Created by
Last edited December 25, 2025
Talk
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Manjunath Nagar
Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found. station
Station Board as of February 2025
LocationTumkur Road, Manjunath Nagar, Bagalkunte, Bengaluru, Karnataka 560073
Coordinates13°03′00″N 77°29′40″E / 13.0501368°N 77.4944134°E / 13.0501368; 77.4944134
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Lua error in Module:Adjacent_stations at line 500: attempt to index local 'data' (a nil value).
PlatformsSide platform
Platform-1 → Madavara
Platform-2 → Silk Institute
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
Parking(TBC)
ArchitectSimplex Infrastructure
Other information
StatusOperational & Staffed
Station codeMNJN
History
Opened7 November 2024; 23 months ago (7 November 2024)
Electrified750 V DC third rail
Services
Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found.
Location
Map

Manjunath Nagar is an elevated metro station on the North-South corridor of the Green Line of Namma Metro in Bengaluru, India. Around this metro station holds the main Bengaluru-Nelamangala Expressway (NH-75) leading towards the suburb of Nelamangala in Karnataka.

The Madavara - Nagasandra stretch trial run was conducted on August 6 2024[1][2] and with approval from Commissioner of Metro Railway Safety (CMRS) received on October 4, the section finally opened to public on 7 November 2024, with the formal inauguration to be done at a later stage. [3][4][5][6][7]

Station layout

Manjunath Nagar track layout
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Silk Institute
Next Station: Nagasandra
Platform 1
Northbound
Towards ← Madavara
Next Station: Chikkabidarakallu
Side platform | Doors will open on the left Disabled access
L2

See also

References

  1. ↑ Ghoshal, Sudeshna (6 August 2024). "Bengaluru metro update: New trains on Green line for THESE stations in Bangalore; trial run today". Mint. Retrieved 7 August 2024.
  2. ↑ Sridhar Vivan (5 August 2024). "Green line trial runs kick off in August". Bangalore Mirror. Retrieved 7 August 2024.
  3. ↑ "Day before public launch, DK Shivakumar takes metro ride to Madavara". Deccan Herald. Retrieved 7 November 2024.
  4. ↑ "After 7 years, extended Green Line opens today". The Times of India. 6 November 2024. ISSN 0971-8257. Retrieved 7 November 2024.
  5. ↑ "Extended Metro green line from Nagasandra to Madavara inaugurated - Public TV English". 6 November 2024. Retrieved 7 November 2024.
  6. ↑ "Extended Namma Metro Green Line operation launch likely on November 6". The Times of India. 5 November 2024. ISSN 0971-8257. Retrieved 6 November 2024.
  7. ↑ "Bengaluru Metro's Green Line extension set to open on Nov 7". Deccan Herald. Retrieved 6 November 2024.

External links