Created by Kanchin789
Last edited April 23, 2026


Template:Infobox road junction

Ragigudda - Silk Board Flyover is a rail-cum-road flyover in the city of Bengaluru in Karnataka, India.[1] It is the first double decker flyover in Bengaluru, which is was built by the Bangalore Metro Rail Corporation Limited between Template:Stl and Template:Stl metro stations as part of the Yellow Line (Rashtreeya Vidyalaya Road-Delta Electronics Bommasandra). After completion, it will become the first rail-cum-road flyover in South India, which is expected to be completed by 2026.[2].On 22nd of April 2026 another section of road was open to public on trial basis.[3]

Overview[edit | edit source]

The flyover has two levels above ground, with the first level having four lanes for carrying vehicles while the second level carries the metro tracks. The total length of the flyover is 3.2 kilometres long. At 31 metres tall, it is tallest rail-cum-road flyover in South India.[4]

References[edit | edit source]

  1. Menezes, DHNS, Naveen. "Half-finished flyover work means South B'luru-IT hub won't be signal-free for two years". Deccan Herald. Retrieved 12 August 2023.
  2. "South India's tallest rail-road flyover almost ready, but can't be opened". The New Indian Express. Retrieved 12 August 2023.
  3. "Bengaluru's first double-decker flyover finally opens fully on trial basi". The Hindu. Retrieved 23 April 2026.
  4. "Bengaluru's first double-decker flyover likely to be completed within three months". TimesNow. 31 December 2022. Retrieved 12 August 2023.