Kalyan Junction railway station: Difference between revisions

Created by Sachinn77
Last edited March 22, 2026
->Sachinn77
Added content
 
Pranav (talk | contribs)
m reworked article based on references and added references
 
Line 4: Line 4:
{{Use Indian English|date=March 2015}}
{{Use Indian English|date=March 2015}}
{{Infobox station
{{Infobox station
| name         = [[File:Indian_Railways_Suburban_Railway_Logo.svg|50px|up|link=Mumbai Suburban Railway]]<br>Kalyan Junction
| name               = Kalyan Junction
| type          = [[Mumbai Suburban Railway]] station
| type              = [[File:Indian_Railways_Suburban_Railway_Logo.svg|30px]] [[Indian Railways]] and [[Mumbai Suburban Railway]] station
| style         = Mumbai Suburban Railway, National Railway
| style             = Indian Railways
| image         = Kalyan Junction railway station - Stationboard.jpg
| image             = Kalyan Junction railway station - Stationboard.jpg
| image_size   =
| image_size         =  
| image_caption =
| image_caption     =  
| address      =
| coordinates       = {{Coord|19.23525|N|73.1305|E|region:IN_type:railwaystation|display=inline,title}}
| coordinates   = {{Coord|19.23525|N|73.1305|E|region:IN_type:railwaystation|display=inline,title}}
| line               = [[Central line (Mumbai Suburban Railway)|Central line]]<br />[[Howrah–Nagpur–Mumbai line]]<br />[[Howrah–Allahabad–Mumbai line]]<br />[[Mumbai–Chennai line]]<br />[[Bhusawal–Kalyan section]]<br>[[Mumbai Dadar–Solapur section]]
| line         = [[Central line (Mumbai Suburban Railway)|Central line]]<br />[[Howrah–Nagpur–Mumbai line]]<br />[[Howrah–Allahabad–Mumbai line]]<br />[[Mumbai–Chennai line]]<br />[[Bhusawal–Kalyan section]]<br>[[Mumbai Dadar–Solapur section]]
Kalyan-Murbad line (this line is at survey stage)
| other         = Auto stand, Taxi stand
| other             = KDMT Bus Stand, Auto stand, Taxi stand, Mumbai Metro Line 5, Line 12 (Under construction)
| structure     = Standard (on ground)
| structure         = Standard (on ground)
| platform     = 8
| platform           = 8 + 6 (underconstruction)
| elevation     = {{convert|8.840|m|ft}}  
| elevation         = {{convert|8.840|m|ft}}
| depth         =
| depth             =  
| levels       =
| levels             =  
| tracks       = 9
| tracks             = 15+
| parking       = Yes
| parking           = Yes
| bicycle       = Yes
| bicycle           = Yes
| opened       =
| opened             = 1 May 1854 <ref>{{cite web| url =
| closed       =
https://www.irfca.org/docs/mumbai-cr-suburban-timeline.html| title =
| rebuilt       =
&#91;IRFCA&#93; CR Mumbai Timeline of Suburban Stations}} </ref>
| electrified   = Yes
| closed             =  
| ADA          = {{access icon|20px}} Available
| rebuilt           =  
| code         = {{Indian railway code
| electrified       = Yes
| accessible                = {{access icon|20px}} Available
| code               = {{Indian railway code
| code          = KYN
| code          = KYN
| zone          = [[Central Railway zone]]
| zone          = [[Central Railway zone]]
| division      = {{rwd|Mumbai CR}}
| division      = {{rwd|Mumbai CR}}
}}
}}
| status       = Functioning
| status             = Functioning
| owned         = [[Indian Railways]]
| owned             = [[Indian Railways]]
| operator     = [[Central Railways]]
| operator           = [[Central Railways]]
| former       =  
| former             = Calian Railway Station
| passengers   = 360,000/day
| passengers         = 360,000/day
| pass_year     =
| pass_year         =  
| pass_percent =
| pass_percent       =  
| pass_system   =
| pass_system       =  
| mpassengers   =
| mpassengers       =  
| services     = {{s-rail|title=Mumbai Suburban Railway}}
| services           = {{Adjacent stations|system=Mumbai Suburban Railway
{{s-line|system=Mumbai Suburban Railway|line=Central |branch=North-east branch |previous=Thakurli |next=Shahad |type2=Kasara |rows1=2}}
|line1=Central|left1=Thakurli|right1=Shahad|type1=Kasara  
{{s-line|system=Mumbai Suburban Railway|line=Central |branch=South-east branch |previous=Thakurli |next=Vithalwadi |type2=Khopoli |hide1=yes}}
|line2=Central|left2=Thakurli|right2=Vithalwadi|type2=Khopoli}}
| map_type     = India Maharashtra
| map_type           = India Maharashtra
| map_dot_label = Kalyan Junction
| map_dot_label     = Kalyan Junction
| route_map     = {{MSR Central line}}
| route_map         = {{MSR Central line}}
| map_state     = collapsed
| map_state         = collapsed
}}
}}


