Mettuguda metro station
Mettuguda | ||
|---|---|---|
| Hyderabad Metro station | ||
| Location | Near St.Anthony Shrine,Krishna Deva Raya Rd, Lallaguda Railway Colony, Lalaguda, Mettuguda, Secunderabad, Telangana 500017 | |
| Coordinates | 17°26′08″N 78°31′11″E / 17.4355°N 78.5196°ECoordinates: 17°26′08″N 78°31′11″E / 17.4355°N 78.5196°E | |
| Platforms | 2 | |
| Tracks | 4 | |
| Construction | ||
| Structure type | Elevated | |
| Depth | 7.07 meters | |
| Platform levels | 2 | |
| History | ||
| Opened | 28 November 2017 | |
| Services | ||
|
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Hyderabad Metro' not found. | ||
Mettuguda Metro Station is located on the Blue Line of the Hyderabad Metro. It is part of Corridor III of the Hyderabad Metro starting from Nagole and towards Hi-Tech city and was opened to the public on 28 November 2017.[1]
History[edit | edit source]
Nagole-Mettuguda stretch was initially proposed to open in March 2015 but was later put off.[2] The station received the safety certification from the Commissioner for Metro Rail Safety (CMRS) in 2016.[3]
The station[edit | edit source]
Structure[edit | edit source]
Metuguda elevated metro station situated on the Blue Line of Hyderabad Metro.[4]
Station layout[edit | edit source]
- Street Level
- This is the first level where passengers may park their vehicles and view the local area map.[5]
- Concourse level
- Ticketing office or Ticket Vending Machines (TVMs) is located here. Retail outlets and other facilities like washrooms, ATMs, first aid, etc., will be available in this area.[5]
- Platform level
- This layer consists of two platforms. Trains takes passengers from this level.[5]
| G | Street Level | Exit/Entrance |
| L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| L2 | Side platform No- 1, doors will open on the left | |
| Westbound | Towards →Raidurg→ → | |
| Eastbound | →Towards ← Nagole← ← | |
| Side platform No- 2, doors will open on the left | ||
| L2 | ||
References[edit | edit source]
- ↑ "Hyderabad Metro Rail: Route, Ticket Fares, Smart Card, Map, Timings, Stations; all you need to know". The Financial Express. 27 November 2017. Retrieved 29 June 2020.
- ↑ Rahul, N. (19 March 2015). "Nagole-Mettuguda stretch launch put off". The Hindu. ISSN 0971-751X. Retrieved 29 June 2020.
- ↑ "68% of Hyderabad Metro Rail work completed". Moneycontrol. Retrieved 29 June 2020.
- ↑ "Metro Stations". Hyderabad Metro Rail. Retrieved 29 June 2020.
- ↑ 5.0 5.1 5.2 "Platform level". Hyderabad Metro Rail.