | | ren_awards = | ||
| rooms | | rooms = <!-- or | unit_count = --> | ||
| parking | | parking = {{Parking symbol}} available | ||
| website | | website = http://chennaimetrorail.org/ | ||
| embed | | embed = | ||
| embedded | | embedded = | ||
| references | | references = | ||
| footnotes | | footnotes = | ||
}} | |||
===Station layout=== | ===Station layout=== | ||
| Line 167: | Line 167: | ||
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=50 valign=top|'''G''' | |style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=50 valign=top|'''G''' | ||
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=100 valign=top|Street level | |style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=100 valign=top|Street level | ||
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=390 valign=top|Exit/ Entrance | |style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=390 valign=top|Exit/Entrance | ||
|- | |- | ||
|style="border-bottom:solid 1px gray;"|'''M''' | |style="border-bottom:solid 1px gray;"|'''M''' | ||
| Line 174: | Line 174: | ||
|- | |- | ||
|style="border-bottom:solid 1px gray;" width=50 rowspan=3 valign=top|'''P''' | |style="border-bottom:solid 1px gray;" width=50 rowspan=3 valign=top|'''P''' | ||
|style="border-bottom:solid 1px white;" width=100|<span style=color:#{{Chennai Metro | |style="border-bottom:solid 1px white;" width=100|<span style=color:#{{rail color|Chennai Metro|Green}}>'''Southbound'''</span> | ||
|style="border-bottom:solid 1px white;" width= | |style="border-bottom:solid 1px white;" width=500|Platform 1 → Towards → [[St. Thomas Mount railway station#Integrated Terminus for suburban.2C MRTS .26 METRO|St. Thomas Mount]] <small>next station is [[Nehru Park metro station|Nehru Park]]</small> | ||
|- | |- | ||
|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" colspan=2|<small>[[Island platform]], doors will open on the right</small> {{access icon}} | |style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" colspan=2|<small>[[Island platform]], doors will open on the right</small> {{access icon}} | ||
|- | |- | ||
|style="border-bottom:solid 1px gray;" width=100|<span style=color:#{{Chennai Metro | |style="border-bottom:solid 1px gray;" width=100|<span style=color:#{{rail color|Chennai Metro|Green}}>'''Northbound'''</span> | ||
| style="border-bottom:solid 1px gray;" width=" | | style="border-bottom:solid 1px gray;" width="500" |Platform 2 ← Towards ← [[Chennai Central metro station|M.G.R Chennai Central]] <small>'''''Change at the next station for '''{{color box|#{{rail color|Chennai Metro|Blue}}; font-size:100%|[[Blue Line (Chennai Metro)|<span style="color:white;">'''Blue Line'''</span>]]|}}''</small> | ||
|} | |} | ||
{{Routemap | |||
| title = Egmore track layout | |||
| title-bg = #{{rail color|Chennai Metro|Green}} | |||
| legend = track | |||
| collapsible = no | |||
| map = STRg\STRf | |||
STR+BSl\STR+BSr ~~ ~~ ~~ to [[Chennai Central metro station|M.G.R Chennai Central]] | |||
STR+BSl\STR+BSr | |||
STR+BSl\STR+BSr ~~ ~~ ~~ to [[Nehru Park metro station|Nehru Park]] | |||
STRg\STRf | |||
| bottom = <div style="width:35em;text-align:center">Station with two tracks and one Island platform</div> | |||
}} | |||
===Facilities=== | ===Facilities=== | ||
| Line 196: | Line 208: | ||
{|class="wikitable" style="text-align: center;" width="70%" | {|class="wikitable" style="text-align: center;" width="70%" | ||
|- | |- | ||
! align="center" colspan="5" style="background:#{{Chennai Metro | ! align="center" colspan="5" style="background:#{{rail color|Chennai Metro|Green}};"| <span style="color:WHITE;">'''Egmore metro station Entry/exits '''</span> | ||
|- | |- | ||
! style="width:5%;"|Gate No-A1 | ! style="width:5%;"|Gate No-A1 | ||
| Line 203: | Line 215: | ||
! style="width:5%;"|Gate No-A4 | ! style="width:5%;"|Gate No-A4 | ||
|- | |- | ||
| Chennai Egmore | | Chennai Egmore Railway Station (Platform 9) || || || | ||