'''Kalyan Junction railway station''' is a major railway junction station on the central line of the [[Mumbai Suburban Railway]] network, lying at the junction of the north-east and south-east lines of the suburban [[Mumbai]] division of the Central Railway, {{cvt|54|km}} north-east of Mumbai. It come under top 10 busiest railway junction in India.
'''Kalyan Junction''' is a major railway junction station on the Central Line of the [[Mumbai Suburban Railway]] network, lying at the junction of the north-east and south-east lines of the suburban [[Mumbai]] division of the Central Railway, {{cvt|54|km}} north-east of Mumbai.
Unfortunately one of the important railway project of Kalyan Viz Kalyan-Ahmednagar Railway project could not take off.Kalyan-Ahmednagar railway project was in planning stage during british regime.post independance, the PECT survey of this project was announced in 1970 with estimated cost of 58.93 crs. This report is not located at Railway Board and headquarter or field unit. Hence fresh survey was conducted in 1999 and report submitted in 2000 with estimated cost of 772 crs with negative ROR (-0.55%). Railway board shelved this project on 1st may 2000. However it was again directed to update this project in 2005. Updated cost of project was 2349.71 crs. Updating of this survey was again sanctioned vide Annexure A demand no. 2 0f 13-14 blue book. Survey report submitted on 25th aug 2014 with estimated cost of 6264 crs with negative ROR (-3.39%) Railway board has not taken any decision on this report. The project involved 24 stations and 17 tunnels. The longest tunnel wasof 18.96 kms which was in malsjej ghat. The allignment length of kalyan Ahmednagar railway project was 184 kms. Which means it could have been shortest rote to mararthwada compared with mumbai-manmad-aurangabad-nanded route. Northern and southern marathwada regions could be connected either by kalyan-nagar-Aurangabad route or kalyan-nagar-parali-nanded route. Kalyan nagar-parali-Secunderabad route is also shorter route compared with kalyan-solapur-wadi jn.-Secunderabad route. Currently kalyan-murbad section of this project is in pink book and DPR of this section is under preparation as a separate work wirh new allignment of kalyan-ambivali-murbad.


==Infrastructure==
It is one of the most important [[List of railway junction stations in India|railway junctions]] serving the country. Kalyan Junction is an important stop for all the trains. The station currently has '''8 platforms currently and more than 15 railway tracks,''' with additional platforms proposed under a yard-remodelling project to separate suburban and long-distance operations. The '''Kalyan Electric Loco Shed''' and '''Kalyan Diesel Loco Shed''' located nearby are important maintenance facilities serving the Mumbai region.
There are 8 platforms at Kalyan station. Platform 2&3, 4&5 and 6&7 share a common platform base. Platform 4,5,6,7 serves for [[Express trains in India|Express trains]]. Platform 5 serves for all [[Chhatrapati Shivaji Terminus]]-bound [[Slow and fast passenger trains in India|Fast local trains]] where Platform 4 serves for all Khopoli/Kasara bound Fast local trains.<ref>[https://indiarailinfo.com/departures/72?date=0&dd=0&ad=0&co=0&tt=0&ed=0&dp=&ea=0&ap=&loco=&drev=0&arev=0&trev=0&rake=&rsa=0&idf=0&idt=0&dhf=0&dmf=0&dht=0&dmt=0&ahf=0&amf=0&aht=0&amt=0&nhf=-1&nht=-1&ttf=0&ttt=0&dstf=0&dstt=0&spdf=0&spdt=0&zone=0&pantry=0&stptype=undefined&raketype=0&cu=undefined&trn=0&q= Kalyan Jn IndiaRailInfo]</ref> Majority of trains towards Nashik side from Chhatrapati Shivaji Maharaj Terminus stops at platform no. 4.


