Created by StellaWindsor21
Last edited December 19, 2025


AEC
Template:Ahmedabad Metro Infobox station line
LocationDharm Nagar II, Sabarmati, Ahmedabad, Gujarat 380005
Coordinates23°04′30″N 72°35′36″E / 23.07511°N 72.59321°E / 23.07511; 72.59321
Owned byGujarat Metro Rail Corporation Limited
Operated byAhmedabad Metro
Line(s)Template:Rcb
PlatformsSide platform
Platform-1 → Sector-1 / Template:Stl
Platform-2 → APMC
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
Other information
StatusOperational
History
Opened6 October 2022; 3 years ago (6 October 2022)
Electrified750 V DC third rail
Services
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Ahmedabad Metro' not found.
Location
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).

AEC is an elevated metro station on the North-South Corridor of the Red Line of Ahmedabad Metro in Ahmedabad, India.[1][failed verification] Around this metro station holds the main and upcoming Sabarmati HSR Terminal railway station along with AEC Garden Park and Torrent Power Limited.

This phase of the metro system was inaugurated on 30 September 2022 by Prime Minister Narendra Modi and was opened to the public on 6 October 2022.[2][3][4][5]

Station layout[edit | edit source]

style="color:;background:#Template:Rail color;text-align:center;padding:5px"|
AEC track layout
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → APMC
Next Station: Sabarmati Railway Station
Platform 1
Northbound
Towards ← Sector-1

Next Station: Sabarmati

Side platform | Doors will open on the left Disabled access
L2

See also[edit | edit source]

References[edit | edit source]

  1. ↑ "Ahmedabad: Metro service on North-South corridor to begin on October 6". The Indian Express. 3 October 2022. Retrieved 12 August 2023.
  2. ↑ "Ahmedabad: Metro service on North-South corridor to begin on October 6". The Indian Express. 3 October 2022. Retrieved 12 August 2023.
  3. ↑ "Ahmedabad: North-South corridor metro service to be operational from October 6". TimesNow. 5 October 2022. Retrieved 12 August 2023.
  4. ↑ "Huge demand on Day 1 of Ahmedabad Metro". The Indian Express. 2 October 2022. Retrieved 4 October 2022.
  5. ↑ "Prime Minister Modi inaugurates phase-1 of Ahmedabad Metro rail project". The Economic Times. Retrieved 4 October 2022.

External links[edit | edit source]

Template:Ahmedabad Metro navbox