Created by 2405:9800:BC10:3A42:98E2:490A:7379:511D
Last edited July 18, 2023
Red Line
Overview
StatusUnder Construction
LocaleAhmedabad
Gandhinagar
TerminiMahatma Mandir
APMC
Stations38
Service
TypeRapid Transit
SystemAhmedabad Metro
Operator(s)Gujarat Metro Rail Corporation Limited
Rolling stockHyundai Rotem
History
Opened6 October 2022
Technical
Line length41.36 km (25.70 mi)
CharacterElevated
Track gauge1,435 mm (4 ft 8+1⁄2 in) (Standard gauge)
Electrification750V DC Third Rail
Route map

Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. Subway interchange Lua error: expandTemplate: template "Ahmedabad Metro color" does not exist.
Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. Ahmedabad Bus Rapid Transit System
Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. Ahmedabad Bus Rapid Transit System Sabarmati Juction railway station
Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist.
Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. Ahmedabad Bus Rapid Transit System GSRTC
Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. Ahmedabad Bus Rapid Transit System
Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist.
Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist.
Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. Subway interchange Lua error: expandTemplate: template "Ahmedabad Metro color" does not exist.
Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. Gandhigram railway station
Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist.
Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist.
Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist.
Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist.
Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. GSRTC
Gyaspur Depot


The Red Line of the Ahmedabad Metro is a metro route of the mass rapid transit system in Ahmedabad, India.

History[edit | edit source]

Phase-1[edit | edit source]

North-South Corridor under construction near Sabarmati Powerhouse and Sabarmati Railway Station 9 July 2017

The Phase-1 of the North-South Corridor consists of 15 metro stations from APMC to Motera Stadium with a total distance of 18.87 km (11.73 mi). The line is completely elevated. It will connect Motera Stadium to APMC, Vasna and will be passing through Sabarmati, AEC, Sabarmati Railway station, Ranip, Vadaj, Vijaynagar, Usmanpura, Old High court, Gandhigram, Paldi, Shreyas, Rajivnagar and Jivraj stations.[1] The Phase-1 of the North-South Corridor was inaugurated on 30 September 2022 by Indian Prime Minister Narendra Modi.[2] It was opened to public on 6 October 2022 except Sabarmati Railway Station metro station which is under construction.[3][4]

Phase-2[edit | edit source]

The Government of Gujarat approved the Phase-2 in October 2017 and revised it in October 2018. In February 2019, the Union cabinet approved the Phase-2 worth cost of ₹5,384.17 crore (US$750 million). It will extend the North-South corridor from Motera in Ahmedabad to Mahatma Mandir in Gandhinagar (23.838 km (14.812 mi)) with a branch line from Gujarat National Law University (GNLU) linking Pandit Deendayal Energy University (PDEU) and GIFT City (5.416 km). The Phase-2 will have total 28.26 km (17.56 mi)-long elevated corridor with 22 stations.[5][6][7]

The tendering for the Phase 2 began in January 2020.[8][9] On 18 January 2021, the foundation stone of the Phase-2 was laid by Prime Minister Modi.[10] The branch line connecting to GIFT City is expected to open in early 2024.[11]

List of stations[edit | edit source]

Main Line[edit | edit source]

Following is a list of stations on this route:[12]

