Versova metro station: Difference between revisions

Created by 103.58.152.217
Last edited January 14, 2026
m Removed empty portal template using script
No edit summary
 
Line 1: Line 1:
{{Short description|Mumbai Metro's Blue Line 1 terminal metro station}}
{{Use dmy dates|date=January 2016}}
{{Use dmy dates|date=January 2016}}
{{Use Indian English|date=January 2016}}
{{Use Indian English|date=January 2016}}
{{Infobox station
{{Infobox station
| name = [[File:Mumbai_Metro_Line_1_logo.png|70px|link=Mumbai_Metro]] Versova
| name               = Versova
| type = [[Mumbai Metro]] station
| native_name        = {{nobold|वर्सोवा}}
| style = Mumbai Metro
| style             = Mumbai Metro One
| image = Versova metro station - Main.jpg
| image             = Versova metro station feb 2025.jpg
| image_caption =  
| image_upright      = 1.3
| address = JP Road, Model Town, [[Andheri]] (West), Mumbai
| image_caption     = Street-level view of Versova metro station concourse on Line 1
| coordinates = {{coord|19.130277|N|72.821314|E|display=inline}}
| address           = JP Road, Model Town, [[Andheri]] (West), Mumbai
| line = {{color box|#000080; font-size:100%|[[Line 1 (Mumbai Metro)|<span style="color:white;">'''Blue Line 1'''</span>]]|}}
| coordinates       = {{coord|19|7|49|N|72|49|17|E|display=inline,title}}
| other =  
| line               = {{rcb|Mumbai Metro|Blue Line|croute}}
| structure = [[Elevated]]
| other             =  
| platform = 2 [[side platform]]s
| structure         = [[Elevated]]
  Platform-1 [[Ghatkopar metro station|Ghatkopar]]<br />Platform-2 → Train Terminates
| platform           = 2 [[Side platforms]]
| operator = Mumbai Metro One Pvt Ltd (MMOPL)
| operator          = [[File:Logo of Mumbai Metro Line 1.svg|22px|link=Mumbai_Metro_One]] [[Mumbai Metro One Pvt Ltd]]
| owned = [[Mumbai Metro One Private Limited]] (MMOPL)
| parking            = No
| depth =  
| bicycle            = Yes<ref>{{cite web |title=Bike-sharing services to be extended to 3 more Mumbai Metro stations |website=[[Hindustan Times]] |access-date=21 January 2024 |date=31 December 2020 |last=Venkatraman |first=Tanushree |place=[[Mumbai]] |url=https://www.hindustantimes.com/mumbai-news/bike-sharing-services-to-be-extended-to-3-more-mumbai-metro-stations/story-ztDm9JAkOfnHa7l2B0DLYJ.html}}</ref>
| levels = 3
| opened             = {{start date and age|2014|June|8|df=yes}}
| tracks = 2
| closed             =  
| parking = No
| rebuilt           =  
| bicycle =  
| accessible        = Yes<ref name="map">{{cite web|title=Versova metro station layout|website=reliancemumbaimetro.com|access-date=December 25, 2023|url=https://www.reliancemumbaimetro.com/images/station-layout/versova.jpg}}</ref>
| opened = {{start date and age|2014|June|8|mf=yes}}
| code               = VER
| closed =  
| zone               =  
| rebuilt =  
| smartcardname     =  
| electrified = 25 kV 50 Hz AC through [[overhead catenary]]
| smartcardstatus   =  
| ADA = Yes {{access icon}}{{citation needed|date=February 2019}}
| former             =  
| code = VER
| passengers         =  
| zone =  
| pass_year         =  
| smartcardname =  
| pass_rank         =  
| smartcardstatus =  
| pass_percent       =  
| former =  
| pass_system       =  
| passengers =  
| mpassengers       =  
| pass_year =  
| services           = {{adjacent stations|system=Mumbai Metro One|line=1|left=|right=D N Nagar}}
| pass_rank =  
| route_map          = {{MM Blue Line}}
| pass_percent =  
| map_state          = collapsed
| pass_system =  
| mapframe          = yes
| mpassengers =  
| mapframe-marker    = rail
| services = {{s-rail|title=Mumbai Metro}}
| mapframe-marker-color = #{{rail color|Mumbai Metro|Blue Line}}
{{s-line|system=Mumbai Metro|line=1|previous=|next=D.N. Nagar}}
| mapframe-zoom      = 14
| map_type = Mumbai
| map_dot_label = Versova
| map_size = 300
| route_map = {{MM Line 1}}
| map_state = collapsed
}}
}}


