Created by ChristenHii
Last edited April 21, 2026

Dahisar (East)
LocationGhartan Pada, Dahisar East
Mumbai, Maharashtra 400068
India
Coordinates19°15′04″N 72°52′01″E / 19.2511°N 72.8670°E / 19.2511; 72.8670
Owned by Mumbai Metropolitan Region Development Authority
Operated byFile:Mumbai Metro Line 1 logo.png Maha Mumbai Metro Operation Corporation Ltd.
Line(s)Lua error: expandTemplate: template "Mumbai Metro color" does not exist. Lua error: expandTemplate: template "Mumbai Metro color" does not exist. Lua error: expandTemplate: template "Mumbai Metro color" does not exist.
Platforms4 side platforms
Tracks5
Connections Lua error in Module:Adjacent_stations at line 500: attempt to index local 'data' (a nil value). Dahisar
Bus interchange BEST bus services
Construction
Structure typeElevated
ParkingNo
Other information
Station code<span style="background-color:#Lua error: expandTemplate: template "Mumbai Metro color" does not exist.; color:#000">201; <span style="color:#Lua error: expandTemplate: template "Mumbai Metro color" does not exist.;">901
History
Opened
  • 2 April 2022; 4 years ago (2022-04-02) (Line 2A, Line 7)
  • 7 April 2026; 5 months ago (2026-04-07) (Line 9)
Services
Template:Adjstn
Track layout
2
1
Location
<mapframe>: The JSON content is not valid GeoJSON+simplestyle. The list below shows all attempts to interpret it according to the JSON Schema. Not all are errors.
  • /0/query: The property query is required
  • /0/ids: The property ids is required
  • /0: Failed to match at least one schema
  • /0/title: The property title is required
  • /0/service: The property service is required
  • /0: Failed to match exactly one schema
  • /0/type: Does not have a value in the enumeration ["ExternalData"]
  • /0/properties/marker-color: Does not match the regex pattern ^#?([0-9a-fA-F]{3}){1,2}$
  • /0/geometries: The property geometries is required
  • /0/type: Does not have a value in the enumeration ["GeometryCollection"]
  • /0/type: Does not have a value in the enumeration ["MultiPolygon"]
  • /0/type: Does not have a value in the enumeration ["Point"]
  • /0/type: Does not have a value in the enumeration ["MultiPoint"]
  • /0/type: Does not have a value in the enumeration ["LineString"]
  • /0/type: Does not have a value in the enumeration ["MultiLineString"]
  • /0/type: Does not have a value in the enumeration ["Polygon"]
  • /0/coordinates: The property coordinates is required
  • /0/features: The property features is required
  • /0/type: Does not have a value in the enumeration ["FeatureCollection"]

Dahisar (East) is an elevated metro station on the Mumbai Metro in Mumbai, India, located on the Western Express Highway in northern Mumbai. It serves as the northern terminus of both the Yellow Line 2A and the Red Line 7, and as the southern terminus of Line 9, which extends the Red Line northward into Mira-Bhayandar. The station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA) and was opened to the public on 2 April 2022, alongside the first phases of Lines 2A and 7. On 7 April 2026, Line 9 Phase 1 (Dahisar East metro station to Kashigaon metro station) was inaugurated,[1] making Dahisar East a three-line interchange. Passengers can transfer between all three lines at concourse level without exiting the paid area or passing through additional security checks.[2]

History[edit | edit source]

J Kumar Infraprojects was awarded the contract to construct the station in June 2016.[3] The MMRDA announced that electrification of the line had been completed on 26 May 2020.[4]

Dahisar East was opened to the public on 2 April 2022, along with the first phases of Line 2A and Line 7.[5]

Both lines were extended to their full lengths on 19 January 2023, with Line 2A reaching Andheri West and Line 7 reaching Gundavali in Andheri East. The inauguration was performed by Prime Minister Narendra Modi.[6]

On 7 April 2026, the Red Line was extended northward from Dahisar East to Kashigaon in Mira-Bhayandar, with the inauguration of Phase 1 of Line 9 by Chief Minister Devendra Fadnavis along with Deputy Chief Ministers Eknath Shinde and Sunetra Pawar. Commercial services began the following day.[7] This made Dahisar East an interchange station, as passengers could now transfer between the Red Line and Yellow Line at concourse level without exiting the paid area.[8]

Station layout[edit | edit source]

2nd Floor

Side platform Disabled access

<span style=color:#Lua error: expandTemplate: template "Mumbai Metro color" does not exist.>Platform # towards
  1. redirect Template:Line terminus link (Lua error: expandTemplate: template "Mumbai Metro stations" does not exist.)
<span style=color:#Lua error: expandTemplate: template "Mumbai Metro color" does not exist.>Platform # ← towards
  1. redirect Template:Line terminus link (Lua error: expandTemplate: template "Mumbai Metro stations" does not exist.)

Side platform Disabled access

<span style=color:#Lua error: expandTemplate: template "Mumbai Metro color" does not exist.>Platform # ← Pocket track
1st Floor Concourse Fare control, station agent, Metro Card vending machines, crossover to Lua error: expandTemplate: template "Mumbai Metro color" does not exist.
2nd Floor

Side platform Disabled access

<span style=background-color:#Lua error: expandTemplate: template "Mumbai Metro color" does not exist.>Platform 1 Alighting only →
<span style=background-color:#Lua error: expandTemplate: template "Mumbai Metro color" does not exist.>Platform 2 ← towards
  1. redirect Template:Line terminus link

(Anand Nagar)

Side platform Disabled access

1st Floor Concourse Fare control, station agent, Metro Card vending machines, crossover to Lua error: expandTemplate: template "Mumbai Metro color" does not exist.
Ground Street level Exit/Entrance

Power and signaling system[edit | edit source]

Like all other stations and railways of the Mumbai metro, Dahisar East station also uses a 25,000 volt AC power system by "overhead catenary" to operate the trains.

References[edit | edit source]

  1. "Mumbai Metro Gets Major Boost As Two New Lines Launched". NDTV. 8 April 2026. Retrieved 9 April 2026.
  2. Kharade, Prathamesh (7 April 2026). "Mumbai Metro Expansion: Dahisar East Station Emerges As Key Interchange For Lines 7, 9 & 2A; Step-By-Step Guide For Commuters". Free Press Journal. Retrieved 9 April 2026.
  3. "Tainted J Kumar Infraporjects bags Dahisar-DN Nagar Metro 2A project". dna. 9 August 2016. Archived from the original on 15 October 2016. Retrieved 14 October 2016.
  4. "MMRDA to conduct test run for two elevated Metro lines next week". Mumbai Mirror. IANS. 26 May 2021. Retrieved 9 July 2023.
  5. "Mumbai: Phase 1 of Metro Line 2A and 7 opened for public". The Indian Express. 3 April 2022. Retrieved 9 July 2023.
  6. "PM Modi inaugurates two new Mumbai Metro Lines, projects in Maharashtra". WION. 19 January 2023. Retrieved 9 April 2026.
  7. "Mumbai metro expands with launch of lines 2B and 9: Check new routes and timings from April 8". News9live. 7 April 2026. Retrieved 9 April 2026.
  8. Cite error: Invalid <ref> tag; no text was provided for refs named fpj-interchange