Platform 1 and Platform 1A are dedicated to local trains that start from Kalyan and go to CSMT.
== Major developments ==
* A proposed '''Kalyan–Ahmednagar railway line''' (often called the “third ghat project”) has been discussed since the British period and would create a shorter route connecting Mumbai with Marathwada, Andhra Pradesh and Telangana. The major challenge for this project is 18.96 km long tunnel Malshej Ghat section.<ref>{{cite web| url =
https://marathi.indiatimes.com/editorial/article/development-route-of-kalyan-ahmednagar-railway/articleshow/59907427.cms| title = कल्याण-नगर रेल्वे हा विकासाचा मार्ग | website = Maharashtra Times | language = mr}} </ref>
* The '''Kalyan–Murbad section''', considered the first phase of this route, has been surveyed in recent years.<ref>{{cite news|url=https://www.loksatta.com/thane/article-on-malshej-ghat-railway-route-1210026/|title=संजीवनी देणारा माळशेज घाट रेल्वे मार्ग|website=Loksatta|language=mr}}</ref>                                                              Kalyan Junction is a '''major interchange on the Central Railway network''' and lies at the branching point of the '''north-east (towards [[Kasara]])''' and '''south-east (towards [[Karjat]]/Khopoli)''' suburban lines. It serves as the '''last stop for fast suburban services''' from Mumbai before trains begin halting at all stations on the Kasara and Khopoli sections.
 
== History ==
Even before the [[Bori Bunder railway station|Bori Bunder]]-[[Thane railway station|Tannah]] line opened on April 16, 1853, further progress was already underway. The extension beyond [[Thane|Tannah]] required the navigation of the two [[Thane Creek|Tannah Creeks]], and tunnels in the Godadunghur hills all the way till the Parseek point (Under today's [[Parsik Hill]]). This section was let out to contractors William Whythes and Jackson all the way back in April 1851, at a cost of Rs. 3,41,407, and was completed by December 1853. The section further ahead to Callian was let out to a Parsi contractor Mr. Jamsetjee Dorabjee in May 1852, for a cost of Rs. 1,65,851 and was completed by April 1854. The line to Callian (Kalyan) opened finally on 1 May 1854.<ref>[https://swr.indianrailways.gov.in/uploads/files/1597914101378-The%20first%20%20running%20of%20%20railway%20locomotive%20%20in%20India.pdf https://swr.indianrailways.gov.in/uploads/files/1597914101378-The_first_running_of_a_railway_locomotive_in_India.pdf] {{Webarchive|url=https://web.archive.org/web/20231204222555/https://swr.indianrailways.gov.in/uploads/files/1597914101378-The%20first%20%20running%20of%20%20railway%20locomotive%20%20in%20India.pdf |date=4 December 2023 }} pg 8</ref>
 
The first journey to Callian from [[Bori Bunder]] was scheduled that day to begin at 4:50 p.m, with [[John Elphinstone, 13th Lord Elphinstone|Lord Elphinstone]] accompanied by around 250 guests. The journey proceeded, with a halt at [[Bhandup railway station|Bhandoop]] to fill in water. The train finally reached Callian at 6:10 p.m, however, it did not go all the way till the station, rather only to the comparatively nearer Creek ground. Similar to the first train journey of 1853 from Bombay to Tannah, at the destination were bands, decorative tents, and a dinner. The celebration was concluded with a display of fireworks, with the train leaving for its origin at 9 p.m., reaching two hours later at 11 p.m.<ref>{{cite web | url=https://memumbai.com/railway-line-opened-from-bombay-to-callian-kalyan-on-1st-may-1854/ | title=Railway Line Opened from Bombay to Callian (Kalyan) on 1st May 1854 | date=11 January 2022 }}</ref>
 
==Station layout==
There are 7 platforms at Kalyan Jn. Platform 2&3, 4&5 and 6&7 share a common platform base. Platform 4,5,6,7 serves for [[Express trains in India|Express trains]]. Platform 5 serves for all [[Chhatrapati Shivaji Maharaj Terminus]]-bound [[Slow and fast passenger trains in India|Fast local trains]] where Platform 4 serves for all Khopoli/Kasara bound Fast local trains.<ref>[https://indiarailinfo.com/departures/72?date=0&dd=0&ad=0&co=0&tt=0&ed=0&dp=&ea=0&ap=&loco=&drev=0&arev=0&trev=0&rake=&rsa=0&idf=0&idt=0&dhf=0&dmf=0&dht=0&dmt=0&ahf=0&amf=0&aht=0&amt=0&nhf=-1&nht=-1&ttf=0&ttt=0&dstf=0&dstt=0&spdf=0&spdt=0&zone=0&pantry=0&stptype=undefined&raketype=0&cu=undefined&trn=0&q= Kalyan Jn IndiaRailInfo]</ref> Majority of trains towards Nashik side from Chhatrapati Shivaji Maharaj Terminus stops at platform no. 4. Platform 1 and Platform 1A are dedicated to Slow local trains that start from Kalyan and go to CSMT.