'''Versova''' is a metro station and the western terminus of [[Line 1 (Mumbai Metro)|Line 1]] of the [[Mumbai Metro]] serving the [[Seven Bungalows]], [[Yari Road]] and [[Versova, Mumbai|Versova]] neighbourhoods of [[Andheri]] in [[Mumbai]], India. It opened to the public on 8 June 2014 and consists of two side platforms.<ref>http://www.mid-day.com/articles/mumbai-metro-hits-tracks-and-handful-of-speed-bumps/15363181</ref> The station is located at [[Seven Bungalows]].<ref>{{Cite web|url=http://timesofindia.indiatimes.com/city/mumbai/Metro-station-at-Chakala-may-be-renamed-JB-Nagar/articleshow/31626822.cms|title=Metro station at Chakala may be renamed JB Nagar &#124; Mumbai News - Times of India}}</ref>
'''Versova''' is the elevated western terminal metro station on the East-West Corridor of the [[Blue Line (Mumbai Metro)|Blue Line 1]] of [[Mumbai Metro]] serving the [[Seven Bungalows]], [[Yari Road]] and [[Versova, Mumbai|Versova]] neighbourhoods of [[Andheri]] in [[Mumbai]], India. It opened to the public on 8 June 2014 and consists of two side platforms.<ref>{{Cite web|url=http://www.mid-day.com/articles/mumbai-metro-hits-tracks-and-handful-of-speed-bumps/15363181|title = Mumbai Metro hits tracks, and handful of speed bumps|date = 9 June 2014}}</ref> The station is located at [[Seven Bungalows]].<ref>{{Cite news|url=http://timesofindia.indiatimes.com/city/mumbai/Metro-station-at-Chakala-may-be-renamed-JB-Nagar/articleshow/31626822.cms|title=Metro station at Chakala may be renamed JB Nagar &#124; Mumbai News - Times of India|website=[[The Times of India]]|date=8 March 2014 }}</ref>


With 12% of all Line 1 commuters traveling through the station, Versova is the third-busiest station on the line, after [[Ghatkopar metro station|Ghatkopar]] and [[Andheri metro station|Andheri]].<ref>http://www.dnaindia.com/mumbai/report-3-commuters-fall-off-mumbai-metro-platform-in-separate-incidents-2010004</ref>
With 12% of all Blue Line 1 commuters traveling through the station, Versova is the third-busiest station on the line, after [[Ghatkopar metro station|Ghatkopar]] and [[Andheri metro station|Andheri]].<ref>{{Cite web|url=http://www.dnaindia.com/mumbai/report-3-commuters-fall-off-mumbai-metro-platform-in-separate-incidents-2010004|title = 3 commuters fall off Mumbai Metro platform in separate incidents}}</ref>


[[File:Versova metro station.jpg|thumb|Versova metro station]]
[[File:Versova metro station.jpg|thumb|Versova metro station]]


==History==
==History==
{{Empty section|date=February 2017}}
{{expand section|date=February 2017}}
Versova metro station was not planned for the metro rail but after many negotiations, the station was added. In 2012 the construction of the station was completed at a cost of ₹200Cr. A new metro is under construction in the same area by the name of Pink Line (Line 6) and will make the congestion less on Line 1.