|- | |- | ||
| || || || | | || || || | ||
| Line 244: | Line 256: | ||
{{Chennai Metro}} | {{Chennai Metro}} | ||
{{Transport in Chennai}} | {{Transport in Chennai}} | ||
[[Category:Chennai Metro stations]] | [[Category:Chennai Metro stations]] | ||
[[Category:Railway stations in Chennai]] | [[Category:Railway stations in Chennai]] | ||
Revision as of 10:51, 7 June 2022
| Chennai Metro Station | |||||
![]() | |||||
| Location | Egmore, Chennai, Tamil Nadu 600008 | ||||
| Coordinates | 13°04′45″N 80°15′40″E / 13.0791464°N 80.2610885°E | ||||
| Owned by | Chennai Metro | ||||
| Operated by | Chennai Metro Rail Limited (CMRL) | ||||
| Line(s) | Green Line (Chennai Metro) | ||||
| Platforms | Island platform Platform-1 → St. Thomas Mount Platform-2 → M.G.R Chennai Central | ||||
| Tracks | 2 | ||||
| Construction | |||||
| Structure type | Underground, Double Track | ||||
| Platform levels | 2 | ||||
| Parking | |||||
| Disabled access | Yes | ||||
| History | |||||
| Opened | 25 May 2018 | ||||
| Electrified | Single phase 25 kV, 50 Hz AC through overhead catenary | ||||
| Services | |||||
|
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Chennai Metro' not found. | |||||
| |||||
| Location | |||||
Egmore Metro station is a Metro railway station on Line 2 of the Chennai Metro. The station is among the underground stations coming up along corridor II of the Chennai Metro, Chennai Central–St. Thomas Mount stretch. The station will serve the neighbourhoods of Egmore and Vepery.
History
This section is empty. You can help by adding to it. (December 2017) |
Construction
The station
The station covers an area of about 8,000 square meter and is located adjacent to the Egmore railway station.[1] The station has four entry and exit points.[2]
Structure
Egmore is underground Metro station situated on Green Line (Chennai Metro).
| Egmore metro station | |
|---|---|
எழும்பூர் | |
| General information | |
| Status | Complete |
| Type | Metro station |
| Location | Egmore |
| Town or city | Chennai |
| Country | India |
| Completed | 2018 |
| Opened | 25 May 2018 |
| Inaugurated | 25 May 2018 |
| Design and construction | |
| Main contractor | L&T-SUCG JV |
| Other information | |
| Parking | |
| Website | |
| http://chennaimetrorail.org/ | |
Station layout
| G | Street level | Exit/Entrance |
| M | Mezzanine | Fare control, station agent, Ticket/token, shops |
| P | Southbound | Platform 1 → Towards → St. Thomas Mount next station is Nehru Park |
| Island platform, doors will open on the right | ||
| Northbound | Platform 2 ← Towards ← M.G.R Chennai Central Change at the next station for Blue Line | |
| style="color:;background:#Template:Rail color;text-align:center;padding:5px"| Egmore track layout | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and one Island platform
| ||||||||||||||||||||||||||||||||||||||||||
Facilities
List of available ATM at Egmore metro station are
Connections
Bus
Metropolitan Transport Corporation (Chennai) bus routes number 15A, 15B, 20, 23A, 28, 28A, 28B, 53A, 53E, 120K, serves the station from nearby Egmore bus stand.[3]
Rail
Chennai Egmore railway station
Entry/Exit
| align="center" colspan="5" style="background:#Template:Rail color;"| Egmore metro station Entry/exits | |||
|---|---|---|---|
| Gate No-A1 | Gate No-A2 | Gate No-A3 | Gate No-A4 |
| Chennai Egmore Railway Station (Platform 9) | |||
See also
References
- ↑ "New Metro stretches may be launched from Egmore". The Hindu. Chennai: Kasturi & Sons. 14 May 2018. Retrieved 12 August 2018.
- ↑ "Metro stretch to have fewer entry points". The Hindu. Chennai. 8 May 2017. Retrieved 10 May 2017.
- ↑ http://www.mtcbus.org/
External links
- chennaimetrorail
.org - UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.
- Google. "Egmore metro station" (Map). Google Maps. Google.
{{cite map}}:|author=has generic name (help)