== Loco Sheds==
== Loco Sheds==
 
The [[Electric Loco Shed, Kalyan|Kalyan Electric Loco Shed]] and Kalyan Diesel Loco Shed are located to the North-East and the South-East of the station respectively. They are two of five loco sheds serving the Mumbai Metropolitan region, with the others being [[Kurla railway station|Kurla]], [[Bandra Terminus|Bandra]] and [[Neral Junction railway station|Neral]].
The [[Electric Loco Shed, Kalyan|Kalyan Electric Loco Shed]] and Kalyan Diesel Loco Shed are also located nearby. They are the lone sheds serving Mumbai region.
{| class="wikitable"
|+Locomotives at Diesel Loco Shed, Kalyan
!Serial No.
!Locomotive Class
!Horsepower
!Quantity
|-
|1.
|[[Indian locomotive class WDG-3A|WDG-3A]]
|3100
|11
|-
|2.
|[[Indian locomotive class WDM-3D|WDM-3D]]
|3300
|15
|-
|3.
|[[Indian locomotive class WDG-4|WDG-4/4D]]
|4000/4500
|64
|-
|4
|[[Indian locomotive class WDP-4|WDP-4/4B/4D]]
|4000/4500
|12
|-
| colspan="3" |'''Total Locomotives Active as of August 2025'''<ref>{{Cite web |title=Ministry of Railways (Railway Board) |url=https://indianrailways.gov.in/railwayboard/view_section.jsp?lang=0&id=0,1,304,366,541,710,717 |access-date=28 May 2025 |website=Railway Board, Ministry of Railways}}</ref>
|102
|}


== 1991 Train bomb blast ==
== 1991 Train bomb blast ==
On November 8, 1991, a bomb exploded on a train when it reached Kalyan railway station. Twelve people were killed and 65 injured in the explosion. Ravinder Singh alias Bittu who was linked to the [[Babbar Khalsa]], a [[Sikhs|Sikh]] [[Khalistan movement|militant]] organization was convicted in the case.<ref>{{Cite web|date=2016-08-18|title=Kalyan 1991 train blast: SIT to probe convict's activities since he jumped parole in 2007|url=https://indianexpress.com/article/india/india-news-india/1991-kalyan-train-blast-sit-to-probe-convicts-activities-since-he-jumped-parole-in-2007-2981742/|access-date=2020-12-17|website=The Indian Express}}</ref><ref>{{Cite web|date=August 17, 2016|first=Manjeet|last=Sehgal|title=1991 Mumbai blast convict arrested from Phagwara|url=https://www.indiatoday.in/india/story/1991-mumbai-blast-convict-arrested-from-phagwara-335611-2016-08-17|access-date=2020-12-17|website=India Today}}</ref><ref>{{Cite web|title=Ravinder Singh @ Bittu vs The State Of Maharashtra on 30 April, 2002|url=https://indiankanoon.org/doc/568914/}}</ref>
On November 8, 1991, a bomb exploded on a train when it reached Kalyan railway station. Twelve people were killed and 65 injured in the explosion. Ravinder Singh alias Bittu who was linked to the [[Babbar Khalsa]], a [[Sikhs|Sikh]] [[Khalistan movement|militant]] organization was convicted in the case.<ref>{{Cite web|date=2016-08-18|title=Kalyan 1991 train blast: SIT to probe convict's activities since he jumped parole in 2007|url=https://indianexpress.com/article/india/india-news-india/1991-kalyan-train-blast-sit-to-probe-convicts-activities-since-he-jumped-parole-in-2007-2981742/|access-date=2020-12-17|website=The Indian Express}}</ref><ref>{{Cite web|date=August 17, 2016|first=Manjeet|last=Sehgal|title=1991 Mumbai blast convict arrested from Phagwara|url=https://www.indiatoday.in/india/story/1991-mumbai-blast-convict-arrested-from-phagwara-335611-2016-08-17|access-date=2020-12-17|website=India Today}}</ref><ref>{{Cite web|title=Ravinder Singh @ Bittu vs The State Of Maharashtra on 30 April, 2002|url=https://indiankanoon.org/doc/568914/}}</ref>
== Gallery ==
<gallery>
File:Kalyan Junction railway station booking office.jpg|Kalyan Junction railway station booking office
File:Kalyan Junction railway station - Overview.jpg|Kalyan Junction railway station - Overview
File:Kalyan JN.jpg|Kalyan Junction platform view
File:Kalyan Junction railway station - Platformboard.jpg|Kalyan Junction railway station - Platformboard
File:Kalyan Junction station.jpg|Entering Kalyan Junction station
File:Kalyan Railway Station During Floods.jpg|Kalyan Railway Station During Floods
File:Crowd outside Kalyan Junction..jpg|Crowd outside Kalyan Junction
File:Kalyan Junction station on the Great Indian Peninsula Railway near Bombay LCCN2004707348.jpg|Kalyan Junction station, c.1895
</gallery>