Red Line (Main Line)
# Station Name Opening Connections Layout
English Gujarati
1 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. મહાત્મા મંદિર Under Construction None Elevated
2 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. સેક્ટર-24 Under Construction None Elevated
3 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. સેક્ટર-16 Under Construction None Elevated
4 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. જૂના સચિવાલય Under Construction None Elevated
5 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. અક્ષરધામ Under Construction None Elevated
6 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. સચિવાલય Under Construction None Elevated
7 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. સેક્ટર-10એ Under Construction None Elevated
8 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. સેક્ટર-1 Under Construction None Elevated
9 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. ઇન્ફોસિટી Under Construction None Elevated
10 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. ધોળાકુવા સર્કલ Under Construction None Elevated
11 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. રાંદેસણ Under Construction None Elevated
12 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. રાયસન Under Construction None Elevated
13 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. જી એન એલ યુ Under Construction <span style="background-color:#Lua error: expandTemplate: template "Ahmedabad Metro color" does not exist.; border:0.1em solid #Lua error: expandTemplate: template "Ahmedabad Metro color" does not exist.;"> Red Line (Branch Line)  Elevated
14 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. કોબા ગામ Under Construction None Elevated
15 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. જૂના કોબા Under Construction None Elevated
16 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. કોબા સર્કલ Under Construction None Elevated
17 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. નર્મદા કેનાલ Under Construction None Elevated
18 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. તપોવન સર્કલ Under Construction None Elevated
19 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. વિશ્વકર્મા કોલેજ Under Construction None Elevated
20 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. કોટેશ્વર રોડ Under Construction None Elevated
21 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. મોટેરા સ્ટેડિયમ 30 September 2022 None Elevated
22 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. સાબરમતી 30 September 2022 None Elevated
23 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. એ ઇ સી 30 September 2022 None Elevated
24 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. સાબરમતી રેલવે સ્ટેશન 30 September 2022 Ahmedabad BRTS, Sabarmati Junction railway station and Mumbai–Ahmedabad high-speed rail corridor[12] Elevated
25 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. રાણીપ 30 September 2022 Ahmedabad BRTS and GSRTC Bus Station at Ranip[12] Elevated
26 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. વાડજ 30 September 2022 None Elevated
27 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. વિજય નગર 30 September 2022 None Elevated
28 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. ઉસ્માનપુરા 30 September 2022 None Elevated
29 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. જૂની હાઇ કોર્ટ 30 September 2022 <span style="background-color:#Lua error: expandTemplate: template "Ahmedabad Metro color" does not exist.; border:0.1em solid #Lua error: expandTemplate: template "Ahmedabad Metro color" does not exist.;"> Blue Line [12] Elevated
30 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. ગાંધીગ્રામ 30 September 2022 Gandhigram railway station[12] Elevated
31 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. પાલડી 30 September 2022 None Elevated
32 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. શ્રેયસ 30 September 2022 None Elevated
33 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. રાજીવ નગર 30 September 2022 None Elevated
34 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. જીવરાજ પાર્ક 30 September 2022 None Elevated
35 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. એ પી એમ સી 30 September 2022 None Elevated

Branch Line[edit | edit source]

Following is a list of stations on this route:

Red Line (Branch Line)
# Station Name Opening Connections Layout
English Gujarati
1 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. જી એન એલ યુ Under Construction <span style="background-color:#Lua error: expandTemplate: template "Ahmedabad Metro color" does not exist.; border:0.1em solid #Lua error: expandTemplate: template "Ahmedabad Metro color" does not exist.;"> Red Line (Main Line)  Elevated
2 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. પી ડી ઇ યુ Under Construction None Elevated
3 Lua error: expandTemplate: template "Ahmedabad Metro stations" does not exist. ગિફ્ટ સિટી Under Construction None Elevated

References[edit | edit source]

  1. ↑ "Project Profile". GMRC. Retrieved 8 March 2019.
  2. ↑ "PM Modi to launch Ahmedabad Metro Phase 1, flag off Vande Bharat Express during two-day Gujarat visit".
  3. ↑ "મેટ્રો ટ્રેનની સવારી: અમદાવાદમાં થલતેજ-વસ્ત્રાલ મેટ્રો ગાંધી જયંતીથી, એપીએમસી-મોટેરા 6 ઓક્ટોબરથી શરૂ થશે". Divya Bhaskar (in ગુજરાતી). Retrieved 30 September 2022.
  4. ↑ "Ahmedabad: Metro service on North-South corridor to begin on October 6". The Indian Express. Retrieved 4 October 2022.
  5. ↑ "Gujarat nod for Rs 6,758crore Metro Phase II". The Times of India. Retrieved 18 January 2018.
  6. ↑ Nair, Avinash. "Ahmedabad Metro Rail: After Centre objects, Metro rail link to GIFT City shortened by 6 km". The Indian Express. Retrieved 21 October 2018.
  7. ↑ "Ahmedabad Metro Phase 2 gets Modi Cabinet clearance ahead of Phase 1 inauguration on 4 March". The Financial Express. Retrieved 4 March 2019.
  8. ↑ "GMRC Invites Bids for Ahmedabad Metro's Phase 2 Construction". The Metro Rail Guy. Retrieved 20 April 2020.
  9. ↑ "Ahmedabad Metro Phase 2 – Information, Route Maps, Tenders & Updates". The Metro Rail Guy. Retrieved 20 April 2020.
  10. ↑ "'Very important gifts for Ahmedabad, Surat': PM Modi launches metro rail projects in Gujarat". www.timesnownews.com. Retrieved 18 January 2021.
  11. ↑ "Ahmedabad Metro connectivity to GIFT City by early 2024, says GMRC".
  12. ↑ 12.0 12.1 12.2 12.3 12.4 "Chugging in, clearing hurdles: Prime Minister to inaugurate Phase I of Ahmedabad Metro in August this year". The Indian Express. Retrieved 13 July 2022.