The topic of this article may not meet Bharatpedia's general notability guideline. (January 2024) |
Gandhigram | |||||
|---|---|---|---|---|---|
| Template:Ahmedabad Metro Infobox station line | |||||
| Location | Ellis Bridge, Ahmedabad, Gujarat 380009 | ||||
| Coordinates | 23°01′36″N 72°34′08″E / 23.02667°N 72.56890°E | ||||
| Owned by | Gujarat Metro Rail Corporation Limited | ||||
| Operated by | Ahmedabad Metro | ||||
| Line(s) | Template:Rcb | ||||
| Platforms | Side platform Platform-1 → Mahatman Mandir / Template:Stl Platform-2 → APMC | ||||
| Tracks | 2 | ||||
| Connections | Template:Ric Gandhigram | ||||
| Construction | |||||
| Structure type | Elevated, Double track | ||||
| Platform levels | 2 | ||||
| Other information | |||||
| Status | Operational | ||||
| History | |||||
| Opened | 6 October 2022 | ||||
| Electrified | 750 V DC third rail | ||||
| Services | |||||
|
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Ahmedabad Metro' not found. | |||||
| |||||
| Location | |||||
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | |||||
Gandhigram is an elevated metro station on the North-South Corridor of the Red Line of Ahmedabad Metro in Ahmedabad, India.[1] Around this metro station holds the main Gandhigram railway station along with Ahmedabad Medical Association (AMI) and Reserve Bank of India Main Office (Ahmedabad). This phase of the metro system was inaugurated on 30 September 2022 by Prime Minister Narendra Modi and was opened to the public on 6 October 2022.[2][3][4][5]
Station layout[edit | edit source]
| style="color:;background:#Template:Rail color;text-align:center;padding:5px"| Gandhigram track layout | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
| ||||||||||||||||||||||||||||||||||||||||||
| G | Street level | Exit/Entrance |
| L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| L2 | Side platform | Doors will open on the left | |
| Platform 2 Southbound |
Towards → APMC Next Station: Paldi | |
| Platform 1 Northbound |
Towards ← Mahatma Mandir / GIFT City Next Station: Old High Court Change at the next station for Template:Rcb | |
| Side platform | Doors will open on the left | ||
| L2 | ||
See also[edit | edit source]
References[edit | edit source]
- ↑ "Ahmedabad: Metro service on North-South corridor to begin on October 6". The Indian Express. 3 October 2022. Retrieved 12 August 2023.
- ↑ "Ahmedabad: Metro service on North-South corridor to begin on October 6". The Indian Express. 3 October 2022. Retrieved 12 August 2023.
- ↑ "Ahmedabad: North-South corridor metro service to be operational from October 6". TimesNow. 5 October 2022. Retrieved 12 August 2023.
- ↑ "Huge demand on Day 1 of Ahmedabad Metro". The Indian Express. 2 October 2022. Retrieved 4 October 2022.
- ↑ "Prime Minister Modi inaugurates phase-1 of Ahmedabad Metro rail project". The Economic Times. Retrieved 4 October 2022.