==References==
==References==
Line 76: Line 128:


[[Category:Railway junction stations in Maharashtra]]
[[Category:Railway junction stations in Maharashtra]]
[[Category:Mumbai CST-Kalyan rail line]]
[[Category:Kalyan-Igatpuri rail line]]
[[Category:Kalyan-Igatpuri rail line]]
[[Category:Kalyan-Lonavala rail line]]
[[Category:Kalyan-Lonavala rail line]]
Line 84: Line 135:
[[Category:Mumbai Suburban Railway stations]]
[[Category:Mumbai Suburban Railway stations]]
[[Category:Year of establishment missing]]
[[Category:Year of establishment missing]]
[[Category:Indian Railway A1 Category Stations]]
[[Category:Railway stations in India opened in 1854]]

Latest revision as of 22:24, 22 March 2026


Kalyan Junction
Indian Railways and Mumbai Suburban Railway station
Coordinates19°14′07″N 73°07′50″E / 19.23525°N 73.1305°E / 19.23525; 73.1305
Elevation8.840 metres (29.00 ft)
Owned byIndian Railways
Operated byCentral Railways
Line(s)Central line
Howrah–Nagpur–Mumbai line
Howrah–Allahabad–Mumbai line
Mumbai–Chennai line
Bhusawal–Kalyan section
Mumbai Dadar–Solapur section Kalyan-Murbad line (this line is at survey stage)
Platforms8 + 6 (underconstruction)
Tracks15+
ConnectionsKDMT Bus Stand, Auto stand, Taxi stand, Mumbai Metro Line 5, Line 12 (Under construction)
Construction
Structure typeStandard (on ground)
ParkingYes
Bicycle facilitiesYes
Other information
StatusFunctioning
Station codeKYN
Zone(s) Central Railway zone
Division(s) Mumbai CR
History
Opened1 May 1854 [1]
ElectrifiedYes
Previous namesCalian Railway Station
Passengers
360,000/day
Services
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Mumbai Suburban Railway' not found.
Location
Kalyan Junction is located in Maharashtra
Kalyan Junction
Kalyan Junction
Location within Maharashtra

Kalyan Junction is a major railway junction station on the Central Line of the Mumbai Suburban Railway network, lying at the junction of the north-east and south-east lines of the suburban Mumbai division of the Central Railway, 54 km (34 mi) north-east of Mumbai.

It is one of the most important railway junctions serving the country. Kalyan Junction is an important stop for all the trains. The station currently has 8 platforms currently and more than 15 railway tracks, with additional platforms proposed under a yard-remodelling project to separate suburban and long-distance operations. The Kalyan Electric Loco Shed and Kalyan Diesel Loco Shed located nearby are important maintenance facilities serving the Mumbai region.

Major developments[edit | edit source]

  • A proposed Kalyan–Ahmednagar railway line (often called the “third ghat project”) has been discussed since the British period and would create a shorter route connecting Mumbai with Marathwada, Andhra Pradesh and Telangana. The major challenge for this project is 18.96 km long tunnel Malshej Ghat section.[2]
  • The Kalyan–Murbad section, considered the first phase of this route, has been surveyed in recent years.[3] Kalyan Junction is a major interchange on the Central Railway network and lies at the branching point of the north-east (towards Kasara) and south-east (towards Karjat/Khopoli) suburban lines. It serves as the last stop for fast suburban services from Mumbai before trains begin halting at all stations on the Kasara and Khopoli sections.