== Station layout ==
== Station layout ==
{|table border=0 cellspacing=0 cellpadding=3
{| border=0 cellspacing=0 cellpadding=3
|style="border-bottom:solid 1px gray;border-top:solid 1px gray;" width=50 valign=top|'''G'''
|style="border-bottom:solid 1px gray;vertical-align:top;border-top:solid 1px gray;" rowspan=4;|'''2nd Floor'''
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=100 valign=top|Street level
|style="border-top:solid 1px gray;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" colspan=2|{{small|[[Side platform]] {{access icon}}}}
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=500 valign=top|Exit/Entrance
|-
|-
|valign=top|'''L1'''
|style="border-bottom:solid 1px gray;" width=50 height=45|'''<span style=color:#{{rail color|Mumbai Metro|1}}>Platform 1</span>'''
|valign=top|Mezzanine
|style="border-bottom:solid 1px gray;" width=390| {{0|→}} towards {{ltl|Mumbai Metro|line 1|Right}} {{small|([[D N Nagar metro station|D N Nagar]])}} →
|valign=top|Fare control, station agent, Metro Card vending machines, crossover<br/>
|-
|-
|style="border-top:solid 1px gray;border-bottom:solid 1px gray;" width=50 rowspan=4 valign=top|'''L2'''
| height=45|<span style=color:#{{rail color|Mumbai Metro|1}}>'''Platform 2'''</span>
|style="border-top:solid 1px gray;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" colspan=2|<small>[[Side platform]] No- 1, doors will open on the left {{access icon}}</small>
| ←  Alighting only
|-
|-
|style="border-bottom:solid 1px gray;" width=100|<span style=color:#{{Mumbai Metro color|1}}>'''Eastbound'''</span>
|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;text-align:center;" colspan=2|{{small|[[Side platform]] {{access icon}}}}
|style="border-bottom:solid 1px gray;" width=500|Towards →[[Ghatkopar metro station|Ghatkopar]]  
|-
|-
|<span style=color:#{{Mumbai Metro color|1}}>'''Westbound'''</span>
|style="vertical-align:top"|'''1st Floor'''
|<span style=color:white>→</span>Towards ←Train Terminates
|style="vertical-align:top"|Mezzanine
|-
|style="vertical-align:top"|Fare control, station agent, Metro Card vending machines, crossover
|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;" colspan=2  align=center|<small>[[Side platform]] No- 2, doors will open on the left {{access icon}}</small>
|-
|style="border-bottom:solid 1px gray;" width=50 rowspan=2 valign=top|'''L2'''
|style="border-bottom:solid 1px gray;" width=100|
|style="border-bottom:solid 1px gray;" width=500|
|-
|-
|style="border-bottom:solid 1px gray;border-top:solid 1px gray; vertical-align:top" width=50 |'''Ground'''
|style="border-top:solid 1px gray;border-bottom:solid 1px gray; vertical-align:top" width=100 |Street level
|style="border-top:solid 1px gray;border-bottom:solid 1px gray; vertical-align:top" width=420 |Exit/Entrance
|}
|}


==Connections==
==Connections==
{{Empty section|date=February 2017}}
The Versova-Andheri-Ghatkopar corridor<ref>{{Cite web |title=Versova metro station - Mumbai Metro |url=https://www.metrolinemap.com/station/mumbai/versova/ |access-date=2024-05-07 |website=Metro Line Map |language=en}}</ref> spans 11.40 kilometers and is elevated. It serves as a crucial link connecting the Eastern and Western suburbs to the Western and Central Railway lines. The corridor facilitates seamless interchange between the suburban rail system and the MRT system at Andheri and Ghatkopar Stations, enhancing commuter convenience. It has slashed the journey time between Versova and Ghatkopar from 71 minutes to just 21 minutes, greatly improving efficiency and reducing travel hassles for passengers. Additionally, the corridor provides rail-based access to key industrial zones such as MIDC and SEEPZ, along with fostering connectivity to various commercial developments.


==Exits==
== Entrances and exits ==
{{Empty section|date=February 2017}}
*'''1''' - Near 7 Bungalows bus depot {{Access icon|15px|Wheelchair user access}}<ref name=map/>
Exit No. 1- Seven Bungalows Bus Station
*'''2''' - <ref name=map/>
*'''3''' - Near Model Town, Towards Kokilaben Hospital<ref name=map/>
*'''4/5''' - Near Bon Bon Shoes<ref name=map/>
*'''6''' - Near Yari Road {{Access icon|15px|Wheelchair user access}}<ref name=map/>


==See also==
==See also==
Line 96: Line 91:


{{Clear}}
{{Clear}}
 
{{Portal bar|Train|Transport|Engineering}}


==References==
==References==
Line 107: Line 102:
* [http://www.urbanrail.net ''UrbanRail.Net''] – descriptions of all metro systems in the world, each with a schematic map showing all stations.
* [http://www.urbanrail.net ''UrbanRail.Net''] – descriptions of all metro systems in the world, each with a schematic map showing all stations.


