| Green Line | |||
|---|---|---|---|
![]() Metro train arriving at Secunderabad West metro station | |||
| Overview | |||
| Other name(s) | Corridor – II | ||
| Status | Operational | ||
| Locale | Hyderabad | ||
| Termini | JBS Parade Ground Falaknuma | ||
| Connecting lines | |||
| Stations | 15 (9 opened, 6 yet to open) | ||
| Service | |||
| Type | Rapid transit | ||
| System | Hyderabad Metro | ||
| Operator(s) | Hyderabad Metro Rail Ltd. (HMRL) | ||
| Depot(s) | Falaknuma | ||
| Rolling stock | Hyundai Rotem | ||
| History | |||
| Opened | 8 February 2020[1] | ||
| Technical | |||
| Line length | 16.6 km (10.3 mi) | ||
| Number of tracks | Double-track | ||
| Character | Elevated | ||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
| Electrification | Template:25 kV 50 Hz Overhead catenary | ||
| Operating speed | 80 km/h (50 mph) | ||
| Signalling | CBTC | ||
| |||
The Green Line is a part of the Hyderabad Metro system in Telangana, India.[2] The line is 16.6 km long and spans 15 stations from JBS Parade Ground to Falaknuma.[3] It was funded by a public–private partnership (PPP),[4][5] with the state government holding a minority equity stake.[6] A special purpose vehicle company, L&T Metro Rail Hyderabad Ltd (L&TMRHL), was established by the construction company Larsen & Toubro (L&T)[7][8] to develop the Hyderabad Metro rail project.[9][10]
An 11-kilometre (6.8 mi) stretch of the Green Line from JBS Parade Ground to MG Bus Station, with 9 stations, was inaugurated on 7 February 2020 by Telangana Chief Minister K. Chandrasekhar Rao,[11] and opened to the public the next day.[1] A 5.6 km southward extension from MG Bus Station to Falaknuma is yet to be completed in the Old City.[1]
Construction[edit | edit source]
Green Line sections were opened as indicated below.
| colspan="6" align="center" style="background:#Template:Rcr;" |Green Line | |||||
|---|---|---|---|---|---|
| Stage | Extension date | Terminal Stations | Length | Stations | |
| 1 | 8 February 2020 | Parade Ground | MG Bus Station | 11 km (6.8 mi) | 9 |
| 2 | Yet to start construction | MG Bus Station | Falaknuma | 5.6 km (3.5 mi) | 6 |
| Total | Parade Ground | Falaknuma | 16.6 km (10.3 mi) | 15 | |
Stations[edit | edit source]
| colspan="7" align="center" style="background:#Template:Rcr;" |Green Line | ||||||
|---|---|---|---|---|---|---|
| # | Station Name | Opened | Connections | Alignment | ||
| English | Telugu | Urdu | ||||
| 1 | Parade Ground | జేబీస్ పెరేడ్ గ్రౌండ్ | جے بی ایس پریڈ گراؤنڈ | 8 February 2020 | Template:Rcb |
Elevated |
| 2 | Secunderabad West | సికింద్రాబాద్ వెస్ట్ | سکندرآباد ویسٹ | 8 February 2020 | Template:RicSecunderabad | Elevated |
| 3 | Gandhi Hospital | గాంధీ హాస్పిటల్ | گاندھی ہسپتال | 8 February 2020 | None | Elevated |
| 4 | Musheerabad | ముషీరాబాద్ | مشیرآباد | 8 February 2020 | None | Elevated |
| 5 | R.T.C. Cross Roads | ఆర్.టి.సి క్రాస్ రోడ్ | آر ٹی سی کراس روڈز | 8 February 2020 | None | Elevated |
| 6 | Chikkadpally | చిక్కడపల్లి | چکداپلی | 8 February 2020 | None | Elevated |
| 7 | Narayanguda | నారాయణగూడ | نارائن گوڈا | 8 February 2020 | None | Elevated |
| 8 | Sultan Bazaar | సుల్తాన్ బజార్ | سلطان بازار | 8 February 2020 | None | Elevated |
| 9 | M.G. Bus Station | ఎం.జి బస్ స్టేషన్ | ایم جی بس اسٹیشن | 8 February 2020 | Template:Rcb |
Elevated |
| 10 | Salarjung Museum | సాలార్జంగ్ మ్యూజియం | سالارجنگ میوزیم | Approved | None | Elevated |
| 11 | Charminar | చార్మినార్ | چارمینار | Approved | None | Elevated |
| 12 | Shah-Ali-Banda | షా-అలీ-బందా | شاہ علی بندہ | Approved | None | Elevated |
| 13 | Aliabad | అలియాబాద్ | علی آباد | Approved | None | Elevated |
| 14 | Falaknuma | ఫలక్నుమా | فلک نما | Approved | None | Elevated |
| 15 | Chandrayangutta | చాంద్రాయణగుట్ట | چندرائن گٹہ | Approved | Template:Rcb (Proposed) | Elevated |
Line Map[edit | edit source]
References[edit | edit source]
- ↑ 1.0 1.1 1.2 Smith, Kevin (10 February 2020). "Hyderabad Metro opens Green Line". International Railway Journal. Retrieved 28 November 2021.
- ↑ "The Green Metro Line blues".
- ↑ "Poor frequency & bad infra hit Metro green line footfall".
- ↑ "Skywalks to connect Metro with schools & malls: NVS Reddy | Hyderabad News - Times of India". The Times of India.
- ↑ Sood, Jyotika (26 July 2017). "How metro rail networks are spreading across India". Livemint.
- ↑ "EPC vs PPP in metro rail". Projectsmonitor.com. 2 December 2007. Archived from the original on 2 December 2007. Retrieved 18 April 2013.
- ↑ "The Next Station Is... | Outlook India Magazine". outlookindia.com/.
- ↑ Kumar, V. Rishi. "Eyeing non-fare revenues, L&T Metro Hyderabad takes up transit oriented development". @businessline.
- ↑ "N.V.S. Reddy to be AP Govt nominee on L&T Metro Rail board". @businessline.
- ↑ "Hyderabad metro on tricky track, running on losses | Hyderabad News - Times of India". The Times of India.
- ↑ "K Chandrasekhar Rao: Telangana CM to inaugurate 11-km stretch of Hyderabad Metro on February 7". The Times of India. Retrieved 28 November 2021.