History[edit | edit source]

Even before the Bori Bunder-Tannah line opened on April 16, 1853, further progress was already underway. The extension beyond Tannah required the navigation of the two Tannah Creeks, and tunnels in the Godadunghur hills all the way till the Parseek point (Under today's Parsik Hill). This section was let out to contractors William Whythes and Jackson all the way back in April 1851, at a cost of Rs. 3,41,407, and was completed by December 1853. The section further ahead to Callian was let out to a Parsi contractor Mr. Jamsetjee Dorabjee in May 1852, for a cost of Rs. 1,65,851 and was completed by April 1854. The line to Callian (Kalyan) opened finally on 1 May 1854.[4]

The first journey to Callian from Bori Bunder was scheduled that day to begin at 4:50 p.m, with Lord Elphinstone accompanied by around 250 guests. The journey proceeded, with a halt at Bhandoop to fill in water. The train finally reached Callian at 6:10 p.m, however, it did not go all the way till the station, rather only to the comparatively nearer Creek ground. Similar to the first train journey of 1853 from Bombay to Tannah, at the destination were bands, decorative tents, and a dinner. The celebration was concluded with a display of fireworks, with the train leaving for its origin at 9 p.m., reaching two hours later at 11 p.m.[5]

Station layout[edit | edit source]

There are 7 platforms at Kalyan Jn. Platform 2&3, 4&5 and 6&7 share a common platform base. Platform 4,5,6,7 serves for Express trains. Platform 5 serves for all Chhatrapati Shivaji Maharaj Terminus-bound Fast local trains where Platform 4 serves for all Khopoli/Kasara bound Fast local trains.[6] Majority of trains towards Nashik side from Chhatrapati Shivaji Maharaj Terminus stops at platform no. 4. Platform 1 and Platform 1A are dedicated to Slow local trains that start from Kalyan and go to CSMT.

Loco Sheds[edit | edit source]

The Kalyan Electric Loco Shed and Kalyan Diesel Loco Shed are located to the North-East and the South-East of the station respectively. They are two of five loco sheds serving the Mumbai Metropolitan region, with the others being Kurla, Bandra and Neral.

Locomotives at Diesel Loco Shed, Kalyan
Serial No. Locomotive Class Horsepower Quantity
1. WDG-3A 3100 11
2. WDM-3D 3300 15
3. WDG-4/4D 4000/4500 64
4 WDP-4/4B/4D 4000/4500 12
Total Locomotives Active as of August 2025[7] 102

1991 Train bomb blast[edit | edit source]

On November 8, 1991, a bomb exploded on a train when it reached Kalyan railway station. Twelve people were killed and 65 injured in the explosion. Ravinder Singh alias Bittu who was linked to the Babbar Khalsa, a Sikh militant organization was convicted in the case.[8][9][10]

Gallery[edit | edit source]

References[edit | edit source]

  1. "[IRFCA] CR Mumbai Timeline of Suburban Stations".
  2. "कल्याण-नगर रेल्वे हा विकासाचा मार्ग". Maharashtra Times (in मराठी).
  3. "संजीवनी देणारा माळशेज घाट रेल्वे मार्ग". Loksatta (in मराठी).
  4. https://swr.indianrailways.gov.in/uploads/files/1597914101378-The_first_running_of_a_railway_locomotive_in_India.pdf Archived 4 December 2023 at the Wayback Machine pg 8
  5. "Railway Line Opened from Bombay to Callian (Kalyan) on 1st May 1854". 11 January 2022.
  6. Kalyan Jn IndiaRailInfo
  7. "Ministry of Railways (Railway Board)". Railway Board, Ministry of Railways. Retrieved 28 May 2025.
  8. "Kalyan 1991 train blast: SIT to probe convict's activities since he jumped parole in 2007". The Indian Express. 18 August 2016. Retrieved 17 December 2020.
  9. Sehgal, Manjeet (17 August 2016). "1991 Mumbai blast convict arrested from Phagwara". India Today. Retrieved 17 December 2020.
  10. "Ravinder Singh @ Bittu vs The State Of Maharashtra on 30 April, 2002".

External links[edit | edit source]