{{Mumbai Metro navbox}}
{{Mumbai Metro navbox|line 1 = yes}}
{{Rapid transit in India}}
{{Rapid transit in Asia}}


[[Category:Mumbai Metro stations]]
[[Category:Mumbai Metro stations]]
[[Category:Railway stations in India opened in 2014]]
[[Category:Railway stations in India opened in 2014]]
[[Category:2014 establishments in Maharashtra]]
[[Category:2014 establishments in Maharashtra]]
 
[[Category:Andheri]]
 
{{Maharashtra-railstation-stub}}

Latest revision as of 17:10, 14 January 2026


Versova

वर्सोवा
Street-level view of Versova metro station concourse on Line 1
LocationJP Road, Model Town, Andheri (West), Mumbai
Coordinates19°7′49″N 72°49′17″E / 19.13028°N 72.82139°E / 19.13028; 72.82139
Operated by Mumbai Metro One Pvt Ltd
Line(s)Template:Rcb
Platforms2 Side platforms
Construction
Structure typeElevated
ParkingNo
Bicycle facilitiesYes[1]
Other information
Station codeVER
History
Opened8 June 2014; 12 years ago (2014-06-08)
Services
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Mumbai Metro One' not found.
Location
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).

Versova is the elevated western terminal metro station on the East-West Corridor of the Blue Line 1 of Mumbai Metro serving the Seven Bungalows, Yari Road and Versova neighbourhoods of Andheri in Mumbai, India. It opened to the public on 8 June 2014 and consists of two side platforms.[3] The station is located at Seven Bungalows.[4]

With 12% of all Blue Line 1 commuters traveling through the station, Versova is the third-busiest station on the line, after Ghatkopar and Andheri.[5]

Versova metro station

History[edit | edit source]

Versova metro station was not planned for the metro rail but after many negotiations, the station was added. In 2012 the construction of the station was completed at a cost of ₹200Cr. A new metro is under construction in the same area by the name of Pink Line (Line 6) and will make the congestion less on Line 1.

Station layout[edit | edit source]

2nd Floor Side platform Disabled access
Platform 1 towards Template:Ltl (D N Nagar)
Platform 2 ← Alighting only
Side platform Disabled access
1st Floor Mezzanine Fare control, station agent, Metro Card vending machines, crossover
Ground Street level Exit/Entrance

Connections[edit | edit source]

The Versova-Andheri-Ghatkopar corridor[6] spans 11.40 kilometers and is elevated. It serves as a crucial link connecting the Eastern and Western suburbs to the Western and Central Railway lines. The corridor facilitates seamless interchange between the suburban rail system and the MRT system at Andheri and Ghatkopar Stations, enhancing commuter convenience. It has slashed the journey time between Versova and Ghatkopar from 71 minutes to just 21 minutes, greatly improving efficiency and reducing travel hassles for passengers. Additionally, the corridor provides rail-based access to key industrial zones such as MIDC and SEEPZ, along with fostering connectivity to various commercial developments.

Entrances and exits[edit | edit source]

  • 1 - Near 7 Bungalows bus depot Wheelchair user access[2]
  • 2 - [2]
  • 3 - Near Model Town, Towards Kokilaben Hospital[2]
  • 4/5 - Near Bon Bon Shoes[2]
  • 6 - Near Yari Road Wheelchair user access[2]

See also[edit | edit source]

References[edit | edit source]

  1. Venkatraman, Tanushree (31 December 2020). "Bike-sharing services to be extended to 3 more Mumbai Metro stations". Hindustan Times. Mumbai. Retrieved 21 January 2024.
  2. 2.0 2.1 2.2 2.3 2.4 2.5 "Versova metro station layout". reliancemumbaimetro.com. Retrieved 25 December 2023.
  3. "Mumbai Metro hits tracks, and handful of speed bumps". 9 June 2014.
  4. "Metro station at Chakala may be renamed JB Nagar | Mumbai News - Times of India". The Times of India. 8 March 2014.
  5. "3 commuters fall off Mumbai Metro platform in separate incidents".
  6. "Versova metro station - Mumbai Metro". Metro Line Map. Retrieved 7 May 2024.

External links[edit | edit source]